Loading...
HomeSearchMy WebLinkAboutTask Order 10012.D with CH2MHill for Well 30 Test and Production Well DesignTask Order No. 0640c with SPF Water Engineering for Municpal Well 26 Evaluation and Reconstruction DesignTask Order No. 0759.c with Hydro Logic, Inc. for Ground Water Level and Quality Monitoring and Aquifer Testing and ReportingTask Order No. 10044 with CH2M Hill Engineers, Inc. for WWTP Headworks Capacity Evaluation and Expansion Alternatives and AnalysisTask Order No. 10055 with CH2M Hill Engineers, Inc. for WWTP UV Disinfection System Expansion Phase 1 DesisgnTask Order No. 10340.G with CH2M Hill Engineers, Inc. for Well 21 Iron and Manganese Removal Treatment Facility Services during ConstructionTask Order No. 10353 B with Brown and Caldwell for Infiltration Evaluation for Wastewater Effluent ManagementTask Order No. 10369.b with Civil Survey Consultants for Franklin Road Black Cat Road to Ten Mile Road Sewer and Water Improvements and DesignTask Order No. 10372.a with Riedesel Engineering for Waltman Lane Waterline Extension Construction ServicesTask Order No. 10430.b with Civil Survey Consultants for WWTP Frontage Improvements Phase 1 Entrance DesignTask Order No. 10444 with Riedesel Engineering for Waterline Replacement Lynhurst Place to W. Penwood to EndTask Order No. 10460.e with Brown and Caldwell for WWTP Capacity AssessmentTask Order No. 10481b with Civil Survey Consultants for Meridian Heights Water Sewer District Phase 2 Water Meter DesignTask Order No. 10489 with Civil Survey for Water Meter SurveyTask Order No. 10492.A with Keller Associates, Inc. for Well 27 Water Treatement FacilityTask Order No. 10494.a with JUB Engineers, Inc. for Locust Grove Waterline Extension Blackrock to Reflection Ridge DesignTask Order No. 10498 with Brown and Caldwell for WWTP Ammonia Data AnalysisTask Order No. 10499 with Murray, Smith and Associates, Inc. for Sewer Line Replacements Site 12BTask Order No. 10521.A with CH2M Hll Engineers, Inc. for WWTP Areation PLC Upgrade