Loading...
Task Order No. 10521.A with CH2M Hll Engineers, Inc. for WWTP Areation PLC UpgradeTASK ORDER NO. 10521.A Under the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN AND CH2M HILL ENGINEERS, INC. This Task Order is made this 25th day of November, 2014 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by CH2M HILL ENGINEERS, INC., hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 7a) between the above mentioned parties dated September 18, 2012. The Project Name for this Task Order 10521.A is as follows: CITY OF MERIDIAN WASTEWATER TREATMENT PLANT - AREATION PLC UPGRADE PROJECT UNDERSTANDING The following Scope of Services describes the services that will be provided by the ENGINEER to convert the existing Aeration PLC hardware and software to the City's standard Allen Bradley Control logix and Wonderware Archestra platform. The Aeration PLC system consists of 3 control panels located in the Aeration Electrical Room, plus remote flex 1/0 panels located Primary Clarifier 4, Primary Clarifier 5 and at the Aeration Electrical Distribution Panel. The work will be completed in 2 phases. Phase 1: 1 Design will include drawings that can be issued to a contractor for construction. A construction cost estimate will also be included. Phase 2: Software will include software planning, development, testing and startup. Task Order 10521.s WWTP-AREATION PLC UPGRADE Page 1 of 12 CH2M HILL ENGINEERS, INC. SCOPE OF SERVICES Task Order Administration Engineer shall manage, coordinate and lead Engineer's Team's activities and perform administration of the task order execution and quality reviews. Activities include contract administration, project accounting, Health &Safety Plan preparation, project documentation, monitoring progress, change management, periodic invoicing, and closeout. The effort associated with these functions is based on a thirty-five (35) week duration from City -issued notice -to -proceed for completion of the tasks described herein. Phase 1- Design To convert the system to the owner standard hardware platform, the existing equipment requires modification. The extent of the required modifications will be determined during the design phase of the project. ENGINEER shall provide the following services: • Provide field investigation of existing conduit and cabling between the field mounted flex 1/0 modules and the control panels. Note: An owner supplied electrician may be required to assist with the investigation to determine the best solution for these locations. • Develop pre -design report summarizing the field investigation notes and explaining the design approach. • Provide design review meetings with the owner at the 50% and 90% design. • Develop biddable construction drawings including bill of material lists and notes required to complete the construction. • Develop implementation plan including impacts to operation, construction sequence, and software installation sequence. • Provide Services During Construction (SDC) o Assist Owner with Bid Walk through and project description o Review Submittals and answer Contractor questions Deliverables • Pre -design report • Biddable Construction Drawings o 1 Cover Sheet o 1 Legend Sheet o 1 1/0 network block diagram o 3 panel layout drawings o 2 panel external wiring diagrams o 2 panel internal power wiring diagrams o 16 1/0 module wiring diagrams Task Order 10521.s WWTP -AREATION PLC UPGRADE Page 2 of 12 CH2M HILL ENGINEERS, INC. 0 2 flex I/O replacement wiring diagrams • Record Drawings • Implementation plan • Construction cost estimate • Updated project schedule Details • Panel SABB1-PLC-1A contains One Allen Bradley Control logix PLC and 4 slot rack. This panel was installed with the blower controls upgrade in 2012. No hardware changes are anticipated. The existing PLC program will be re-used, with additional logic added to replace the control functions currently provided by the SLC platform shown in figures 2 and 3. Figure 1: Panel SABB1-PLC-1 A 11". I4111111111111117 5 A + a hC # * ff' / Task Order 10521.s VVVVTP-AREATION PLC UPGRADE Page 3 of 12 CH2M HILL ENGINEERS, INC. • Panel SABB1 PLC0001 contains One Allen Bradley SLC 13 slot remote I/O rack with 8 I/O modules and 1 remote I/O scanner module. We anticipate replacing only the I/O rack and modules in this panel. Internal wiring and terminal strips shall be reused. Figure 2: Panel SA BB1 PLC0001 teaiii ' ' 'L'''''', t 4: t„..........i.........,;, REPLACE Vo-.y`. � .F N. I)...„....„,.j x s Y f' RE-USE \ ' i . e — ti; .; '''''.17: arm . git I r"---7: ',7,177.4—'-',,,....Z$.er.. ,,,„,....t... ._:,..,, i t 1 . ., y ♦r..A yi `R.d• � If ,1 ,. zr� • ' :, , — \ i sv,,,,1_141-11a i F.,,,,,...,....§, ,„,li E t,..,1::, _........,i: i w a • ;/ 451 ♦ '°°„'°e 9. i . 1.........;., Z. . ... j 5 V.e:.., �.t�R . 1 err`.+._' . tt } ,cr,''''''''' d,iii , , ..,,,I, g1.1„ OP 1 h Y wy> ; tsiP ` "z elq-.. '-,,, ,,f+. ,,,I, '; ''',. -—* )1.I 7#7,4.',1::f,x4,1 . '`:: ,,, '1,tik. tr:'', i . 1 : I 1 +:3' .c57.- '''''''''''' .:'''' •' -,,,,;:,:fif.',.:::,N, . (isst, ::',/ "r __,,,,,,,,,,, , I a,\,,, ,„,,,,,,,,., VV1/VTRS, P-AREATION Task PLC UPGRADE Page 4 of 12 CH2M HILLOrder ENGINEE10521.s INC. • Panel SABB1 LCP0006 contains One Allen Bradley SLC and 10 slot rack with 8 I/O modules and 1 remote I/O scanner module. We anticipate replacing the entire back panel and all internal wiring, terminal strips and components in this panel. Figure 3: Panel SABB1 LCP0006 R 2d2 V ,�fi 'rr y�s�, +tin...:... �h ',A e �� ,.,,-.u =fie fes"". y 6'7 IA41 -. T s~-i' i t $ Nom_._ REPLACE BACKPANEL NEL 111 ' .= — �-, .Aiiillii;A AND DEVICES. ty RE-USE FIELD . -... om.. 1 WIRING .� ....AI +assrls�++w,aa.:....<....w.,....,.°,.r .._ .',.'4.MJ..ws I , t i f,�+ y,y.. 5`f 'f,. �'. �„: orf` � fir.4,404”". y..., p7 {,`1� i } .":::...,;7.7 6RWi, iii i -1 ...' Ai i I t k {, �.$'.�:. may' '�k � aa..ur« , 7.7:7,:,...77,7° "� ram r..—1.%'-'-'- -44..t. ,,,' y ,� �':,..y�,k"" p c< ate �.,� �iiw 4 y 1' x17,7:— ,71=,d19'=.AW.:.......r.-....."'""'''''. .$�➢. .-INeY A1�iMMF.. .sx6 AM.i91eE-s.sH..7Rak w .....„„. 4$1141.,,...: v. , :-,,,/ 4„,* r — ` , .. 'A` .�.. ... _ ':'l. alk"i °'$+ ;,z.,;',',,,,' 'P .,.. ..:ry.. v.7,4g.,; ;a s it tr T -v4,,,,,,,:. '.���°`�`� e+¢ 3.+ R"�ir+wd�yu'7da��e'�4'k5'+n+�,��la1''w a,�""vr'dry�`:,:���s+r':��, .� t , rr• t„,,,,,,,,:.:.'::ib.;,--:( �.. to !s' Bey. ''�e '”' ill,,,,,,,, M;. 6,! ,�4: # ,we, lr..:: � ra s J 3 I fy iy„:,,, '` # e ritaa '# eBYV: im ::... T 4 ,'::',4,:i `� _ � E � $rte°: �' -' � x ,..� �` � � `� i ...7 is M. as'E�, re v-w:.�r-„,„ta,.!' t,.a -1 4,7 #M 'v, .. 1 g .-i. ? � . , .a�,�g,". sial..t.i.�..7=-:d , 1.,, i it I flirfftlrf - 'ti's _.'�' '' ' b t* f``; �, ,�n s � p vy/ t _..o�� 3... E ^--, .�. .meq.: .. _ -- F S f 3651 :µ.��f9.u'o•1 f ,,IL. a/ 1 j 1 o \ti. 1 ec / ? L R �: •,.....,.....,., *i rw,__ ,...„,,,,, , b.,,,,,,,,,,,,,,,wit 1, ...: "�E 3,/, z f� a w { 'N.,. \ttl, ', 0 ..£`)sot., a * �s � � "�S. ,,ate-'"°A � ° ..ear.. �, ,,,, .mak a! •nom __� • The approach for updating the 3 remote flex I/O modules will be determined during the design phase of the project. Currently we anticipate removing the clarifier flex I/O modules from the field panels, and hardwiring the signals back to one of the I/O racks located in the blower electrical room. We anticipate replacing the communication module on the Electrical Distribution Panel flex I/O with an Ethernet communication module. Task Order 10521.s WWTP-AREATION PLC UPGRADE Page 5 of 12 CH2M HILL ENGINEERS, INC. Phase 2 — Software Task 2.1 - Existing Aeration System Software To complete the system conversion the PLC and HMI software applications will be updated to Owner standards. ENGINEER shall provide the following services: • Software Planning o Lead a one day workshop at the project site with City staff to review the existing process control approaches that are to be replicated by the system upgrade. This information shall be used as the basis for developing process narratives and detailed loop descriptions documenting the automated monitoring and control functions. o Lead one half-day workshop at the project site with City staff to review and finalize the process narratives and detailed loop descriptions. • PLC Programming: o Program existing Aeration PLC to consolidate of functions agreed upon during the software planning. o Investigate the following undocumented PLC code with City staff to determine functions that will need to be duplicated. ■ Ladder File 2; main routine ■ Ladder File 3; scaling ■ Ladder File 9; sludge blanket ■ Ladder File 11; aeration basin 1 air flow valve ■ Ladder File 12; aeration basin 2 air flow valve ■ Ladder File 21; basin 1 mixers ■ Ladder File 22; basin 2 mixers ■ Ladder File 23; basin 3 mixers ■ Ladder File 24; basin 4 mixers ■ Ladder File 27; secondary clarifier 5 • HMI Programming: o Create new process graphics, control pop -ups, trends and alarming for the systems. o Modify the existing Wonderware Intouch graphics that are affected by the process modifications. o Lead one half-day telephone workshop with the City for review of draft HMI graphics. The City's comments will be incorporated prior to the factory software demonstration test. Task Order 10521.s WVVTP - AREATION PLC UPGRADE Page 6 of 12 CH2M HILL ENGINEERS, INC. • Win 911 Programming: o Modify existing Win911 software for dial -out alarms associated with the project. • Historian Programming: o Update Historian tags currently linked to the Aeration SLC processor to the new control logix PLC tags. • Software Testing: o Execute offsite testing to confirm that the PLC, and HMI programs are ready for site acceptance testing. o Lead a Factory Software Acceptance Test (FSAT) workshop to demonstrate that the PLC and HMI programs are ready for site acceptance testing. The test will be conducted by CH2MHill programmers for demonstration to City staff that the software functions operate as defined in the final software loop descriptions. o Execute Site Acceptance Testing (SAT) to confirm that the new automated monitoring and control functions operate as defined in the loop descriptions. • Final Documentation o Provide a software operation manual to instruct operators how to use the control system graphics for system operation. Includes screen shots of the new and revised HMI graphics, written operating instructions, PDF copy of the final control narratives, PDF copy of the final loop descriptions, and PDF copy of the final test documentation. Deliverables • Written process narratives • Detailed software loop descriptions • Software test documentation forms for signature by a City representative authorized to witness and approve successful test completion. • Updated Wonderware HMI application • Updated Historian tag database export • Final PLC program • Updated Win911 program Task 2.2 - Aeration DO and Blower System Software To incorporate the aeration basin air flow control valves (6 per basin), basin DO control loops (2 per basin), revise the aeration blower header pressure controls, and aeration blower sequence the PLC and HMI software applications will be developed. All software will be developed to Owner standards. ENGINEER shall provide the following services: Task Order 10521.s WWTP - AREATION PLC UPGRADE Page 7 of 12 CH2M HILL ENGINEERS, INC. • Software Planning o Lead up to two days of workshops at the project site with City staff to review the existing process control approaches that are to be replicated by the system upgrade. This information shall be used as the basis for developing process narratives and detailed loop descriptions documenting the automated monitoring and control functions. o Lead one half-day workshop at the project site with City staff to review and finalize the process narratives and detailed loop descriptions. • PLC Programming: o Program aeration basin FCV, DO, header pressure and blower PLC to functions agreed upon during the software planning. • HMI Programming: o Create new process graphics, control pop -ups, trends and alarming for the new systems. o Modify the existing Wonderware Intouch graphics that are affected by the process modifications. o Lead one half-day telephone workshop with the City for review of draft HMI graphics. The City's comments will be incorporated prior to the factory software demonstration test. • Win 911 Programming: o (completed as part of task 2.1) Historian Programming: o Develop Historian tags for the new control logix PLC tags. • Software Testing: o Execute offsite testing to confirm that the PLC, and HMI programs are ready for site acceptance testing. o Lead a Factory Software Acceptance Test (FSAT) workshop to demonstrate that the PLC and HMI programs are ready for site acceptance testing. The test will be conducted by CH2MHill programmers for demonstration to City staff that the software functions operate as defined in the final software loop descriptions. o Execute Site Acceptance Testing (SAT) to confirm that the new automated monitoring and control functions operate as defined in the loop descriptions. • Final Documentation o Provide a software operation manual to instruct operators how to use the control system graphics for system operation. Includes screen shots of the new and revised HMI graphics, written operating instructions, PDF copy of the final control narratives, PDF copy of the final loop descriptions, and PDF copy of the final test documentation. Deliverables Task Order 10521.s W WTP - AREATION PLC UPGRADE Page 8 of 12 CH2M HILL ENGINEERS, INC. • Written process narratives • Detailed software loop descriptions • Software test documentation forms for signature by a City representative authorized to witness and approve successful test completion. • Updated Wonderware HMI application • Updated Historian tag database export • Final PLC program • Updated Win911 program REIMBURSABLE EXPENSES Reimbursement will NOT exceed the limits allowed under the US General Services Administration Per Diem Rates for the Boise area. Transportation (Pre -approved by Project Manager): All travel must be by the most economical means practical. If there is interruption of travel or deviation from the direct route for the traveler's convenience, the deviation may not exceed the cost of uninterrupted travel. Airline: Consultants will only be reimbursed for coach or economy class rates. Rental Cars: A vehicle is only allowed with prior authorization by the City Project Manager. Mileage: Mileage to and from consultants office and airport may be reimbursed if incorporated in any associated task order. Task 1 • The estimated expenses for the base scope are based on the following: o Travel — Airline: 1 round-trip o Travel — Rental Cars: 1 day onsite and 2 total to/from airport o Travel —Lodging: 1 nights o Travel —Meals: 2 days Task 2.1 • The estimated expenses for the base scope are based on the following: Task Order 10521.s wWTP - AREATION PLC UPGRADE Page 9 of 12 CH2M HILL ENGINEERS, INC. o Travel — Airline: 5 round-trip flights o Travel — Rental Cars: 11 days onsite and 10 total to/from airport o Travel — Lodging: 14 nights o Travel — Meals: 14 days Task 2.2 • The estimated expenses for the base scope are based on the following: o Travel — Airline: 5 round-trip flights o Travel — Rental Cars: 15 days onsite and 6 total to/from airport o Travel —Lodging: 24 nights o Travel —Meals: 24 days ASSUMPTIONS • Field instruments and devices shown on the Aeration Basin Control Improvement drawings are assumed to be accurate. • Control functionality shall be as identified during software workshops. The functionality shall be reviewed with the Owner for schedule and budget impacts before proceeding. • The Owner will provide the following items following notice to proceed: o Complete, tested and ready for software installation of the Aeration Basin Control Improvements. o The AB Control Improvements software will not begin onsite testing until 100% of the AB Control Improvements hardware as shown on the drawings have been installed, tested and finalized by the installation Contractor. • PLC programming for this project will be done remotely from the site. • PLC modifications are based upon the 1/0 shown on Aeration Basin Control Improvement drawings. Produced by CH2M Hill Engineers, Inc. • The software programming effort for Control logix PLC is based on the use of the ENGINEER'S existing add-on instructions (AOIs) similar to those used on the Fermentation project. • HMI programming for this project will be done remotely from the site. Programming will be done in a similar fashion as the WWTP Fermentation programming and the City of Meridian HMI programming standards. • New HMI graphics will be developed using Wonderware System Platform Objects similar to those used on the Fermentation project. • Win911 modifications will add a limited number of new alarms based on new PLC programs. Task Order 10521.s W WTP - AREATION PLC UPGRADE Page 10 of 12 CH2M HILL ENGINEERS, INC. • The total effort for onsite software testing includes up to 23 person days at the site. Onsite software testing will not begin until system readiness testing has been successfully completed by the City and authorization to proceed issued to ENGINEER. System readiness means that all wiring is complete and tested, field instrumentation is calibrated and operational, phase rotation has been confirmed on all 3-phase powered rotating machinery, all required manufacturer's startup service is complete, and local manual control of all equipment has been confirmed. • City staff will be available for coordination and assistance during software testing. ENGINEER will use software test documentation forms for signature by an authorized City representative (similar to those used for previous work executed at the WWTP by ENGINEER). TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by November 2014 and resulting in task order completion by June 2015. A NTP issued on a different date will change the schedule accordingly. COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation Task Order Administration ovember 2014 through June 2015 . $9,600.00 1 Design November 2014 through January 2015 • $37,500 (labor) • $970 travel expense) 2.1 Existing Aeration System Software January 2015 to April 2015 • $83,000 (labor) • $6,171 travel expense) 2.2 Aeration DO and Blower System Software January 2015 through June 2015 • $92,650 (labor) • $7,461 travel expense TASK ORDER TOTAL $237,352.00 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10521.a is Two hundred thirty-seven thousand three hundred fifty-two dollars ($237,352.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses shall be billed per the approved Rate Schedule and Master Agreement (by this reference made a part hereof) and will be the basis for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. Task Order 10521.s W WTP - AREATION PLC UPGRADE Page 11 of 12 CH21VI HILL ENGINEERS, INC. CITY OF MERIDIAN NAME OF CH2 HILL ENGINEERS, INC. B 7 BY: TAMMY de RD, MAYOR Dated: //- Z5 -d Approved by Council: jlod5 Dated: O 00 oma, CITY CLER '✓ ' " �u a u o�' Purchasin Approval 9°, SF�� D@v a Appro I BY: BY: KEIT ATTS, Purchasing Manager W REN STEW RT, Engineering Manag /��� City Project Manager Dated: / 9 / I �t Emily Skoro Task Order 10521.s WWTP- AREATION PLC UPGRADE Page 12 of 12 CH2M HILL ENGINEERS, INC.