Loading...
HomeSearchMy WebLinkAboutTask Order No. 0659c with Civil Survey Consultants, Inc. for Black Cat Road Flush Line and PRVTask Order No. 0707a with Hydro Logic for Well No. 15 Reevaluation of Current Condition of Well Construction, Groundwater Chemistry and Reconstruction DesignTask Order No. 0759b with Hydro Logic, Inc. for Well Monitoring and Aquifer Testing 2012Task Order No. 0777f with HDR Engineering for Recycled Water Master PlanTask Order No. 10002d with CH2M Hill for WWTP Odor Control DesignTask Order No. 10010e with CH2M Hill Engineers, Inc. for Meridian Ground Reservoir No. 2 Annexation Phase ConsultationTask Order No. 10142a with Hydro Logic for Source Water Protection, area of Drilling Conern, Drilling OrdinanceTask Order No. 10158 with SPF Water Engineering, LLC for WWTP Chemical Feed Design ProjectTask Order No. 10162c with CH2M Hill for WWTP Turbine Blower Installation Services and Control System Implementation ServicesTask Order No. 10162e with CH2M Hill Engineering for WWTP Turbo Blower Installation Controls SystemTask Order No. 10238b with CH2M Hill for WWTP RAS Conveyance System ReconfigurationTask Order No. 10238f with CH2M Hill Engineers, Inc. for WWTP RAS Conveyance System ReconfigurationTask Order No. 10312h with Hydro Logic for Well No. 16 Evaluation and Reconstruction Design, Inspection and Geotechnical ServicesTask Order No. 10328 with Murray Smith & Associates for the NW 8th Street Sewer Trunk Main Broadway to Cherry Phase 1Task Order No. 10340 with CH2M Hill Engineering, Inc. for Water Treatment Equipment and Design of New Iron and Manganese Removal Treatment FacilityTask Order No. 10356 with HDR Engineering, Inc. for Secondary Effluent Coagulation Flocculation TankTask Order No. 10360 with JUB Engineers for 2012 Engineering Policy Manual and Standards UpdateTask Order No. 10364 with JUB Engineers, Inc. for Ten Mile Diversion Trunk Sewer Extension