Task Order No. 10158 with SPF Water Engineering, LLC for WWTP Chemical Feed Design ProjectTASK ORDER NO. 10158 Under the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND SPF WATER ENGINEERING, LLC (ENGINEER) This Task Order is made this 7th day of February, 2012 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City', and accepted by SPF Water Engineering, Inc, hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 2A) between the above mentioned parties dated December 6, 2011. The Project Name for this Task Order 10158 is as follows: CITY OF MERIDIAN WASTEWATER TREATMENT PLANT CHEMICAL FEED DESIGN PROJECT SCOPE OF WORK Engineer shall prepare construction plans and specifications for bidding and construction of new chemical feed facilities at the City's Wastewater Treatment Plant (WWTP). The chemical facilities are planned to feed a number of different chemicals (polymer, PaCI, sodium hypochlorite, and coagulant(s)) to the existing WWTP's secondary and tertiary treatment systems. The design will be based on the preliminary engineering report prepared for the chemical feed project. Engineer shall prepare and submit construction plans and specifications to the City and Idaho DEO for review and approval. Engineer shall assist the City through the construction bidding process and provide construction services support. Construction services will include submittal reviews, on-site construction meetings, and site visits to coordinate construction activities with the contractor, as needed. After construction is complete, record drawings will be prepared and provided to the City and DEQ. Engineer will also assist the City with lab scale and demonstration scale testing to further define and evaluate phosphorus reduction alternatives using the existing tertiary filters. Engineer will work with City WWTP lab staff to prepare and conduct bench scale testing for defining chemical types, dose rates, and flocculation conditions to maximize phosphorus reduction. The following sub consultants are included on our project team: Lochsa Engineering -Structural Engineering Control Engineers -Electrical and Instrumentation Engineering DC Engineers -Electrical Engineering Oversight and Coordination Task Order 10158 c W WTP Chemical Feed Facilities Design Page 1 of 3 SPF Water Engineering Programming and system integration services are not included within the scope of this proposal. Engineer proposes to have the programming and system integration services provided separately by the City after the project is constructed or this scope can be included within the bid documents. PROJECT DELIVERABLES • 30 Percent Design Documents (plans and specifications) for City Review • 100 Percent Design Documents (plans and specifications) for DEQ Review and Approval • 100 Percent Design Documents (plans and specifications) incorporating DEO comments for bidding purposes. • As-Built Plans TIME OF COMPLETION The Anticipated Project Schedule: 30 Percent Design Documents -completed within 30 days of notice to proceed 100 Percent Design Documents -completed within 30 days of receiving City comments (anticipate 4 to 6 weeks for DEQ review and approval) COMPENSATION The Not-To-Exceed amount for this Task Order No. 10158 is eighty seven thousand dollars ($87,000.00). The hourly rates for services and direct expenses are per the Master Agreement and by this reference made a part hereof. No compensation will be paid over the Not-to- Exceed amount without prior written approval by the City in the form of a Change Order. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN ~ SPF WATER ENGINEERING, LLC BY: ,~„~i1~' TAMMYde WEER AYOR BY: C H COOPER, MANAGER Dated: a- I ~,-- Dated: Approved by Attest: City of CITY CLERK op SEAL r rfB °~~de THE A,UaO~a Task Order 10158 c W WTP Chemical Feed Facilities Design Page 2 of 3 SPF Water Engineering Approved as to Content BY: KEITHa9 ~ , PURC SI ANAGER Dated: ~////~ Approved as to Form CITY ATTORNEY Task Order 10158 c W WTP Chemical Feed Facilities Design SPF Water Engineering Depart e t Approv BY: WA REN STEW T. ENGINEERING MGR Dated: r t~tiG / 1 ~ Page 3 of 3