Loading...
Task Order No. 10328 with Murray Smith & Associates for the NW 8th Street Sewer Trunk Main Broadway to Cherry Phase 1TASK ORDER NO. 10328 Under the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (CITY} AND HURRAY, SM1TH AND ASSOCIATES, INC (ENGINEER) This Task Order is made this 24~' day of January, 2012 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City",and accepted by M•„ array, Smith and Asspciates, Inc, hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Mas#er Agreement Category 2C} between the above mentioned parties dated April 13, 2010. The Project Name for this Task Order 10328 is as follows: NW 8TH STREET SEWER TRUNK MAIN BRaADWAY AVENUE TO CHERRY PHASE 1 BACKGROUND Under a previous scope of work SOW}, ENGINEER performed an alternatives analysis and prey design for new sewer mains} to be located within the W. 7th Street or W. 8th Street right•of-way (ROW} between W. Broadway Avenue and W. Cherry Lane. The purpose of the new sewer line is to replace the existing 18-inch sewer line currently located between the W. 7th Street and W. 8th ~ Street ROWs. The CITY selected the alternative to locate the new sewer line in the 8th Street ROW. Additional sewer lines will also be needed to collect sewer services and convey f low to the new sewer main in 8th Street. The project will be constructed in the following phases in order to meet CITY budget limitations: • Phase 1: W. 8th Street from W. Carlton Avenue to W. Cherry Lane • Phase 2: W. 8th Street and W. 7th Street from W, Broadway Avenue to W. Carlton Avenue • Phase 3: W. lth Street from W. Criterion Street to W. Washington Street SCOPE OF SERVICES Task 1-Data Collection ENGINEER will perform the following tasks as part of a data collection effort, prior to development of design plans and spec~ficat~ons. Task 1.1- K~ck~off Meetfn~ in #his task, ENGINEER will attend akick-off meeting with the CITY to introduce project staff; review communication protocol, SOW, schedule and budget; and make any required data requests. f ~'\ Task order 10328 NW 8~" Street Sewer Trunk Main-6roadway Ave to Cherry Phase 1 Pag$1 of 8 Murray, Smith and Associates, Inc ,,.~ task ~.2 -Survey ENGINEER will perform a topographic survey, as described below. The sunray will be done horizontally on the NAD f 983 translated to the Ada County G.I.S. system} datum and vertical control based on NAVD 1988 datum. Contours will be developed atone-foot intervals. The survey will include: • Data from the survey performed as part of the pre~design SQw • Road centerline and curb elevations at a maximum interval of 50 feet • Underground utilities as marked by Digline or from provided as-built plans • Inverts of all irrigation and storm drain facilities in the project area • Land corners, as needed to show street ROw Task 1.3 - Potho!!ng ENGINEER will perform potholing to confirm existing asphalt, 3/a" rock, pit run depths and confirm location of existing utilities at critical locations in the project area. This task includes the follawin 9 • 23 total pothole loco#ions 9 potholes in intersections requiring traffic control g 14 potholes at locations requiring safety signs ono additional traffic control required) Assumpflans 1. SO1N assumes that an Ada County Highway District ~ACHD~ permit for potholing is ~, required, but the fee will be waived. Aellverables 1. Notes from kick-off meeting Task 2 -Sewer Service Coordination ENGINEER will work with the GlTY to identity the locations of existing sewer services and coordinate new sewer service alignment with property owners. Approximately 81 sewer services will be located as part of this task. There are 54 existing sewer services currently connected to mains located along the back property lines and 27 that connect to mains located in the ROV1r. ENGINEER will perform a data analysis effort that includes the following tasks: 1. Send flyer to property owners notifying them of the project. Flyer will be approved by CITY pnor to delivery to property owners. 2. Make initial contact with property owners (CITY staff may attend}. 3. Visit all properties where sewer services will be affected by the project, determine location of sewer service line and develop preferred sewer service route with property owner and C ITY staff . 4. CCTV and location services will be performed on each building to in order to verify horizontal location and depth of existing services. ~' Task Order 10328 IWV 8~' Street Sewer Trunk Main•8roadway Ave to Cherry Phase 1 Pa e 2 of 8 Murray, Smith and Associates, Inc q r~ ~. Survey horizontal locations and ground elevations of existing side sewers at the exit of existing structures. The ground elevation and data from the sewer service locate will be used to approximate sewer service elevation. 6. Develop schematic drawing of proposed sewer service route and send to property owners and CITY for review and approval. Assump#ions 1. Engineer will provide up to 40 hours for pre-field work, contact of property owners and documentation of the proposed sewer service routes and a surveyed point of service connection. 20 8-hour days of fieldwork for one ENGINEER staff are included in this task. 2. The routes will be field measured and documented with digital photos. This data will be shown on the design drawings. 3. The data collection does not include excavation to verify number and location of side sewer service connections into the main. All work will be based on sewer service locations from the OWNER CCTV tapes amain line}, side sewer location services, observa#lons from site investigations, and a survey point of the sewer service as it exits the building. Deliverables ~. Draft and final version of property owner notification form 2. Documentation of proposed sewer service routes Task 3 -Design ENGINEER will develop 30% and 60°/o designs for all phases of the work described in the background section of this SOW. ENGINEER will then develop a construction packa a for Phase 1 of the im rovemen ~ g p ts. Separate construction packages will be developed far Phases 2 and 3 of work under a separate task order. Fask 3. i - 3~/o Design package (AI! Phases ENGINEER will develop a 30% design package that will include the followin ; g • Plan and Profile Roll • Results of the surrey, po#holing and sewer service coordination tasks • Opinion of probable cost for each phase of work • Reassessment of design schedule • basis of design letter that will be submitted to Idaho Department of Environmental Qualit IDEA for review and a rov I. y ~ } pp a The letter will address the proposed slo es that do not p meet minimum slopes recommended by 1 o State Standards. The 30°/° design plans will be reviewed with the CITY at an "over the shoulder" review meetin . g The SOW 'rncludes 4 hours to meet and review license agreement requirements with the Nam a Meridian Irri ation District NMID . p g t ~~` Task Order 10326 NW 8~' Streel Sewer Trunk Main-Broadway Ave to Cherry Phase 1 Murray, Smith and Associates, Inc Page 3 of 8 ,,~, Task 3.2 -- 60% Des~gr~ package (Al! Phases) ENGINEER will develop a 50°/° design package based on the comments at the 30% review meeting that will include the following DRAFT documents: • Separate packages for the three phases of work • Plan and Profile Sheets • Standard Notes and Details specific to the project. Standard details are not required} • Erosion and Sediment Control {ESC} plan ar Stormwater Pollution Prevention Plan {S~UPPP} as required by Idaho Department of Environmental Quality {IDEA} and ACRD. The plan will be reviewed by the City of Meridian Environmental Division} • Traffic Control Plan • Technical Specifications • Bid Schedule • Qpinion of probable cost for each phase of work • Reassessment of design schedule The G9% design plans and specifications will be submitted to the City for review and comment. ENGINEER may attend a mee#ing with the CITY to review comments from the fig°/° desi n g package, The 60% design plans will also be submitted to ACRD for preliminary review and comment. Task 3.3 - 95 % D~eslgn Package (Phase ~) ~''~``~ ENGINEER will develop a 95% design packs a for Phase 1 based on the comments n h ° g o t e 60 /° plans. The 95% design package will include the following #inal documents: • Plan and Profile Sheets • Erosion and Sediment Control {ESC} plan or Stormwater Pollution Prevention Plan {SvUPPP} as required by IDEA and ACHD, • Traffic Control Dian approved and signed by ACRD. • Notes and Details specific to the project, Standard details are not required. • Technical Specifications • Qpinion of probable cast for Phase 1 of work • Bid Schedule with quantities The 95°/° plans are assumed to be "bid ready" and are only missing minor CITY and ACRD comments and approvals. The 95% design plans and specifications will be submitted to the Cit far review and comment. ENGINE ~ ~ y ER will attend a meeting with the CITY to review comments from the 95% design package if needed. The 95% design plans will also be submitted to ACRD for final review and ap royal si natures. p g Task 3.4 - X00°lo Deslgn Package (Phase !) ENGINEER will finalize the 190% design package for Phase 1 based on the comments an the 95% plans, The 190% design package will include the following FINAL documents with all the approval stamps and signatures; '~` Task Order 10328 iVw 8~' Street Sewer Trunk Main-Broadwa Ave to Che Phas 1 Murray, Smith and Associates, Inc Y ~ e Pale 4 of 8 • Plan Set for Phase ~ of work • Erosion and Sediment Control (ESC) (SwPPP) as required by IDEA and ACRD. • Traffic Control Plan signed by ACRD. • Technical Specification Package • Bid Schedule • Qpinion of probable cost plan or Stormwater Pollution Prevention Plan The final plan will be signed by ACRD. The 100% design plans and specifications will be submitted to the City for inclusion in the bid package. assumpftons 1. Construction of Phase 1 will occur in the Summer of 2012 when Meridian Middle School is out of session. 2. 95% and 100% design and construe#ion of Phases 2 and 3 will be performed in subsequent budget years under a separate task order. 3. Sewer and water service bypass plans will be developed by the cons~uction contractor and are not included in #his SOW. These plans will be based on performance requirements that ENGINEER will develop as part of the Technical Specifications. 4. The design budget assumes that the entire project will be designed with plan and profiles for traditional open trench construction. 5. The Engineer will attend up to one 2•haur meeting with ACHD to review the design packages during the design phase, Q. The CITY will provide a QLPE review of the plans in lieu of submittal to the IDEQ if waiver of the minimum grade can be obtained by emails andlor the Basis of Design letter (referred to in Task 3.1 of the 30% Design Package). 7. ENGINEER will prepare the technical specifications. The Idaho Standards far Public forks Construction (ISPwC) and CITY supplements will be used as the basis of the technical specifications. ISPUVC specifications will be referenced and not reproduced in the specif~cat~on package. Supplemental technical specifications will be developed as required. (Specifications will state specifically what points shall be staked with a reference that the contractor will pay for additional staking or re-staking} 8, The CITY will prepare the "front end" specification section. 9. MSA will prepare and reproduce sixteen (1 fi) sets of the bid packages ~ 0. The CITY will administer the contract. 11. Plans will be full size (22 "x 34"}, 12.Any required permitting fees will be paid by the CITY Deliverables 1. Two (2} hard copies of the 30% design package 2.One (1 ~ electronic copy of the basis of design letter to IDEQ 3. Six (fi} hard copies of the s0% design package ~'~`~ Task Order 10328 NW 8'~ Street Sewer Trunk Main-Broadway Ave to Cherry Phase 1 Page 5 of 8 Murray, Smith and Associates, Inc 4. Six ~fi) hard copies of the 95% design package 5.One ~1 }reproducible copy of the FINAL 100% design package in PDF format on disk 6. Sixteen X16) hard copies of the FINAL 100% design package Task 4 -Services during Construction Phase 1} Th',s Task Order includes ~ 70 hours for services during construction of Phase t . Services durin construction for Phases 2 ~ ~ g & 3 w,ll be lane under separate task order. Services during construction will include the fallowing tasks: • Attend pre-bid meeting • Answer questions during the bid period • Assist the CITY in creating any required addenda during the bid period • Attend the pre-construction meeting • Respond to requests for information ~RFIs) • ENGINEER will review the technical submittals. Up to twenty (20} submittals are included • Perform site visits, attend construction meetings during donstruction and provide final unch list as re uested p q • Construction survey control and staking for new manholes Assumptions 1. Construction of Phase 1 will occur in the summer of 2012. Services during construction for Phases 2 and 3 will be performed in subsequent budget years under a separate task order. 2. The CITY will produce any required addenda during the bid period. 3. The CITY will review bids and determine the apparent low bidder. 4. Pay reques#s will be reviewed by the CITY. 5. The CITY will provide a Project Representative that will be responsible for ins action of the p project. Task 5 -Record Survey Drawings (Phase i) t 8 hours for services after construction completion for the first phase. Services after construction for Phase 2& 3 will be done under separate task order: • Collect any as-built information from the contractor and the City of Meridian inspector. • Perform a survey for rim and invert elevation for manholes constructed in Phase 1. • Prepare and produce complete sets of Record Drawings per the City of Meridian Record Drawing Requirements Assumptions 1. The City will perform a review of the proposed Record Drawings for completeness and accuracy ''~" Task Qrder f 0328 NW ~h Street Sewer Trunk Main-6roadway Ave to Cl~rry Phase 1 Murray, Smfth and Associates, InC Page 6 of 8 ,,..,~ De!lverables 1, Record drawings per the City of Meridian Submittal Requirements, TIME OF COMPLETION A preliminary schedule is attached to this SOw, ENGINEER will make eve effort to com lets the work in a timel ~ p y manner; however, it is agreed that ENGINEER cannot be responsible for delays occasioned by factors beyond its control, nor by factors that could not reasonab! have been foreseen at the time this T k y as Order was executed. COMPENSATIt~N The Not-To-Exceed amount for this Task Order No. 10328 is one hundred ninet two thousand four hundred dollars 192 4 y t$ , 00,00} as summarized in the table below. The hourly rates for services and direct expenses are per the Master A reement and b this reference made a g y part hereof. No compensation will be paid over the Not-to~Exceed amount without prior written approval by the City in the form of a Chan a Order. Tr g avel and meals are excluded from this Task Order unless explicitly lis#ed in the Scope of Services AND Pa ment Schedule. y Table 1 Total Project Costs Subconsultant Pees Task Num bar Labor- Hours Surveying Sew r a Potholing Service Total Cast CCTVllacate Task 1-Data Collection 35 $17,800 $6,200 - $27,800 Task 2 -Sewer Service 216 $5,400 - $i 2,000 $39 900 ' Coordination Task 3 -Design 864 - - - $99100 Task 4 -Services Durin Construction 166 $1,000 - - $22,100 Task 5 -Record Survey and 18 $1,000 - - $3 500 ' Drawn s Project Total 1,299 $25,000 $6,200 $12,000 $192 40Q ~` Task order 10328 Nw 8~' street Sewer Trunk Main-Broadway Ave to the Phase 1 Murray, Smith and Associates, Inc m Page 7 of 8 CITY QF MERIDIAN 5~ JR~~~I~A~y~~i~' I ~ ~~ EY. :i4:M:4.1'.Y~ WYYYY+ TAMMY de ` RD, AitAYQR Attest: BY: HURRAY, • ~' S OCIATES • ~ ... C I RS~N, P.E. PRINCIPAL ENGYNEER MEaA~~~ s ted: . -- ~- ..~. .I ~~~~~:G4MIliYYYYYi4M~ :~::v:+:4kmvF tt~Y.•:4i.Fi:JF.•i'f.UkH:~WiW>AW.+B.i~i:ORRm.RRRIiYYYYvwww.- ~,q, :~. ~ d~~l:C~LMAN, CITY CLERK Ci~~ II~~AN~ Dated. ~w ~~ ~ ~r~- • ~ ~~~~~ Depar e t Appr a EY: ..r~ ~. WARRE'~1 STEWART, PE ENGINEERING MANAGER Dated: ~ ~.. n~~ ti~ ~ t~~