Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Change Order No. 1 with DC Engineering for Water Administrative Building Generator Task Order 10378a
Change Order No. 4 with HDR Engineering for NPDES Permit Strategy and Technical Assistance Task Order 10264
Task Order No. 0759b-D with Hydro Logic for Ground Water Level and Quality Monitoring and Aquifer Testing
Task Order No. 10010F with CH2M Hill Engineers, Inc. for Ground Reservoir No. 2 Final Design and Services during Bidding and Construction
Task Order No. 10033.d with JUB Engineers for Ashford Greens Trunk Sewer
Task Order No. 10045C with CH2M Hill Engineers, Inc. for Fermentation and Odor Control Project Services during Construction
Task Order No. 10045E with CH2M Hill Engineers, Inc. for WWTP Fermentation and Odor Control Project Programming and Integration
Task Order No. 10121.a with SPF Water Engineering for 77 Acre Park Well and Pump Conceptual Design
Task Order No. 10158g with CH2M Hill Engineers, Inc. for WWTP Chemical Feed Building Control System Software
Task Order No. 10198 with Civil Survey Consultants for Ustick to Locust Grove to Leslie Way Utility Improvements
Task Order No. 10238h with CH2M Hill Engineering, Inc. for WWTP RAS Reconfiguration Project Programming and Integration
Task Order No. 10264a with HDR Engineering, Inc. for NPDES Permit Strategy and Technical Assistance
Task Order No. 10312-D with Keller Associates for Well 16b and 16c Pumping Facility Design
Task Order No. 10329 with Murray Smith & Associates for NW 8th Street Sewer Trunk Main Broadway to Cherry Phase 2
Task Order No. 10353a with Brown and Caldwell for Infiltration Evaluation for Wastewater Effluent Management
Task Order No. 10371 with GSI Water Solutions for Phase 2 Aquifer Conditioning Feasibility Study Wells 18 and 22
Task Order No. 10371a-D with GIS Water Solution for Well 22 Pilot Testing
Task Order No. 10383-I with STRATA for Special Inspections WWTP Admin Lab Site Pkg
Task Order No. 10413 with JUB Engineers, Inc. for Sewer Line Replacements Sites 14 and 15
Task Order No. 10418-D with JUB Engineers for Well 19 Water Treatment Facility
Task Order No. 10426 with Civil Survey Consultants for Locust Grove Water Main Extension Project Management
Task Order No. 10430 with Civil Survey Consultants for Creason Lateral Improvements
Task Order No. 10432 with Civil Survey Consultants for ACHD Ustick Road and Meridian Road Utility Improvements
Task Order No. 10433 with Civil Survey Consultants for Franklin Road Black Cat Road to Ten Mile Road Reclaimed Water Improvements
Task Order No. 10436 with JUB Engineers, Inc. for City Wide Irrigation Feasibility Study
Task Order No. 10450 with Johnson Architects for City Hall 3rd Floor Tenant Improvements
Task Order No. 10461D with SPF Water Engineering for Well 29 Test and Production Well Design