Loading...
HomeSearchMy WebLinkAboutChange Order No. 1 with DC Engineering for Water Administrative Building Generator Task Order 10378aChange Order No. 4 with HDR Engineering for NPDES Permit Strategy and Technical Assistance Task Order 10264Task Order No. 0759b-D with Hydro Logic for Ground Water Level and Quality Monitoring and Aquifer TestingTask Order No. 10010F with CH2M Hill Engineers, Inc. for Ground Reservoir No. 2 Final Design and Services during Bidding and ConstructionTask Order No. 10033.d with JUB Engineers for Ashford Greens Trunk SewerTask Order No. 10045C with CH2M Hill Engineers, Inc. for Fermentation and Odor Control Project Services during ConstructionTask Order No. 10045E with CH2M Hill Engineers, Inc. for WWTP Fermentation and Odor Control Project Programming and IntegrationTask Order No. 10121.a with SPF Water Engineering for 77 Acre Park Well and Pump Conceptual DesignTask Order No. 10158g with CH2M Hill Engineers, Inc. for WWTP Chemical Feed Building Control System SoftwareTask Order No. 10198 with Civil Survey Consultants for Ustick to Locust Grove to Leslie Way Utility ImprovementsTask Order No. 10238h with CH2M Hill Engineering, Inc. for WWTP RAS Reconfiguration Project Programming and IntegrationTask Order No. 10264a with HDR Engineering, Inc. for NPDES Permit Strategy and Technical AssistanceTask Order No. 10312-D with Keller Associates for Well 16b and 16c Pumping Facility DesignTask Order No. 10329 with Murray Smith & Associates for NW 8th Street Sewer Trunk Main Broadway to Cherry Phase 2Task Order No. 10353a with Brown and Caldwell for Infiltration Evaluation for Wastewater Effluent ManagementTask Order No. 10371 with GSI Water Solutions for Phase 2 Aquifer Conditioning Feasibility Study Wells 18 and 22Task Order No. 10371a-D with GIS Water Solution for Well 22 Pilot TestingTask Order No. 10383-I with STRATA for Special Inspections WWTP Admin Lab Site PkgTask Order No. 10413 with JUB Engineers, Inc. for Sewer Line Replacements Sites 14 and 15Task Order No. 10418-D with JUB Engineers for Well 19 Water Treatment FacilityTask Order No. 10426 with Civil Survey Consultants for Locust Grove Water Main Extension Project ManagementTask Order No. 10430 with Civil Survey Consultants for Creason Lateral ImprovementsTask Order No. 10432 with Civil Survey Consultants for ACHD Ustick Road and Meridian Road Utility ImprovementsTask Order No. 10433 with Civil Survey Consultants for Franklin Road Black Cat Road to Ten Mile Road Reclaimed Water ImprovementsTask Order No. 10436 with JUB Engineers, Inc. for City Wide Irrigation Feasibility StudyTask Order No. 10450 with Johnson Architects for City Hall 3rd Floor Tenant ImprovementsTask Order No. 10461D with SPF Water Engineering for Well 29 Test and Production Well Design