Loading...
Change Order No. 2 with Civil Survey Consultants, Inc. for Ustick Rd Utility Improvements Task Order 10432CITY OF MERIDIAN CHANGE ORDER NO. 2 PROJECT NO. 10432 33 EAST BROADWAY DATE: 07/1/14 MERIDIAN, ID 83642 EFFECTIVE DATE: 0711/14 TASK ORDER CHANGE ORDER ENGINEER/CONSULTANT: Civil Survey Consultants, Inc. PROJECT: Ustick Road Utility Improvements The Englnoar/Consullant Is hereby directed to make the following changes from the Task Order Documents. Description: Proposal to expand the original scope of services to Include utility Improvements on Uslick Road between Linder Rd and Meridian Rd. The improvements will be constructed in conjunction with ACHD's rebuild of Ustick Rd. Reason for Change Order: The ACHD road Improvement project boundaries have been extended past the original scope of work's extents. Additional utility Improvements are required due to the ACHD widening the current road extents on Ustick Rd between Linder Road and Meridian Road, Attachments: Change Order Documentation (2 pages) CHANGE IN TASK ORDER PRICE: CHANGE IN TASK ORDER TIMES: Original Task Order Price $23,649.40 Original Task Order Times: Net changes from previous Change Orders Nei changes from previous Change Orders No _0_ to _7_ No. to— (calendar days) $29,866.80 Task Order Price Prior to this Change Order: Task Order Times prior to this Change Order: (calendardays) $53,516.20 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (catendardays) $22,648.10 Task Order Price with all Approved Change Orders: Task Order Times with all Approved Change Orders: Task Order Is based on ACHD's constmdton $76,164.30 schedule. APPROVED; (CITY PURCHAS GMAN ER)�//�///�//71� ACCEPTED: (Civil Survey) By: Keith Watts ay: Corey Peacock Date: -7/ 1`�// X Date: olO/� RECOMMENDED: (ASST CITY ENGINEER) DATE APPROVED BY COUNCIL By:`'✓' J DatIlV /14 DATE: ,-IDsl Z)O\q wonnrao,I APPROVED: (CITY) n (2 ATTEST: y —C - � i , Eity of By: Mayo Sa a Weerd a , Ra u N1tY By: City Cie , Jayc L. Holman JD Dale: ZZ I Date: SEAL A9 �rrAe Tai AaUA� a,` T� \T,t. Re: Ustick Read and Meridian Road Intersection Utility Improvements -Additional Services Task Ordet Nn. 10432 —Change Order No. 2 [Teat Cmilyl Per your rcquest, cosi aro proposing to expand our original scope of services to include utility improvements on Ustick [toad between Linder Road and Meridian Road. These improvements will be constructed in corijuncdon with ACHD's rebuild or Ustick Road. We are proposing to provide the following additional services; t. TaskI.I — E -builder, Three additional hours at$123.30AIour-$369,9X!. 2. Task L1•�Field Sorveying. Twelve additional hours at$I451hour-S1,740=W Field work associated with verifying inverts ofexisting sewer cleanouts in Ustick Road as needed to extend existing sewer stubs and to locate two existing water stub blow -offs. + Field work associated with marking pWholo locations and field surveying potholes after they are co spieled. Also, includes coordination with pothole contractor. The exisling water main will be potholad nt five potential conflicts with the now storm drain main or Irrigation pipe. 3 Tusk 2.2—Survey Dmfling. Six mchhh mat hoary al S123.3ftour - $739.80. o Office work associated with drafting field survey and pottx7le results. 4, lask 3.1 — Water Systom Improvements. Sixteen additional hoursat$123,30/hour= 51,972,80. Adjust approximately fourteen existing valve boxes to grade. + Adjust existing water main at approximately five locations where conflicts exist with naw storm drain or iaiagation pipes. + Design four new fire hydrants at locations iden8fied by the City. Relocate two existing water miters, • Extend five existing water stubs to the right-of•way Pure, + Adjust one existing fire hydrant w grade. Das'agn comer service Stabs to four properties along Ustick Road, as requested by property owner. S. Task 3.2 — Sewer System huprovenumis, 12 additional lours at $123,301hour = $1,479.(x0, + Ocsign server stubs to two properties along Ustick Road, as requester) by property owner. + Extend 3 existing sewer stubs to the righderf-way line. 6, Task 33 — Property Owner Coordination. Six additional hours at 5127.30/h oar - S739.80. • Send letters to the property owners of four properties fronting Ustick Road that currently are not connected to City water nod sewer services, 7. Tad: 4.1 — Develop plaits, specifications, cost estimate and bid scWvle, 84 additional hours at $123.30Jhour - $10,357.20 A complete set or pians and specifications will be Prepared for the work related to this supptemeol. Meese plans and specifications will be separate from the playas and specifications for the Ustick Road/Meridian Road 1nteralion Project and the Ustiok Roil (Meridian to Locust Grove) projul. 8, Task 4.2 — City Engineering 'Departmental review and comment, Four additional hours at $123.30lhwur= $493.20 9, Task 4.3 — Development Services and Environmental review and comment. Tluee additional hours at $123.301hour $369.90 Cavil Survey Consultants, he, UMYI a�101,S. Rnidw (]08)8884 3 1 7 1400 r- Wroanower Surd rw 888-0143 Suite iia 11 .*$ X bjnt f PC, Mioridiaa, ldaha 83642 V1"avu6&nt lime 23,2014 Entity Skoro, P.Ti. City of Meridian 33 E. Broadway Avenue, Ste. 200 Meridian, [U 83642 Re: Ustick Read and Meridian Road Intersection Utility Improvements -Additional Services Task Ordet Nn. 10432 —Change Order No. 2 [Teat Cmilyl Per your rcquest, cosi aro proposing to expand our original scope of services to include utility improvements on Ustick [toad between Linder Road and Meridian Road. These improvements will be constructed in corijuncdon with ACHD's rebuild or Ustick Road. We are proposing to provide the following additional services; t. TaskI.I — E -builder, Three additional hours at$123.30AIour-$369,9X!. 2. Task L1•�Field Sorveying. Twelve additional hours at$I451hour-S1,740=W Field work associated with verifying inverts ofexisting sewer cleanouts in Ustick Road as needed to extend existing sewer stubs and to locate two existing water stub blow -offs. + Field work associated with marking pWholo locations and field surveying potholes after they are co spieled. Also, includes coordination with pothole contractor. The exisling water main will be potholad nt five potential conflicts with the now storm drain main or Irrigation pipe. 3 Tusk 2.2—Survey Dmfling. Six mchhh mat hoary al S123.3ftour - $739.80. o Office work associated with drafting field survey and pottx7le results. 4, lask 3.1 — Water Systom Improvements. Sixteen additional hoursat$123,30/hour= 51,972,80. Adjust approximately fourteen existing valve boxes to grade. + Adjust existing water main at approximately five locations where conflicts exist with naw storm drain or iaiagation pipes. + Design four new fire hydrants at locations iden8fied by the City. Relocate two existing water miters, • Extend five existing water stubs to the right-of•way Pure, + Adjust one existing fire hydrant w grade. Das'agn comer service Stabs to four properties along Ustick Road, as requested by property owner. S. Task 3.2 — Sewer System huprovenumis, 12 additional lours at $123,301hour = $1,479.(x0, + Ocsign server stubs to two properties along Ustick Road, as requester) by property owner. + Extend 3 existing sewer stubs to the righderf-way line. 6, Task 33 — Property Owner Coordination. Six additional hours at 5127.30/h oar - S739.80. • Send letters to the property owners of four properties fronting Ustick Road that currently are not connected to City water nod sewer services, 7. Tad: 4.1 — Develop plaits, specifications, cost estimate and bid scWvle, 84 additional hours at $123.30Jhour - $10,357.20 A complete set or pians and specifications will be Prepared for the work related to this supptemeol. Meese plans and specifications will be separate from the playas and specifications for the Ustick Road/Meridian Road 1nteralion Project and the Ustiok Roil (Meridian to Locust Grove) projul. 8, Task 4.2 — City Engineering 'Departmental review and comment, Four additional hours at $123.30lhwur= $493.20 9, Task 4.3 — Development Services and Environmental review and comment. Tluee additional hours at $123.301hour $369.90 !8. Task 4,4— ACHD review and comment. Two additional hours of $123.3ftour- $246.60 11, T"ask 4.5 -, Qi.Ph review and approval. Three additional hours at $123.30fhour=$369.413 12, Task 4.6 — Final Plana to City F,ngineering Department. Chia additional how at $123,30/hour SMAD 13. Task 4,7 - Submit plans to Nampa Meridian Irrigation District and Settlers Irrigation District f`ar revi4wv and approval. - 1 nye'neor will submit me %as of plus to each irrigation district for tvvim% Engineer will revise plans as necessary per comments. City shall handle all work assoeiated with obtaining license agreements and pay all asaociawd fees, ant additional hours at $123.30fltuur- $739.80 14, Direct Costs. Printing, $300 Potltnla -• 5 socio at 82$0/ea = 51,250,60 I$. Additional trema. Attend ACHD 75% plias onsite walk duough. Three additional lotus at $123.3Mrour- $369.90, s Review ACRD 75% plans and provide comments. Pour additional hours at 123 3nour=SA97,20 • Review ACHD 95% plans and provide continents. Pour addilional hours at 123.301hout-5493.30 'Phis scope of services strap include the following assumptions; It will be the City's responsibility to negotiate mid execute tate Joint Effort Agreement for construction whit ACHD. Plans will be prepared once the City has provided our office with AutoCAD electronic files of AC:IID's 9S°% plans, The City will obtain permission from ACHD to cue die electronic idea for utility design purposes, 2. It is assumed that the electronic design files provided by ACHD art complete cnough to prepare our design without major revisions prior to cattsuuctiun, Th(s scope of services does not include revising our plans due to majormvisions to AMD's plans, 3. All improvements will be designed based off topographic survey information provided by ACRD. 4, The City will provide. the Engineer with property owner mailing information necessary to send Project notification letters. S. It is anticipated that all improvements will be installed with the public right�of--way and this scope of services does nol include preparing or obtaining co sements. b, 'no City will assist the Engineer with obtaining special provision numbers rmm ACRD. 7, An Hiesion and Sodiment Control Platt (E,9CP) will not be prepared, The City will coordinate with ACHD to have all work covered under AC) ID SSCP and SWPPP. We are requcvring $22,648,10 to eovcr tate additional services. The revised total contract amount will be $76,166.30. City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith - Unposted Transactions Included In Report 3590 - WWTP Construction Projects 60 - Enterprise Fund From 10/1/2013 Through 9/30/2014 I Mte: 7/15/14 08:13:35 As Page: 1 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 95000 Service Line/Main Replacement 213,738.91 0.00 213,738.91 100.008' 0000 NON -DEPARTMENTAL 0.00 2,500.00 (2,500.00) 0.00& 10005 ACHD Split Corridor, Phase 205,000.00 3,287.69 201,712.31 98.408' 2 10005b Split Corridor Ph 2 0.00 132,713.57 (132,713.57) 0.00& Construction 10234 Downtown Sewer Line 56,000.00 3,029.93 52,970.07 94.59& Replacements Sites 10-12 10234.c Elm Street Sewer Main Site 0.00 48,120.00 (48,120.00) 0.00% 12a 10329 NW 8th ST Sewer Trunk Main 974,736.71 31,439.00 943,297.71 96.778 Broadway to Cherry Ph2 Design 10329a NW 8th ST Sewer Trunk Main 0.00 804,010.60 (804,010.60) 0.008 Broadway to Cherry Ph2 Constructi 10330 NW 8th St Sewer Trunk Main 49,800.00 49,800.00 0.00 0.00& Broadway to Cherry Ph 3 Design 10366 Five Mile Trunk Relief - 11,919.29 11,919.29 0.00 0.008 8th Street Park 10394 Sewer Line Replacement - 40,000.00 5,869.28 34,130.72 85.338 NE 3rd St 10394.a NE 3rd St Williams King 0.00 193,548.60 (193,548.60) 0.008 Ada - Sewer Water Main Construction 10400 Sewer Line Replacements - 15,000.00 6,441.00 8,559.00 57.068 Big O Fairview 10413 Sewer Line Replacements - 13,500.00 13,154.47 345.53 2.568 Sites 14 & 15 10413.a Sewer Line Replacement - 0.00 51,332.30 (51,332.30) 0.008 Site 14 - Construction 10478 Sewer Collection System 24,512.00 24,512.00 0.00 0.008 Rehabilitation & Replacement Program 10495 Meridian Interchange 145,000.00 145,000.00 0.00 0.008 Rebuild Sewer Improvements - ITD 10499 Sewer Line Replacement - 136,659.00 136,659.00 0.00 0.00% Site 12b Total Capital Outlay 1,885,865.91 1,663,336.73 222,529.18 11.808 TOTAL EXPENDITURES 1,885,865.91 1,663,336.73 222,529.18 11.808 I Mte: 7/15/14 08:13:35 As Page: 1