Loading...
2014-07-01�E IDIAN CITY COUNCIL REGULAR IDAHO MEETING AGENDA City Council Chambers 33 East Broadway Avenue Meridian, Idaho Tuesday, July 01, 2014 at 6:00 PM 1. Roll -Call Attendance X David Zaremba O Joe Borton X_ Charlie Rountree X Keith Bird X Genesis Milam X Luke Cavener X Mayor Tammy de Weerd 2. Pledge of Allegiance 3. Community Invocation by Becca Nothohm 4. Adoption of the Agenda Adopted 5. Consent Agenda Approved A. Amendment to Subgrant Agreement Between Ada County and City of Meridian B. Findings of Fact, Conclusions of Law for Approval: AP 14-001 Southridge Gravel Mining by Idaho Sand and Gravel Located South of W. Overland Road and East of S. Ten Mile Road Request: City Council Review of the Conditional Use Permit Modification (MCU 14-001) Application C. FP 14-028 Oaks South No. 2 by Coleman Homes LLC Located South Side of W. McMillan Road Between N. McDermott Road and N. Black Cat Road Request: Final Plat Approval Consisting of Thirty -Four (34) Single Family Residential Lots and Nine (9) Common Lots on 11.23 Acres of Land in an R- 4 Zoning District D. Development Agreement for Approval: PP 14-004 Biltmore Subdivision by L.C. Development, Inc. Located South of W. Victory Road and West of S. Meridian Road Request: Preliminary Plat Approval Consisting of 159 Single Family Residential Building Lots and Twelve (12) Common/Other Lots on 56.19 Acres of Land in an R-4 Zoning District Meridian City Council Meeting Agenda —Tuesday, July 01, 2014 Page 1 of 3 All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearing, please contact the City Clerk's Office at 888-4433 at least 48 hours prior to the public meeting. E. Lease Agreement for Lift Station Lot at Southern Highlands Vacated from the agenda F. Approval of Agreement to Apex Integrated Security Systems for the "Wastewater Treatment Plant (WWTP) Administration, Lab and Control Buildings Access Control" Project for the Not -To -Exceed Amount of $70,221.01 G. FP 14-029 Amberwave Subdivision by The Land Group Inc. Located Southwest Corner of W. McMillan Road and N. Meridian Road Request: Final Plat Approval Consisting of Twenty -Seven (27) Residential Lots and Three (3) Common Lots on Approximately 4.70 Acres in the R-15 Zoning District H. Approval of Award of Bid and Agreement to Granite Excavation, Inc. for the "NE 3rd Street, Williams King Ada Sewer and Water Main" Project for the Not -To -Exceed Amount of $489,683.71 I. Approval of Agreement to Apex Integrated Security Systems for the "Access Control System Equipment and Installation at Fire Stations 1-5" Project for a Not -To -Exceed Amount of $50,197.58 6. Items Moved From Consent Agenda None 7. Action Items A. FP 14-027 Woodburn West Subdivision No. 2 by Northside Management Located North of W. Ustick Road and East of N. Linder Road Request: Final Plat Approval Consisting of Forty -Eight (48) Building Lots and Seven (7) Common / Other Lots on 25.75 Acres of Land in the R-8 Zoning District Continued to July 15, 2014 B. Public Hearing: AZ 14-007 Sugarman Subdivision by George Sugarman Located 1450 W. Ustick Road Request: Annexation and Zoning of 5.04 Acres of Land with a C -C Zoning District Approved C. Public Hearing: SHP 14-001 Sugarman Subdivision by George Sugarman Located 1450 W. Ustick Road Request: Short Plat Approval Consisting of Four (4) Building Lots on 3.99 Acres of Land in a Proposed C -C Zoning District Approved D. Public Hearing: Southern Highlands Real Property Exchange Meridian City Council Meeting Agenda — Tuesday, July 01, 2014 Page 2 of 3 All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearing, please contact the City Clerk's Office at 888-4433 at least 48 hours prior to the public meeting. 8. Department Reports A. Pegasus Planning and Development — Economic Development and Fields District Recommendations and Findings B. Public Works: Public Works Week Update 9. Ordinances A. Ordinance No. 14-1616: Southern Highlands Property Exchange Approved 10. Executive Session per Idaho State Code 67-2345(1)(d) To Consider Records That are Exempt from Disclosure as Provided in Chapter 3, Title 9, Idaho Code Into Executive Session at 7:23 p.m. Out of Executive Session at 8:22 p.m. 11. Future Meeting Topics Adjourned at 8:23 p.m. Meridian City Council Meeting Agenda— Tuesday, July 01, 2014 Page 3 of 3 All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearing, please contact the City Clerk's Office at 888-4433 at least 48 hours prior to the public meeting. Meridian City Council July 1, 2014. A meeting of the Meridian City Council was called to order at 6:00 p.m., Tuesday, July 1, 2014, by Mayor Tammy de Weerd. Members Present: Charlie Rountree, Keith Bird, Genesis Milam, David Zaremba and Luke Cavener. Members Absent: Joe Borton. Others Present: Bill Nary, Jaycee Holman, Bruce Chatterton, Tom Barry, Kyle Radek, Tracy Basterrechea, Parry Palmer, and Dean Willis. Item 1: Roll -call Attendance: Roll call. X David Zaremba Joe Borton X Charlie Rountree X Keith Bird X Genesis Milam X Luke Cavener X Mayor Tammy de Weerd De Weerd: We'd like to welcome you to our City Council meeting. Thank you. It's always nice to see members of our community here. For the record it is Tuesday, July 1 st. What a great day July 1 st is, don't you think? Bird: Oh, yeah, it's your birthday. De Weerd: We will start today's meeting with roll call attendance, Madam Clerk. Item 2: Pledge of Allegiance De Weerd: Thank you. Item No. 2 is the Pledge of Allegiance. If you will all rise and join us in the pledge to our flag. (Pledge of Allegiance recited.) Item 3: Community Invocation by Becca Nothohm De Weerd: Okay. Item No. 3 is our community invocation. Is Becca here tonight? All right. If you will all join us in the community invocation or take this as an opportunity for a moment of reflection. Thank you. Nothohm: Thank you. Will you pray with me. Precious Father God, it is wonderful to be here tonight and we thank you for this Council and we thank you for our Mayor and the leadership that is provided here in this room tonight. Father, I thank you for the blessings that we have, for health and just for the leadership that we have in this Meridian City Council July 1, 2014 Page 2 of 28 community and for the many blessings that you have bestowed upon us. Lord, I pray this night that you would be about the business of this Council, that you would bless our Mayor and each Council Member as they seek to guide our community. Lord, we ask that you grant them wisdom, that you would grant them understanding of the needs and hopes for the people of this great community and, Lord, I just pray for unity amongst your people, that you would bond them together this night. Lord, we, again, just thank you so much and ask your blessing to be upon all the proceedings for this evening in your precious name we pray, amen. De Weerd: Becca, I would like to offer you a City of Meridian pin for leading us. Nothohm: Thank you. De Weerd: Thank you. Sorry, I'm too curious. I have to open my card first. Okay. It's from my husband. Now, this is a real shock. I just want you to know that. Bird: Happy Birthday. Come on. Happy birthday. Milam: If you would like to join us in a song for our Mayor. (Happy Birthday sung to Mayor De Weerd.) Item 4: Adoption of the Agenda De Weerd: Thank you. Item No. 4 is adoption of the agenda. Rountree: Madam Mayor? De Weerd: Mr. Rountree. Rountree: Item 5-E has been requested to be vacated from the agenda. Item 7-A, the applicant has requested a continuance on that item until July 15th and Item 9-A, the ordinance number is 14-1616. And with those changes I move that we adopt the agenda as published. Milam: Second. De Weerd: I have a motion and a second to adopt the agenda as -- as amended. All those in favor say aye. All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. Item 5: Consent Agenda A. Amendment to Subgrant Agreement Between Ada County and City of Meridian Meridian City Council July 1, 2014 Page 3 of 28 B. Findings of Fact, Conclusions of Law for Approval: AP 14-001 Southridge Gravel Mining by Idaho Sand and Gravel Located South of W. Overland Road and East of S. Ten Mile Road Request: City Council Review of the Conditional Use Permit Modification (MCU 14-001) Application C. FP 14-028 Oaks South No. 2 by Coleman Homes LLC Located South Side of W. McMillan Road Between N. McDermott Road and N. Black Cat Road Request: Final Plat Approval Consisting of Thirty -Four (34) Single Family Residential Lots and Nine (9) Common Lots on 11.23 Acres of Land in an R-4 Zoning District D. Development Agreement for Approval: PP 14-004 Biltmore Subdivision by L.C. Development, Inc. Located South of W. Victory Road and West of S. Meridian Road Request: Preliminary Plat Approval Consisting of 159 Single Family Residential Building Lots and Twelve (12) Common/Other Lots on 56.19 Acres of Land in an R-4 Zoning District F. Approval of Agreement to Apex Integrated Security Systems for the "Wastewater Treatment Plant (WWTP) Administration, Lab and Control Buildings Access Control" Project for the Not - To -Exceed Amount of $70,221.01 G. FP 14-029 Amberwave Subdivision by The Land Group Inc. Located Southwest Corner of W. McMillan Road and N. Meridian Road Request: Final Plat Approval Consisting of Twenty -Seven (27) Residential Lots and Three (3) Common Lots on Approximately 4.70 Acres in the R-15 Zoning District H. Approval of Award of Bid and Agreement to Granite Excavation, Inc. for the "NE 3rd Street, Williams King Ada Sewer and Water Main" Project for the Not -To -Exceed Amount of $489,683.71 Approval of Agreement to Apex Integrated Security Systems for the "Access Control System Equipment and Installation at Fire Stations 1-5" Project for a Not -To -Exceed Amount of $50,197.58 De Weerd: Item 5 is our Consent Agenda. Rountree: Madam Mayor? Meridian City Council July 1, 2014 Page 4 of 28 De Weerd: Mr. Rountree. Rountree: I move that we approve the Consent Agenda and as amended, authorize the Clerk to attest and the Mayor to sign. Bird: Second. De Weerd: I have a motion and a second to approve the Consent Agenda as changed. Madam Clerk, will you call roll. Roll Call: Bird, yea; Rountree, yea; Zaremba, yea; Borton, absent; Milam, yea; Cavener, yea. De Weerd: All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. Item 6: Items Moved From Consent Agenda De Weerd: There were no items moved from the Consent Agenda. Item 7: Action Items A. FP 14-027 Woodburn West Subdivision No. 2 by Northside Management Located North of W. Ustick Road and East of N. Linder Road Request: Final Plat Approval Consisting of Forty - Eight (48) Building Lots and Seven (7) Common / Other Lots on 25.75 Acres of Land in the R-8 Zoning District De Weerd: So, we will move into Item 7-A, which is FP 14-027. Chatterton: Madam Mayor, Council Members, as Council Member Rountree just mentioned, the applicant is requesting continuance to July 15th. I understand the reason is to resolve some boundary issues with the site. I believe the applicant is present if you have any questions about that. De Weerd: Okay. Council, any questions for the applicant? Rountree: I have none. De Weerd: If not I would entertain a motion to continue to this to July 15th. Bird: Madam Mayor? De Weerd: Mr. Bird. Meridian City Council July 1, 2014 Page 5 of 28 Bird: I move we continue FP 14-027 to July 15th, 2014. Milam: Second. De Weerd: I have a motion and a second to continue Item 7-A until July 15th. All those in favor say aye. All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. B. Public Hearing: AZ 14-007 Sugarman Subdivision by George Sugarman Located 1450 W. Ustick Road Request: Annexation and Zoning of 5.04 Acres of Land with a C -C Zoning District C. Public Hearing: SHP 14-001 Sugarman Subdivision by George Sugarman Located 1450 W. Ustick Road Request: Short Plat Approval Consisting of Four (4) Building Lots on 3.99 Acres of Land in a Proposed C -C Zoning District De Weerd: Item 7-B and C are public hearings on AZ 14-007 and SHP 14-001. 1 will open these two public hearings with staff comments. Chatterton: Madam Mayor and Council Members, this is, as you mentioned, an annexation and zoning. It's a short plat for the Sugarman Subdivision. The site consists of 3.99 acres of land. It is currently zoned RUT. Is located at 1450 West Ustick and that's the northeast corner of Linder and Ustick. The applicant requests annexation and zoning of just over five acres with a C -C zoning district and a short plat is also proposed, consisting of four building lots on 3.99 acres. A conceptual development plan is proposed that shows a 3,600 square foot gas station, 12,500 square foot retail commercial multi -tenant building and a 5,000 square foot bank with a drive-thru. Because the drive-thru is shown at the east boundary of the site adjacent to property that's designated for residential, staff recommends the concept plan be revised to relocate the drive-thru internally within the site. Access is shown on the concept plan via Linder and Ustick, with cross -access to the north. Staff recommends a right -in, right -out access via Linder and access to Ustick to be determined by ACHD. The P&Z's recommendation was to approve with the development agreement and those provisions are in Exhibit B of your staff report. At the Commission in favor Laren Bailey testified. No opposition. And the only written testimony has also been submitted by Laren Bailey in favor of the application. There are no outstanding issues from either P&Z or staff for you tonight. Happy to answer any questions. De Weerd: Thank you, Bruce. Council, any questions? Milam: I have none. Rountree: I have none at this time. Meridian City Council July 1, 2014 Page 6 of 28 Bird: I have none. De Weerd: Okay. Is the applicant here? Thank you. Good evening. If you will, please, state your name and address for the record. Sherrow: My name is Scott Sherrow. I'm with LEI Engineers and Surveyors. I'm standing in for Laren Bailey tonight. My address is 3032 East Copperpoint Drive, Meridian. De Weerd: Thank you. Sherrow: By the way, happy birthday. De Weerd: Thank you. Sherrow: We agree with the staff report. The only comment that we would like to make -- or request we would like to make is under the Site Specific Conditions of Approval, Section 2.11. We agree that it's our responsibility to construct the sewer and water through the site. What we do request is that we'd like to defer its construction until after a user is identified and construct the improvements at the time of the building permit. There are currently two eight inch stubs and two sewer services to the site. It's our belief that if a larger user comes through and utilizes more than one of the four lots proposed, that the additional services through the site will not be needed or may be -- need to be reconfigured. So, it's our request that we try to come to an understanding of that need at the time of building permit and, again, we do understand it's our responsibility to put in those improvements at the time, but we'd like to have it deferred until we better understand it. Short of that I'm here to answer any questions that I can. And thank you for hearing this tonight. De Weerd: Thank you. Council, any questions? Bird: I have none. Rountree: Madam Mayor? De Weerd: Mr. Rountree. Rountree: I have a question for Kyle on the request of the applicant with respect to sewer and water. And it looks like he's studying that right now. Radek: Yeah. Councilman Rountree, I was not prepared for that question and that -- we have -- we have site specific conditions of approval that say the applicant shall be responsible for constructing that and, I apologize, I -- sir, could you repeat your -- your argument for not constructing it? Meridian City Council July 1, 2014 Page 7 of 28 Sherrow: Well, it's not that we are -- won't construct it. We do understand it's our responsibility, but what we'd like to do is defer it until we can better understand where those utilities would be best located. Right now I think there is a proposal out there to kind of loop the water through the site. If we have one or two major users on that particular piece of property -- Nary: Sir, could you speak into the mike. It's hard for him to pick it up. Sherrow: Excuse me. We may want to reroute those utilities in a different configuration. Radek: Yeah. This is just an annexation and zoning and as long as -- I'm not sure this is -- oh, there we go. As long as the -- we doing annexation and zoning first. De Weerd: And the short plat. Radek: And the short plat, which I'm not really familiar short plats. Same rules for a short plat as far as Warren signing it as -- Nary: Yes. Radek: Because we will want that infrastructure built before Warren signs the short plat. Chatterton: Madam Mayor and Council Members, I apologize, I wasn't aware of any outstanding issues here, so we are really not prepared for this. I don't see a problem with -- with granting the applicant's desire here, if engineering doesn't. Radek: No. As long as we get the infrastructure where we want it at the end of the platting process and we are going to -- we have controls to make sure that happens, but that's okay with me and Public Works, I should say. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: Bruce, really with a short plat all he's asking is not to put it in until we definitely know where it's at. So, I believe we have done this before on a short plat. Now, with a preliminary plat, then, we -- he would have to do it, but until you know exactly on a short plat where it's going to be, I believe we have allowed this before and as long as he knows that he's got to get it through -- to and through his property. Chatterton: Madam Mayor and Council Member Bird, I'm comfortable with the request. Bird: Comfortable with that? Okay. Meridian City Council July 1, 2014 Page 8 of 28 De Weerd: Okay. Zaremba: Madam Mayor? De Weerd: Okay. Mr. Zaremba. Zaremba: We do respond to staff's suggestion that the back building be refigured to move the drive -up window away from the residential. Sherrow: That site plan that was provided was in concept only. We are not asking for the building placement approval at this time, that was just for concept for an idea of what may occur. If a bank or drive-thru does come into play on one of those parcels, we would be happy to talk about the configuration that best meets the community's needs. By no means what we have shown you today is what we are looking for approval. It was concept only. Zaremba: Thank you. De Weerd: Okay. Any further questions? Bird: I have none, Mayor. De Weerd: Okay. Thank you so much. Sherrow: Thank you. De Weerd: This is a public hearing. Is there anyone who would like to offer testimony on either of these two items? Seeing none, Council, any further questions for staff or the applicant at this time? Bird: I have none. De Weerd: If not, I would entertain a motion to close these two public hearings. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: I move we close the public hearings on AZ 14-007 and SHP 14-001. Zaremba: Second. Milam: Second. De Weerd: I have a motion and a second to close the public hearing on Items 7-B and C. All those in favor say aye. All ayes. Motion carried. Meridian City Council July 1, 2014 Page 9 of 28 MOTION CARRIED: FIVE AYES. ONE ABSENT. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: I move we approve AZ 14-007 and to include all staff and applicant comments. Milam: Second. De Weerd: I have a motion and a second to approve Item 7-B. Any discussion from Council? Madam Clerk. De Weerd: All ayes. Motion carried. Roll Call: Bird, yea; Rountree, yea; Zaremba, yea; Borton, absent; Milam, yea; Cavener, yea. De Weerd: All ayes. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: I move we approve SHP 14-001 and to include all staff and applicant comments and this is the part that has -- takes the sewer line to and through, which the -- when we get to the preliminary plat the determination of location will be at that time. Milam: Second. Zaremba: Madam Mayor? De Weerd: This is the preliminary plat. So, it will be -- Bird: No. This is a short plat. De Weerd: So, it will be -- this is a short plat. So, it is a plat. But it would be upon building permit. I believe that was the request. Bird: Yeah. Preliminary. De Weerd: Okay. So, does motion and second agree with that? Bird: Yeah. Meridian City Council July 1, 2014 Page 10 of 28 Milam: Second agrees. De Weerd: Okay. Any discussion? Mr. Zaremba. Zaremba: Madam Mayor, would the maker of the motion clarify that the applicant has stated that this is concept and this is not an approval of the drive-thru on the residential side on the east. Bird: Yes. His comments stated that and that was my motion to accept his comments. Milam: Second concurs. De Weerd: Okay. Okay. That's noted in the motion. If there is no further discussion, Madam Clerk. Roll Call: Bird, yea; Rountree, yea; Zaremba, yea; Borton, absent; Milam, yea; Cavener, yea. De Weerd: All ayes. MOTION CARRIED: FIVE AYES. ONE ABSENT. D. Public Hearing: Southern Highlands Real Property Exchange De Weerd: Item 7-D is a public hearing on the Southern Highlands real property exchange. I'm not sure who is taking this. Mr. Nary? Nary: Madam Mayor, I don't know if Public Works has any input on this particular item. This is a property exchange. It's been properly noticed. We have a parcel of ground in the Southern Highlands development that is for a lift station. There was originally going to be a small public park that was going to be in this area that was decided they were going to make it a private park, so they didn't need as much ground for that and a different location. Eventually there will be sewer, obviously, to this parcel, as the lift station can go away. So, what they have offered to do is the city has a well lot site already in this parcel -- and if I'm getting this wrong Kyle probably knows more specifics. But, anyway, what they are willing to do is, essentially, move the equivalent amount of ground that the lift station lot currently occupies when the lift station is -- can go away, they will add that ground to the city's well site, which will allow us a little bit more of a use of that site for a future water development in that southern area. So, they are, essentially, exchanging the land that's currently being used for a lift station to adding that to the well site that we already have and that's what the land exchange is in regards to. And if I messed any of that up, Kyle, please correct me, but -- so, all we are doing is, essentially, moving that. But we are going to be continuing to use that well -- or that lift station lot for a period of time until the sewer connection is completed, which I don't know what the date of that is, but we will have a short window of using that lift station and actually leasing it back. That was on -- that was the item on your Consent Agenda Meridian City Council July 1, 2014 Page 11 of 28 that was moved off, we had to clarify a few things with that first. So, anyway, that's the public hearing part. I don't know if anyone else is here from the public to talk about it. De Weerd: Okay. Kyle, did you have anything you wanted to add? Is anyone here to make comment on this? Council, any questions for staff? Rountree: I have none. Bird: I have none. Nary: Oh, Madam Mayor, one last thing. And so on your -- Council, on your ordinance in Section 9 -- so, when that comes up that ordinance just will finalize this exchange, so that's the purpose of that. De Weerd: I did have two people signed up in favor of this property exchange. But if they don't want to make any comment, we will just include that in the record. Rountree: Madam Mayor? De Weerd: Mr. Rountree. Rountree: Seeing that, I move that we close the public hearing on Item 7-D. Bird: Second. De Weerd: I have a motion and a second to close the public hearing on Item 7-D. All those in favor say aye. All ayes. MOTION CARRIED: FIVE AYES. ONE ABSENT. Rountree: Accept 9-A, then, to finalize this. Bird: That, yeah, just goes to the ordinance on it. De Weerd: Yes. We will wait until the ordinance. Okay? Item 8: Department Reports A. Pegasus Planning and Development— Economic Development and Fields District Recommendations and Findings De Weerd: Okay. So, we will move into our Department Reports. Council, I'm pleased to introduce you to this next item. Pegasus is coming back to report on their findings and I guess I would just like to give a little bit of an overview. As the report really demonstrates, there has been a lot of work done in this community leading up to their report and putting together a plan on how best to move forward as a community. We Meridian City Council July 1, 2014 Page 12 of 28 have placed a lot of the building blocks to get us to this point and we have seen a lot of residential, office, retail and healthcare grow in our community and certainly a lot of that was in the healthcare sector. We have seen a lot of activity and result from a real focus on what the CORE put together and looking at health sciences and technology and certainly the addition of Idaho State University was -- was kind of the completion -- that final piece that really brought all of that together. We have consolidated our Building and Planning Departments, we have looked at our permitting processes, our Planning Department has put together a small business concierge program to help those one time only users through the bureaucracy sometimes of permitting and the unknown -- I guess atmosphere or terrain of that. So, this was the logical next step in hiring a consultant to -- to look at where we are, looking at a comprehensive economic development program. They -- when we first hired Pegasus we hired them to take a look at the Fields District and the Fields District we had prepared a white paper that contemplated another industry cluster that was similar to our health science and technology corridor, but what made it different is that the CORE was developed by a free market. They really started putting that with Blue Cross, with St. Luke's, with ISU and a number of the healthcare providers in that area. The Fields Districts are a little bit different. It's open space, it's -- it's not developed and it has a lot of questions in addition to what we did with the white paper. So, we have the concept, we have the -- a branding effort and the naming of it and Pegasus has really taken it to that next step. The first step was a go or a no go. Did it merit enough consideration to, then, take it to the next level and further flushing out the viability of an economic development cluster in that area and in the meantime we also embarked on an economic development strategy that I have been really impressed and pleased with the consultants in how they have pulled in a number of stakeholders in the conversation. By doing so, they have created ownership and some buy -in to the process and into the conversations that have surrounded all of this and I can tell you that there has been quite a buzz that has been created and a great deal of the excitement about what role we all play in moving forward in becoming -- in rolling out the strategy, but also creating that synergy that will net new upstarts and what we hope are family wage jobs and seeing our existing businesses thrive in our community. We need to put more arrows in our economic development quiver and so today we certainly welcome our consultants back to make their presentation on their findings and steps to move forward. So, I will turn this over -- I believe to Sean and welcome you and your team back to City Council Chambers. Garretson: Thank you, Mayor and Council. I have a couple of brochures and I'm not sure -- Bruce, have they received this before? To be honest with you, what I think I'd like to do is hand one out to you all, because I primarily brought them for the public and if you can share those. I think you received one yesterday also. But we will make sure that you get some copies. Some of you in the audience have seen these before, too, but I'm just going to hand out a couple and you can share. Okay. De Weerd: Now, Sean, if you will, please, state your name and address for the record first. Meridian City Council July 1, 2014 Page 13 of 28 Garretson: Yes. Sean Garretson. Austin, Texas. U.S.A. So, Mayor, thank you very much for that -- those opening remarks. It really -- I love hearing that, especially the part about buy in. You know, that is part of our process. We have found that the more you involve people, the more they are bought in, and the more effective you are going to be at implementation. So, you know, we have spent -- Steven and I -- Steven Spaulding with Point A Consulting, we were talking today and we first started with you in September, so, you know, we have come a long way and we have really enjoyed our time here. I want to just point out this logo on the top here. Meridian Rising. The Mayor's initial comments, actually, were the origin for us putting this together, where Meridian is where agriculture meets technology. So, my project manager Jillian, she -- she's a great project manager, but she's also starting a brewery on the side. So, I questioned her if that was a hops, but she assures me it's wheat. You guys might be able to decipher that better than 1. But I think this is a very exciting time for you guys and what I would like to do is not really go into a lot of the detail of the audit, you heard a lot of that. So, really, kind of hit the broad brush strategies, knowing that there is a lot more detail in the strategic plan. So, this is the agenda that we are going to cover, but this -- this theme really is the overall vision for this economic development strategy, diversify the economy by cultivating talent, developing an innovation eco system and continuing to improve quality of place to keep and attract talent. That's a theme throughout this project. There we go. So, just a little bit of background. Some redundancy with what the Mayor was saying. So, the go, no go, was phase one of that Fields District and we finished that before Christmas and, then, you engaged us to develop phase two, which is to put together a plan for implementing the Fields District and, then, at the same time you also hired us to do an economic audit and, then, a strategy based on that audit. So, all of those elements of that economic audit went into that and we are going to go through the recommendations tonight. I'm having a hard time advancing this. Oh, did you do that for me? Chatterton: Yeah. Garretson: Thanks. So, what goes into this secret sauce of the economic development strategy, which is a five year plan. You know, it really is a lot about the -- the quantitative part that you have seen before. All these fancy pens aren't working for me either. So, the quantitative input and, then, qualitative input all goes into the five year plan and I'm curious if we can just get a show of hands of anybody that has been in any of our interviews, focus groups and you won't mind just raising your hand. Love seeing that. Love seeing that. So, we have put a lot into this. One of the things that you will see a little bit later is one of the charts that we have from the business survey that we did, an online business survey. Their top three priorities, small business assistance, business expansion, downtown improvements and business recruitment is right behind. Mind advancing that again? Chatterton: Sean, try it again. And we think we might have gotten the so-called smart board working again. Are you able to draw on there? No luck, uh? Okay. I will -- just let me know when you want it advanced. Please go ahead. Meridian City Council July 1, 2014 Page 14 of 28 Garretson: So, just the executive summary. So, first of all, you have two deliverables now. You have the economic audit and strategy with an appendix that has all of the data that we have been collecting, which is pretty extensive and I think for Brenda and Bruce and the Mayor I think you're going to find a lot of that data helpful in your business development efforts. And then -- but the real crux of this whole strategy -- it's about fostering a culture of innovation, having predictable growth, economic diversification, talent development and quality of place. So, some of our key findings. I first -- you know, when you do an audit you look at the good and you look at the -- the areas where you can improve upon and I want to just say, first off, that you guys have done an excellent job of putting those building blocks in place that has lead you to the success you have seen in office, retail, healthcare, especially with the CORE initiative. Economic diversification is necessary. It's necessary for a lot of reasons, as you probably know. One, just job opportunities. When you have a recession disposable income, you know, really is not spent, so your retail suffers. So, there is a need for that. We also have definitely noticed there is -- there is insufficient collaboration among the business and workforce groups. Lack of tourism assets. I think what is going on in your downtown I think is great, but I think that our recommendation is going to help you build upon that. Also insufficient small business support resources I think the efforts that the city has made in having the business concierges I think is a great step, but in terms of technical assistance for small business, that's an area needed. And, then, you have also had a significant loss of farmland and the missing key demographics, particularly the millennial demographic, that 25 to 35 year old demographic. Next slide, please. So, I wanted to point this out. First of all, why are the millennials important? First, it is one, if not the second largest demographic in the United States. Fifty-five million 25 to 35 and they spend money. They like to spend money. I have an 18 year old and she spends money. I know she's going to be a spender as well. But what's really telling and very important for you guys to understand is that while your population growth has really just kicked off, especially since 2010, your millennial growth declined during that same period. In Boise that millennial growth increased during that same time frame. Downtown Boise has a lot of those assets that millennials seek. You know, if you go downtown you see -- you see that. And I think you know kind of what I mean. So, there is several themes that really form the basis for all these economic development strategies. One, this is not an -- this is not a project that should be implemented by one person or one department. Every city department and its economic development partners have a role in its implementation. Secondly, future land, utility extension, and your capital improvements plan has to be predictable and that's -- that's very important for economic development growth and for sustainability fiscally for the city. Making education, business, and workforce partnerships number one priority. Investing in the downtown and the quality of place improvements. That's going to attract talent, it's going to keep people here. It's going to make your city better than it already is. Again, attractive demographics that Meridian is missing. Breed that culture of innovation and build on your ag historic strengths. And, lastly, I just want to say economic development is a marathon, not a sprint and what do I mean by that is, you know, another analogy -- there is no silver bullet in economic development. It takes the building blocks that you put in place and it takes a sophisticated and long-term effort to be successful. Next slide, please. So, we did a lot of target industry analysis. All of that analysis is in the Meridian City Council July 1, 2014 Page 15 of 28 appendix and in the report and there is a lot more specificity to those industries. But we also did occupational analysis to understand which of these industries makes the most sense for the region and, you know, obviously, we looked at what the state is looking at, as well as BVEP, who I think is represented here tonight. Those last three target industries are very much related to healthcare and the CORE initiative, but just know that, again, the economic development strategy is built upon the input that we have received, the quantitative input on the target industry analysis as well. So, let me slide into the economic development strategy and talk about that. Next slide, please. So, the components of the overall strategy -- of course the Fields District -- we have two reports, but all the strategy in the Fields District have been folded into the economic development strategy. So, you have one economic development plan now that can be implemented. You have eight target industries. You have five catalyst projects and, then, you have six strategies -- all of those catalyst projects within those strategies. And I will explain that in just a second. So, these catalyst projects, they are not always necessarily brick and mortar projects, but several of them are, including the Venture Meridian start up center and the downtown conference center and what we -- we are going to talk about the catalyst projects first, but just, again, know that each of these projects is folded within the strategies. Next slide. So, I'm going to let Steven come up and talk about three of these catalyst projects and, then, I'm going to hop back up. Spaulding: Thank you. I'm Steven Spaulding with Point A Consulting based in Louisville, Kentucky, and part of the team with Pegasus Planning. We are delighted to be back with you again and we are bringing to closure this great amount of work in the form that you see it here. I just have to comment back on -- there was one of the earlier slides that Sean showed that had the secret sauce and everything and you might have thought that was a martini glass. It was not. It was a funnel and the point of the funnel is that everything is coming together to a point of common -- of common importance to us. The other things I think -- the Mayor teed up excellently were this first catalyst project comes from in the sense that this desire to parallel the experience that had been achieved with the CORE. In developing this other cluster, which was self evident that agriculture was this basic strength of the region, the historic strength of the region and you have seen that in all of the previous slides that lead up to this, whether it's target industries and the themes and so forth, but as the Mayor also pointed out in developing this cluster, is that it's scattered over the wide region. In fact, the assets that are part of the cluster are scattered as far as Moscow -- to be obvious for the College of Agriculture, but they are even in other states and they are in Idaho Falls and in Twin Falls and so forth. So, we really got close to the stakeholder group here and the issue for us was what is it the stakeholders are really looking for. And as we originally started with the theme of research, which, again, was part of what the Mayor and the city was asking us to look at, we really found that behind that came the question of innovation and what is the innovation system that delivers the talent that the businesses need. The businesses are here and they are conducting many different kinds of research and, you know, ranging from the classic fuel research to the classic laboratory research and new varieties and new food processes and so forth. But as we came to that conclusion, then, it shifted the focus from the research itself to the people who are the foundations for this industry sector and so we called this our talent and innovation center and as you Meridian City Council July 1, 2014 Page 16 of 28 will see we are going to go forward -- also this will be wrapped into a strategy as well. I will let you advance the slides for me. The diagram on the right shows sort of the concept of the strategy already that if you focus on workforce or the CORE and you develop that -- that critical mass and competitive advantage, that you have the ability, then, to fuel entrepreneurship, to build industry partnerships and to ultimately research and through collaborations is part of what can come about through that. It's really self- evident that every university -- every one of the major success communities that we think of automatically, Research Triangle Park or the San Francisco Bay area or any others, and many smaller communities, it is based on the back of the universities, the community colleges and all those workforce developments are centered. So, the recommendations here really build on what we have already started in the dialogue with all of the educational institutions in your region, including your community colleges and including the public schools. This is very important to emphasize that it's that entire continuum of K through 12. Each of them interestingly do have the industry partnerships, but they are themselves somewhat finalized and there hasn't been a cluster wide strategy among them to say given what we do with K through 12, given what we do in community college, given what we do in higher education and looking at the full range of things, the higher education does not just think that you think of as agriculture research, but now all these applied areas of research -- like in nano technology and precision agriculture and computer science that -- things that are going on at Boise State, how do you bring all that together to support the ag -- the industry. And so the idea of a campus as a place to do that is -- builds on actually the precedence that you have with Idaho State and the school board or with College of Western Idaho and it's other partnerships with industries and that the public schools have already done. So, we believe that by building this together, creating a business plan on how to do that and, then, above all I think this 1-D, creating the leadership structure for this initiative. The key is going to get that group to coalesce and see themselves as having a common agenda and a common initiative to drive this forward. Next slide, please. This was just an example project that we know exists, so, you know, we are not making this up that this kind of thing could be done and this reflects two different projects that were really impressive, one of which is in Illinois in Richland Community College, which has its own campus that includes all of these different features from trade shows to classic research and industry partnership space, but also in the lower box the local traits, the agri-science farm in Lexington, Kentucky, which has its own farm and this is the key thing about this. This is a high school, very similar to what you have at the Meridian technical school, the professional center, but it's actually located on an 80 acre farm and we have other examples like this around the country where these blends of activity can occur. Next slide. The second area -- we have talked so much about agri-tourism and it's really indicative -- and Sean and I have had this experience coming to the community. I actually brought my wife on this trip. It was a chance for us to do this. And to say what is it we can do in our spare time and beyond, obviously, going to the mountains, the question is how would you access all the things that are related to agriculture if you're wanting to access them and, in fact, there are a lot of ag heritage and agricultural related tourism bits and pieces and we have confirmed, actually, even in our conversations with the state Department of Agriculture, that they are keeping an inventory of them, but it is bits and pieces. It's this winery and Meridian City Council July 1, 2014 Page 17 of 28 that winery and this dairy experience and something else going on over here and there is no place we found, whether it's at the Boise airport or whether it's anywhere in the region, that you can kind of get a sense of what is the gateway to get to all of this. So, the strategy here is to build a comprehensive approach. This is a case where you can say, well, why Meridian. It's a matter sometimes of who steps forward and leads and I think that by stepping forward and leading and beginning to build the platform where these kinds of activities are already in place can come together. You will see that there is an unmet need here that can be filed in this community. Next slide, please. We think a way to do this is to build on experiences that, again, we have seen in other places, something that we call an agricultural experience center, but it's -- and this requires a specific site, it's going to require some significant investment of capital, public-private partnerships and so forth and it really needs to bring the industry together to support it. But I would dare say that if this existed, this is the type of thing that somebody coming up here to do some fly fishing in the region, somebody coming to see some wineries, somebody coming into the airport and sees, oh, there is a place where we can go and from this we can access everything that's going on. We have made some suggestions that the Highway 16 area, because of the development that's going on there, could be a place. But, again, it's going to require leadership of convening the stakeholders, bringing them together on a consensus vision and a business plan to show how it would operate. Next slide, please. And, finally, you have seen this other theme of innovation and all of these pieces connect so beautifully. We know that there have been already efforts to create a center for entrepreneurship in Meridian and there are also activities going on throughout the region and Nampa has an incubator and there is other -- there is a water cooler downtown Boise and there are programs that are statewide. They haven't necessarily been brought together with all of their greatest strengths here and so the question here is can we support the innovation, can we support the tourism, all of this by maximizing the resources and the focus on an incubator and this is the piece that could be a low hanging fruit, because you actually already have a city -- a city - owned facility, the question is are the programming and the support for it robust and our point is it isn't robust now, but it could be and it wouldn't take that much to bring it to the next level. If you go forward. And these were just sort of examples, again, showcasing the existing facility you have. There is no one organization that has a monopoly on this space and clearly you're going to have private equity investors and angels in the region that can be brought together. We think that that's part of the secret sauce for this particular piece. Sean. Garretson: Thank you, Steven. So, the last two catalyst projects and, then, I will talk briefly about the strategy. We were told we had two hours; is that accurate? Now, we are going to try to wrap up -- De Weerd: Sean, it's my birthday. Garretson: I know. I know. De Weerd: And as much I love this community, I don't really need to spend my whole evening here. Meridian City Council July 1, 2014 Page 18 of 28 Garretson: Exactly. So, the fourth one is the ag focus real estate development project, which we -- which we have talked a lot about before and this was, you know, a lot of -- this was a result of our first analysis in the Fields District where we noticed how much ag land was being lost in this whole region. Next slide. I think you have seen this model before of what goes into an ag focus real estate development project. Again, we are not making this up. They have several hundred of these across the country. But you have a small almost organic sort of CSA -- community gardens, put a garden in the middle with development around that. Next slide. So, you can see some of the recommendations here. I will talk later about the fiscal impact modeling. We actually worked with a group during this project that did a fiscal analysis of a typical land development and an ag-based development, so that's a teaser for what I will show you a little bit later. But I think that this is something that the city is going to need work on to develop a mode for how that is fostered in terms of the codes and, then, trying to work with a couple of developers that would have interest in that. Next slide. And, then, the last one is a downtown conference center. Creating that space downtown, bringing people downtown, having entertainment options there, training facilities, meeting facilities, as well as theater and performing arts facilities all downtown and I'm stressing that downtown. Invest in your downtown for that, not out on the interstate. Next slide. So, we don't recommend that the city take the lead and do this on your own. The most successful ones I have seen are public-private partnerships. That would be the way to go. First item of business there would be to conduct a feasibility to identify what exactly is the space and demand and use needs before you start planning that. Next slide. So, let me get more into the strategies. Next slide, please. For the first ones Steven talked a lot about -- he said K through 12, but I know he meant K through 20 collaboration. This is, again, the catalyst projects of Venture Meridian Center, the innovation campus are part of this strategy. Next slide. I'm not going to go through all of those, just know that they are each within -- within each one of those, like 1-A, there is about ten different bullets of specific actions that -- that we are recommending need to happen. But, again, this is about developing an innovation system, cultivating entrepreneurship in your downtown through the -- the ag innovation center and elsewhere. Next slide. So, business expansion recommendations. This is a snapshot from the online business survey that we had and what's interesting when asked what should the main focus area for economic development in Meridian be, overwhelmingly keeping and expanding existing businesses was number one. Strengthening downtown was number two. Small business support was number three and, then, attracting business number four. So, I think those are very good. We had about 115 survey responses on that. Next slide. So, on business expansion, again, you know, the catalyst projects related to the innovation campus, Venture Meridian, and conference center, but you already do a great job with your business retention -expansion. I think, you know, Brenda and the Mayor doing that, I think it's been effective. I do think, though, you need to increase your resources for that. I think the business ready team that you have created has been great. I know you have been meeting with them a lot. I think the chamber needs to take the lead on this -- and this is our recommendation -- on the small business services support programs and the technical assistance and, then, also developing and implement a Made in Meridian campaign. Next slide. So, on through the development. Meridian City Council July 1, 2014 Page 19 of 28 You know, I don't want to repeat too much of what Steven said, but I did mention to the Mayor yesterday during one of our meetings that I also got here -- I took a couple days of R&R and had a friend in Idaho and we got to tour. We went up to McCall and went to Burgdorff -- although we couldn't find -- we actually went for Crystal -- anyway, we went all the way over to the Sawtooth mountains, down to Sun Valley, down the Shoshone, and all the way through. So what's great about that is I really did experience how Meridian is the center for experiencing this region's tourism and you need to own that space. Geographically you're in a great place for it, but as Steven said, the first one out of the gate that really develops that and owns that, you're going to be successful with it. I think -- next slide, please. So, you know, I think first off, you know, a lot of it is about partnering with the chamber, developing a tourism strategy, implementing some of those catalyst projects. You know, you can see we have taken some liberties in -- looking at the scenic byways map and putting Meridian right in the middle. Highway 16 happens to be that connector between your -- between the scenic byways that you have right here. Next slide. Next slide, please. Okay. So, the next strategy, land use transportation and infrastructure. This is an interesting one. We put -- your Public Works director, I'm glad he's here. He will be happy to see the amount of detail that we put into this. So, this is really about integrating sustainable land use practices with transportation improvements and infrastructure investment. One of the things that's -- of course, you know, when we left Boise to come out here we left a little bit late. We probably should have left a little bit earlier and we were stuck in traffic and I said to Steven, well, you know what, maybe it might be a good thing we are late, we can -- it will underline our point about really focusing on the connectivity throughout the region and definitely within the city. One of the things that was really interesting for us was looking at your water reclamation program. The byproducts that are coming from that, the amount -- the ability for the city to provide free water in the Ten Mile area, that is an economic tool that needs to be better utilized. Next slide. As I mentioned, we did -- we worked with Anne Westcott and Idaho Smart Growth, who I believe had done some work here for -- she did a specific analysis of looking at a 500 acre ag-based development and a traditional development. All of that analysis is in the report and in the appendix. But you can see the differences and the net impact is, you know, the ag- based development project is more sustainable and fiscally better for the city and for the developers. Next slide. So, with that being said, you know, of course, in our recommendations we are recommending, you know, implementing the catalyst projects, but, then, also conduct a fiscal impact analysis to assess the whole city, to assess the implications of the current development pattern. We have worked in a lot of cities. Our hunch is that fiscally it is not sustainable, the kind of growth patterns that you're having. We recommend doing that fiscal analysis right up front. We also recommend looking at the capital improvements plan, basing it on some of that analysis. At a hearing to the city's ten year and, then, annual CIP and, then, establishing an approval permit and utility system that maintains to the city's Comprehensive Plan and capital improvement plan. The last thing, just under related findings, is that last little bullet. Our recommendation is don't worry about providing the utility infrastructure and beating your neighbor to the south and providing that utility infrastructure. Let it remain rural. Focus and be strategic with your utility infrastructure and put it where you really want to grow your community. Next slide. There are a lot more -- as I mentioned, Tom, you would be Meridian City Council July 1, 2014 Page 20 of 28 happy, there is probably more recommendations in this than any of the other areas, but I really do think that marketing Meridian as green and sustainable, including your Fields initiatives, water recommendation, is a very good strategy for you from an economic development perspective. Really improve the connectivity on the bicycle and the other -- on transportation projects and, of course, regional rail and, then, complete that Highway 16 and, then, 20/26 improvements. Next slide. So, downtown. You know, downtown should be the heart of the city. I think it is. It used to be and I think the efforts of Meridian Development Corporation and the downtown business owners association, along with the city, have been great. Yesterday we had the pleasure, actually, and opportunity -- MDC asked us, just kind of on our dime, since we were going to be out here, to facilitate a discussion about what -- among the downtown economic development partners. So, yesterday here in City Hall we had probably about 35 people and several of the folks, including the Mayor and Council Member Zaremba were there as well, but -- so, of all the projects everybody went through and identified -- we asked them to write in on a piece of paper the top three projects and, then, we asked every one of them to tell us what those were and, then, they had those sticky dots and they scored them. So, it was -- it was pretty clear these five projects -- these top five projects of all of those economic development partners and they reached some consensus on that. Top one is downtown amenities. So, entertainment options. You know, brew pubs. More things for family. More things for -- what we call third places for millennials and others where they can go have a cup of coffee, et cetera. And, then, of course, a conference center. Housing diversity. And that is, you know, housing -- affordable housing, market rate housing, high end housing, apartments, condos, some for the 55 year olds and above, some for the millennials. And, then, transportation connectivity and, of course, redevelopment of UP land. Next slide. So, you can see the recommendations there. One -- and we definitely talked about this yesterday -- is MDC expanding its role in economic development. Not only just within the downtown, but we are recommending that, you know, they have by -- by authority with the state to be able to expand their existing boundaries by ten percent. They should do that. And, then, also they do have the ability to develop new urban renewal areas and we recommend that just as Twin Falls has done that and become very successful, Meridian do the same thing and Meridian Development Corporation do the same thing. I want to just mention on the bottom there. This is what a lot of people were actually looking at yesterday, the mixed use kind of development, ground floor commercial, a couple of levels of residential. I happen to be developing this project in Austin. This building, plus two others side by side. It's about a 12 million dollar project. It's called the Chicon. In an area that used to be, you know, the heart of darkness, really, it was a bad area. But all of that, building 43 units, 9,000 square feet of commercial space. Of the 43 units 33 are affordable to those making 80 percent of median family income and, then, the rest are market rate. It's going to be very successful. What we did is we identified what the demographic demand is and we definitely found the millennials and the 55 and over, those are the two biggest demographics. I will guarantee you that is the case here as well. Next slide. And, then, the last strategy it is quality of place. Promoting that quality of place through arts, entertainment options, way finding and signage, streetscape improvements. You know, I'm very impressed with the historical tour that MDC just put together with the logos on the ground and the walking program, I think that's great. Meridian City Council July 1, 2014 Page 21 of 28 Next slide. So, you can see from our recommendations -- definitely feel like you need to implement an art in public places project. You have seen to the right there all over downtown Boise, you know, you had a great example of that right in your downtown where that giant silver box is that houses the filtration system, paint it. Make it pretty. Do something with that. De Weerd: We are doing a mural. Garretson: Excellent. Good. So, you can see some of the other recommendations -- and I'm not going to move into those. Next slide, please. So, at the end of the strategy we have an implementation table for that -- we are going to help the city and all of its partners. We have put all the major recommendations in there. When? We are recommending that those start and stop, etcetera. Next slide. And, then, the next steps. You know, you kind of are at that intersection of planning and implementation right now. You know, the next steps are adopting the Fields strategy and the economic development strategy. Aggressively pursuing implementation. Don't let this sit on the shelf. As the Mayor said, you have a lot of buy -in right now, people that are ready to kind of get this going. They already are moving forward on a lot of initiatives as well. For example, Venture Meridian, I know that the city has been working very aggressively behind the scenes to move that forward. Establish, you know, an organizational leadership framework or frameworks -- for example, with the innovation -- excuse me -- the ag innovation center. There is a lot of organizations, they are -- all of which -- all of them are ready to participate, but there needs to be an organizational framework and business plan set up for that. Engage all your city departments. That's one of the big recommendations. We put a lot of detail in there about having some presentations, educating all the city departments and their heads about their potential role in this economic development effort. Again, MDC becoming more aggressive in its economic development role, as well as understanding other -- the Chamber of Commerce and other partners. Integrate the fiscal analysis CIP. Develop detailed business plans where appropriate. And, of course, increase your resources for economic development. I know you have a gentleman from BVEP this evening to talk about a project I think and I'm very familiar with the state incentive program. That's a very good example of what I'm talking about in terms of increasing those resources. You know, in the name of economic development there is an adage of you got to pay to play and you have a good opportunity in front of you, so I'm curious to see how you move forward on that. Next slide. That is it. You can move to the next slide. And if you have any questions we would be happy to answer. De Weerd: You did that in record time, Sean. That's a lot of information. Council, any questions? Bird: I have none. Milam: Great. Rountree: I'm sure I have some, but I haven't had enough time to digest it. Meridian City Council July 1, 2014 Page 22 of 28 Bird: Digest it Spaulding: Well, we were pleased that we were able to have multiple passes with you and a chance to get acquainted a little bit and peal back the layers of the onion and you will still have that with the written documents that we can address questions by e-mail and on the web, you know, to get to the heart of the matter. Rountree: Very good. Garretson: And I will say also that, you know, as we said to Bruce, we are committed -- you know, our contract is pretty much done after this evening, but we are committed to continue to make, you know, minor edits, et cetera, should you -- once you have an opportunity to kind of review and I know Tom as well, so thank you very much. Oh. Sorry. Chatterton: Mayor and Council Members, a couple points. As far as the energy behind this, we had aspects that says -- as Sean mentioned -- to come up with really not so much time a branding for this effort, but a name, a moniker, and that's what we have. We have a number of folks in the room tonight that are also going to be meeting at 7:30 tomorrow morning over at -- is it Heritage building? Heritage Insurance Building. To talk about -- De Weerd: What next. Chatterton: -- the ready team and also the recommendations as well and so you will be putting some structure and movement. Sean talked about the collaboration between the chamber, between the business community at large, between folks like the city. BVEP. The Department of Commerce. We really want -- we are very serious about that. So, trying to promote this energy. One of the things that's not cued up tonight -- oh, and I should also mention that Scott Oliver with Idaho Smart Growth is here. The model and Anne Westcott's services were provided through the auspices of Idaho Smart Growth and we also want to -- when Sean was talking about the long-term sustainability of our land use pattern, we wanted to be able to take a wider look at the entire city and see, really, the path that we are on, make adjustments as necessary to become fiscally sustainable if we are not, indeed, sustainable right now. So, all that's to say that we want this to have energy and to make some real lasting changes in the community around this and I think that Steven said several times during this process that a plan really is a series of conversations, so we need to keep the conversations going and have actions around those conversations as well. We had prepared -- actually, Pegasus had prepared a draft resolution, so that you could, if you wish, actually adopt the findings, so the Fields District and the economic strategy we -- that's not cued up for this meeting, but if it's your pleasure we can bring that back and have discussion around -- around that resolution. The idea of giving it the blessing and the resources of the city, but I think it also acknowledges all the efforts of the various stakeholders, some of who are here tonight. Meridian City Council July 1, 2014 Page 23 of 28 De Weerd: I think that would be perfect and I would -- I know we do have a group meeting tomorrow morning at 7:30 -- after my birthday is not really my idea of great timing, but I would like to maybe when we put that on the agenda for resolution to adopt the study that we have this group kind of give an overview of what the ownership is and what the rolls and responsibility will be of each of the stakeholders. Because, really, what we envisioned is this would be a community -- a community -owned report and effort, because all of us play a role in it, which has been so nicely laid out in that report. So, I'm excited to see that. I was very excited to see that there is an emphasis and certainly in the survey that you did on that priority of keeping our existing businesses in the forefront. Certainly we want to see our primary employers thrive, because their vitality -- you know where rising tides float all boats, they are going to support the other -- the other business community, achieving realistic opportunities and building on our CORE competencies and looking at how to grow our own, but also attract others, because of the CORE competencies that we have in place, instead of recreating something that -- that is not who we are, understanding and defining who we are and exactly what direction that we want to go and certainly, as you stated, growing our talents, continuing to focus on the quality of place and being able to communicate that quality of place and what it means in business attraction, business retention, and how it benefits the entire community as a whole, is very exciting and, finally, putting strategies behind fostering innovation and seeing how we can capture the talent, instead of losing that talent, but capture the talent and see it grow, that economic -- or that organic, economic gardening type of thing. So, your work has been very exciting. It's great to see the -- again, the energy that you have created, the excitement that you have stirred within our community and a lot of the key players are sitting out in the audience behind you ready to pick up where you just left off and I think we are going to start seeing some great wins and we appreciate the impetus, the fuel that you have given to launch this effort. Garretson: Well, I just -- on behalf of our consulting team I want to thank all of you, as well as everybody else who has provided us a lot of resources and we put a lot of demands on your time and their time and staff time, so thank you very much. Bird: Thank you. De Weerd: Thank you. B. Public Works: Public Works Week Update De Weerd: Okay. Well, Item 8-B is under our Public Works Department. We will get an overview and an update of Public Works Week. Barry: Thank you, Madam Mayor, Members of the Council. It's my pleasure to share with you tonight an update from the Public Works Week celebration that we just really had a couple weeks back. As you know this is our sixth annual Public Works Week celebration. What better way to show you what happened than through a video. So, we Meridian City Council July 1, 2014 Page 24 of 28 are just going to -- put a short little video slide show together, it's about five minutes or so, and hope that you enjoy it and it covers most of the activities that were covered through the week, so -- (Video played.) Barry: Thank you. That's just a quick slide show of some of the events that we held. As you know we had the proclamation Tuesday of that week, then, we had the expo. We also held a Go With The Flow tour and we had a golf scramble and, then, finally, the poop scoot. So, it's a really great week for us. The events continue to grow in size and interest. We continue to reach out to more and more people. We have estimated this year that we have reached out to about 1,100 to 1,200 folks in total for the whole week, which is great for us. I wanted to give you a couple other statistics here. About 80 organizations contributed either money or prizes or in kind assistance. Eighty different organizations, which is phenomenal. We had 21 major sponsors donate each over 200 dollars to this event and these activities, of course, ran from June 3rd to June the 7th. This activity -- or week I should say of activities is really not possible without the men and women of my department who work tirelessly to put this event on and I wanted to recognize them now if you don't mind. Give me a few minutes. Certainly Kyle Radek, who is with us tonight, he has been our committee chair almost since the inception of Public Works Week started six years ago and he has been a passionate advocate for the activities and the events and continues to encourage and motivate the staff to think of new things. It was his idea to bring the hydro car to the expo this year and have the kids learn about pressure and water, hydraulics, and go through some engineering analysis there, which was really great and he's been our committee chair for -- for the last several years and this event or series of events would not be possible without his leadership. Also Austin Petersen was our expo chair. David Allison helped us run the expo. Mollie Mangerich was our tour chair. Matt Hoffman also helped on the tour. Deana Smith was our Poop Scoot Fund Run chair. Alex Frietag also helped on the poop scoot. And, then, Joe Meusch was our golf chair, along with Dave Miles and Randy Elliott, who helped with golf. Susie Deardorff was our marketing chair. Diana Russell did the majority of the marketing for the week's activities. And, then, finally Brent Bjornson from the development services team helped coordinate the bird houses and Home Depot, which has been, obviously, a great success for the past couple years and we get great feedback from them as well. A couple other interesting perspectives or points that I'd like to also convey to you, but I think for those I will have Kyle come up and if you wouldn't mind give us a couple more fun facts about the week's events and, then, we'd like to present the proceeds of our week's worth of activities and sponsorship funds to the Meridian Food Bank, who are also with us tonight. Radek: Thanks, Tom. Yeah. Just a -- I think it was on the slides that were up, but we -- we think maybe 800 to 900 people attended the expo infrastructure tour. We had 52 people on the bus. We had 23 teams fill up the golf course for our golf scramble, significant generator of -- of funds for the food bank. And also a great marketing opportunity. The big news, really, is that I didn't win the Poop Scoot Fun Run this year, Austin Petersen won it. Of course he's got like 20 years on me, so if you actually Meridian City Council July 1, 2014 Page 25 of 28 handicapped it I probably really beat him, but -- we had 21 major sponsors -- actually also 410 pounds of food were collected for our entry fees for the fun run as well. So, all in all a pretty successful week of outreach to our community, our customers, our citizens, so I keep thinking we are going to plateau at some point, but it seems to be getting a little bit bigger every year, so it was -- it was another good week to learn about Public Works. So, we want to present a check to the food bank today and so Tom is going to come say a few words about the food bank and, then, we will do that. Barry: Thanks, Kyle. Dan, would mind coming on up and joining us. Thank you, sir. Dan Clark is the -- well, essentially, the chairman and executive director of the food bank for the Meridian Food Bank and, you know, we partnered really with the food bank for a number of years on this series of activities and are proud to support them. They do a phenomenal job in our community supporting those in need in our community. The food bank was founded in 1996 and it's an all volunteer organization, there are no paid personnel at the food bank, which I found interesting. Over a hundred volunteers make the food bank run on a daily basis. They currently serve 21 cities throughout the Treasure Valley with regard to the food pantry, with 76 percent of those clients being within Meridian and adjoining Boise. Eighty-five percent of the clients that they serve are low to very low income levels. Last year they served almost a million pounds of food that was distributed in the food bank, which was astonishing and about 63, 64 thousand people are touched by the Meridian Food Bank at least in 2013. So, it's with our pleasure to present to you a donation of 5,000 dollars on behalf of the representatives, the City of Meridian, and most importantly our sponsors -- and that's not the real check, we will have the real one to you here in just a little bit. And we are firming up our finances, so there might be just a little bit more coming, but we are very pleased -- De Weerd: Tom, you need to speak into the microphone. Barry: I thought I was already fairly vocal. Anyway -- so, I will repeat all of that De Weerd: No, that's all right. Barry: In any event, we did want to thank you for all that you do in the community and let you know how much we support and value your services and it's our pleasure on behalf of the men and women of the Public Works Department -- I'm sure I speak for the City Council and Mayor when we say just how fortunate we are to have you and the dedicated volunteers of the Meridian Food Bank giving so much to our community, so thank you very much. Thank you again. Do you have a few words or -- Clark: I just -- this is just an awesome thing. I love it and I really appreciate what you guys do to support us. I mean you have been behind us for these many years and I really appreciate that. The timing on this is perfect. We have -- this time of year we start to get slight in money and slight in food and so we start looking for ways to gain and this does help a lot. A couple pallets of milk right here. Good deal. Meridian City Council July 1, 2014 Page 26 of 28 De Weerd: God does provide; right? Clark: God does provide. That's right. So, this is awesome. I really thank all of you for just your support and I thank you for -- this has been great. I really appreciate this. Thank you. Barry: Lastly, I would just like to thank the sponsors and there are so many of them to thank, but I think just in general to say if it wasn't for the sponsors of the activities that we provide we would not be able to do this particular series of events. It's been phenomenal to see the support from all over the community, not just for the food bank, but for also promoting and supporting Public Works Week. So, we are just very very pleased and, again, we appreciate your support and the opportunities you provide us each and every day in our work and just want to thank you for that and I will stand for any questions you might have. De Weerd: Tom, that's awesome. Good job. Thank you, Kyle, being chair again Barry: Thank you. De Weerd: Thank you. Outstanding. Item 9: Ordinances A. Ordinance No. 14-1616: Southern Highlands Property Exchange De Weerd: Okay. Item 9-A is an ordinance 14-1616. Madam Clerk, will you, please, read this ordinance by title only. Holman: City of Meridian Ordinance No. 14-1616. An ordinance authorizing the conveyance of certain city owned real property to BHH Investments One, LLC, located in the City of Meridian, consisting of approximately 9,200 square feet of real property along East Tekonic Drive, identified as a portion of the southerly portion of Lot 16, Block 1, Black Rock Sub No. 1, Ada county parcel number R-0988260167, the surplus parcel. Authorizing the Mayor and City Clerk to execute and attest on behalf of the City of Meridian the deed and other documents necessary to complete the transaction. Providing for a waiver of the reading rules and providing an effective date. De Weerd: You have heard this ordinance read by title only. Is there anyone who would like to hear it read in its entirety? Nope, I don't see anyone. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: I move we approve Ordinance No. 14-1616 and with suspension of rules. Meridian City Council July 1, 2014 Page 27 of 28 Milam: Second. De Weerd: I have a motion and a second to approve Item 9-A. Any discussion from Council? Seeing none, Madam Clerk, will you call roll. Roll Call: Bird, yea; Rountree, yea; Zaremba, yea; Borton, absent; Milam, yea; Cavener, yea. De Weerd: All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. Item 10: Executive Session per Idaho State Code 67-2345(1)(d) To Consider Records That are Exempt from Disclosure as Provided in Chapter 3, Title 9, Idaho Code De Weerd: Item 10 is Executive Session. Do I have a motion? Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: I move we go into Executive Session as per Idaho State Code 67-2345(1)(d). Rountree: Second. De Weerd: I have a motion and a second to adjourn into Executive Session. Madam Clerk, will you call roll. Roll Call: Bird, yea; Rountree, yea; Zaremba, yea; Borton, absent; Milam, yea; Cavener, yea. De Weerd: All ayes. MOTION CARRIED: FIVE AYES. ONE ABSENT. EXECUTIVE SESSION. (7:23 p.m. to 8:22 p.m.) De Weerd: I would entertain a motion to come out of Executive Session. Rountree: So moved. Bird: Second. De Weerd: All those in favor say aye. All ayes. Meridian City Council July 1, 2014 Page 28 of 28 MOTION CARRIED: FIVE AYES. ONE ABSENT. De Weerd: Do I have a motion to adjourn? Bird: So moved. Rountree: Second. Item 11: Future Meeting Topics Zaremba: Do we want to talk about future meeting topics? Rountree: Do you have something? De Weerd: Do you have something? Zaremba: It's not a topic, but National Night Out is August 5th or something. Do we need to close the calendar, so we don't -- De Weerd: Already done. Holman: We did that. We have remembered this year. Zaremba: Good. Thank you. Holman: Yeah. We are on it. Zaremba: That's it. De Weerd: Do I have a motion to adjourn? Bird: So moved. Rountree: Second. De Weerd: All those in favor? All ayes. MOTION CARRIED: FIVE AYES. ONE ABSENT. MEETING ADJOURNED AT 8:23 P.M. (AUDIO RECORDING ON FILE OF THESE PROCEEDINGS) MAYOR MY DE WEERD DATE APPROVED ATTES o�oRPgCDA GU5 r 9 City JAYCE--E_gL-MAN, CIT -CtER F 11 ppxa W 6�n. SEES >P, Changes to Agenda: • Item #7A: Woodburn West Subdivision (FP -14.027) — Request for continuance to July 151h Item #7B, C: Sugarman Subdivision (AZ -14.007; SHP-14.001) Application(s): ➢ Annexation & Zoning ➢ Short Plat Size of property, existing zoning, and location: The site consists of 3.99 acres of land, is currently zoned RUT, and is located at 1450 W. Ustick Road at the NEC of N. Linder & W. Ustick Roads. Comprehensive Plan FLUM Designation: MU -C (Mixed Use — Community) Summary of Request: The applicant requests annexation & zoning of 5.04 acres of land with a C -C zoning district consistent with the MU -C future land use map designation for this site. A short plat is also proposed consisting of 4 building lots on 3.99 acres. A conceptual development plan is proposed that depicts a 3,600 s.f. gas station, a 12,500 s.f. retail/commercial multi -tenant building and a 5,000 s.f. bank with a drive-thru. Because the drive-thru is depicted at the east boundary of the site adjacent to property that is designated for residential use, staff recommends the concept plan is revised to relocate the drive-thru intemally within the site. Access is depicted on the concept plan via Linder & Ustick Roads with cross -access to the north. Staff recommends a right-in/right-out access via Linder & access to Ustick to be determined by ACHD. ACHD's draft report restricts access to Linder to right-in/right-out & access to Ustick as a temporary full access that will be restricted in the future to right-in/right-out. No additional street improvements or ROW dedication is required for Ustick or Linder Roads. Commission Recommendation: Approval of the AZ with a development agreement (see provisions in Exhibit B of the staff report) Summary of Commission Public Hearing: i. In favor: Laren Bailey ii. In opposition: None iii. Commenting: None iv. Written testimony: Laren Bailey Key Issue(s) of Discussion by Commission: None Key Commission Change(s) to Staff Recommendation: None Outstanding Issue(s) for City Council: None Written Testimony since Commission Hearing: None Notes: Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: Amendment to Subgrant Agreement Between Ada County and COM MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFF/CE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Bola Covr� Ernema ��-I NO. Ijq AGREEMENT N • AMENDMENT TO SUBGRANT AGREEMENT COUNTY AND CITY OF MERIDIAN BETWEEN ADA 11Pri. t is made and entered into on this da , THIS AMENDMENT y of May, 2014, by . and between Ada County, a dulyformed and existing County pursuant to the laws and • the State of Idaho, as subgrantee of of the Idaho Bureau of Homeland Security("County") and City of Meridian ("Subawardee"). WITNESSETH WHEREAS, County and Subawardee entered into Agreement No. 10668 on April 1.. 15, 2014, for the purpose of building and sustaining regional core emergency capabilities while ensuringcompliancewith state and federal grant management requirements (hereinafter "Agreement"); WHEREAS, the Agreement references the 2011 and 2012 Homeland Security Grant Program (HSGP) grants from the Idaho Bureau of Homeland Security, which grant awards were attached to the Agreement and were the source of funds ultimately provided to the Subawardee; WHEREAS, County and Subawardee recognize that 2013 HSGP grant funds are also available to Subawardee; NOW, THEREFORE, thep arties agree that the County has received a 2013 HSGPg rant, which is available for the purposes set forth in the Agreement, a copy of • • attached hereto as Exhibit A. The parties further agree that this which grant is AMENDMENT TO SUBGRANT GRANT AGREEMENT BETWEEN ADA COUNTY AND CITY OF MERIDIAN—PAGE 1 n;\emergency mgmt\amendment to meridian subgrant.docx • 16 of the Agreement to strike the reference to Amendment corrects Article g "subgrantee" and replace it with "subawardee." IN WITNESS WHEREOF, the parties have executed this Amendment on the date andy ear written above. . t t t t Board of Ada County Commissioners _,1. IVT. L. Case, Commissioner 4.11 ) : By• ~-• � I t‘el Tibbs, Commissioner t Ciiii • By: Rick Yzagui Co issioner i . ATTEST: I... I Christopher D. Rich,Ada County Clerk by Phil McGrane,Chef Deputy i 1 • i. i 1 It 1 AMENDMENT TO SUB GRANT AGREEMENT BETWEEN ADA COUNTY AND CITY OF MERIDIAN--PAGE 2 i. n:\emergency mgmt\amendment to meridian subgrant.docx 1: la t • (Subawardee) By: . i Title Me14tv • • STATE OF IDAHO ) ) ss. County of Ada ) SUBSCRIBED AND SWORN to before me this I day of a.)it.3 2014. • **CA AlkArk,of,0 .� a 41 o s 'ublic for Idaho • ,� � Comml sion Expires r\ I - Doao % P PUBV • AMENDMENT TO SUB G RANT AGREEMENT BETWEEN ADA COUNTY AND CITY OF MERIDIAN--PAGE 3 n:\emergency mgmt\amendment to meridian subgrant.docx • i (:. • I .. • • 1 4, [ JO 'r:,--.).) e - . _ _ . .• __ __ .. .,(44 .., . - D,,„6 BUREAU OP 1-101 f.AlrD. Ctiffi1YS • k .<',s_, s. SIAL m•A 1xNXSTEtt1N•G A 3II itY Ad151 OP 6 - %,�" �•4. AWAR DOCUMENT '.. 44;y*" HOMI LAND ri.fCu3.UUy•4aArc P4 Qg1tAMS • ►U4:tRNYO NAM AMS-/ 7DR09$ xNlt1pN0=ZxFCOAL) .AWARS Nu utt 3.PeRPORMANCGFLRxan _ Ada Cbunt .IMW o11M$ -0149 9t1/ q•1 a•to 711i/20i 5 .. 1200 Ji O L `%t ac t QiSt, ID 03''lf g • _ 4,.•AWARD DAtf• •0. CFDA .. 6.ACTxo.N • 7. Su13 3RANTga IF /V u.POR NoS 1484911 .0.907 , w rd • 826000277 , 2013 hcai eInt-d Security t~{thnf.t rogtarti a.•Pn13u•au6.AWARD•AMOUNT: $0,06 ..9, PROGRAM ARUMSHS ' 10. 4.04611NT oP•irHxs AWARDt $470,05:75 75 TOTAL vWARD $470,4A5;78 • 11.. SIr4C1f4L CONE ZIIQN$ • • Tho,above grant project f5,a1)ptoVtid scabjeat:to'auoh conditions,or.lirnitatlofl as.aro.sot.forth on the following . pores of itils dooulnent mr d lA the(4.ener tl hrnag,and Qoridition's scir►t with the=:original award or as . amended. • 12. b•0RAL AAaNCY. UtHOR12(No•THIe AWAti.D The Department:of Homeland Security Oilice.of,}3tato ancl.Local Gciverniriarn•Qoarziirtatian and. .Prbparednose, ' 13. METHOD of PAYMENT • • • . • • • RelmlAireement It macro upon rc aoipt of tho jiriediotion'e l-1ianalol$tatul Elepaftg/Rein taur.s m9ot Recluac•t, F . iAONCY•APPROVAL SUIP.GhAffille ACCnPTANCn AAP �..- 11MtNi�.Ts.���AurH R o. 'u©�G ,NT �O�PxC s' � Px N , 14. NANO AND TrriaOtt AAP.ROVxN.g n .1 A,, .�-.l--G 114 _Brad MichY,Colo7e.l I Wid:L,Owe,C ii ttar • frctgr,Idaho tireauof.1-1m.el4nd Soority. Ada•Ca�i•:it DQCc • i16. SxoNATU#6 OP OpitOVXNct Bu S/S to C}FPYoAL :,7. lot ATURU•OP•AuTHORXZaD SU6-GRANTbIi Qt rxazAI.• "4"--"--" i".. .A. 4' C.2......L.E.2 / '. C"L 0 ; . C KV. :„144/2 • . t .• �Aq� rr 3\13prsNovember 1.6,2U1a .. mu,...a;y j tor,(},ritmAtr-Dowoof 00'..•Asittvitcs 4111 fete+:A fuurl4000'2 001' . (-- '4,—. :11*** " • • ATTEST:: •.•,... �,,.,•) cb. istgpher a Rich,AU County cied( 'w Pbit Mci rrfc;Chief MVO, • • • • EXHIBIT A Idaho Bureau of Homeland Security Sub Grant Award Continuation Sheet Page 2 of 5 S ere enc Mana;ement 'erformance Grant N //word Numbart BNW72Oi4-SS 0149 Award Dabs 8/20/2013 SPECIAL CONDITIONS Article I- Acceptance of Post Award Changes In the event FEMA determines that changes are necessary to the award document after an award has been made, including changes to period of performance or terms and conditions,recipients will be notified of the changes in e writing. Once notification has been made,any subsequent request for funds will indicate recipient acceptance of th changes to the award. Please call the FEMA/GMO Call Center at(866) 977-5646 or via e-mail to ASK-GMDCa dhs,gov if you have any questions. Article XI - Compliance with Funding Opportunity Announcement and use of funds under thisgrant will be in accordance with the Funding • The recipient agrees that all allocationss Opportunity Announcement, Acknowledgements and Assurances Article XIX �- DHS SpocifiG Acknn .� Alire p c ients of financial assistance must acknowledge and agree-and require any sub-recipients,contractors, • successors, transferees,and assignees acknowledge and agree-to comply with applicable provisions governing DHS access to records,accounts,documents, information, facilities, and staff, • 1, Recipients must cooperate with any compliance review or complaint investigation conducted by OHS. 2, Recipients must give OHS access to and the right to examine and copy records, accounts, and other documents and sources of information related to the grant and permit access to facilities, personnel, and other individuals b DHS and information as may be necessary, as requiredY regulations and other applicable laws or program guidance. 3. Recipients must submit timely, complete, and accurate reports to the appropriate 0HS•officials and maintain appropriate backup documentation to supportthe reports. 4, Recipients must comply withall other special reporting,data collection,and evaluation requirements,as prescribed by law or detailed in program guidance. 5. If, during the past three years, the recipient has been accused of discrimination on the grounds of race, color, national origin (including limited English proficiency), sex, age,disability,religion,or familial status,the recipient must provide a list of all such proceedings, pending or completed,including outcome and copies of settlement agreements to the OHS awarding office and the DHS Office of Civil Rights and Civil Liberties. • t g 6. In the event anycourt or administrative agency makes a finding of discrimination on grounds of race,color, national origin (including limited English proficiency), sex,age,disability, religion,or familial status against the recipient,or the recipient settles a case or matter alleging such discrimination, recipients must forward a copy of the complaint and findings to the OHS Component and/or awarding office, The United States has the right to • seek judicial enforcement of these obligations. Article IV M- Use of 1)115 Seal, Logo and Flags All recipients must obtain OHS's approval prior to using the OHS seal(s),logos,crests or reproductions of flags or likenesses of OHS agency officials, including use of the United States Coast Guard seal,logo,crests or reproductions of flags or likenesses of Coast Guard officials, r � Article V -- USA Patriot Act of 2001 All recipients must comply with the requirements of the Uniting and Strengthening America by Providing Appropriate Tools Required to Intercept and Obstruct Terrorism Act(USA PATRIOT Act), which amends 18 U.S.C. §§ 175-175c, Among other things,the USA PATRIOT Act prescribes criminal penalties for possession of any biological agent,toxin, A 9 or delivery system of a type or In a qu ntit that is not reasonably justified by a prophylactic,protective,bona fide a y research,or other peaceful purpose, • EXHIBIT A • • r • 1 • Idaho 5ursau of Homeland Security Sub Grant Award Continuation Sheet Page 3 of 5 • • Emergency Manajjement Performance Grant . - Award C1atfit 8/28/2n13 • '� r.... Protection Act of 2000 Article VI Trafficking Victims Pr All 1 r p ecl ients of financial assistance will comply with the requirements of the government-wide award term which , Implements Section 106 g)of the Trafficking Victims Protection Act(TVPA)of 2000,as amended (22 U.S.C. § 7104), P t� Inaccordance with OMB Interim Final Guidance, Federal Register, located at 2 CFR Part I.75, This is implemented acc rd Volume 72, No, 218,November 13, 2007, • . E 1 In accordance with the statutory requirement, in each agency award under which funding is provided to a private • . entity,Section 106(g) of the TVPA,as amended, requires the agency to include a condition that authorizes the , agency to terminate the award,without penalty,if the recipient or a subgrantee— (a) Engages in severe forms of trafficking in persons during the period of time that the award is in effect; (b) Procures a commercial sex act during the period of time that the award is in effect; or :. c Uses forced labor in the performance of the award or subawards under the award. 1 Full text of the award term is provided at 2 CFR§ 175,15. . Article VII- Non-Supplanting Requirement . All recipients must ensure that Federal funds do not replace (supplant)funds that have been budgeted for the same purpose through non-Federal sources. Applicants or award recipients may be required to demonstrate and document that a reduction in non-Federal resources occurred for reasons other than the receipt of expected receipt of Federal funds. l.: s Article VIII — Lobbying Prohibitions - 1 All recipients must comply with 31 U.S.C, § 1352,which provides that none of the funds provided under an award i•• recipient• payperson to Influence, or attempt to influence an officer or employee of l may be expended by the to any any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any Federal action concerning the award or renewal. Article IX— hotel and Motel Fire Safety Act of 1990 •. In accordance with Section 6 of the Hotel and Motel Fire Safety Act of 1990, 15 U.S.C, §2225(a),all recipients must - I ensure that all conference, meeting, convention,or training space funded in whole or in part with Federal funds :•' complies with the fire prevention and control guidelines of the Federal Fire Prevention and Control Act of 1974, 15 , U.S,C, §2225. • • Article X — Fly America Act of 1974 All recipients must comply with Preference for U.S. Flag Air Carriers:Travel supported by U.S, Government funds , requirement, which states preference for the use of U.S. flag air carriers(air carriers holding certificates under 49 U.S.C. §41102) for international air transportation of people and property to the extent that such service is available, in accordance with the International Air Transportation Fair Competitive Practices Act of 1974 (49 U.S.C. § . 40118) and the interpretative guidelines issued by the Comptroller General of the United States In the March 31, . 1981,amendment to Comptroller General Decision B138942, Article XX r Federal Debt Status All recipients are required to be non-deiinquent in their repayment of any Federal debt. Examples of relevant debt Include delinquent payroll and other taxes,audit disallowances, and benefit overpayments.See GMB Circular A-129 • and form SF-424, item number 17 for additional information and guidance. • Article XII -. False Claims Act and Program Fraud Civil Remedies All recipients must comply with the requirements of 31 U.S,C. § 3729 which set forth that no recipient of federal : I payments shall submit a false claim for payment.See also 38 U.S.C, § 3801-3812 which details the administrative • remedies for false claims and statements made, Article XIII — Duplication of Benefits State, • Local and Tribal Recipients must comply with 2 CFR Pert§225,Appendix A, paragraph(C)(3)(c), which proviess that any cost allocable to a particular Federal award or cost objective under the principles provided for in this authority may not be charged to other Federal awards to overcome fund deficiencies, • • I-. i EXHIBIT A i ::ti • I I Idaho Bureau oYorneia>~d Security • Sub Grant Award Continuation Sheet Page 4 of S l8mergenc Mana.ement Performance Grant Awad Nuptbars EMW-Z0 349-o0i49 Award Oates 8/28/2013 Article XIV w Drug-Free Workplace Regulations All recipients must comply with the Drug-Free Workplace Act of 1988 (412 U.S.C. §701 et seq.), which requires that . I all organizations receiving grants from any Federal agency agree to maintain a drug-free workplace,These regulations are codified at 2 CFR 3001. • Article XV Debarment and Suspension All recipients must comply with Executive Orders 12549 and 12689,which provide protection against waste, fraud ;.. • and abuse by debarring or suspending those persons deemed irresponsible in their dealings with the Federal ;: overnment, Article XVI— Copyright . All recipients must affix the applicable copyright notices of 17 U.S.0, § 401 or 402 and an acknowledgement of :. Government sponsorship(including award number)to any work first produced under Federal financial assistance s. awards,unless the work Includes any information that is otherwise controlled by the Government(e.g., classified information or other information subject to national security or export control laws or regulations), • f Article XVII - Best Practices for Collection end Use of Personally Identifiable Information (PH) '. Ail award recipients who collect P11 are required to have a pubiicaliy-avalloble privacy policy that describes what P11 they coilect,how they use the P11,whether they share-P1!with third parties,and how individuals may have their PIX corrected where appropriate. • Award recipients may also find as a useful resource the DHS Privacy Impact Assessments: . and { a • . v, . to . i.ra - : ?i* . .riv. _42.1.Liernglate.pdf, respectively, Article XVIII — Activities Conducted Abroad All recipients must ensure that project activities carried on outside the United States are coordinated as necessary with appropriate government authorities and that appropriate licenses, permits, or approvals are obtained. - Article XIX Acknowledgement of Federal Funding from 0115 Ali recipients must acknowledge their use of federal funding when issuing statements, press releases, requests for proposals,bid invitations,and other documents describing projects or programs funded in whole or in part with Federal funds, Article XX — Assurances, Administrative Requirements and Cost Principles a, Recipients of OHS federal financial assistance must complete OMB Standard Form 4248 Assurances Non- Construction Programs, Certain assurances in this form may not be applicable to your project or program,and .: the awarding agency may require applicants to certify to additional assurances, Please contact the program awarding office if you have any questions. . The administrative requirements that apply to OHS award recipients originate from two sources: • Office of Management and Budget(OMB)Circular A.102, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments(also known as the"A•102 Common Rule"), These A-102 requirements are also located within DHS regulations at Title 44,Code of Federal Regulations (CFR) Part 13. • • oMB Circular A,110, Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitais,and Other Non-Profit Organizations, relocated to 2 CFR Part 215. 1 i I EXHIBIT A • • . t Idaho Bureau of Homeland Security Sub Grant Award continuation Sheet Page S of 5 Enter:e o Mena!einent Performance Grant Award Dater O/2&/2013 1 AwAr•Nu batt EMW.2013- 5•++f,R9 � i • b► The cost principles that apply to DHS award recipients through a grant or cooperative agreement originate from one of the following sources: o OMB Circular A-21, Cost Principles for Educational institutions, relocated to 2 CFR Part 220, • • ! OMB Circular A-87, Cost Principles for State, Local, and Indian Tribal Governments, relocated to 2 CFR Part 225. • OMR Circular A-I.22, Cost Principles for Non-Profit Organizations, relocated to 2 CFR Part 230, • The audit requirements for State, Local and Tribal recipients of OHS awards originate from: • OMB Circular A-133,Audits of States,Local Governments and Non-Profit Organizations. Article XXX— Fusion Center Investment A program hold is placed on Investment#1 and the grantee is prohibited from obligating,expending, or drawing down SHSP funds In the amount of$170,000 in support of their State and/or Major Urban Area Fusion Center.In order to release this hold, the grantee is required to submit the Fusion Center Investment 3ustification Supplemental • Form, which captures requirements for all Fusion Center Investment Justifications, per pages 40.-41 of the FY 2013 1. HSGP Funding Opportunity Announcement(FOA), Please contact your FEMA GPO Headquarters Program Analyst to receive a copy of this addendum, and to receive further guidance on the steps required to release this hold. • Article XXIX —Summary Description of Award The FY 2013 HSGP plays an important role in the Implementation of the National Preparedness System(NPS)by • . supporting the building,sustainment,and delivery of core capabilities essential to achieving the National Preparedness Goal(NPG)of a secure and resilient Nation. HSGP funding shall be used for statutorily eligible costs • , related to the planning, organization,equipment, training, and exercise needs that prevent, protect against,mitigate, }' respond to, and recover from acts of terrorism and other catastrophic events.This HSGP award consists of State Homeland Security Program (Si-ISP) funding in the amount of$3,459,364,and Operation Stonegarden(OPSG) funding in the amount of$49,121.The following counties received Operation Stonegarden funds; Boundary County, $49,121,These programs provide an integrated mechanism that builds and sustains core capabilities to support the Nation's Preparedness against terrorist attacks, major disasters and other emergencies+ I Article X)UXX — Operation Stonegarden Program Hold 1 ' The recipients are prohibited from drawing down or reimbursing sub-recipients of Operation Stonegarden (OPSG) I i fundingprovided through this award until each unique,specific or modified county level, tribal or equivalent 9 Operations Order and or Frag Order has been reviewed,and approved by official notification by FEMA and Customs and Border Protection/Border Patrol(CBP/BP).Each Operations Order will he transferred via the secure portal (CBP/BP) (WETS system from each respective AOR Sector HQ to CBP/BP HQ in Washington DC for review and pre- approval for Operational continuity, then forwarded to FEMA GPO/PGD OPSG Program Office for final I review/approval.Official notification of approval will be sent by FEMA via email to the respective State Administrative I . ! • Agertc (SM) and CBPJBP HQ in Washln_,gton DC, •• • • I • I. • t � . •i I • • • EXHIBIT A • i 1- • 1 e j 1 i I(")'')'.) Jr 1 AGREEMENT'NO.„, •,•t•+►.,+an�uK.taiacx,�tr. . , MEMORANDUM OF UNDERSTANDING BETWEEN TH.8 STATE bF:IDAHO,BUREAU OF HOMELAND SECURITY- AND ADM COUNTY .R8GARolNG STATE USE'OF 2013 STATE HOMELAID•$ECUnf'1`'GRANT PRGGilAM FU.NPiN ON:BEHALF OF ADA COUNT 1. PARTlds, The parties to this•Agreement ate the State of Idaho,Bureau of Homeland'Security an.d°Ada *County,referred•to as subgrantee, ;: .2. AUTH6Ri Y. This agreeme•nt•is authorized under the provisions of Idaho•Statute: TITLE-46,CHAPTER r• 10, • 3: ` PuaP�s�, The p«r�;os of this Agreee .ls.to set forth ter s.bywh.i h the id � cr au. f Homeland Security shall.expend Homeland Security*Grant Program (HSGP)funds an behalf of the ttibgranted, On August•28,2Q13,the•Ufited States 0epartm nt of Homeland Security Issued grant number[AW- 2013a:SS-00149 to'the State°of Idaho, Under this:grant; the State of•idahq, 13urea0 of Homeland Security must ailooate•grant funding;to local Jurisdictions, Under tit grant, th.e, subgrantee.may • authorize the Idaho Bureau of Homeland.Security to obirgate••and pay equipment-purchases and program execution;provided that the subgrantee and the Idaho Bureau.of Homeland Security enter • Into an agreement on the matter, 4. R°ESPONSIUI.UTIES, .• A, Idaho RureSumoof•Hamelattd Security: 's . Will.providesfund management•for the Learning Management System (LMS), Fusion Center and equipment tfiraugih obligations:and payments for*the period o•f•ttiis••award and any extensions. l• B. Sub r enteei°. The duly authorized Official has read and und.grstands the 2013 Horkeland Security Grant Program description and°application from the Idaho Bureau of Homeland Security;. As the authorized - representative, he•or She hereby authorizes the Idaho Bureau of Homeland Security to obligate and ex end•2013 Homeland Security Grant Pro •rens funds for.aiibwable•LMS,Fusion•Centerand r : equipment purchases and program exeCutlon:in support of subgrantee., i. S, APPROVINe OFFICIAL. IDAwa D �' RITY SUBoftANTEE: Brad Alchy,Director Dave Case,Chairman . 4040 Guard-Street,Bldg;600 Ada County aoard of Commissioners Eloise,ID 8.3705 290 Prortt street• Bois ID 83;702 Phone:* (200 4224040 Fax; (208)422-3044 Page 1 oft • :. 1 EXHIBIT A • • 1 . , i 1 6 OTHER httovlsI9Ns. Nothing in this Agreement Is intended to Conflict with Wrrent laws or regulations• i i of the-State of.lda'ho.or.anysubgra.nt jurisdiction. if a'erm of thls•agreement Is inconsistent with such: authority,.then the term shall be invalid,bUt the.remaining torrhs and condltlorts of this a cement ( . shall remain In-furl force and a fest, . 7. EFFECTIVE DATE. The'terms of this agreement will become-effective upon signing-by the parties, • 8. MODIFICATION, This agreement may be mo.dified.upon the mutual written consent of the parties, 9, TERMINATION. The terms of this agreement in Its.original'form,or If modified with the consent-of both 1 parties,will.remain in effect until the end of.the grant, kither party upon 30.days written'notice.to the.other may terminatO this agreement. I. QIP•VED t; ( i,a. t t - '..:. .Reif" .. . ) i•-. -,1) \ ._) . : D. 7Case date . I 1 halm* I -Ada County Board of Commissioners --,-47,.... ..........c, • Ct?,.....-L-5.::., • ..: •�..N. oy olg N ,�2Q1a {. Brad Ricky Data Director - Who Bureau of'Honisland�Security • . C.11...., S i ....r++ C.ti foplier P,Rich AdA pu n.ty Clerk - �1,Phil McGratr , Pike Otiptity I ; . • !. i.: . i I. . i• • .- . 1 I. • 1 , • . i Page2of2 • . • i ' � I EXHIBIT A . 1 , . Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: 5 PROJECT NUMBER: AP 14-001 ITEM TITLE: FFCL for Southridge Gravel Mining by Idaho Sand and Gravel Located South of W. Overland Road and East of S. Ten Mile Road Request: City Council Review of the Conditional Use Permit Modification (MCU 14- 001) Application MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER IDIAN�-- IDAHO In the Matter of the Request for City Council Review of the Planning and Zoning Commission's Decision Regarding the Modification to the Conditional Use Permit (MCU -14-001) for Southridge Gravel Mining, Located South of W. Overland Road, East of S. Ten Mile Road and Southwest of the Ridenbaugh Canal in the R-2, R-4 and R-8 Zoning Districts, by Idaho Sand and Gravel. Case No(s). AP -14-001 For the City Council Hearing Date of. June 24, 2014 (Findings on July 1, 2014) A. Findings of Fact 1. Hearing Facts (see attached Staff Report for the hearing date of April 17, 2014, incorporated by reference) 2. Process Facts (see attached Staff Report for the hearing date of April 17, 2014, incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of April 17, 2014, incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of April 17, 2014, incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503). 2. The Meridian City Council takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has, by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian, which was adopted April 19, 2011, Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A 4. Due consideration has been given to the comment(s) received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. 6. That the City has granted an order of approval in accordance with this decision, which shall be signed by the President of the City Council and City Clerk and then a copy served by the Clerk CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASENO(S). AP -14-001 Page 1 upon the applicant, the Planning Department, the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the conditions of approval in the attached staff report for the hearing date of April 17, 2014, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the City Council's authority as provided in Meridian City Code § 11-5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for City Council review of the Planning and Zoning Commission's decision was denied in part and approved in part as noted in the attached staff report for the hearing date of April 17, 2014, attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Six (6) Month Conditional Use Permit Duration The applicant shall have a maximum period of six (6) months in which to complete reclamation of the site in accord with the approved grading and reclamation plans, including hauling off existing stockpiles and removal of all equipment. ALL reclamation shall be complete by November 1, 2014. E. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, a denial of a conditional use permit entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. 2. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight (28) days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. F. Attached: Staff report for the hearing date of April 17, 2014 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASENO(S). AP -14-001 Page 2 By action of the City Council at its regular meeting held on the 2014. COUNCIL PRESIDENT CHARLIE ROUNTREE COUNCIL VICE PRESIDENT KEITH BIRD COUNCIL MEMBER DAVID ZAREMBA COUNCIL MEMBER JOE BORTON COUNCIL MEMBER LUKE CAVENER day of VOTED _N2(— VOTED 1 (U VOTED VOTED VOTED 1 nom. COUNCIL MEMBER GENESIS MILAM VOTED MAYOR TAMMY de WEERD VOTED (TIE BREAKER) Mayor Tammy e Veerd Copy served upon Applicant, The Planning Division, Public Works Department and City Attorney. Dated:��uh Cit e c') ' O ce CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). AP -14-001 Page 3 EXHIBIT A STAFF REPORT HEARING DATE: April 17, 2014 Nj`E IDIAN'�- TO: Planning & Zoning Commission IDAHO FROM: Sonya Walters, Associate City Planner 208-884-5533 SUBJECT: MCU -14-001 — Southridge Gravel Mining I. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, Idaho Sand and Gravel, has applied for a modification to the conditional use permit (MCU) for the gravel mining operation at Southridge Subdivision. The applicant requests an 18 month extended period of time, 60 days of which to mine and crush additional material, to remove the processed material from the site and reclaim the site. H. SUMMARY RECOMMENDATION Staff recommends approval of the proposed MCU with the conditions listed in Exhibit B, based on the Findings of Fact and Conclusions of Law in Exhibit D of the Staff Report. The Meridian Planning and Zoning Commission heard this item on April 17. 2014. At the public hearing, the Commission moved to approve the subject MCU request with conditions. a. Summary of Commission Public Hearing: i. In favor: Todd Lakev, Applicant's Representative; Ryan Russell; Steve Prvzbos; Scott Nichols; ii. In opposition: None iii. Commenting: Patrick Clark; Robert Marsland; Keith Ebeling; Wyatt Johnson (speaking for large group); Jerry Ross; Maureen Brewer; Tony Martarano; Robert Schoelkoph; Peg Hickey; Susan Carlson. iv. Written testimony: Larry & Carolyn Van Hees; Scott & Jennifer Nichols; Joe & Patsy Kendall; Glen Hickey; Jerry Ross; Maureen & Ryan Brewer; Peg Hickey; John & Tina Fitzgerald; Robert & Susan Carlson; Dick & Susan Bagley; Rick & Nancy Brecks; Keith & Dianne Ebeling; Naomi Elton; Robert & Nadine Marsland; Tony Martarano; Johnson; Gordon Hamilton, Williams Pipeline; Jim Montgomerv: petition v. Staff presenting application: Sonya Walters vi. Other staff commenting on application: None b. _Key Issues of Discussion by Commission: i. Impact of use on adjacent residential neighborhood ii. Duration of use c. Kev Commission Changes to Staff Recommendation: i. None The Meridian City Council heard this item on .Tune 24.2014. At the public hearing, the Council denied in part and approved in part a request for City Council review of the Plannin & Zoning Commission's decision. :L Summary of City Council Public Hearing: i n favor: Todd Lakev: Ryan Russell; Steve Pryzbos; and Susan Pryzbo. Southridge Gravel Mining MCU -14-001 PAGE 1 EXHIBIT A i� In opposition: Wyatt Johnson (Attorney representing a large group of nei hbor l: Curtis Elton: Tony Martarano: Jerry Ross: Maureen Brewer: Brian Rue Keith Elipling; Glenn Hickey: Jacob Rower: and Lisa Martarano Commenting: None iy. Written testimony: Memo from Staff: Glen Hickey: Dick & Susan Bagley: Ryan ewer: Jerry Ross: Joe & Patsy Kendall: Maureen Brewer: Lynne Reiber: Bob Marsland; Nadine Marsland: Keith & Dianne Ebeling: William & Phyllis Weiss: Robert & Susan Carlson; and Tnnv Martarano y Staff presenting application: Sonya—)Yat ter YL Other staff commenting on application: None Ii. Key Issues of Discussion by CounciL- i Allowance for grading of the site beyond the approved 6 -month time period: ii. Treating the stockpile(s) with magnesium chloride vs. spraying the stockpile(s)-with water from a water truck to reduce dust impacts on adjacent residences: an iii Relocation of the scale and scale house/office to the north side of the stockpile(sl c. Key Council Changes to Commission Decision iii. Modification of condition #1.1.6 to allow the scale and scale house/office to remain h its fisting location and not be relocated to the north side of the stockpile" HI. PROPOSED MOTION Approval After considering all staff, applicant and public testimony, I move to approve File Number MCU -14- 001 as presented in the staff report for the hearing date of April 17, 2014, with the following modifications: (Add any proposed modifications.) I further move to direct Staff to prepare an appropriate findings document to be considered at the next Planning and Zoning Commission hearing on May 1, 2014. Denial After considering all staff, applicant and public testimony, I move to deny MCU -14-001 as presented during the hearing on April 17, 2014, for the following reasons: (You should state specific reasons for denial.) I further move to direct Staff to prepare an appropriate findings document to be considered at the next Planning and Zoning Commission hearing on May 1, 2014. Continuance I move to continue File Number MCU -14-001 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The site is located south of W. Overland Road, southwest of the Ridenbaugh Canal, and east of S. Ten Mile Road (Parcel No.'s S1223244502 & 5 1223131350), in the north 1/2 of Section 23, Township 3 North, Range 1 West. B. Owner(s): Corey Barton Homes, Inc. P.O. Box 369 Meridian, ID 83642 Southridge Gravel Mining MCU -14-001 PAGE 2 EXHIBIT A C. Applicant: Ryan Russell, Idaho Sand and Gravel 924 N. Sugar Street Nampa, ID 83687 D. Representative/Contact: Same as Applicant E. Applicant's Statement/Justification: Please see applicant's narrative for this information. V. PROCESS FACTS A. The subject application is for a modification to the existing conditional use permit. A public hearing is required before the Planning & Zoning Commission on this matter, consistent with Meridian City Code Title 11, Chapter 5. B. Newspaper notifications published on: March 31, and April 14, 2014 C. Radius notices mailed to properties within 1,000 feet on: March 27, 2014 D. Applicant posted notice on site by: April 8, 2014 VI. LAND USE A. Existing Land Use(s) and Zoning: Commercial sand and gravel mining and crushing has been operating on this property up until April 4, 2014. Since that time, the applicant has been hauling processed material from the site. The property is zoned R-2, R-4 and R-8. B. Character of Surrounding Area and Adjacent Land Use and Zoning: North: Overland Road & vacant land in the development process, zoned R-4, R-8, TN -R. South: Rural residential properties in Val Vista & Aspen Cove Subdivisions, zoned RUT and R respectively, in Ada County East: Vacant land, zoned R-4 & R-8 West: Rural residential properties, zoned RUT in Ada County; S. Ten Mile Road and vacant land in the development process, zoned R-8 C. History of Previous Actions & Background Information: • This property was annexed (AZ -06-031) in 2007 with a development agreement (Instrument #107074205) and preliminary platted (PP -06-031) as part of Southridge Subdivision. • A time extension (TE -09-009) to obtain the City Engineer's signature on a final plat was approved by the Director on February 20, 2009, which extended the preliminary plat until April 6, 2010. • A second time extension (TE -10-018) to obtain the City Engineer's signature on a final plat was approved by City Council on September 7, 2010, which extended the preliminary plat until February 6, 2012. The first final plat received City Engineer signature on December 22, 2011. In order for the preliminary plat to remain valid, the second phase final plat was required to be signed by the City Engineer within 2 years. The second phase final plat nor a time extension was submitted- therefore, the prelinsinary plat expired on December 22, 2013. • A conditional use permit (CUP -10-015) was approved on February 3, 2011 for construction sand and gravel mining and crushing of material on approximately 76 acres of land in the R- 2, R-4, and R-8 zoning districts. The purpose of the use was to conduct mass grading of the Southridge Gravel Mining MCU -14-001 PAGE 3 EXHIBIT A property to achieve a gentler overall landform to facilitate the planned residential subdivision. The use was approved for 18 months and expired on August 3, 2012. The applicant originally requested a time period of three (3) years in which to complete the grading, crushing and removal of material necessary to prepare the site for the approved residential development and reclaim the site. Because of the proximity of residential properties in relation to the project site and impacts from the proposed use, the Commission approved a lesser period of 18 months with the understanding that a modification to the CUP could be requested to extend the time if needed. • A modification to the conditional use permit (MCU -11-001) was requested by the applicant to allow the use of backup warning signals on construction vehicles within the site. The Director denied the applicant's request on April 27, 2011. A request for City Council review (AP -11-001) of the Director's decision was approved by City Council on June 7, 2011 that granted approval to use audible backup warning signals on construction vehicles within the site with the stipulation that the devices be turned to the lowest level allowed by OSHA. Additionally, the applicant was required to make reasonable efforts to reduce noise impacts on surrounding residents by providing a buffer of solid material (e.g. earthen berm) between the residences and the operation and/or orienting operations in such a way as to deflect noise away from the residences. • On July 23, 2012, a request for a modification to the CUP (MCU -12-003) was submitted for an 18 month time extension of the sand and gravel mining and crushing use. Because no one testified at the public hearing or submitted written testimony in opposition, the Commission approved the request to allow the operation to continue for an additional 18 months until April 4, 2014. At such time, the site was required to be graded per the reclamation plan; or, a modification to the CUP was allowed to be requested to extend the use. No one filed a requestfor City Council review of the Commission's decision. During the three years of the ruining and crushing operation on this site, the City has received a few complaints from adjacent neighbors pertaining mostly to dust and noise resulting from the operation. To address these concerns, the applicant has paved the main haul road (800+1 -feet) into and out of the site and has a water truck that they state regularly circles the site to control the dust; vegetated berms have been constructed along -portions of the southern boundary of the site; a paper mulch product has been applied over Hutch of the site to the surface of exposed dirt areas in an attempt to prevent dust, the volume of the back-up beepers on construction equipment has been turned down to the lowest level allowed by OSHA; and the applicant has oriented crushing and loading operations so that the stockpile of material serves as a barrier between those operations and the neighbors to deflect noise and dust from the site. D. Utilities: 1. Public Works: a. Location of sewer: NA b. Location of water: NA c. Issues or concerns: NA E. Physical Features: 1. Canals/Ditches Irrigation: The Ridenbaugh Canal runs along the northeast boundary of the site. 2. Hazards: The Williams Pipeline crosses the western portion of this site. Southridge Gravel Mining MCU -14-001 PAGE 4 W4 : :1 3. Flood Plain: This property is not within a flood plain or flood way. F. Access: Access for this site is depicted on the site plan in Exhibit A.2 via an existing curb cut to/from W. Overland Road. VII. COMPREHENSIVE PLAN POLICIES AND GOALS This site is designated "Low Density Residential (LDR)," "Medium Density Residential (MDR)," and "Civic" on the Comprehensive Plan Future Land Use Map with the majority of the site being designated MDR. Per the Comprehensive Plan (page 99), LDR designated areas, "allow for the development of single- family homes on large lots where urban services are provided. Uses may include single-family homes at densities of three dwelling units or less per acre." MDR designated areas, "allow smaller lots for residential purposes within city limits. Uses may include single-family homes at densities of three to eight dwelling units per acre." Civic areas, "are designated to preserve and protect existing and planned, municipal, state, and federal lands for area residents and visitors. This category includes, public lands, law enforcement facilities, post offices, fire stations, cemeteries, public utility sites (excluding ACED), parks, public schools, and other government owned sites within the Area of Impact." This site is zoned R-2, R-4, and R-8 which is consistent with the LDR, MDR, and Civic land use designations. The proposed construction sand and gravel mining use is listed in UDC Table 11-2A-2 as a conditional use. Single-family residential homes are planned to ultimately be constructed on this site. When the Comprehensive Plan was adopted in 2002, the type of use proposed was not anticipated and therefore not included in the Plan. Additionally, the proposed use is an interim use and not the approved end use for the property. Staff finds the following Comprehensive Plan policy to be applicable to this property and apply to the proposed use (staff analysis in italics): • "Minimize noise, odor, air pollution, and visual pollution in industrial and commercial development adjacent to residential areas." (3.06.01 B) The applicant is required to minimize air and noise pollution as much as possible by the means specified in Exhibit B of this report. • "Protect public health by reducing ozone, fine particulate matter and other greenhouse gases and toxics in the air." (5.03.01) The applicant is responsible to water the site and apply mulch to contain material on the site as often as necessary to reduce the amount offine particulate matter from traveling through the air to adjacent residential properties. • "Require industrial development to conform to Federal and State air, water, and noise pollution standards, and local landscaping, traffic, noise, and environment standards." (3.06.01D) The applicant is required to comply with all Federal and State standards applicable to the proposed use. VHL UNIFIED DEVELOPMENT CODE (UDC) A. Purpose Statement of Zone: The purpose of the residential districts is to provide for a range of housing opportunities consistent with the Meridian Comprehensive Plan. Connection to the City Southridge Gravel Mining MCU -14-001 PAGE 5 EXHIBIT A of Meridian water and sewer systems is a requirement for all residential districts. Residential districts are distinguished by the allowable density of dwelling units per acre and corresponding housing types that can be accommodated within the density range. The subjectproperty is located in the R-2, R-4, and R-8 zoning districts and is planned to ultimately develop with single-family residences. B. Schedule of Use: Unified Development Code (UDC) 11-2A-2 lists the principal permitted, accessory, conditional, and prohibited uses in the R-2, R-4, and R-8 zoning districts. The proposed construction sand and gravel mining use is listed as a conditional use in all of the aforementioned districts; crushing of material is prohibited. C. Dimensional Standards: The dimensional standards listed in UDC Table 11 -2A -4,11-2A-5, and 11-2A-6 for the R-2, R-4, and R-8 zoning districts apply to development of this site. D. Landscaping Standards (UDC 11-313): NA E. Off -Street Parking: NA IX. ANALYSIS A. Analysis of Facts Leading to Staff Recommendation: CONDITIONAL USE PERMIT MODIFICATION (MCU) Request: The applicant has submitted a request to modify the existing conditional use permit (MCU -12-003) by extending the period of time in which they can operate the previously approved use for an additional 18 months; 60 days of which would be used to extract/mine the remaining approximate 10% of material from the ground and crush that material. Within this time period, the existing 200,000+/- tons (or 110,000+/- cubic yards) of already processed material and additional processed material proposed to be mined will be hauled off as the market demands and the site will be reclaimed in accord with the approved grading and reclamation plan. The final grading of the site would be complete by the end of the 18 month period and the site would be ready for residential development. The 60 days requested to excavate/mine and crush the remaining material could commence upon approval of the subject MCU or during the winter or spring months when the soil is damp so as to create less dust. Either way, the 60 days would be consecutive once commenced. The applicant further requests that if the City does not allow the crushing of material on the site that they still be allowed to excavate/mine the remaining material from the ground and have it crushed elsewhere off the site. The applicant does not propose any other changes to the previous conditions of approval. Staff has carefully reviewed the applicant's request and, based on the facts and analysis described in more detail below, does not support several of the applicant's requested provisions. Mining Defined: The previous and proposed use of the site is classified in Idaho State Code (§47-1503) as a "surface mining operation" and is defined as follows, "the activities performed on a surface mine in the extraction of minerals from the ground, including the excavating of pits, removal of minerals, disposal of overburden, and the construction of haulage roads, exclusive of exploration operations ... " The UDC (I 1-1A-1) defines "construction sand and gravel mining" as follows, "The use of a site for one or more of the following activities: a) operating commercial grade (i.e. construction) sand and gravel pits; b) dredging for commercial grade sand and gravel; and Southridge Gravel Mining MCU -14-001 PAGE 6 EXHIBIT A c) washing, screening, or otherwise preparing commercial grade sand and gravel (excluding crushing operations)." For clarification and further definition of what operating a commercial grade sand and gravel pit/surface mining operation includes, the following activities will also be addressed in this report: • extracting/digging/removing material from the ground with the intent to process said material into a saleable product and/or; • the existence of a portable scale, scale house/office and/or other temporary structure(s), conveyors, screens, crushing equipment, etc. on the site; • weighing material to be hauled from the site; • sale of material on/froln the site; • hauling of processed/mined material from the site; and, • grading of the pit(s), ridge(s), road(s), etc. resulting from the mining operation and reclamation of the site after mining has been completed. Note: Although the City does deem hauling off ofprocessed material to be part of the mining use, it was allowed to continue after the expiration of MCU -11-001 solely as a means to an end— the material needs to be removed from the site. Staff did not believe a delay during the interim of the request for on extension and decision on the matter would be in the best interest of the City, the neighbors/public, or the applicant. Issues and Analysis: • There are massive stockpiles of processed/crushed material on the site that need to be hauled off as part of the mining operation before reclamation (grading and slope stabilization) of the site can occur. Because this processed material is a product of the mining operation and not merely excess native unprocessed material needing to be removed to achieve a grade level acceptable for development, staff determines the hauling off of the material is part of operating a construction sand and gravel mine and therefore, requires a CUP. • There is considerable grading and reclamation work that needs to be completed on the site by the applicant in order to prepare the site for a residential development. Staff determines this work is directly associated with and resulting frons the mining activity/process on the site and therefore, requires a CUP. • Because the mining use on this site has been and is still proposes to be "market driven," it is taking longer to conclude than would be typical for an operation that simply mines the site, reclaims it and leaves. Because this use is directly adjacent to a residential development rather than an industrial or rural area, the ongoing use may be detritnental to the neighbors. Staff believes the additional 18 months requested by the applicant in which to conclude operations is excessive as operations have already been occurring for 3 years and were anticipated to conclude within that time period- if not market driven, the operation would most likely be complete. • There have been allegations from neighbors of airborne material blowing onto their properties from the site that contain a high amount of silica (87%, based on a private analysis). The neighbors are vety concerned about potential health impacts from this material generated from the mine. While the City is not a regulating authority on air Soulhridge Gravel Mining MCU -I4-001 PAGE 7 EXHIBIT A quality, the City is concerned for the health of the public and any such potential adverse impacts from the proposed use. If the MCU request is denied, the site will be left with a huge amount of processed material and uneven land with pits and ridges and haul roads that will still need to be dealt with in the future in order to develop the site. Staff does not believe ceasing all operations at this would be in the best interest of the City, neighbors, or applicant; it would only delay the inevitable of grading and hauling off of previously process materials. If the MCU application is approved as requested by the applicant, the impact on the neighbors will continue for another 18 months. The applicant originally requested a 3 year period of time in which to mine and reclaim the site; that time is up and the neighbors have been relatively cooperative up until this point believing that it would be over at the end of the 3 years. Staff does not believe approving the MCU with all of the terms requested by the applicant is in the best interest of the City, adjacent residents or the general public. Public Testimony/Impacts: As of April l Os', 34 letters of testimony along with a petition has been submitted to the City. All of the testimony is in opposition of the continuation of the mining use on the site based on what they deem to be excessive noise, dust, truck traffic, visual blight of the site from their properties, perceived decline in property values, and health concerns based on the air quality generated by the mining operation. However, most letters seem to recognize that the existing stockpile of material needs to be removed and the site needs to be reclaimed in order for the mining operation to conclude. Therefore, they're willing to support a modification to the CUP based on the following conditions: 1. No more crushing; 2. Immediate reclamation of all portions of the site except where the stockpile is located; 3. Move the scale house to the north side of the stockpile to minimize dust and noise; 4. Treat stockpiles with magnesium chloride to alleviate dust; water other areas as necessary; 5. Load and haul from the north side of the stockpile leaving the south side as a buffer against noise and dust until the very end; 6. No more extraction of material from the site; 7. That the applicant be responsive to and monitor silica within the adjacent subdivisions and not just the pit; 8. Reclaim the remaining area and vacate the site; 9. Accomplish this within a reasonable time frame (general consensus is 4 months but the minimum time physically possible); 10. Ramifications and Idaho Sand and Gravel signature on an agreement. Governing Agencies for Mining: Mine Safety and Health Administration (MSHA): MSHA is a division of the U.S. Department of Labor which administers the provisions if the Federal Mine Safety and Health Act of 1977 to enforce compliance with mandatory safety and health standards as a means to eliminate fatal accidents to reduce the frequency and severity of nonfatal accidents, to Southridge Gravel Mining MCU -14-001 PAGE 8 EXHIBIT A minimize health hazards, and to promote improved safety and health conditions in the nation's mines. MSHA carries out the mandates of the Mine Act at all mining and mineral processing operations in the United States, regardless of size, number of employees, commodity mined, or method of extraction. MSHA has jurisdiction over mines when material is being excavated from the ground and/or when portable crushing equipment is being used. Permits for mines are handled under local and/or state jurisdiction. Department of Environmental Quality (DEQ): The DEQ is the department of the Idaho state government responsible for administration of state and federal environmental laws and regulations, including those related to air and water quality. The DEQ issues a "permit by rule" for mobile crushers and related equipment which does not expire. Staff confirmed with Dave Luft, Air Quality Manager at DEQ, that the subcontractor in charge of crushing operations on the site, H &B Crushing, does have the necessary permit for the crushing equipment that has been previously used on the site. On March 21, 2014, a DEQ inspector conducted a complaint based investigation at the gravel pit. At the time of the investigation, operations on the site were deemed to be in compliance with permit requirements and a records review was not conducted. It was determined that DEQ did not have significant concerns regarding the dust impacts on air quality or water quality in the Ridenbaugh Canal. DEQ has visited the site several times since the original complaint and hasn't observed any significant air quality issues. Crushing equipment is typically inspected while in operation every 5 years; no inspections of the equipment had been conducted on this site prior to March 21". State air quality rules require the implementation of reasonable precautions to prevent fugitive dust from leaving property boundaries under normal atmospheric conditions. The Hiles do not require the elimination of all fugitive dust but that reasonable steps are taken to prevent its occurrence such as, watering of haul roads and stockpiles, paving or oiling of haul roads, sweeping up track -out, etc. The inspector determined that the applicant is taking reasonable precautions to prevent fugitive dust emissions from leaving the facility. They were in compliance with the DEQ issued air quality permit operating opacity (amount of site that is obscured by dust) requirements, as well as the state's fugitive dust rules. No permits are required by the Environmental Protection Agency (EPA) for the operation of gravel pits. Bureau of Reclamation: The Bureau of Reclamation is a federal agency under the U.S. Department of the Interior, which oversees water resource management. The Idaho Surface Mining Act (§47-1506) requires the operator of a surface mine to obtain an approved reclamation plan and bond. The Bureau of Reclamation is holding a surety bond in the amount of $17,221.88 and a reclamation plan (50602904). Additional Information: Biological Evaluation: The applicant submitted a Biological Evaluation prepared by Axiom - Points, LLC, dated May of 2010. The evaluation was prepared to identify and analyze the potential effect to endangered species and special status species as identified by Idaho Fish and Game (IFG) within the project area. Based on reports from 1FG and the U.S. Department of the Interior, Idaho Fish and Wildlife Office, no endangered or special status species were believed to be in the project area; therefore, the evaluation found there would be no effect to endangered or sensitive species. The full report is included in the public record. Southridge Gravel Mining MCU -14-001 PAGE 9 EXHIBIT A Williams Pipeline: The Williams Pipeline crosses the southwest corner of the site as shown on the site plan in Exhibit A.2. No material is proposed to be or has been approved to be removed from within the pipeline easement or on the west side of the easement. Comments have been received on this application from Gordon Hamilton on behalf of the Williams Pipeline. Staff has included a condition in Exhibit B based on his comments (see #1.1.13). Hours of Operation: The previous approved hours of operation on the site for mass grading, gravel extraction, rock crushing, loading and hauling were limited to weekdays (Monday thru Friday) between the hours of 8:00 a.m. and 5:00 p.m. The Commission approved extended hours of operation solely for the removal of material from the site on non -holiday weekdays (Monday thru Friday) between the hours of 6 am and 6 pm. The applicant has requested to continue fill -scale sand and gravel raining on the site. Staff does not support the intensity of the operation as proposed. Staff recommends a compromise of saris that would allow a more limited paining operation to continue with a focus on reclaiming the site per the approved grading and reclamation plan and removing the existing stockpiles within a 6 month time period. Further excavation/processing of material from the ground would not be allowed, except for the removal of native unprocessed material necessary to achieve the grade on the approved grading plan. Staff Recommendation: Based on the above -noted issues, analysis, public testimony submitted by adjacent neighbors, and the Findings listed in Exhibit C, staff recommends approval of a modified version of the applicant's request per the conditions included in Exhibit B. Staff believes approving the request under these conditions is in the best interest of the City and neighbors and will ultimately benefit the applicant more than a decision of denial. X. EXHIBITS A. Drawings 1. Vicinity Map 2. Project Overview & Site Plan (dated: 12/3/10) 3. Grading Plans (dated: 12/3/10) B. Conditions of Approval 1. Planning Department 2. Public Works Department 3. Fire Department 4. Police Department 5. Sanitary Service Company 6. Parks Department 7. Ada County Highway District C. Required Findings from Unified Development Code (UDC) Southridge Gravel Mining MCU -14-001 PAGE 10 EXHIBIT A Exhibit A.1: Vicinity Map a x F TBE E AND GROUP I,1 11 In ippF�, aye a>w 1�+, 1�31liY1Ml = Fds 3td.4+g:u�5 •.s�a..�.®®�,�' �. p vin Sauthridge Gravel Mining Conditional Use Permit VUnity Mao Aftfam Southridge Gravel Mining MCU -14-001 PAGE 11 EXHIBIT A Exhibit A.2: Project Overview & Site Plan (dated: 12/3/10) Southridge Gravel Mining MCU -I4-001 PAGE 12 EXHIBIT A Exhibit A.3: Grading Plans (dated: 12/3/10) Southridge Gravel Mining MCU -14-001 PAGE 13 EXHIBIT A 22!1- A .`�`7 A 1 ww /law'v3v�' C1.11 Southridge Gravel Mining MCU -14-001 PAGE 14 EXHIBIT A B. Conditions of Approval 1. PLANNING DEPARTMENT 1.1 Site Specific Conditions of Approval 1.1.1 No further mining/excavation of material from the ground and/or processing/screening/crushing of material shall be allowed on the site. This does not include the removal of native, unprocessed material that may need to he removed from the site to achieve the final grade shown on the approved grading plan which is allowed. 1.1.2 Reclamation of the site shall begin immediately, leaving the areas where the stockpiles are located until last. 1.1.3 The applicant shall have a maximum period of six (6) months in which to complete reclamation of the site in accord with the approved grading and reclamation plans, including hauling off existing stockpiles and removal of all equipment. ALL reclamation shall be complete by November 1, 2014 (6 months from the date the Findings are approved) — no further extensions will be considered. 1.1.4 The screening equipment, conveyor(s), and other related equipment, excluding the scales and associated scale house/office, shall be removed from the site by May 9, 2014. 1.1.5 The stockpiles shall be treated with magnesium chloride (or other comparable material) to prevent dust from blowing onto adjacent properties. If this treatment is not efficient in controlling dust, sprinklers shall be installed on the piles and the piles watered as necessary. 1.1.6 _94h side 8fthe mMaterial shall be loaded and hauled from the north side of the stockpile(s) leaving the southernmost stockpile(s) as a buffer against noise and dust until last. 1.1.7 The work hours for loading, hauling, grading, and other reclamation related activities shall be limited to non -holiday weekdays (Monday thru Friday) between the hours of 7:00 a.m. and 6:00 p.m. 1.1.8 Noise created from the proposed use shall not create a public disturbance between the hours of 11:00 p.m. and 6:00 am or at any time so as to unreasonably disturb or interfere with the peace, comfort or enjoyment of others in accord with Meridian City Code 6-3-6. 1.1.9 The extraction/grading area(s) and haul roads shall be watered daily as often as necessary to reduce dust impacts to surrounding properties. Haul roads shall be graded to drain all surface water away from the haul roads and such drainage shall be confined to the site. 1.1.10 The applicant shall comply with all notices and compliances required by, but not limited to, Federal, State, City laws and regulations applicable to the proposed use. 1.1.11 The applicant shall comply with MCC 7-1-13 "Uncovered Loads Prohibited" when hauling material from the site. 1.1.12 The applicant shall maintain the bond (#09036838 & 09036842) with Fidelity and Deposit Company of Maryland for the cost of completing the reclamation of the site to ensure the site is graded as shown on the grading plan attached in Exhibit A.3 and re -vegetated at the end of the mining project in accord with the Bureau of Reclamation's requirements. 1.1.13 No activities shall occur within the 75 -foot wide Williams Pipeline easement without property and timely notification to Williams Pipeline. Working and finish grades adjacent to the easement shall meet stable sloping guidelines to prevent erosion or slope failure that may impact the cover over the pipelines. The applicant shall submit documentation indicating the Southridge Gravel Mining MCU -14-001 PAGE 15 EXHIBIT A maximum working and finished grade at all points along the easement boundary to Williams Pipeline. No blasting shall be allowed within 500 feet of the pipeline easement without prior evaluation and monitoring of particle velocities by Williams Pipeline. 1.2 General Conditions of Approval 1.2.1 Comply with all bulk, use, and development standards of the applicable district listed in UDC Chapter 2 District regulations. 1.2.2 Comply with all provisions of 11-3A-3 with regard to access to streets. 1.2.3 Comply with the provisions for irrigation ditches, laterals, canals and/or drainage courses, as set forth in UDC 11-3A-6. 1.2.4 Comply with all provisions of UDC 11-3A-3 with regard to maintaining the clear vision triangle. 1.3 Ongoing Conditions of Approval 1.3.1 The conditional use may only be transferred or modified consistent with the provisions as set forth in UDC 11-511-6G. The applicant shall contact Planning Division staff regarding any proposed modification and/or transfer of ownership. 2. PUBLIC WORKS DEPARTMENT 2.1 The Public Works Department has no comments on this application. 3. FIRE DEPARTMENT 3.1 The following will be the requirements and/or concerns to provide minimum levels of fire protection for the proposed project: a. All radii shall be 28' inside and 48' outside radius. b. The driveways shall have a 20' wide driving surface available at all times. c. The most remote portion of any structure as measured around the perimeter shall be within 150' of a fire lane or paved surface capable of supporting 75,000 lbs. d. Driveways greater than 150' in length shall be provided with an approved turn -around. e. The storage of any Hazardous Materials and Flammable/ Combustible Liquids will have to comply with the requirements of the International Fire Code. 4. POLICE DEPARTMENT 4.1 The applicant shall comply with all City ordinances including noise (MCC 6-3-6). 5. SANITARY SERVICES 5.1 SSC has no concerns related to this application. 6. PARKS DEPARTMENT 6.1 The Parks Department had no comments on this application. 7. ADA COUNTY HIGHWAY DISTRICT ACHD did not submit comments on this application. Southridge Gravel Mining MCU -14-001 PAGE 16 EXHIBIT A C. Required Findings from Unified Development Code (UDC) 1. Conditional Use Permit (UDC 11-513-6E) The Commission shall base its determination on the Conditional Use Permit request upon the following: a. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The City Council finds that the subject property is large enough to accommodate the proposed use; there is no development proposed, therefore, compliance with dimensional and development regulations are not applicable (see Analysis Section Dt for more information). b. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this Title. Due to the nature of the proposed use, the City Council finds it will lower the grade level and ultimately prepare the site for future residential development, which is harmonious with the Comprehensive Plan. c. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. Because of the site's proximity to regional transportation infrastructure and public and private projects, the material mined from this site has been used in many construction projects within the City and general area and the use has been compatible with these uses. However, the intended character of the site and nearby area is residential. The mining use of the property, although an interim use, has adversely affected the residential character of the area due to dust, noise and visual blight from/of the site. Therefore, the City Council finds the proposed use is not compatible with existing residential uses in the general vicinity of the site. The City Council approves of the MCU only to extend the time period in which they can reclaim the site and conclude the mining operation. d. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity. The City Council finds that if the applicant complies with the conditions outlined in this report, the proposed use should not significantly adversely affect other properties in the area. e. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools, parks, police and fire protection, drainage structures, refuse disposal, water, and sewer. The City Council finds the proposed use will be adequately served by essential public facilities. The mass grading and material transport aspects of the project have limited public facility needs, mainly consisting of access to public streets; the site has direct access to W. Overland Road. Southridge Gravel Mining MCU -14-001 PAGE 17 EXHIBIT A f. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. If approved, the applicant will be financing any costs associated with the proposed use. The City Council finds there will not be excessive additional requirements at public cost and that the proposed use will not be detrimental to the community's economic welfare. g. That the proposed use will not involve activities or processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. The City Council recognizes there may be activities associated with the proposed use (as restricted by staff) such as production of traffic and noise that may impact persons, property or the general welfare. Based on the restrictions of the subject approval, the City Council finds these impacts should not be excessive. h. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. The City Council is unaware of any natural, scenic or historic features on the site of major importance. Therefore, the City Council finds the proposed use will not result in the destruction, loss or damage of such features. i. That the duration and intensity of the proposed mining activities are appropriately addressed in the conditions of approval. The City Council finds the conditions of approval contained in Exhibit B of this report limit the term of the proposed use to an additional six (6) months and address the intensity and terns of such use. j. That the environmental impacts of the proposed mining activities are appropriately addressed in the conditions of approval, including but not limited to dust, groundwater safety, stormwater runoff, slope stability, and preservation of natural resources. The City Council included conditions of approval with the original CUP requiring the applicant to submit documentation from applicable agencies that the proposed use is in compliance with all federal and state regulations in regard to air and water quality and site reclamation, which the applicant has done. k. That the noise impacts and hours of operation of the proposed mining activities are appropriately addressed in the conditions of approval; and The City Council finds the conditions of approval in Exhibit B include restricted hours of operation and restrictions on the type of operations that may occur on the site that should reduce noise impacts. 1. That timing and responsible party of implementing approved reclamation plans are appropriately addressed in the conditions of approval. The City Council finds the conditions of approval in Exhibit B address a timeframe in which the site must be reclaimed and tic reclamation to a previously approved grading and reclamation plan. Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER: FP 14-028 ITEM TITLE: Oaks South No. 2 Final Plat approval consisting of 34 single family residential lots and 9 common lots on 1 1.23 acres of land in the R-4 zoning district by Coleman Homes LLC - south side of W. McMillan Road between N. McDermott Road and N. Black Cat Road MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: 5D PROJECT NUMBER: PP 14-004 ITEM TITLE: Develoment Agreement for Biltmore Subdivision by L.C. Development, Inc. Located South of W. Victory Road and West of S. Meridian Road Request: Preliminary Plat Approval Consisting of 159 Single Family Residential Building Lots and Twelve (12) Common/Other Lots on 56.19 Acres of Land in an R-4 Zoning District MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS ADA COUNTY RECORDER Chrislopher D. Rich AMOUNT .00 40 BOISE IDAHO 07102114 11:02 AM RDEPUTY Nola Olson ECORDED -REQUEST OF III IIIIIIIIII'IIII IIIIIIIIIII�I' �I III Meridian City 114052424 DEVELOPMENT AGREEMENT PARTIES: 1. City of Meridian 2. L.C. Development, Inc., Owner/Developer THIS DEVELOPMENT AGREEMENT (this Agreement), is made and entered into this 1 day of W 2014, by and between City of Meridian, a municipal corporation of the State of Idaho, hereafter called CITY whose address is 33 E. Broadway Avenue, Meridian, Idaho and L. C. Development, Inc., whose address is PO Box 518, Meridian, Idaho 53680, hereinafter called OWNER/DEVELOPER. 1. RECITALS: 1.1 _ WHEREAS, Owner/Developer is the sole owner, in law and/or equity, of certain tract of land in the County of Ada, State of Idaho, described in Exhibit "A", which is attached hereto and by this reference incorporated herein as if set forth in full, herein after referred to as the Property; and 1.2 WHEREAS, Idaho Code § 67-6511A provides that cities may, by ordinance, require or permit as a condition of zoning that the Owner/Developer make a written commitment concerning the use or development of the subject Property; and 1.3 WHEREAS, City has exercised its statutory authority by the enactment of Section 11-513-3 of the Unified Development Code ("UDC"), which authorizes development agreements upon the annexation and/or re -zoning of land; and 1.4 WHEREAS, the property described in Exhibit "A" was part of the Victory South annexation that was processed as a "Category B" annexation. One of the provisions of the Declaration of Consent to Annexation is that the property may not develop (or receive development approval) until such time as the property owners and the City execute a Development Agreement (DA). Therefore, in compliance with this provision, a DA is required to be approved by City Council and recorded prior to submittal of a final plat application; and 1.5 WHEREAS, Owner/Developer has submitted an application for preliminary plat consisting of 159 single-family residential building lots and 12 common/other lots on 56.19 acres of land in an R-4 zoning district as described in Exhibit "A; and DEVELOPMENT AGREEMENT-BILTMORE ESTATES SUBDIVISION (PP 14-004) PAGE 1 OF 8 1.6 WHEREAS, Owner/Developer made representations at the public hearings both before the Meridian Planning & Zoning Commission and before the Meridian City Council, as to how the subject Property will be developed and what improvements will be made; and 1.7 WHEREAS, the record of the proceedings for the requested preliminary plat of the subject Property held before the Planning & Zoning Commission, and subsequently before the City Council, includes responses of government subdivisions providing services within the City of Meridian planning jurisdiction, and includes further testimony and comment; and 1.8 WHEREAS, on the 6`h day of May, 2014, the Meridian City Council approved certain Findings of Fact and Conclusions of Law and Decision and Order ("Findings"), which have been incorporated into this Agreement and attached as Exhibit "B"; and 1.9 WHEREAS, the Findings require the Owner/Developer to enter into a Development Agreement before the City Council takes final action on Final Plat approval; and 1.10 WHEREAS, Owner/Developer deems it to be in its best interest to be able to enter into this Agreement and acknowledges that this Agreement was entered into voluntarily and at its urging and request; and 1.11 WHEREAS, City requires the Owner/Developer to enter into a development agreement for the purpose of ensuring that the Property is developed and the subsequent use of the Property is in accordance with the terms and conditions of this Agreement, herein being established as a result of evidence received by the City in the proceedings for zoning designation from government subdivisions providing services within the planning jurisdiction and from affected property owners and to ensure zoning designation are in accordance with the amended Comprehensive Plan of the City of Meridian on April 19, 2011, Resolution No. 11-784, and the UDC, Title 11. NOW, THEREFORE, in consideration of the covenants and conditions set forth herein, the parties agree as follows: 2. INCORPORATION OF RECITALS: That the above recitals are contractual and binding and are incorporated herein as if set forth in full. 3. DEFINITIONS: For all purposes of this Agreement the following words, terms, and phrases herein contained in this section shall be defined and interpreted as herein provided for, unless the clear context of the presentation of the same requires otherwise: DEVELOPMENT AGREEMENT-BILTMORE ESTATES SUBDIVISION (PP 14-004) PAGE 2 OF 8 3.1 CITY: means and refers to the City of Meridian, a party to this Agreement, which is a municipal Corporation and government subdivision of the state of Idaho, organized and existing by virtue of law of the State of Idaho, whose address is 33 East Broadway Avenue, Meridian, Idaho 83642. 3.2 OWNER/DEVELOPER: means and refers L.C. Development, Inc., whose address is PO Box 518, Meridian, Idaho 83680, the party that is developing said Property and shall include any subsequent owner/developer(s) of the Property. 3.3 PROPERTY: means and refers to that certain parcel(s) of Property located in the County of Ada, City of Meridian as described in Exhibit "A" describing the parcel zoned Medium Low Density Residential District (R-4) and attached hereto and by this reference incorporated herein as if set forth at length. 4. USES PERMITTED BY THIS AGREEMENT: This Agreement shall vest the right to develop the Property in accordance with the terms and conditions of this Agreement. 4.1 The uses allowed pursuant to this Agreement are only those uses allowed under the UDC. 4.2 No change in the uses specified in this Agreement shall be allowed without modification of this Agreement. 5. CONDITIONS GOVERNING DEVELOPMENT OF SUBJECT PROPERTY: 5.1. Owner/Developer shall develop the Property in accordance with the following special conditions: a. Direct lot access to S. Kentucky Way and W. Harris Street, both collector streets, is prohibited in accord with UDC 11-3A-3. b. All development within the Williams pipeline easement at the southwest corner of the site shall comply with the Williams Gas Pipeline Developers' Handbook. An encroachment permit is required for any development improvements within the pipeline easement. C. Future development of this site shall be generally consistent with the site plan and conceptual building elevations submitted with this application included in Exhibits A.4 and A.5 as set forth in the attached Findings (Exhibit B). d. The rear and/or sides of homes on lots that face or back up to S. Kentucky Way and W. Harris Street, both collector streets, shall incorporate articulation through changes in materials, color, modulation, and architectural elements (horizontal and vertical) to break up monotonous wall planes and roof lines. DEVELOPMENT AGREEMENT-BILTMOREESTATES SUBDIVISION (PP 14-004) PAGE 3 OF 8 e. All existing structures on the site are required to be removed prior to signature on the first phase final plat by the City Engineer, except for the existing home in Phase 2 which is allowed to remain until signature on the 2nd phase final plat by the City Engineer. f The park proposed on Lot 1, Block 7 shall be constructed with phase 2 of the development. 6. COMPLIANCE PERIOD This Agreement must be fully executed within two (2) years after the date of the Findings for the Preliminary Plat or it is null and void. 7. DEFAULT/CONSENT TO DE -ANNEXATION AND REVERSAL OF ZONING DESIGNATION: 7.1 Acts of Default. Either party's failure to faithfully comply with all of the terms and conditions included in this Agreement shall constitute default under this Agreement. 7.2 Notice and Cure Period. In the event of Owner/Developer's default of this Agreement, Owner/Developer shall have thirty (30) days from receipt of written notice from City to initiate commencement of action to correct the breach and cure the default, which action must be prosecuted with diligence and completed within one hundred eighty (180) days; provided, however, that in the case of any such default that cannot with diligence be cured within such one hundred eighty (180) day period, then the time allowed to cure such failure may be extended for such period as may be necessary to complete the curing of the same with diligence and continuity. 7.3 Remedies. In the event of default by Owner/Developer that is not cured after notice as described in Section 7.2, Owner/Developer shall be deemed to have consented to modification of this Agreement and de -annexation and reversal of the zoning designations described herein, solely against the offending portion of Property and upon City's compliance with all applicable laws, ordinances and rules, including any applicable provisions of Idaho Code §§ 67-6509 and 67-6511. Owner/Developer reserves all rights to contest whether a default has occurred. This Agreement shall be enforceable in the Fourth Judicial District Court in Ada County by either City or Owner/Developer, or by any successor or successors in title or by the assigns of the parties hereto. Enforcement may be sought by an appropriate action at law or in equity to secure the specific performance of the covenants, agreements, conditions, and obligations contained herein. 7.4 Delay. In the event the performance of any covenant to be performed hereunder by either Owner/Developer or City is delayed for causes that are beyond the reasonable control of the party responsible for such performance, which shall include, without limitation, acts of civil disobedience, strikes or DEVELOPMENT AGREEMENT- BILTMORE ESTATES SUBDIVISION (PP 14-004) PAGE 4 OF 8 similar causes, the time for such performance shall be extended by the amount of time of such delay. 7.5 Waiver. A waiver by City of any default by Owner/Developer of any one or more of the covenants or conditions hereof shall apply solely to the default and defaults waived and shall neither bar any other rights or remedies of City nor apply to any subsequent default of any such or other covenants and conditions. 8. INSPECTION: Owner/Developer shall, immediately upon completion of any portion or the entirety of said development of the Property as required by this Agreement or by City ordinance or policy, notify the City Engineer and request the City Engineer's inspections and written approval of such completed improvements or portion thereof in accordance with the terms and conditions of this Agreement and all other ordinances of the City that apply to said Property. 9. REQUIREMENT FOR RECORDATION: City shall record this Agreement, including all of the Exhibits, and submit proof of such recording to Owner/Developer, prior to the third reading of the Meridian Zoning Ordinance in connection with the re -zoning of the Property by the City Council. If for any reason after such recordation, the City Council fails to adopt the ordinance in connection with the annexation and zoning of the Property contemplated hereby, the City shall execute and record an appropriate instrument of release of this Agreement. 10. ZONING: City shall, following recordation of the duly approved Agreement, enact a valid and binding ordinance zoning the Property as specified herein. 11. SURETY OF PERFORMANCE: The City may also require surety bonds, irrevocable letters of credit, cash deposits, certified check or negotiable bonds, as allowed under the UDC, to insure the installation of required improvements, which the Owner/Developer agrees to provide, if required by the City. 12. CERTIFICATE OF OCCUPANCY: No Certificates of Occupancy shall be issued in any phase in which the improvements have not been installed, completed, and accepted by the City. 13. ABIDE BY ALL CITY ORDINANCES: That Owner/Developer agrees to abide by all ordinances of the City of Meridian unless otherwise provided by this Agreement. 14. NOTICES: Any notice desired by the parties and/or required by this Agreement shall be deemed delivered if and when personally delivered or three (3) days after deposit in the United States Mail, registered or certified mail, postage prepaid, return receipt requested, addressed as follows: CITY.- with copy to: City Clerk City Attorney City of Meridian City of Meridian 33 E. Broadway Ave. 33 E. Broadway Avenue Meridian, Idaho 83642 Meridian, ID 83642 DEVELOPMENT AGREEMENT-BILTMOREESTATES SUBDIVISION (PP 14-004) PAGE 5 OF 8 OWNERIDEVELOPER: L.C. Development, Inc. P. O. Box 518 Meridian, ID 83680 14.1 A party shall have the right to change its address by delivering to the other party a written notification thereof in accordance with the requirements of this section. 15. ATTORNEY FEES: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorney's fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate contract between the parties and shall survive any default, termination or forfeiture of this Agreement. 16. TIME IS OF THE ESSENCE: The parties hereto acknowledge and agree that time is strictly of the essence with respect to each and every term, condition and provision hereof, and that the failure to timely perform any of the obligations hereunder shall constitute a breach of and a default under this Agreement by the other party so failing to perform. 17. BINDING UPON SUCCESSORS: This Agreement shall be binding upon and inure to the benefit of the parties' respective heirs, successors, assigns and personal representatives, including City's corporate authorities and their successors in office. This Agreement shall be binding on the Owner/Developer, each subsequent owner and any other person acquiring an interest in the Property. Nothing herein shall in any way prevent sale or alienation of the Property, or portions thereof, except that any sale or alienation shall be subject to the provisions hereof and any successor owner or owners shall be both benefited and bound by the conditions and restrictions herein expressed. City agrees, upon written request of Owner/Developer, to execute appropriate and recordable evidence of termination of this Agreement if City, in its sole and reasonable discretion, had determined that Owner/Developer has fully performed its obligations under this Agreement. 18. INVALID PROVISION: If any provision of this Agreement is held not valid by a court of competent jurisdiction, such provision shall be deemed to be excised from this Agreement and the invalidity thereof shall not affect any of the other provisions contained herein. 19. DUTY TO ACT REASONABLY: Unless otherwise expressly provided, each party shall act reasonably in giving any consent, approval, or taking any other action under this Agreement. 20. COOPERATION OF THE PARTIES: In the event of any legal or equitable action or other proceeding instituted by any third party (including a governmental entity or official) challenging the validity of any provision in this Agreement, the parties agree to cooperate in defending such action or proceeding. 21. FINAL AGREEMENT: This Agreement sets forth all promises, inducements, agreements, condition and understandings between Owner/Developer and City relative to the subject DEVELOPMENT AGREEMENT- BTLTMORE ESTATES SUBDIVISION (PP 14-004) PAGE 6 OF 8 matter hereof, and there are no promises, agreements, conditions or understanding, either oral or written, express or implied, between Owner/Developer and City, other than as are stated herein. Except as herein otherwise provided, no subsequent alteration, amendment, change or addition to this Agreement shall be binding upon the parties hereto unless reduced to writing and signed by them or their successors in interest or their assigns, and pursuant, with respect to City, to a duly adopted ordinance or resolution of City. 21.1 No condition governing the uses and/or conditions governing re -zoning of the subject Property herein provided for can be modified or amended without the approval of the City Council after the City has conducted public hearing(s) in accordance with the notice provisions provided for a zoning designation and/or amendment in force at the time of the proposed amendment. 22. EFFECTIVE DATE OF AGREEMENT: This Agreement shall be effective on the date first above written and upon execution of the Mayor and City Clerk. [end of text; signatures, acknowledgements, and Exhibits A and B follow] ACKNOWLEDGMENTS IN WITNESS WHEREOF, the parties have herein executed this agreement and made it effective as hereinabove provided. OWNER/DEVELOPER: L.C. Development, Inc. By CITY OF MERIDIAN By: Uov P, ='D AUCb.S Mayor y de Weerd o� ATTEST: _ n City of IDAHO Holman, City Clerk ` r FR O�IAe iRCRSUPU DEVELOPMENT AGREEMENT—BILTMORE ESTATES SUBDIVISION (PP 14-004) PAGE 7 OF 8 STATE OF IDAHO ) ss: County of Ada, On this -�i day of , 2014, before me, the undersigned, a Notary Public in and for said State, personally app red L' ('�Piri�'B✓g known or identified to me to be the Rez61 a(p,r-+ of L.C. Development, Inc., and acknowledged to me that he executed th same on behalf of said Company. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written. (SEAL) SCA L. ••g FVE xr �l % yip• ^j� �'exa� x.,u•1��0��� M•'Bl i:. a D i V byi STATE OF IDAHO• ) ss County of Ada Residing at: 4 My Commission Q1 On this day of , 2014, before me, a Notary Public, personally appeared Tammy de Weerd and Jaydee L. Holman, know or identified to me to be the Mayor and Clerk, respectively, of the City of Meridian, who executed the instrument or the person that executed the instrument of behalf of said City, and acknowledged to me that such City executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written. •.,Ones,.• •Op• J01y •. (SEAL) : �Sti�TARp s'0 ItI 00 p• ••4TE C--��� Noi ryy Public for Idaho Residing at: ( Commission expires: a- a DEVELOPMENT AGREEMENT —BILTMORE ESTATES SUBDIVISION (PP 14-004) PAGE 8 OF 8 1101 -til �V.N Legal Description Biltmore Estates A parcel located In the S % of the N % of Section 25, Township 3 North, Range 1 West, Boise Meridian, City of Meridian, Ada County, Idaho, and more particularly described as follows: Commencing at a Brass Cap monument marking the southeast comer of the NE'/, of said Section 25, from which a Brass Cap monument marking the northeast corner of said NE bears N 0025'47" E a distance of 2642.94 feet; Thence N 89029'05" W along the southerly boundary of said NE '/+ a distance If 1320.30 feet to a 5/8 Inch diameter Iron pin marking the southeasterly corner of Meridian Heights No. 3 Subdivision as shown In Book 62 of Plats on Pages 6274 and 6275, Records of Ada County, Idaho, and the POINT OF BEGINNING; Thence continuing along said southerly boundary N 89°23'56" W a distance of 1320.68 feet to a 6/8 inch diameter Iron pin marking the southwest corner of said NE 1/n; Thence N 89026'30" W along the southerly boundary of the NW 1/1 of sold Section 25 a distance of 143.16 feet to a 5/8 Inch diameter Iron pin on the northerly and easterly easement line of the Sundall Lateral; Thence along said northerly and easterly easement line the following described courses; Thence N 45°31'35" W a distance of 113.85 feet to a 5/8 Inch diameter Iron pin; Thence a distance of 74.10 feet along the arc of a 130.00 foot radius curve right, said curve having a central angle of 32"39'29" and a long chord bearing N 29°11'50" W a distance of 73.10 feet to a 5/8 inch diameter iron pin; Thence N 12952'05" W a distance of 326.67 feet to a 5/8 Inch diameter Iron pin; Thence a distance of 84.58 feet along the are of a 420.00 foot radius curve left, said curve having a central angle of 11032'16" and a long chord bearing N 18038'13" W a distance of 84.43 feet to a 6/8 Inch diameter iron pin; Thence N 24024'21" W a distance of 319.79 feet to a 5/8 Inch diameter Iron pin; Thence a distance of 91.77 feet along the arc of a 120.00 foot radius curve left, said curve having a central angle of 43°49'06" and a long chord bearing N 48018'54" W a distance of 89.56 feet to a 6/8 inch diameter Iron pin; Thence N 68°13'27" W a distance of 350.55 feet to a 5/8 inch diameter iron pin; Thence a distance of 90.10 feet along the are of a 100,00 foot radius curve right, said curve having a central angle of 51°37'25" and a long chord bearing N 42°24'45" W a distance of 87.08 feet to a 5/8 inch diameter Iron pin; divirr d blulif;�oYVs fano fwrgln" am canmumy Biltrnore Estates Sub PP 14-004 Bllhoore Estates Job No. 13-74 Page 1 of 2 EXHIBIT A Thence N 18'36'02" W a distance of 254.04 feet to a 5/8 Inch diameter Iron pin on the southerly boundary of Kentucky Ridge Estates Subdivision as shown In Book 70 of Plata on Pages 7191 and 7192, records of Ada County; Thence S 89°22'59" E along said southerly boundary, and the southerly boundary of Kentucky Ridge Subdivision No. 2 ash shown in Book 72 of Plats on Pages 7389 and 7390, records of Ada County, a distance of 1024.16 feet to a 5/8 Inch diameter Iron pin marking the northwest corner of the SW Y4 of the ME 1/4 of said Section 25; Thence S 89023'26" E along said southerly boundary of Kentucky Ridge Subdivision No, 2 and the northerly boundary of said SW '/a of the NE '! a distance of 1320,12 feet to a 5/8 inch diameter iron pin marking the northeast corner of said SW �/< of the NE 1/a; Thence S 0°25'59" W along the easterly boundary of said SW 1/a of the NE 1/, and the westerly boundary of said Meridian Heights No. 3 Subdivision a distance of 1323.12 feet to the POINT OF BEGINNING. This parcel contains 88,19 acres. A LA Land Snton olutions,, PC . Hansen, PLS NAS Tt February 12, 2014 r �`,{A 1118 ) 0 Z(Iz fy s/-�, qj"fJo,n BilmoreEslales L/'wnamn.ymo."d cummimy Job No. 13-74 Page 2 of 2 Biltmore Estates Sub PP 14-004 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CE IDIAN*-, IDAHO In the Matter of the Request for Preliminary Plat Consisting of 159 Building Lots and 12 Common/Other Lots on 56.19 Acres of Land in an R-4 Zoning District for Biltmore Subdivision, Located South of W. Victory Road and West of S. Meridian Road, by L. C. Development, Inc. Case No(s). PP -14-004 For the City Council Hearing Date of: May 6, 2014 (Findings on May 20, 2014) A. Findings of Fact 1. Hearing Facts (see attached Staff Report for the hearing date of May 6, 2014, incorporated by reference) 2. Process Facts (see attached Staff Report for the hearing date of May 6, 2014, incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of May 6, 2014, incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of May 6, 2014, incorporated by reference) B. Conclusions of law 1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503). 2. The Meridian City Council takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has, by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian, which was adopted April 19, 2011, Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s) received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). PP -14-004 -I- 6. That the City has granted an order of approval in accordance with this Decision, which shall be signed by the Mayor and City Clerk and then a copy served by the Clerk upon the applicant, the Planning Department, the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the Conditions of Approval all in the attached Staff Report for the hearing date of May 6, 2014, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the City Council's authority as provided in Meridian City Code § 11-5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for preliminary plat is hereby conditionally approved per the conditions of approval in the attached Staff Report for the hearing date of May 6, 2014, attached as Exhibit A. A development agreement was required with the preliminary plat per the conditions of AZ - 13 -014. D. Notice 2014 Time Limits Notice of Preliminary Plat Duration Please take notice that approval of a preliminary plat, combined preliminary and final plat, or short plat shall become null and void if the applicant fails to obtain the city engineer's signature on the final plat within two (2) years of the approval of the preliminary plat or the combined preliminary and final plat or short plat (UDC 11 -6B -7A). In the event that the development of the preliminary plat is made in successive phases in an orderly and reasonable manner, and conforms substantially to the approved preliminary plat, such segments, if submitted within successive intervals of two (2) years, may be considered for final approval without resubmission for preliminary plat approval (UDC 11 -6B -7B). Upon written request and filed by the applicant prior to the termination of the period in accord with 11 -6B -7.A, the Director may authorize a single extension of time to obtain the City Engineer's signature on the final plat not to exceed two (2) years. Additional time extensions up to two (2) years as determined and approved by the City Council may be granted. With all extensions, the Director or City Council may require the preliminary plat, combined preliminary and final plat or short plat to comply with the current provisions of Meridian City Code Title 11. If the above timetable is not met and the applicant does not receive a time extension, the property shall be required to go through the platting procedure again (UDC 1I - 6B -7C). Notice of Two (2) Year Development Agreement Duration The development agreement shall be signed by the property owner and returned to the City within two (2) years of the City Council granting annexation and/or rezone (UDC 11-513-31)). A modification to the development agreement may be initiated prior to signature of the agreement by all parties and/or may be requested to extend the time allowed for the agreement to be signed and returned to the City if filed prior to the end of the two (2) year approval period CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). PP44.004 -2- (UDC 11-513-3F). E. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, denial of a development application entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be Fled. 2. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight (28) days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. F. Attached: Staff Report for the hearing date of May 6, 2014 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). PP -14-004 -3- By action of the City Council at its regular meeting held on the 2014. COUNCIL PRESIDENT CHARLIE ROUNTREE COUNCIL VICE PRESIDENT KEITH BIRD COUNCIL MEMBER DAVID ZAREMBA COUNCIL MEMBER JOE BORTON COUNCIL MEMBER LUKE CAVENER COUNCIL MEMBER GENESIS MILANI MAYOR TAMMY de WEERD (TIE BREAKER) cD\ day of "k I VOTED A-je VOTED X -IE VOTED—A, -4 e - VOTED VOTED A4.e. VOTED A, -q e VOTED 1,7 Mayor Tam e Weerd Attest: 3`o44oaieonUe�r� City of 4 IDIAM Jayc o an 10^x6 City Clerk^F SEAL 9Tfp'��de FFF ^bU84,�1 Copy served upon Applicant, The Planning Division, Public Works Department and City Attorney. Dated: h 10.1 �� • ��� Ci ler 's Mice CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). PP-] 4-004 -4- EXHIBIT A STAFF REPORT Hearing Date: May 6, 2014 CVEPIDIAN*�----TO: Mayor & City Council FROM: Sonya Watters, Associate City Planner I D A H O 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: PP -14-004 — Biltmore Subdivision I. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, L.C. Development, Inc., has submitted an application for a preliminary plat (PP) consisting of 159 single-family residential building lots and 12 common/other lots on 56.19 acres of land in an R-4 zoning district for Biltmore Subdivision. See Section Mof the staff report for more information. H. SUMMARY RECOMMENDATION Staff recommends approval of the proposed PP application in accord with the conditions of approval in Exhibit B and the Findings of Fact and Conclusions of Law in Exhibit D. a. Summary of Commission Public Hearing: i. In favor: Becky McKay, Applicant's Representative ii. In opposition: Bill Hansen iii. Commentine: Tamara Hamilton: Val Hill: and Fred Tillman iv. Written testimonv: Beckv. McKay. ADDlicant's Renresentative: and Mark & Christine Freeman v. Staff Presenting application: Sonya Watters vi. Other staff commenting on application: Justin Lucas b. Key Issue(s) of Discussion by Commission: I. Traffic impacts on S. Kentucky Way: ii. The timing for a traffic signal at the Harris Street & Meridian Road intersection: and iii. Connection to S. Carbondale Place, the stub street/cul-de-sac in Meridian Heights Subdivision, at the northeast corner of the site. c. Key Commission Change(s) to Staff Recommendation: i. Modify condition #1.1.1c to allow the existing home in phase 2 to remain until signature on the 2"a phase final Plat by the City Engineer: ii. Modify condition #1.1.8 to allow for ditches to remain open if used as a water amenity or linear open space in accord with UDC 11 -3A -6A: iii. Add new conditions requiring the applicant to install a water main through the common lot required for the microunth in the vicinity of Lot 9. Block 9 to connect into the water main required in the Proposed Revolution Ridge subdivision to the north: and include an easement on the plat for the water main (#1.1.2b & #2.1.4). d. Outstanding Issue(s) for City Council: i. None Biltmore Sub PP. 14-004 PAGE 1 EXHIBIT A L Se development rather than phase 3 !see condition #l.l.f in Exhibm ii. Council modified condition #1 1 2a to delete Block 4 from the pathway requirement because the hlock Bets the required dimensional standards in UDC 11 -6C -3F withou a pathway (measured from the rear of the lots!. III. PROPOSED MOTION Approval After considering all staff, applicant and public testimony, I move to approve File Number PP -14- 004, as presented in the staff report for the hearing date of May 6, 2014, with the following modifications: (Add any proposed modifications). Denial After considering all staff, applicant and public testimony, I move to deny File Number PP -14-004, as presented during the hearing on May 6, 2014, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number PP -14-004 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The site is located south of W. Victory Road and west of S. Meridian Road, in the north %2 of Section 25, Township 3 North, Range 1 West. (Parcel #: S1225131250; S1225131300; S1225131350; S1225131400; and S1225233900) B. Owner(s): L.C. Development, Inc. P.O. Box 518 Meridian, ID 83680 Biltmore Sub PP -14-004 PAGE 2 1 1 1 1 =1W 11 1 I I I I 1 1 lwww :r-11111 _ 1 Irv, I MII 1 1 1 1 1 1_ 11I I 1 I 1 1 i 1 IF L Se development rather than phase 3 !see condition #l.l.f in Exhibm ii. Council modified condition #1 1 2a to delete Block 4 from the pathway requirement because the hlock Bets the required dimensional standards in UDC 11 -6C -3F withou a pathway (measured from the rear of the lots!. III. PROPOSED MOTION Approval After considering all staff, applicant and public testimony, I move to approve File Number PP -14- 004, as presented in the staff report for the hearing date of May 6, 2014, with the following modifications: (Add any proposed modifications). Denial After considering all staff, applicant and public testimony, I move to deny File Number PP -14-004, as presented during the hearing on May 6, 2014, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number PP -14-004 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The site is located south of W. Victory Road and west of S. Meridian Road, in the north %2 of Section 25, Township 3 North, Range 1 West. (Parcel #: S1225131250; S1225131300; S1225131350; S1225131400; and S1225233900) B. Owner(s): L.C. Development, Inc. P.O. Box 518 Meridian, ID 83680 Biltmore Sub PP -14-004 PAGE 2 EXHIBIT A C. Applicant: Same as owner D. Representative: Becky McKay, Engineering Solutions, LLP 1029 N. Rosario Street, Ste. 100 Meridian, ID 83642 E. Applicant's Statement/Justification: Please see applicant's narrative for this information. V. PROCESS FACTS A. The subject application is for a preliminary plat. A public hearing is required before the Planning & Zoning Commission and City Council on this matter, consistent with Meridian City Code Title 11, Chapter 5. B. Newspaper notifications published on: March 17, and 31, 2014 (Commission); April 14, and 28, 2014 (City Council) C. Radius notices mailed to properties within 300 feet on: March 6, 2014 (Commission); April 11. 2014 (City Council) D. Applicant posted notice on site(s) on: March 23, 2014 (Commission); April 25, 2014 (City Council VI. LAND USE A. Existing Land Use(s) and Zoning: This site consists of rural residential properties, zoned R4. B. Character of Surrounding Area and Adjacent Land Use and Zoning: 1. North: Rural and urban (Kentucky Ridge Estates) residential properties, zoned RUT in Ada County and R-4 2. East: Residential properties (Meridian Heights), zoned R-4 3. South: Agricultural property, zoned RUT in Ada County 4. West: Rural residential/agricultural property, zoned RUT in Ada County C. History of Previous Actions: This property was recently annexed with the Victory South application (AZ -13-014, Ordinance No. 14-1594). D. Utilities: 1. Location of sewer: A sanitary sewer main intended to provide service to the subject property is currently under construction through the Hansen property between Meridian Heights and Kentucky Ridge Subdivisions. 2. Location of water: Domestic Water service to the majority of the subject property does not currently exist, and is dependent on the establishment of Pressure Zone #5. This new Pressure Zone will provide service to lands above an approximate elevation of 2700 feet. 3. Issues or concerns: Domestic Water service to the majority of the subject property does not currently exist, and is dependent on the establishment of Pressure Zone #5. This new Pressure Zone will provide service to lands above an approximate elevation of 2700 feet. To establish Pressure Zone #5, two new water sources will be needed, one of which must be a municipal well source, and the other can be from interconnecting pipes to other Pressure Zone #5 piping. The Public Works Department is in the early stages of planning a FY 2016 Biltmore Sub PP -14-004 PAGE 3 EXHIBIT A Capital Improvement Project to construct a pipeline from the existing Pressure Zone #5 west to the vicinity of this development. This developer will be responsible to plan for a connection to this pipeline. Due to the elevation and pressure zone issues, the northeast portion of this proposed preliminary plat is the only area that will be able to be developed without the establishment of Pressure Zone #5. Detailed water modeling analysis will be required of final plat phases in this area to determine how much can be served by the existing Pressure Zone #4. The balance of the proposed development will not be able to be developed until such time that Pressure Zone #5 is established as stated above. E. Physical Features: 1. Canals/Ditches Irrigation: The Sundall Lateral runs off-site along the west boundary of the site; other ditches run north/south and along the northwest portions of the site. 2. Hazards: Staff is not aware of any hazards that exist on this property. 4. Flood Plain: This site does not lie within the Meridian Floodplain Overlay District. VII. COMPREHENSIVE PLAN POLICIES AND GOALS The subject property is designated Low Density Residential (LDR) (16+/ -acres) and Medium Density Residential (MDR) (40+/- acres) on the Future Land Use Map (FLUM) contained in the Comprehensive Plan. The LDR designation allows for the development of single-family homes on large lots where urban services are provided. Uses may include single-family homes at gross densities of three dwelling units or less per acre. The MDR designation allows smaller lots for residential purposes within City limits. Uses may include single-family homes at densities of 3 to 8 dwelling units per acre. The site is currently zoned R-4 which allows a maximum gross density of 4 dwelling units per acre. The proposed plat depicts an overall gross density of 2.83 dwelling units (d.u.) per acre, with a net density of 3.56 d.u. per acre, consistent with the R-4 zoning and LDR FLUM designation for this site. The proposed gross density is lower than anticipated for the MDR designated area. Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed use of this property (staff analysis in italics): • "Support a variety of residential categories (low-, medium-, medium-high and high-density single-family, multi -family, townhouses, duplexes, apartments, condominiums, etc.) for the purpose of providing the City with a range of affordable housing opportunities." (3.07.0113) The proposed low density residential development will contribute to the variety ofhousing options located within the City. • "Require new residential development to meet development standards regarding landscaping, signage, fences and walls, etc." (3.05.02C) Street buffer landscaping is required adjacent to S. Kentucky Way and W. Harris Street, both residential collector streets, in accord with the standards listed in UDC 11 -3B -7C. Separate permits shall be obtained for signage and fencing. Fencing shall comply with the standards listed in UDC 11-3A-7. Biltmore Sub PP -14-004 PAGE 4 EXHIBIT A • "Protect existing residential properties from incompatible land use development on adjacent parcels." (3.06.0117) The proposed low-density residential development should be compatible with existing adjacent residential and agricultural uses. • "Require common area in all subdivisions." (3.07.02F) The proposed plat depicts a total of 5.78 acres of qual f ed open space/common area to be provided on the site in accord with the standards listed in UDC 11 -3G -3B. • "Review new development for appropriate opportunities to connect local roads and collectors to adjacent properties (stub streets). (3.03.020) The proposed plat depicts stub streets to the north, east, south and west for future extension and interconnectivity. The proposed plat also depicts a connection to the existing stub streets, S. Kentucky Way, and W Harris Street. • "Require pedestrian access connectors in all new development to link subdivisions together to promote neighborhood connectivity as part of a community pathway system." (3.03.0313) There are no pedestrian connections proposed to adjacent properties. In order to promote neighborhood connectivity, micro paths should be provided to the north, west, and south. • "Permit new development only where urban services can be reasonably provided at the time of final approval and development is contiguous to the City." (3.01.0 IF) City sewer service will be available to this site upon completion of the sanitary sewer currently under construction across the Hansen property between Kentucky Ridge Estates and Meridian Heights subdivisions. Domestic Water service to the majority of the subject property does not currently exist, and is dependent on the establishment of Pressure Zone #5. This new Pressure Zone will provide service to lands above an approximate elevation of 2700 feet. To establish Pressure Zone #5, two new water sources will be needed, one of which must be a municipal well source, and the other can be from interconnecting pipes to other Pressure Zone #5 piping. The Public Works Department is in the early stages of planning a FY 2016 Capital Improvement Project to construct a pipeline from the existing Pressure Zone #5 west to the vicinity of this development. This developer will be responsible to plan for a connection to this pipeline. Due to the elevation and pressure zone issues, the northeast portion of this proposed preliminaryplat is the only area that will be able to be developed without the establishment of Pressure Zone #5. Detailed water modeling analysis will be required offinal platphases in this area to determine how much can be served by the existing Pressure Zone #4. The balance of the proposed development will not be able to be developed until such time that Pressure Zone #5 is established as stated above. VIII. UNIFIED DEVELOPMENT CODE (UDC) A. Purpose Statement of Zone: Per UDC 11-2A-1, the purpose of the residential districts is to provide for a range of housing opportunities consistent with the Meridian comprehensive plan. Residential districts are distinguished by the allowable density of dwelling units per acre and corresponding housing types that can be accommodated within the density range. The medium low-density residential (R-4) district allows a maximum gross density of 4 dwelling units per acre. B. Schedule of Use: Unified Development Code (UDC) Table 11-2A-2 lists the principal permitted (P), accessory (A), conditional (C), and prohibited (-) uses in the R-4 zoning district. Any use not explicitly listed, or listed as a prohibited use is prohibited. The proposed use of the property for Biltmore Sub PP -14-004 PAGE 5 EXHIBIT A single-family dwellings is a principal permitted use in the R-4 zoning district. C. Dimensional Standards: Development of the site should be consistent with the dimensional standards listed in UDC Tables 11-2A-5 for the R-4 zoning district. D. Landscaping: Street buffer landscaping shall be installed in accordance with the standards listed in UDC Tables 11-2A-5 for the R-4 zoning district. E. Off -Street Parking: Off-street parking is required in accord with UDC Table 11-3C-6 for single- family dwellings. IX. ANALYSIS A. Analysis of Facts Leading to Staff Recommendation: This property was part of the Victory South annexation that was processed as a "Category B" annexation. One of the provisions of the Declaration of Consent to Annexation is that the property may not develop (or receive development approval) until such time as the property owners and the City execute a Development Agreement (DA). Therefore, in compliance with this provision, staff recommends a DA with the provisions contained in Exhibit B of this report. The DA is required to be approved by City Council and recorded prior to submittal of a final plat application. PRELIMINARY PLAT The proposed preliminary plat consists of 159 single-family residential building lots and 12 common/other lots on 56.19 acres of land in the R-4 (low density residential) zoning district. The minimum lot size proposed in the development is 8,640 square feet (s.f.) with an average lot size of 11,020 s.f; the minimum lot size adjacent to existing lots in Kentucky Ridge Estates is 10,000 s.f. The gross density is 2.83 dwelling units per acre with a net density of 3.56. Existing Structure(s): There are three existing homes and accessory structures on the site that are proposed to be removed. All structures on the site are required to be removed prior to signature on the final plat by the City Engineer. Dimensional Standards: Staff has reviewed the proposed plat for compliance with the dimensional standards listed in UDC Table 11-2A-5 for the R-4 district and found the plat in compliance with those standards. Block Length: The maximum block length standard is 750 feet without an intersecting street or alley (UDC 11 -6C -3F). The length of the north block faces of Blocks 4 and 5 measure 822 feet and 867 feet respectively and exceed the maximum block length allowed. Block 3 also exceeds the maximum length; however, there are existing residential lots that abut this block to the north with no street connection to the site. The UDC does allow for the block length to be extended to 1,000 feet when a pedestrian connection is provided in certain circumstances. Therefore, staff recommends a micropath is provided centrally within Blocks 4 and 5 to provide access to the park in Block 7. Access: Access to this site is proposed on the plat from the north via S. Kentucky Way, a collector street in Kentucky Ridge Estates Subdivision; from the east via S. Carbondale Place, a local street in Meridian Heights Subdivision; and from the southeast via W. Harris Street, a collector street. A stub street is proposed to the west and to the north for future extension. To increase emergency access to the site a minimum of two points of access will be required for any portion of the project which serves more than 30 homes, as set forth in International Fire Code Biltmore Sub PP -14-004 PAGE 6 EXHIBIT A Section D107.1. The two entrances should be separated by no less than %a the diagonal measurement of the full development as set forth in International Fire Code Section D 104.3. A Traffic Impact Study (TIS) was submitted by the applicant for this development. Comments have not yet been received from ACHD on this application. Utilities: Street lighting is required to be installed within the development in accord with the City's adopted standards, specifications and ordinances. All development is required to connect to the City water and sewer system unless otherwise approved by the City Engineer in accord with UDC 11-3A-21. Williams Gas Pipeline: A 300+/- foot long section of the Williams Pipeline crosses the southwest corner of the site. The Williams Pipeline is a natural gas pipeline that serves as a primary artery for the transmission of natural gas to the Pacific Northwest and Intermountain Region. The proposed plat depicts a 75 -foot wide right-of-way/easement for use by the pipeline company. All development shall comply with the Williams Gas Pipeline Developers' Handbook. An encroachment permit is required for any developmentlimprovements within the pipeline easement. Pressurized Irrigation (PI): An underground PI system is required to be provided to each lot in the subdivision as proposed in accord with UDC 11-3A-15. Storm Drainage: A storm drainage system is required for the development in accord with the City's adopted standards, specifications and ordinances. Design and construction shall follow best management practice as adopted by the City in accord with UDC l i -3A -I8. Storm drainage seepage beds are depicted within common areas on the preliminary plat. Landscaping: A landscape plan was submitted with this application for the area proposed to be platted as shown in Exhibit A.3. A minimum 20 -foot wide street buffer is required along S. Kentucky Way and W. Harris Street, both collector streets. Landscaping is required to comply with the standards listed in UDC 11 -3B -7C; a detailed plan demonstrating compliance with these standards is required to be submitted with the final plat application(s) for this subdivision. The landscape plan depicts several existing trees on the site within future building lots; however, the calculations table lists "NA" for mitigation of existing trees proposed to be removed. The applicant should contact Elroy Huff, City Arborist, at 888-3579 to schedule an appointment to confirm mitigation requirements prior to removal of any trees on the site. Mitigation calculations for existing healthy trees proposed to be removed should be included on the landscape plan submitted with the final plat application(s). Landscaping is required along all pathways on the site in accord with the standards listed in UDC 11 -3B -12C. Open Space & Site Amenities: Based on the area of the preliminary plat (56.19 acres), a minimum of 10% of the site (or 5.61 acres) is required to consist of qualified open space as defined in UDC 11 -3G -3B. The applicant proposes a total of 10.2% (or 5.73 acres) of qualified open space consisting of a 1.5 acre park, a 0.20 acre pocket park, drainage areas, pathways, street buffers along collector streets (W. Harris St. & S. Kentucky Way) and parkways along local and collector streets, in compliance with the required standards. In accord with UDC 11 -3G -3A.2, a minimum of 3 qualified site amenities are required to be provided with this development as set forth in UDC 11 -3G -3C. The applicant proposes a tot lot with a play structure and a %: basketball court as recreational amenities and a segment of the City's regional pathway as a pedestrian/bicycle circulation system amenity in accord with UDC Biltmore Sub PP -14-004 PAGE 7 LW4461130V.1 requirements. A detail of the play structure proposed in the tot lot should be submitted with the final plat application for the phase in which it is located. Sidewalks: Sidewalks are required along all public streets as set forth in UDC 11-3A-17. Minimum 5 -foot wide detached sidewalks are required along S. Kentucky Way and W. Harris Street, both arterial streets. The street sections shown on the preliminary plat depict 5 -foot wide detached sidewalks throughout the development. Pathways: A 10 -foot wide regional pathway is depicted on the landscape plan across the southwest corner of this site within the Williams gas pipeline easement in accord with the Master Pathways Plan. Landscaping should be provided adjacent to the pathway in accord with UDC 1I - 3B -12C. If landscaping is not allowed within the pipeline easement, it should be provided outside of the easement within the adjacent common area. Internal micropath connections are proposed to the park in Block 7 and the regional pathway in Block 8; however, no pathway connections are proposed to future developments (there are no existing pathway stubs to this site from adjacent existing developments). Therefore, staff recommends micropath connections to the west (somewhere in the vicinity of Lots 16-19, Block 9); to the north in the vicinity of Lot 9, Block 9 to connect to a pathway planned in Revolution Ridge Subdivision; through Blocks 4 and 5 to comply with block length standards; and between Lots 18 and 19, Block 2 to provide a pedestrian connection to the sidewalk along W. Harris Street. Landscaping should be provided adjacent to the pathways in accord with the standards listed in UDC 11 -3B -12C. Waterways: The Sundall Lateral lies off-site along the west boundary of the site. Other ditches also cross this site. All ditches on the site are required to be piped unless waived by City Council in accord with UDC I 1 -3A -6A. Floodplain: This site does not lie within the Meridian Floodplain Overlay District. Building Elevations: The applicant has submitted two conceptual building elevations for the future homes in this development, included in Exhibit A.S. Because the sides of homes on lots adjacent to S. Kentucky Way and the rear of homes that back up to W. Harris Street, both collector streets, will be highly visible, staff recommends the rear and/or sides of structures on these lots incorporate articulation through changes in materials, color, modulation, and architectural elements (horizontal and vertical) to break up monotonous wall planes and roof lines. Fencing: There is an existing 6 -Foot tall fence along the east and a portion of the north boundary of the site adjacent to existing residential lots. The landscape plan depicts 4 -foot tall solid vinyl fencing adjacent to interior common areas and 6 -foot tall vinyl fencing along the west boundary and adjacent to portions of the collector streets. All fencing installed on the site should comply with the standards listed in UDC 11 -3A -6B and 11-3A7. Property Boundary Adjustment (PBA): A PBA application was tentatively approved on March 12, 2014 which created the parcel configuration shown on the preliminary plat. Prior to final approval of the PBA application, the existing structures on the site are required to be removed. Prior to submittal of a final plat application for this site, the applicant must obtain final approval of the PBA application. In summary, Staff recommends approval of the proposed preliminaryplat request for this site with a development agreement and the recommended conditions listed in Exhibit B of this report in accord with the findings contained in Exhibit C. Biltmore Sub PP -14-004 PAGE 8 EXHIBIT A X. EXHIBITS A. Drawings/Other 1. Vicinity Map 2. Proposed Preliminary Plat (dated: 1/21/14) 3. Proposed Landscape Plan (dated: 1/28/14) 4. Site Plan 5. Conceptual Building Elevations -REVISED B. Agency & Department Comments/Conditions C. Required Findings from Unified Development Code Biltmore Sub PP -14-004 PAGE 9 EXHIBIT A A. Drawings 1. Vicinity Map Exhibit A Page I EXHIBIT A 2. Proposed Preliminary Plat (dated: 1/21/14) 96iteiP "'laz•—•�—� Exhibit A Page 1 NOW 2� Mm w gi�,�{� i' i 96iteiP "'laz•—•�—� Exhibit A Page 1 EXHIBIT A 3. Proposed Landscape Plan (dated: 1/28/14) 1. SHEET LyWAM Off* PLM WZA' -mm mom AEWUCRY RINE sum W. I RR.m BUT 'T -4 it 3 L\ ti LANDSCAPE PLAN KAMVNV� NOM � FLAMM �AMM 10 t � M Exhibit A Page 2 EXHIBIT A r e e e] e e ]_ r 1 • .. e Jif • 1 1 �N ee e "".r ^"" F V ! 0 ear uu PBa eNaua APB rAAM ;� 0lmPS /LNR Bim. e! sass. g �L12 R.b 4 LAIDBCAPE PLAN M. Exhibit A Page 3 �G lhY 9rvi 4'.'N 'f'1 S �I .r A..I tl�Y �..r_.aas -- •- Rag:- - wuorr xom _ x �g_y���•_��yy Z.SJL;gr _. olsawrm�amm_ o ®+wawaAv.an m we�me uwru� aAs Not Nl, 0 LMOtGNB RAN 0O! W 101 OtO�ii Rf mlY/ �NIK WBMM�ILTIs L�S16.QSi �ss.r_ �/169fQ7m>9_—..r_ LYNAM mme ' I ; awnoea.IIV61Ml m Exhibit A Page 4 41 ` ��t fef jc f� f r r ,e Y 1 � a i _ fps aw r x d� a � F M _iwo v- EXHIBIT A B. EXHIBIT B - AGENCY & DEPARTMENT COMMENTS/CONDITIONS 1. PLANNING DEPARTMENT 1.1 Site Specific Conditions of Approval 1.1.1 A Development Agreement (DA) was required as a provision of the Declaration of Consent to Annexation of this property. Prior to development of this property, a DA shall be entered into between the City of Meridian, the property owner(s), and the developer. The Applicant shall contact the City Attorney's Office to initiate this process. The DA shall be signed by the property owner and returned to the City prior to submittal of the final plat application. Currently, a fee of $303.00 shall be paid by the applicant to the City Clerk's office prior to commencement of the DA. The DA shall, at minimum, incorporate the following provisions: a. Direct lot access to S. Kentucky Way and W. Harris Street, both collector streets, is prohibited in accord with UDC 11-3A-3. b. All development within the Williams pipeline easement at the southwest comer of the site shall comply with the Williams Gas Pipeline Developers' Handbook. An encroachment permit is required for any development improvements within the pipeline easement. c. Future development of this site shall be generally consistent with the site plan and conceptual building elevations submitted with this application included in Exhibits A.4 and A.5. d. The rear and/or sides of homes on lots that face or back up to S. Kentucky Way and W. Harris Street, both collector streets, shall incorporate articulation through changes in materials, color, modulation, and architectural elements (horizontal and vertical) to break up monotonous wall planes and roof lines. e. All existing structures on the site are required to be removed prior to signature on the first phase final plat by the City Engineer, except for the existing home in Phase 2 which is f. The nark proposed on Lot 1, Block 7 shall be constructed with phase 2 oft development• 1. 1.2 The preliminary plat included in Exhibit A.2 dated 1/21/14 shall be revised as follows: a. Micropath connections shall be provided to the west (somewhere in the vicinity of Lots 16- 19, Block 9); to the north in the vicinity of Lot 9, Block 9 to connect to a pathway planned in Revolution Ridge Subdivision; through Blocks -0 -and 5 to comply with block length standards; and between Lots 18 and 19, Block 2 to provide a pedestrian connection to the sidewalk along W. Harris Street. b. Deoict an easement for a water main throueh the common lot reouired for the microvath in the vicinity of Lot 9- Block 9 1.1.3 The landscape plan included in Exhibit A.3 dated 1/28/14 shall be revised as follows: a. Provide micropath connections as detailed in condition #1.1.2a above and landscaping in accord with the standards listed in UDC 11 -3B -12C; b. Mitigation calculations for existing healthy trees proposed to be removed; c. Landscaping is required adjacent to the 10 -foot wide pathway in Lot 6, Block 8 in accord with UDC 11-3B- 12C. If landscaping is not allowed within the pipeline easement, it should be provided outside of the easement within the adjacent common area. 1.1.4 The developer shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11 -3A -6B. -3- EXHIBIT A 1.1.5 The developer shall provide a minimum 10% qualified open space in accord with the standards listed in UDC 11 -3G -3B. 1.1.6 In accord with the site amenity requirements listed in UDC 11-3G-3, the developer shall provide a tot lot with play equipment, a %, basketball court, and a segment of the City's multi -use pathway system (or equivalent amenities as determined by the Planning Director) as proposed in Exhibit A.3. 1.1.7 A detail of the tot lot play structure proposed in the tot lot on Lot 1, Block 7 shall be submitted with the final plat application for the phase in which it is located. 1.1.8 All ditches are required to be piped in accord with UDC 11 -3A -6A unless waived by City Council or used as a water amenity or linear open space. 1.1.9 Prior to submittal of a final plat application, the applicant must obtain final approval of the Property Boundary Adjustment (PBA -14-001) application. 1.2 General Conditions of Approval 1.2.1 Comply with all bulk, use, and development standards of the R-4 zoning district listed in UDC Table 11-2-A-5. 1.2.2 Comply with all provisions of I 1-3A-3 with regard to access to streets. Direct lot access to S. Kentucky Way and W. Harris Street is prohibited. 1.2.3 Construct on -street bikeways on all collector streets as set forth in UDC 11-3A-5. 1.2.4 Comply with the provisions for irrigation ditches, laterals, canals and/or drainage courses, as set forth in UDC 11-3A-6. 1.2.5 Provide a pressurized irrigation system consistent with the standards as set forth in UDC 11-3A- 15, UDC 11-3B-6 and MCC 9-1-28. 1.2.6 Comply with the sidewalk standards as set forth in UDC 11-3A-17. Minimum 5 -foot wide detached sidewalks are required along S. Kentucky Way and W. Harris Street, both collector streets. 1.2.7 Install all utilities consistent with the standards as set forth in UDC 11-3A-21 and 11 -3B -5J. 1.2.8 Construct all off-street parking areas consistent with the standards as set forth in UDC 11-3C-6 for single-family dwellings. 1.2.9 Construct the required landscape buffers consistent with the standards as set forth in UDC 11 -3B - 7C. 1.2.10 Construct storm water integration facilities that meet the standards as set forth in UDC 11 -3B - 11C. 1.2.11 Construct all parkways consistent with the standards as set forth in UDC 11 -3A -17E, 11 -3G -3B5 and 11 -3B -7C. 1.2.12 Comply with all subdivision design and improvement standards as set forth in UDC 11-6C-3, including but not limited to cul-de-sacs, alleys, driveways, common driveways, easements, blocks, street buffers, and mailbox placement. 1.2.13 Protect any existing trees on the subject property that are greater than four -inch caliper and/or mitigate for the loss of such trees as set forth in UDC l 1-3B-10. 1.2.14 Comply with all provisions of UDC 11-3A-3 with regard to maintaining the clear vision triangle. -4. EXHIBIT A 1.3 Ongoing Conditions of Approval 1.3.1 The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-313-6 and to install and maintain all landscaping as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-3B-14. 1.3.2 All common open space and site amenities shall be maintained by an owner's association as set forth in UDC 11 -3G -3F1. 1.3.3 The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site. 1.3.4 The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 1.3.5 The applicant shall have an ongoing obligation to maintain all pathways. 1.3.6 The applicant has a continuing obligation to comply with the outdoor lighting provisions as set . forth in UDC 11-3A-11. 1.3.7 The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. 1.4 Process Conditions of Approval 1.4.1 No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 1.4.2 The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11 -5C -3B. A surety agreement may be accepted for other improvements in accord with UDC 11 -5C -3C. 1.4.3 The final plat, and any phase thereof, shall substantially comply with the approved preliminary plat as set forth in UDC 11-613-3C2. 1.4.4 The applicant shall obtain approval for all successive phases of the preliminary plat within two years of the signature of the City Engineer on the previous final plat as set forth in UDC 11-611- 713 (if applicable). 1.4.5 The preliminary plat approval shall be null and void if the applicant fails to either 1) obtain the City Engineer signature on a final plat within two years; or, 2) gain approval of a time extension as set forth in UDC 11-613-7. 1.4.6 Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11 -3B -14A. 2. PUBLIC WORKS DEPARTMENT 2.1 Site Specific Conditions of Approval 2.1.1 Domestic Water service to the majority of the subject property does not currently exist, and is dependent on the establishment of Pressure Zone #5. This new Pressure Zone will provide service to lands above an approximate elevation of 2700 feet. To establish Pressure Zone #5, two new water sources will be needed, one of which must be a municipal well source, and the other can be from interconnecting pipes to other Pressure Zone #5 piping. The Public Works Department is in the early stages of planning a FY 2016 Capital Improvement Project to construct -5- EXHIBIT A a pipeline from the existing Pressure Zone #5 west to the vicinity of this development. This developer will be responsible to plan for a connection to this pipeline. Due to the elevation and pressure zone issues, the northeast portion of this proposed preliminary plat is the only area that will be able to be developed without the establishment of Pressure Zone #5. Detailed water modeling analysis will be required of final plat phases in this area to determine how much can be served by the existing Pressure Zone #4. The balance of the proposed development will not be able to be developed until such time that Pressure Zone #5 is established as stated above. 2.1.2 The applicant has offered to donate a site for a new municipal well. The site for the well will need to be coordinated with the Public Works Department, and be a minimum of 140'x140'. If the well site cannot be legally divided off and conveyed to the city at this time, the city can accept a long term lease until such time that the property can legally be conveyed. The timing of the construction of the municipal well can take as much as three -years. Because of the complex nature of water delivery in this area, each phase of the development will require modeling analysis. Results of this modeling may necessitate additional water main connections to ensure fire flow needs are met. 2.1.3 When Pressure Zone 5 is established as noted above, and the developer proceeds with development of property in that area, the developer will be responsible for the installation of Pressure Reducing (PRV) station(s) to separate the Pressure Zones. The applicant shall provide an easement and install a pressure reducing station vault and conduits for the power lines and telemetry cable. The installation of the pressure reducing appurtenances shall be the responsibility of the Meridian Public Works Department. The applicant shall coordinate the vault and conduit design criteria with the Meridian Public Works Department as part of the development plan review process. required in the proposed Revolution Ridge Subdivision 2.2 General Conditions of Approval 2.2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub -grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2.2.2 Per Meridian City Code, the applicant shall be responsible to install sewer and water mains to and through this development. 2.2.3 The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20 -feet wide for a single utility, or 30 -feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. 2.2.4 The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point -6- EXHIBIT A connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to prior to receiving development plan approval. 2.2.5 All existing structures that are required to be removed shall be prior to signature on the final plat by the City Engineer. 2.2.6 All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC I 1-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non -approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to final plat signature. 2.2.7 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 2.2.8 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.2.9 Street signs are to be in place, sanitary sewer and water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 2.2.10 A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, etc., prior to signature on the final plat. 2.2.11 All development improvements, including but not limited to sewer and water, fencing, micro - paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. 2.2.12 Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 2.2.13 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.2.14 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.2.15 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.2.16 All grading of the site shall be performed in conformance with MCC 11-12-3H. 2.2.17 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 2.2.18 The engineer shall be required to certify that the street centerline elevations are set a minimum of 3 -feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above. 2.2.19 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district -7- EXHIBIT A or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 2.2.20 At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 2.2.21 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, comers, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. 2.2.22 The City of Meridian requires that the owner post to the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 2.2.23 The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 3. POLICE DEPARTMENT 3.1 The Police Department has no concerns with this application. 4. FIRE DEPARTMENT 4.1 The proposed project lies outside the five-minute response zone goal. Achievement of this goal is subject to budgetary constraints and is intended to enhance the probability of a favorable outcome on a request for Basic and Advanced Life Support. The budget constraints are typically defined as capital outlay for facilities that are located within 1.5 miles from a given location and sufficient operational funds to staff the facilities. 4.2 One and two family dwellings not exceeding 3,600 square feet require a fire -flow of 1,000 gallons per minute for a duration of 2 hours to service the entire project. One and two family dwellings in excess of 3,600 square feet require a minimum fire flow as specified in Appendix B of the International Fire Code. Fire Hydrant spacing shall be provided as required by Appendix C of the International Fire Code. 4.3 Final Approval of the fire hydrant locations shall be by the Meridian Fire Department in accordance with International Fire Code Section (IFC) 508.5.4 as follows: a. Fire hydrants shall have the 4'/z" outlet face the main street or parking lot drive aisle. b. Fire hydrants shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works specifications. d. Fire Hydrants shall be placed on comers when spacing permits. e. Fire hydrants shall not have any vertical obstructions to outlets within 10'. .8- EXHIBIT A f Fire hydrants shall be placed 18" above finished grade to the center of the 4 %2" outlets. g. Fire hydrants shall be provided to meet the requirements of IFC Section 509.5. h. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet of the project. 4.4 All entrances, internal roads, drive aisles, and alleys shall have a turning radius of 28' inside and 48' outside, per International Fire Code Section 503.2.4. 4.5 Ensure that all yet undeveloped parcels are maintained free of combustible vegetation as set forth in International Fire Code Section 304.1.2. 4.6 Fire lanes, streets, and structures (including the canopy height of mature trees) shall have a vertical clearance of 13'6 as set forth in International Fire Code Section 503.2.1. 4.7 Operational fire hydrants, temporary or permanent street signs, and access roads with an all weather surface are required to be installed before combustible construction material is brought onto the site, as set forth in International Fire Code Section (IFC) 501.4 and Meridian amendment to IFC 10-4-2J. 4.8 The roadways shall be built to Ada County Highway District cross section standards and have a clear driving surface. Streets less than 26' in width shall have no on -street parking; streets less than 32' in width shall have parking only on one side. These measurements shall be based on the drivable surface dimension exclusive of shoulders. The overhead clearance shall be a minimum of 13' 6". The roadway shall be able to accommodate an imposed load of 75,000 GVW as set forth in International Fire Code Section 503.2.1. and D103.6.1 and D103.6.2. 4.9 The fire department requests that any future signalization installed as the result of the development of this project be equipped with Opticom sensors to ensure a safe and efficient response by fire and emergency medical service vehicles. The cost of this installation is to be borne by the developer. (National Fire Protection Std 1141 Section 5.2.11.1) 4.10 The applicant shall work with Public Works and Planning Department staff to provide an address identification plan and a sign which meets the requirements of the City of Meridian sign ordinance and is placed in a position that is plainly legible and visible from the street or road fronting the property, as set forth in International Fire Code Section 505.1. 4.11 Emergency response routes and fire lanes shall not be allowed to have traffic calming devices installed without prior approval of the Fire Code Official. National Fire Protection Standard 1141, Section A5.2.18. 4.12 To increase emergency access to the site a minimum of two points of access will be required for any portion of the project which serves more than 30 homes, as set forth in International Fire Code Section D107.1. The two entrances should be separated by no less than '% the diagonal measurement of the full development as set forth in International Fire Code Section D104.3. 5. REPUBLIC SERVICES 5.1 Republic Services has no comments on this application. 6. PARKS DEPARTMENT 6.1 The applicant shall contact Elroy Huff, City Arborist, at 888-3579 to coordinate mitigation for existing trees on the site that are proposed to be removed, in accord with UDC I 1-313-10C.5. -9- EXHIBIT A 7. ADA COUNTY HIGItWAY DISTRICT 7.1 Site Specific Conditions of Approval 7.1.1 Extend Harris from its current terminus into the site as one half of a 36 -foot residential collector street section plus 12 -feet of pavement to total 30 -feet of pavement with vertical curb, gutter, and an 8 -foot wide planter strip on the north side of Harris Street with a with a 3 -foot gravel shoulder and barrow ditch on the south side of Harris Street within 50 -feet of right-of-way. 7.1.2 Construct a 5 -foot wide detached concrete sidewalk on Harris Street abutting the site within a permanent right-of-way easement, as proposed. 7.1.3 Construct Hams Street to stub to the south, located 740 -feet west of the east property line. Install a sign at the terminus of Harris Street stating that "THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENDED IN THE FUTURE." 7.1.4 Prior to signature on the first final plat, enter into a development agreement with ACHD which will require the building of the collector roadway in the general alignment shown on the concept plan through the parcels south and west of the site at the time they develop. The development agreement shall be recorded and run with the land in the event the applicant should sell the property before it develops. 7.1.5 If allowed by the Idaho Transportation Department (ITD), construct a dedicated southbound right turn lane and eastbound left and right turn lanes at the SH-69/Meridian Road/Harris Street intersection prior to plan approval or signature on the final plat that extends Harris Street to Kentucky Way. 7.1.6 Extend Kentucky Way from its current terminus into the site with two 20 -foot wide travel lanes curb, gutter, an 8 -foot planter strip, 5 -foot wide detached concrete sidewalk, and a 12 -foot center landscape island, as proposed. As Kentucky Way extends south to Harris Street taper the roadway to a standard 36 -foot wide street section with vertical curb, gutter, an 8 -foot wide planter strip, and 5 -foot wide detached concrete sidewalks, as proposed. 7.1.7 Plat the center landscape island as right-of-way owned by ACHD. Enter into a license agreement with ACRD for any landscaping proposed within the center landscape island. 7.1.8 Provide a permanent right-of-way easement for the detached sidewalks on Kentucky Way abutting the site. 7.1.9 Construct all of the internal local streets as 36 -foot street sections with rolled curb, gutter, and a 6 -foot wide landscape strip within 50 -feet of right-of-way. Construct 5 -foot wide detached concrete sidewalks on all internal local street with a permanent right-of-way easement, as proposed. 7.1.10 The applicant has proposed to construct one cul-de-sac with a minimum turning radius of 45 -feet and one knuckle, as proposed. 7.1.11 Construct Whitebird Drive as a stub street to the west property line, located 530 -feet north of the south property line, as proposed. Install a sign at the terminus of Whitebird Drive stating that "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 7.1.12 Harris Street and Kentucky Way are classified as collector roadways. Other than access specifically approved with this application direct lot access to these roadways is prohibited and shall be noted on the final plat. 7.1.13 Payment of impacts fees are due prior to issuance of a building permit. 7.1.14 Comply with all Standard Conditions of Approval. to- EXHIBIT A 7.2 Standard Conditions of Approval 7.2.1 All irrigation facilities shall be relocated outside of the ACHD right-of-way. 7.2.2 Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 7.2.3 hi accordance with District policy, 7203.3, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 7.2.4 Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 7.2.5 A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 7.2.6 All utility relocation costs associated with improving street frontages abutting the site shall be bome by the developer. 7.2.7 It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACED conduits (spare or filled) are compromised during any phase of construction. 7.2.8 Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7.2.9 All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACED Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 7.2.10 Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 7.2.11 No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACRD. 7.2.12 If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. -11- EXHIBIT A C. Required Findings from Unified Development Code 1. Preliminary Plat Findings: In consideration of a preliminary plat, combined preliminary and final plat, or short plat, the decision-making body shall make the following findings: a. The plat is in conformance with the Comprehensive Plan; The City Council finds that the proposed plat is in substantial compliance with the adopted Comprehensive Plan in regard to land use, transportation, and circulation. Please see Comprehensive Plan Policies and Goals, Section V11, of the Staff Report for more information. b. Public services are available or can be made available and are adequate to accommodate the proposed development; The City Council finds that public services are not available at this time. When available, services will be provided to the subject property upon development. (See Exhibit B of the Staff Report for more details from public service providers.) c. The plat is in conformance with scheduled public improvements in accord with the City's capital improvement program; Because City water and sewer and any other utilities will be provided by the development at their own cost, the City Council finds that the subdivision will not require the expenditure of capital improvement funds. d. There is public financial capability of supporting services for the proposed development; The City Council finds there is public financial capability of supporting services for the proposed development based upon comments provided from the public service providers (i.e., Police, Fire, ACRD, etc.). (See Exhibit B for more detail.) e. The development will not be detrimental to the public health, safety or general welfare; and The City Council is not aware of any associated with the platting of this property. analysis. 12- health, safety, or environmental problems ACRD considers road safety issues in their Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER - ITEM TITLE: Lease Agreement for Lift Station Lot at Southern Highland V W, — MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY I SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NIJMRER- ITEM TITLE: Approval of Agreement to Apex Integrated Security Systems for the "Wastewater Treatment Plant (WWTP) Administration, Lab and Control Buildings Access Control' Project for the Not -To -Exceed Amount of $70,221.01 MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Memo To: Jaycee L. Holman, City Clerk, From: Keith Watts, Purchasing Manager CC: Jacy Jones, David Allison Date: 06/26/2014 Re: July 1 s� City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the July 1, 2014 City Council Consent Agenda for Council's consideration. Approval of Agreement to APEX INTEGRATED SECURITY SYSTEMS. INC for the ' WWTP Administration. Lab and Control Buildings Access Control" project for a Not - To -Exceed amount of $70,221.01. Recommended Council Action: Approval of Agreement for WWTP Administration, Lab and Control Buildings Access Control project to APEX INTEGRATED SECURITY SYSTEMS, INC for the Not -To -Exceed amount of $70,221.01. Thank you for your consideration. 0 Page 1 CITY OF MERIDIAN CONTRACT/AGENDA REQUEST CHECKLIST Date: REQUESTING DEPARTMENT Public Works Fund: M Department: 3500 GL Account: 92000 Project If 10383/10057 Construction: PSA: x Task Order: Project Name: Lenel Security Upgrades WWTP Admin and Lab Buildings Project Manager: David Allison Department Representative: Contractor/Consultant/Design Engineer: Apex Integrated Security Systems Budget Available (Attach Report): yes Contract Amount: $70,221.01 Will the project cross fiscal years? Yes No Budget Information: FY Budget: FY14 Enhancement#: Grant#: Other: Type or Grant: ' ;C011f'I'RACfi.�WEGKLIST BASIS OF AWARD Low Bidder Highest Rated (Bid Results Attached) (Ratings Attached) Typical Award Yes No Bid No: If no please state circumstances and conclusion: Professional Services - Sole Source 10 Day Waiting Period Complete: PW License# C-16018 Corporation Status (Attach Print Out): Insurance Certificates Received (Date): Payment and Performance Bonds Received (Date): Builders Risk Ins. Req'd: Yes No x Master Agreement (Category) Bid Opening Date: Date Award Posted: Current? (attach printout) yes Goodstand June 19, 2014 Correct Category? Rating: A++ June 19, 2014 Rating: A- lf yes, has policy been purchased? Date Submitted to Clerk for Agenda: June 26, 2014 Approved by Council Issue Purchase Order No, Date Issued: WH5 submitted Issue Notice of Award: Date: NTP Date: AGREEMENT FOR INDEPENDENT CONTRACTOR SERVICES ACCESS CONTROL FOR NEW WWTP ADMIN, LAB & CONTROL BUILDINGS PROJECTS # 10057.LAB.CC and 10383.ADM.DD ts, THIS REEMENT FOR INDEPENDENT CONTRACTOR SERVICES is made this 'day of _, 2014, and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "CITY", 33 East Broadway Avenue, Meridian, Idaho 83642, and Apex Integrated Security S sv tems, hereinafter referred to as "CONTRACTOR", whose business address is 109 South 4 Street, Boise, ID 83702 and whose Public Works Contractor License # is PWC -C-16018. INTRODUCTION Whereas, the City has a need for services involving Access Control System Equipment and Installation at the Wastewater Treatment Plant — Admin. Lab and Controls Buildings; and WHEREAS, the Contractor is specially trained, experienced and competent to perform and has agreed to provide such services; NOW, THEREFORE, in consideration of the mutual promises, covenants, terms and conditions hereinafter contained, the parties agree as follows: TERMS AND CONDITIONS Scope of Work: 1.1 CONTRACTOR shall perform and furnish to the City upon execution of this Agreement and receipt of the City's written notice to proceed, all services and work, and comply in all respects, as specified in the document titled "Scope of Work" a copy of which is attached hereto as Attachment "A" and incorporated herein by this reference, together with any amendments that may be agreed to in writing by the parties. 1.2 All documents, drawings and written work product prepared or produced by the Contractor under this Agreement, including without limitation electronic data files, are the property of the Contractor; provided, however, the City shall have the right to reproduce, publish and use all such work, or any part thereof, in any manner and for any purposes whatsoever and to authorize others to do so. If any such work is copyrightable, the Contractor may copyright the same, except that, as to any work which is copyrighted by the Contractor, the City reserves a royalty -free, non-exclusive, and irrevocable license to reproduce, publish and use such work, or any part thereof, and to authorize others to do so. Access Control — W WTP Admin, Lab & Control Buildings page 1 of 17 Project 10373.ADM.DD and 10057.LAB.CC 1.3 The Contractor shall provide services and work under this Agreement consistent with the requirements and standards established by applicable federal, state and city laws, ordinances, regulations and resolutions. The Contractor represents and warrants that it will perform its work in accordance with generally accepted industry standards and practices for the profession or professions that are used in performance of this Agreement and that are in effect at the time of performance of this Agreement. Except for that representation and any representations made or contained in any proposal submitted by the Contractor and any reports or opinions prepared or issued as part of the work performed by the Contractor under this Agreement, Contractor makes no other warranties, either express or implied, as part of this Agreement. 1.4 Services and work provided by the Contractor at the City's request under this Agreement will be performed in a timely manner in accordance with a Schedule of Work, which the parties hereto shall agree to. The Schedule of Work may be revised from time to time upon mutual written consent of the parties. 2. Consideration 2.1 The Contractor shall be compensated on a Not -To -Exceed basis as provided in Attachment B "Payment Schedule" attached hereto and by reference made a part hereof for the Not -To -Exceed amount of $70,221.01. 2.2 The Contractor shall provide the City with a monthly statement and supporting invoices, as the work warrants, of fees earned and costs incurred for services provided during the billing period, which the City will pay within 30 days of receipt of a correct invoice and approval by the City. The City will not withhold any Federal or State income taxes or Social Security Tax from any payment made by City to Contractor under the terms and conditions of this Agreement. Payment of all taxes and other assessments on such sums is the sole responsibility of Contractor. 2.3 Except as expressly provided in this Agreement, Contractor shall not be entitled to receive from the City any additional consideration, compensation, salary, wages, or other type of remuneration for services rendered under this Agreement including, but not limited to, meals, lodging, transportation, drawings, renderings or mockups. Specifically, Contractor shall not be entitled by virtue of this Agreement to consideration in the form of overtime, health insurance benefits, retirement benefits, paid holidays or other paid leaves of absence of any type or kind whatsoever. 3. Term: 3.1 This agreement shall become effective upon execution by both parties, and shall expire upon (a) completion of the agreed upon work, (b) or unless sooner Access Control — W WTP Admin, Lab & Control Buildings page 2 of 17 Project 10373.ADM.DD and 10057.LAB.CC terminated as provided in Sections 3.2, 3.3, and Section 4 below or unless some other method or time of termination is listed in Attachment A. 3.2 Should Contractor default in the performance of this Agreement or materially breach any of its provisions, City, at City's option, may terminate this Agreement by giving written notification to Contractor. 3.3 Should City fail to pay Contractor all or any part of the compensation set forth in Attachment B of this Agreement on the date due, Contractor, at the Contractor's option, may terminate this Agreement if the failure is not remedied by the City within thirty (30) days from the date payment is due. 4. Termination: 4.1 If, through any cause, CONTRACTOR, its officers, employees, or agents fails to fulfill in a timely and proper manner its obligations underthis Agreement, violates any of the covenants, agreements, or stipulations of this Agreement, falsifies any record or document required to be prepared under this agreement, engages in fraud, dishonesty, or any other act of misconduct in the performance of this contract, or if the City Council determines that termination of this Agreement is in the best interest of CITY, the CITY shall thereupon have the right to terminate this Agreement by giving written notice to CONTRACTOR of such termination and specifying the effective date thereof at least fifteen (15) days before the effective date of such termination. CONTRACTOR may terminate this agreement at any time by giving at least sixty (60) days notice to CITY. In the event of any termination of this Agreement, all finished or unfinished documents, data, and reports prepared by CONTRACTOR under this Agreement shall, at the option of the CITY, become its property, and CONTRACTOR shall be entitled to receive just and equitable compensation for any work satisfactorily complete hereunder. 4.2 Notwithstanding the above, CONTRACTOR shall not be relieved of liability to the CITY for damages sustained by the CITY by virtue of any breach of this Agreement by CONTRACTOR, and the CITY may withhold any payments to CONTRACTOR for the purposes of set-off until such time as the exact amount of damages due the CITY from CONTRACTOR is determined. This provision shall survive the termination of this agreement and shall not relieve CONTRACTOR of its liability to the CITY for damages. 5. Independent Contractor: 5.1 In all matters pertaining to this agreement, CONTRACTOR shall be acting as an independent contractor, and neither CONTRACTOR nor any officer, employee or agent of CONTRACTOR will be deemed an employee of CITY. Except as Access Control — W WTP Admin, Lab & Control Buildings page 3 of 17 Project 10373.ADM.DD and 10057.LAB.CC expressly provided in Attachment A, Contractor has no authority or responsibility to exercise any rights or power vested in the City and therefore has no authority to bind or incur any obligation on behalf of the City. The selection and designation of the personnel of the CITY in the performance of this agreement shall be made by the CITY. 5.2 Contractor, its agents, officers, and employees are and at all times during the term of this Agreement shall represent and conduct themselves as independent contractors and not as employees of the City. 5.3 Contractor shall determine the method, details and means of performing the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specified in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of Contractor in fulfillment of this Agreement. If in the performance of this Agreement any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction and supervision and control of the Contractor. 6. Indemnification and Insurance: 6.1 CONTRACTOR shall indemnify and save and hold harmless CITY from and for any and all losses, claims, actions, judgments for damages, or injury to persons or property and losses and expenses and other costs including litigation costs and attorney's fees, arising out of, resulting from, or in connection with the performance of this Agreement by the CONTRACTOR, its servants, agents, officers, employees, guests, and business invitees, and not caused by or arising out of the tortious conduct of CITY or its employees. CONTRACTOR shall maintain, and minimum amounts as follow: General Liability One Million Dollars ($1,000,000) per incident or occurrence, Automobile Liability Insurance One Million Dollars ($1,000,000) per incident or occurrence and Workers' Compensation Insurance, in the statutory limits as required by law.. The limits of insurance shall not be deemed a limitation of the covenants to indemnify and save and hold harmless CITY; and if CITY becomes liable for an amount in excess of the insurance limits, herein provided, CONTRACTOR covenants and agrees to indemnify and save and hold harmless CITY from and for all such losses, claims, actions, or judgments for damages or injury to persons or property and other costs, including litigation costs and attorneys' fees, arising out of, resulting from , or in connection with the performance of this Agreement by the Contractor or Contractor's officers, employs, agents, representatives or subcontractors and resulting in or attributable to personal injury, death, or damage or destruction to tangible or intangible property, including use of. CONTRACTOR shall provide CITY with a Certificate of Insurance, or other proof of insurance evidencing CONTRACTOR'S compliance with the requirements of this paragraph and file such proof of insurance with the Access Control — W WTP Admin, Lab & Control Buildings page 4 of 17 Project 10373.ADM.DD and 10057.LAB.CC CITY at least ten (10) days prior to the date Contractor begins performance of it's obligations under this Agreement. In the event the insurance minimums are changed, CONTRACTOR shall immediately submit proof of compliance with the changed limits. Evidence of all insurance shall be submitted to the City Purchasing Agent with a copy to Meridian City Accounting, 33 East Broadway Avenue, Meridian, Idaho 83642. 6.2 Any deductibles, self-insured retention, or named insureds must be declared in writing and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles, self-insured retentions or named insureds; or the Contractor shall provide a bond, cash or letter of credit guaranteeing payment of losses and related investigations, claim administration and defense expenses. 6.3 To the extent of the indemnity in this contract, Contractor's Insurance coverage shall be primary insurance regarding the City's elected officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City or the City's elected officers, officials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with Contractor's insurance except as to the extent of City's negligence. 6.4 The Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 6.5 All insurance coverages for subcontractors shall be subject to all of the insurance and indemnity requirements stated herein. 6.6 The limits of insurance described herein shall not limit the liability of the Contractor and Contractor's agents, representatives, employees or subcontractors. 7. Bonds: Payment and Performance Bonds are required on all Public Works Improvement Projects per the ISPWC and the City of Meridian Supplemental Specifications & Drawings to the ISPWC, which by this reference are made a part hereof. 8. Warranty: All construction and equipment provided under this agreement shall be warranted for 2 years from the date of the City of Meridian acceptance per the ISPWC and the Meridian Supplemental Specifications & Drawings to the ISPWC and any modifications, which by this reference are made a part hereof. All items found to be defective during a warranty inspection and subsequently corrected will require an additional two (2) year warranty from the date of City's acceptance of the corrected work. Access Control — W WTP Admin, Lab & Control Buildings page 5 of 17 Project 10373.ADM.DD and 10057.LAB.CC 9. Notices: Any and all notices required to be given by either of the parties hereto, unless otherwise stated in this agreement, shall be in writing and be deemed communicated when mailed in the United States mail, certified, return receipt requested, addressed as follows: CITY CONTRACTOR City of Meridian Apex Integrated Security Systems Purchasing Manager Attn: Bill Atkinson 33 E Broadway Ave 109 South 4fh Street Meridian, ID 83642 Boise, ID 83702 208-888-4433 Phone: (208) 378-9650 Email: bill@apexboise.com Idaho Public Works License # PWC -C-16018 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 10. Attorney Fees: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorneys' fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate contract between the parties and shall survive any default, termination or forfeiture of this Agreement. 11. Time is of the Essence: The parties hereto acknowledge and agree that time is strictly of the essence with respect to each and every term, condition and provision hereof, and that the failure to timely perform any of the obligations hereunder shall constitute a breach of, and a default under, this Agreement by the party so failing to perform. 12. Assignment: It is expressly agreed and understood by the parties hereto, that CONTRACTOR shall not have the right to assign, transfer, hypothecate or sell any of its rights under this Agreement except upon the prior express written consent of CITY. 13. Discrimination Prohibited: In performing the Work required herein, CONTRACTOR shall not unlawfully discriminate in violation of any federal, state or local law, rule or regulation against any person on the basis of race, color, religion, sex, national origin or ancestry, age or disability. 14. Reports and Information: 14.1 At such times and in such forms as the CITY may require, there shall be furnished to the CITY such statements, records, reports, data and information as the CITY may request pertaining to matters covered by this Agreement. Access Control — W WTP Admin, Lab & Control Buildings page 6 of 17 Project 10373.ADM.DD and 10057.LAB.CC 14.2 Contractor shall maintain all writings, documents and records prepared or compiled in connection with the performance of this Agreement for a minimum of four (4) years from the termination or completion of this or Agreement. This includes any handwriting, typewriting, printing, photo static, photographic and every other means of recording upon any tangible thing, any form of communication or representation including letters, words, pictures, sounds or symbols or any combination thereof. 15. Audits and Inspections: At any time during normal business hours and as often as the CITY may deem necessary, there shall be made available to the CITY for examination all of CONTRACTOR'S records with respect to all matters covered by this Agreement. CONTRACTOR shall permit the CITY to audit, examine, and make excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 16. Publication, Reproduction and Use of Material: No material produced in whole or in part under this Agreement shall be subject to copyright in the United States or in any other country. The CITY shall have unrestricted authority to publish, disclose and otherwise use, in whole or in part, any reports, data or other materials prepared under this Agreement. 17. Compliance with Laws: In performing the scope of work required hereunder, CONTRACTOR shall comply with all applicable laws, ordinances, and codes of Federal, State, and local governments. 18. Changes: The CITY may, from time to time, request changes in the Scope of Work to be performed hereunder. Such changes, including any increase or decrease in the amount of CONTRACTOR'S compensation, which are mutually agreed upon by and between the CITY and CONTRACTOR, shall be incorporated in written amendments which shall be executed with the same formalities as this Agreement. 19. Construction and Severability: If any part of this Agreement is held to be invalid or unenforceable, such holding will not affect the validity or enforceability of any other part of this Agreement so long as the remainder of the Agreement is reasonably capable of completion. 20. Waiver of Default: Waiver of default by either party to this Agreement shall not be deemed to be waiver of any subsequent default. Waiver or breach of any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of the terms of this Agreement unless this Agreement is modified as provided above. 21. Advice of Attorney: Each party warrants and represents that in executing this Agreement. It has received independent legal advice from its attorney's or the opportunity to seek such advice. Access Control — W WTP Admin, Lab & Control Buildings page 7 of 17 Project 10373.ADM.DD and 10057.LAB.CC 22. Entire Agreement: This Agreement contains the entire agreement of the parties and supersedes any and all other agreements or understandings, oral of written, whether previous to the execution hereof or contemporaneous herewith. 23. Order of Precedence: The order or precedence shall be the contract agreement, the Invitation for Bid document, then the winning bidders submitted bid document. 24. Public Records Act: Pursuant to Idaho Code Section 9-335, et seq., information or documents received from the Contractor may be open to public inspection and copying unless exempt from disclosure. The Contractor shall clearly designate individual documents as "exempt" on each page of such documents and shall indicate the basis for such exemption. The CITY will not accept the marking of an entire document as exempt. In addition, the CITY will not accept a legend or statement on one (1) page that all, or substantially all, of the document is exempt from disclosure. The Contractor shall indemnify and defend the CITY against all liability, claims, damages, losses, expenses, actions, attorney fees and suits whatsoever for honoring such a designation or for the Contractor's failure to designate individual documents as exempt. The Contractor's failure to designate as exempt any document or portion of a document that is released by the CITY shall constitute a complete waiver of any and all claims for damages caused by any such release. 25. Applicable Law: This Agreement shall be governed by and construed and enforced in accordance with the laws of the State of Idaho, and the ordinances of the City of Meridian. 26. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. CITY OF MERIDIAN APEX INTEGRATED SECURITY SYSTEMS, INC. BY: TAMMY de W D, MAYOR Bill inson - I —1 q Dated: W171�/ Approved by M*ett L. F(ClLMAN, CITY CLERK Access Control — W W TP Admin, Lab & Control Project 10373.ADM.DD and 10057.LAB.CC $np!IS0,, S caU, s mnea IS SPgi page 8 of 17 e,, y��61 TRF.A6'� Purchasing Approval BY: KEIT TTS, Pur asing Manager Dated:: Access Control — W WTP Admin, Lab & Control Buildings Project 10373.ADM.DD and 10057.LAB.CC De par nt Al, oval BY: WA EN STE ART, Engineering Manager Dated:: 2 page 9 of 17 Attachment A SCOPE OF WORK Provide and install Lenel OnGuard Access Control System to the WWTP Administration, Lab and Control buildings. ADMINISTRATION BUILDING New Administration Building - Lenel OnGuard Access Control Addition All work proposed to be completed during normal business hours. Monday - Friday 8am to 5pm. All door locking hardware to be provided by others. Proposal does not include network switches, routers, hubs, racks, etc. unless noted in proposal. Connectivity to these devices to be supplied by owner. Proposal does not include repair or replacement of existing hardware unless noted within proposal. ** Revision 2 (2/7/2014) ** Doors under this scope of work: 1008, 100C,100D,101A,103A,103B,104A,105C (IN ONLY), 105D, 106A 200 B, 200 C, 200 D, 216A, 228A, 308A Elevator (Reader in Cab) -3 Floors 1 Engineering / Design Labor 16 Apex APEX LABOR: LOCK TERMINATION AND TESTING Installation labor to terminate and test locking hardware. Locking hardware provided by others. 1 Apex APEX PROGRAMMING LABOR Programming Labor 1 Apex APEX PROJECT MANAGEMENT LABOR Project Management Labor 2200 Genesis WG -31211112 ft -16/2 Stranded CL2 Plenum BGE 1 M 2200 Genesis WG -32061112 ft - 22/6 Stranded OAS Plenum Data Cable B Lenel LNL-1320 Dual Reader Interface Module (Series 2 Supports OSDP Readers) 1 Lenel LNL-2220 Intelligent Dual Reader Controller - 12 VDC or 24 VDC @ 700mA, size 16" (152mm) W x 8" (203mm) L x 1" (25mm)H), (5 year lithium battery or 3 months full run) 6 MB standard cardholder flash memory, 50,000 of Event memory, maximum of 32 devices, On -board Ethernet, on -board two door control, eight inputs, four outputs, cabinet tamper and power fault input monitors. RoHS, CE, C -Tick and UL 294 Access Control — W WTP Admin, Lab & Control Buildings page 10 of 17 Project 10373.ADM.DD and 10057.LAB.CC 1 Lenel LNL-64ADV-64RUP Reader Capacity Upgrades on OnGuard ADV Systems Only; 64 Access Readers upgrade for all ADV systems (max of 256 readers on ADV) 1 Lenel LNL-CONV-1 Mounting Plate for one LNL-1300 17 Lenel LNL-MT15 Multi -Technology Single Gang Reader: Medium-sized reader designed to be mounted on a wall over a single gang junction box; Black; Wiegand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifarej 2 LifeSafety Power FP0150B100D8PE4M LENEL - Multi -function all -in -one system specifically engineered to power multi -door Lenel- based access systems. Supports up to 8 Doors (4 x LNL-1320). PS/Charger and 8100 provide two power outputs, one at 24VDC, the other at 12VDC.4A/12V & 4A/24V. 4 Power Sonic IM -1270 12v 7A Hour Backup Battery Access Control — W WTP Admin, Lab & Control Buildings page 11 of 17 Project 10373.ADM.DD and 10057.LAB.CC LABORATORY Lab Expansion - Lenel OnGuard Access Control Addition All work proposed to be completed during normal business hours. Monday - Friday 8am to 5pm. All door locking hardware to be provided by others. Proposal does not include network switches, routers, hubs, racks, etc. unless noted in proposal. Connectivity to these devices to be supplied by owner. Proposal does not include repair or replacement of existing hardware unless noted within proposal. "" Revision 2 (2/7/2014) " Doors under this scope of work: 100A 101A 102A 105A 108A 113A 116A 118A 200A 200B 206A 206B 201A 1 Apex APEX ENGINEERING & DESIGN Engineering / Design Labor 13 Apex APEX LABOR: LOCK TERMINATION AND TESTING Installation labor to terminate and test locking hardware. Locking hardware provided by others 1 Apex APEX PROGRAMMING LABOR Programming Labor 1 Apex APEX PROJECT MANAGEMENT LABOR Project Management Labor 2000 Genesis WG -31211112 ft - 16/2 Stranded CL2 Plenum BGE 1M 2000 Genesis WG -32061112 ft - 22/6 Stranded OAS Plenum Data Cable ® 1 Lenel LNL Single Readerer Interface Module (Series 2 -Supports OSDP Readers) 12/24 VDC, 1 Reader interface, W/M, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and cabinet tamper pigtail , RoHS, CE, C -Tick and UL294 certified. 5 Lenel LNL-1320 Dual Reader Interface Module (Series 2 Supports OSDP Readers) Access Control — W WTP Admin, Lab & Control Buildings page 12 of 17 Project 10373.ADM.DD and 10057.LAB.CC 1 Lenel LNL-2220 Intelligent Dual Reader Controller - 12 VDC or 24 VDC @ 700mA, size ( 6" (152mm) W x 8" (203mm) L x 1" (25mm)H), (5 year lithium battery or 3 months full run) 6 MB standard cardholder flash memory, 50,000 of Event memory, maximum of 32 devices, On -board Ethernet, on -board two door control, eight inputs, four outputs, cabinet tamper and power fault input monitors. RoHS, CE, C -Tick and UL 294 1 Lenel LNL-CONV-1 OLe11eL Mounting Plate for one LNL-1300 13 Lenel LNL-MT15 Multi -Technology Single Gang Reader: Medium-sized reader designed to be mounted on a wall over a single gang junction box; Black; W iegand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifare] 2 LifeSafety Power FP01506100D8PE4M LENEL - Multi -function all -in -one system specifically engineered to power multi -door Lenel- based access systems. Supports up to 8 Doors (4 x LNL-1320). PS/Charger and B100 provide two power outputs, one at 24VDC, the other at 12VDC.4A/12V & 4A/24V. 4 Power Sonic Ill 270 12v 7A Hour Backup Battery Access Control — W W TP Admin, Lab & Control Buildings page 13 of 17 Project 10373.ADM.DD and 10057.LAB.CC CONTROLS BUILDING Controls Building Tenant Improvement - Lenel OnGuard Access Control Addition All work proposed to be completed during normal business hours. Monday - Friday Sam to Spm All door locking hardware to be provided by others. Proposal does not include network switches, routers, hubs, racks, etc. unless noted in proposal. Connectivity to these devices to be supplied by owner. Proposal does not include repair or replacement of existing hardware unless noted within proposal Existing Doors - Reuse readers and Controllers This building is the location of the master controller that connects to the other buildings. Labor is included to relocated and extended existing cable. ** Project Notes ** Currently the building is using a LNL-2220 to control two doors plus it uses a LNL-8000 star -multiplexer to distribute the RS -485 data to the remote buildings. The LNL-2220 can not support additonal local readers. This proposal includes a new LNL-3330 which will control the remote buildings. We will then reuse the LNL-2220 to dedicate to the Control Room Doors. 1 Apex APEX ENGINEERING & DESIGN Engineering / Design Labor 1 Apex APEX INSTALLATION LABOR Installation/Termination Labor 2 Apex APEX LABOR: LOCK TERMINATION AND TESTING Installation labor to terminate and test locking hardware. Locking hardware provided by others. 1 Apex APEX PROGRAMMING LABOR Programming Labor 1 Apex APEX PROJECT MANAGEMENT LABOR Project Management Labor 250 Genesis WG -31211112 Ft —16/2 Stranded CL2 Plenum BGE 1 M 250 Genesis WG -32061112 ft — 22/6 Stranded OAS Plenum Data Cable 500 Genesis WG -32811112 ft — 22/2pr Twisted OAS Plenum Access Control — W WTP Admin, Lab & Control Buildings page 14 of 17 Project 10373.ADM.DD and 10057.LAB.CC 1 Lenel LNL-1320 Dual Reader Interface Module (Series 2 Supports OSDP Readers) 1 Lenel LNL-3300 Intelligent System Controller 12 VDC Or 24 VDC @300ma,size, 15 MB Standard Cardholder Flash Memory, 50,000 Event Memory, Maximum Of 64 Devices, On- board Ethernet, Dual Path Capability, Cabinet Tamper & Power Fault Input Monitors. Rohs, Ce, C -tick & 111294 2 Lenel LNL-MT15 Multi -Technology Single Gang Reader: Medium-sized reader designed to be mounted on a wall over a single gang junction box; Black ; W iegand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifarej 1 LifeSafety Power MC150B-FBPE4 Multi -function all -in -one system specifically engineered to power multi -door Lenel-based access systems. Supports up to 8 Doors (4 x LNL-1320). PS/Charger and B100 provide two power outputs, one at 24VDC, the other at 12VDC.4A/12V & 4A/24V. 2 Power Sonic IM -1270 12v 7A Hour Backup Battery Access Control— WWTP Admin, Lab & Control Buildings page 15 of 17 Project 10373.ADM.DD and 10057.LAB.CC A. Milestone 1 Attachment B MILESTONE / PAYMENT SCHEDULE Total and complete compensation for this Agreement shall not exceed $70,221.01. Substantial Completion 190 (ninety) days Contract includes furnishing all labor, materials, equipment, and incidentals as required for the ACCESS CONTROL FOR NEW WWTP ADMIN, LAB & CONTROL BUILDINGS project CONTRACT TOTAL ....................... $70.221.01 Description Price Equipment & Labor $33,816.76 Shipping & Handling $218.00 Payment & Performance Bonds $1,014.50 ADMIN BUILDING TOTAL $35,049.26 Equipment & Labor $24,982.11 Shipping & Handling $147.00 Payment & Performance Bonds $753.87 LABORATORY BUILDING $25,882.98 Access Control - W W TP Admin, Lab & Control Buildings page 16 of 17 Project 10373.ADM.DD and 10057.LAB.CC Equipment & Labor $8,964.22 Shipping & Handling $54.00 Payment & Performance Bonds $270.55 CONTROLS BUILDING TOTAL $9,288.77 Access Control — WWTP Admin, Lab & Control Buildings page 17 of 17 Project 10373.ADM.DD and 10057.LAB.CC Client#: 1127978 APEXINTI ACORD. CERTIFICATE OF LIABILITY INSURANCE DATE 611812IDDIYYYY) 16/18/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER USI Idaho, Kibble & Prentice 3295 Elder Street Boise, ID 83705 208393-5212 CONTACT NAME: PHONE 208 3935212 Fax AIC No Ea[: AIC No E-MAIL ADDRESS: INSUREF(S)AFFORDING COVERAGE NAICW INSURERA: Philadelphia Indemnity Insuranc 18058 INSURED INSURERS: Idaho State Insurance Fund NONAIC Apex Integrated Security 109 South 4th Street ;- INSURER C: Boise, ID 83702 INSURER 11 `INSURER E: INS R RF: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TOTHE INSURED NAMEDABOVE FORTHE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY" CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED '�BY"THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE_BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE ADDLSUB NSR WVD POLICY NUMBER _ POLICY MMIDUIYEYYY LIMITS A GENERAL LIABILITY x PHPK1111884 -. 1/01/2014 011011201f EACH OCCURRENCE $1 000000 X COMMERCIAL GENERAL LIABIUTV CLAIMS -MADE 51 OCCUR PRE MISES Eance $100000 Eaocurre MED EXP (Any one person) $6,000 PERSONAL & ADV INJURY $11000,000 _ GENERALAGGREGATE 82,000,000 " GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGG $2,000,000 X POLICY PRO- LOC JECT "''^'1"' $ - A AUTOMOBILE LIABILITY x PHPK1111884 _ 1/01/2014 01/01/201CEOMBINEEDI SINGLE LIMIT 1,000,000 BODILY INJURY (Per person) $ X ANY AUTO ,. ALLOWNED SCHEDULED AUTOS AUTOS BODILY INJURY (Per eccJtlenq $ X HIRED AUTOS X NOWOWNED AUTOS PROPERTY DAMAGE $ Peraccident $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ _ AGGREGATE $ _ EXCESS LIAB CLAIMS -MADE DED I I RETENTION $ $ B WORKERS COMPENSATION YIN AND EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNEWEXECLUIVE OFFICERIMEMBER EXCLUDED? J NIA 593154 1107/2014 01/01/201 % WG STATU- OTH- E E.L. EACH ACCIDENT $1000000 E.L. DISEASE - EA EMPLOYEE $1000000 (Mandatory In NH) If yes, describe under DESCRIPTION OF OPERATIONS balm E.L. DISEASE -POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if mare space is required) Certificate holder is added as additional insured per contract with Apex Integrated Security Solutions, Inc. on general liability and auto - liability. City of Meridian 33 E Broadway Ste 106 Meridian, ID 83642 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. _. ACORD 25 (2010105) 1 of 1 The ACORD name and logo are registered marks of ACORD #S127108041M12434600 TATJV *AIA Document A312 TM .2010 Performance Bond CONTRACTOR: (Name, legal status and address) Apex Integrated Security Solutions, Inc 109 South 4th Street Boise, Idaho 83702 OWNER: (Name, legal status and address) City of Meridian 33 E. Broadway Ave Meridian, Idaho 83642 CONSTRUCTION CONTRACT Date: 06/17/2014 Amount: $70,221.01 SURETY: (Name, legal status and principal place ofirusiness) Indemnity Company of California Five Centerpoinle, Suite 530 Lake Oswego, Oregon 97035 Description: (Name and location) Access control for new W WTP Admin, Lab & Control Buildings Projects #10057.LAB.CC and 10383.ADM.DD BOND Date: 06/18/2014 (Not earlier than Construction Contract Date) Amount: $70,221.01 Modifications to this Bond: ® None ❑ See Section 16 CONTRACTOR AS PRINCIPAL SURETY Company: (Corpora! Company: (Corporate Seal) Apex Integrated S Soluti Indemnity Comp y of California Signatu Signatu . t Narprp L4,Aa" ;Z7,rJ Name K IA chter, Attp ney-In-Fact and Tit e: �O�{L–Sii��G� and Title: (Airy additional signatures appear on the last page of this Performance Bond) Bond No. 755889P This document has Important legal consequences. Consultation with an attorney Is encouraged with respect to tis completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. AIA Document A312-2010 combine two separate bonds, a Performance Bond and a Payment Bond, Into one form. This Is not a single combined Performance and Payment Bond. (FOR INFORMATION ONLY—Name, address and telephone) 0„06201#44 AGENT or BROKER: OWNER'S REPRESENTATIVE:CURn Allied Bonding (Architect, Engineer or other party:) R�g� so 5605 Overland Rd. �. `OpfORAp� Boise, ID 83705 Phone (208) 345-4177 7 m tee• Fax (208) 384-1677 4 7t% SQ AL � P ••••••��#~nMHO InIL ArAaeeumen1A312--7010. The American lnstltuteofArchleeb. onrme § 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. § 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except when applicable to participate in a conference as provided in Section 3. § 3 If there is no Owner Default under the Construction Contract, the Surety's obligation under this Bond shall arise after 1 the Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor and Surety to discuss the Contractor's performance. If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner's notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Section 3.1 shall be held within ten (10) business days of the Surety's receipt of the Owner's notice. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; .2 the Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; and .3 the Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract. § 4 Failure on the part of the Owner to comply with the notice requirement in Section 3.1 shall not constitute a failure to comply with a condition precedent to the Surety's obligations, or release the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice. § 5 When the Owner has satisfied the conditions of Section 3, the Surety shall promptly and at the Surety's expense take one of the following actions: § 5.1 Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract; § 5.2 Undertake to perform and complete the Construction Contract itself, through its agents or independent contractors; § 5.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Section 7 in excess of the Balance of the Contract Price incurred by the (hurter as a result of the Contractor Default; or § 5.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or .2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial. § 51f the Surety does not proceed as provided in Section 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Section 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. Ink. AIA Document A312's-2010. The American Institute of Architects. 2 § 7 If the Surety elects to act under Section 5.1, 5.2 or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication, for .1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; .2 additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Section 5; and .3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. § 8 I the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety's liability is limited to the amount of this Bond. § 0 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors and assigns. § 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 11 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. § 13 When this Bond has been famished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so famished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. § 14 Definitions § 14.1 Balance of the Contract Price. The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract. § 14.2 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents. § 14.3 Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract. § 14.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. § 14.5 Contract Documents. All the documents that comprise the agreement between the Owner and Contractor. § 15 If this Bond is issued for an agreement between a Contactor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. Init. AIA Document A312--2010. The American Inaftte ofAmhitects. § 16 Modifications to this bond are as follows: None (Space is provided below for additional signatures of addedparties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Signature: Name and Title: Address Signature: Name and Title: Address CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. Init AIA DOeemeMA072--2010. The Ammiran Institute ofAiehaectL 4 #AIA Document A312 TM .2010 Payment Bond CONTRACTOR: (Name, legal status and address) Apex Integrated Security Solutions, Inc 109 South 4th Street Boise, Idaho 83702 OWNER: (Name, legal status and address) City of Meridian 33 E. Broadway Ave Meridian, Idaho 83642 CONSTRUCTION CONTRACT Date: 06/17/2014 Amount: $70,221.01 SURETY: (Name, legal status and principal place of business) Indemnity Company of California Five Centerpointe, Suite 530 Lake Oswego, Oregon 97035 Description: (Name and location) Access control for new W WTP Admin, Lab $ Control Buildings Projects #10057.LAB.CC and 10383.ADM.DD BOND Date: 06/18/2014 (Not earlier than Construction Contract Date) Amount: $70,221.01 Modifications to this Bond: W None 13 See Section 18 CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Se l) pany: (Corporate Seal) Apex Integrated Secunt lutions, Indemnity Company of California// Signe Signator . C N i�s.�x+v.OLfTk/ ,rot/ Name K��A'hter, Attom y -In -Fact andTitle: OS/.r and Title: (Arty additional signatures appear on the lastpage of this Payond) Bond No. 755889P This document has important legal consequences. Consultation with an attorney Is encouraged with reaped to Its completion or modification. Any singular reference to Contractor, Surety, Owner or other parry shall be considered Plural where applicable. AIA Document A312-2010 combines two separate bonds, a Performance Bond and a Payment Bond, into one forth. This Is not a single combined Performance and Payment Bond. (FOR INFORMATION ONLY— Name, ad,*ess and telephone) UR#r q AGENT or BROKER: OWNER'S REPRESENTATIVE: Allied Bonding (Architect, Engineer or other party:) 01114P4 5605 5605 Overland Rd. Boise, ID 83705 . ry 409w Phone(208)345-4177 2 r SE Fox (208) 384-1677 $ r. '►L f d 1y * IDAHO aahuaaaaa`` R Ina. AIA bOeumardA212--2010. The Amerkan lnalhute ofAmhheoh. Willa § 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference, subject to the following terms. § 2 If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond. § 3 If there is no Owner Default under the Construction Contract, the Surety's obligation to the Owner under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety (at the address described in Section 13) of claims, demands, liens or suits against the Owner or the Owner's property by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety. § 4 When the Owner has satisfied the conditions in Section 3, the Surety shall promptly and at the Surety's expense defend, indemnify and hold harmless the Owner against a duly tendered claim, demand, lien or suit. § 5 The Surety's obligations to a Claimant under this Bond shall arise after the following: § 5.1 Claimants, who do not have a direct contract with the Contractor, .1 have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied or for whom the labor was done or performed, within ninety (90) days atter having last performed labor or last furnished materials or equipment included in the Claim; and .2 have sent a Claim to the Surety (at the address described in Section 13). § 5.2 Claimants, who are employed by or have a direct contract with the Contractor, have sent a Claim to the Surety (at the address described in Section 13). § 6 If a notice of non-payment required by Section 5.1.1 is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant's obligation to furnish a written notice of non-payment under Section 5.1.1. § 7 When a Claimant has satisfied the conditions of Sections 5.1 or 5.2, whichever is applicable, the Surety shall promptly and at the Surety's expense take the following actions: § 7.1 Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and § 7.2 Pay or arrange for payment of any undisputed amounts. § 7.3 The Surety's failure to discharge its obligations under Section 7.1 or Section 7.2 shall not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement. If, however, the Surety fails to discharge its obligations under Section 7.1 or Section 7.2, the Surety shall indemnify the Claimant for the reasonable attorney's fees the Claimant incurs thereafter to recover any sums found to be due and owing to the Claimant. § 8 The Surety's total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney's fees provided under Section 7.3, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. § 9 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. Init. AIA nocument A312^ — 2010. The Amerlun Institute of AmMects. § 10 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make payments to, or give notice on behalf of, Claimants or otherwise have any obligations to Claimants under this Bond. § 11 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 12 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which the project that is the subject of the Construction Contract is located or after the expiation of one year from the date (1) on which the Claimant sent a Claim to the Surety pursuant to Section 5.1.2 or 5.2, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 13 Notice and Claims to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. Actual receipt of notice or Claims, however accomplished, shall be sufficient compliance as of the date received. § 14 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. § 15 Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made. § 16 Definitions § 16.1 Claim. A written statement by the Claimant including at a minimum: .1 the name of the Claimant; .2 the name of the person for whom the labor was done, or materials or equipment famished; .3 a copy of the agreement or purchase order pursuant to which labor, materials or equipment was furnished for use in the performance of the Construction Contract; A a brief description of the labor, materials or equipment furnished; .5 the date on which the Claimant last performed labor or last famished materials or equipment for use in the performance of the Construction Contract; .6 the total amount earned by the Claimant for labor, materials or equipment fumished as of the date of the Claim; .7 the total amount of previous payments received by the Claimant; and .6 the total amount due and unpaid to the Claimant for labor, materials or equipment furnished as of the date of the Claim. § 16.2 Claimant An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic's lien or similar statute against the real property upon which the Project is located. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished. § 16.3 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and all changes made to the agreement and the Contract Documents. Ink. AIA Document A312^-2010. The American Institute Of Architects. § 16.4OMW Defaut Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. § 16.5 Contract DocumeMa. All the documents that comprise the agreement between the Owner and Contractor. 117 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be damned to be Subcontractor and the term Owner shall be deemed to be Contractor. § 1S Modifications to this bond are as follows: None (Space is provided below for additional signatties of added parties, other than those appearing on the cover page) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seat) Company: (Corporate Seat) Signature: Name and Title: Address Signature: Name and Title: Address CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. Ink ANA DoaimantA312^-20fe. The Ammlmn lnaahas OfAmhaseb. POWER OF ATTORNEY FOR DEVELOPERS SURETYAND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725, IRVINE, CA 92623 (949) 263-3300 KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each hereby make, constitute and appoint: "''Karyl A. Richter, Janet K. Holthaus, jointly or severally'** as their true and lawful Attorney(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of surety- ship giving and granting unto said Attorney(s)-in-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and all of the acts of said Altomey(s)-in-Fact, pursuant to these presents, are hereby ratified and confirmed. - This Power of Attorney is granted and is signed by facsimile under and by authority of he following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January 1st, 2008. RESOLVED, that a combination of any two of he Chairman of the Board, the President, Executive Vice -President, Senior Vice -President or any Vice President of the corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attorney(s) named in the Power of Attorney to execute, on behalf of the corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby is, authorized to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power ofAllorneyorlo any certificate relating thereto byfacsimile, and any such Power ofARomey or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective officers and attested by their respective Secretary or Assistant Secretary this November 21, 2013. ey =,.0"-i ANvip0.4 OVNPANyp� Daniel J�Young, ,SSenior Vice�P��resid�deentj/� �dyJQ`4bpp0y{,d1 6gyi �G Op,POq yT P,9 // �.G x+r! OCT. :< ~ 2G Fa! z � OCT. S r By.. Mark J. Lansdon, Vice -President °,r� 1936 _WP :,; cop n 1967 .v 2 State of California County of Orange On November 21, 2013 before me, Antonio Alvarado Notary Public Date Here Insert Name and T8e of the Officer personally appeared Daniel Young and Mark J. Lansdon Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) Ware subscribed to the within instrument and acknowledged to me that hershedhey executed the same in hislhentheir authorized capadly(ies), and that by hislherltheir signature(s) on the instrument the person(s), or the entity upon behalf of ANT0 t0ALVARA d ' which he person(s) acted, executed the instrument. C". # 20336ft6 NOTARY PUBLICTIA (certify under PENALTY OF PERJURY under the laws of the Stale of California that the foregoing paragraph is QFNNOEf:DtNiN. true and correct. MY ccmmu eq�kes AuA Al)1T - WITNESS my hand and official seal. Place. Notary Seal Above Signature Antonio Alvarado, Notary Public CERTIFICATE The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY a INDEMNITY COMPANY OF CALIFORNIA, does hereby certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of he respective Boards of Directors of said corporations set forth in the Power of Attorney are in force as of the date of this Certificate.- /� IThis Certificate is executed in the City of Irvine, California, this j$ day of 1 V �c 19014 By: _C_,A�yn - te� Cassie J. Berrisfic, 91iistant Secretary - ID-1380(Rev.11113) Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: I PROJECT NUMBER: FP 14-029 ITEM TITLE: Amberwave Subdivision Final Plat approval consisting of 27 single family residential lots and 3 common lots on approximately 4.70 acres in the R-15 zoning district by Coleman Homes, LLC - SWC of W. McMillan Road and N. Meridian Road MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER - PROJECT NUMBER: ITEM TITLE: Approval of Award of Bid and Agreement to Granite Excacation, Inc. for the "NE 3rd Street, Williams King Ada Sewer and Water Main" Project for the Not -To - Exceed Amount of $489,683.71 MEETING NOTES JV.. Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY I SENT TO APPLICANT NOTES INITIALS Memo To: Jaycee L. Holman, City Clerk, From: Keith Watts, Purchasing Manager CC: Jacy Jones, John Boyd Date: 06/26/2014 Re: July 1'� City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the July 1, 2014 City Council Consent Agenda for Council's consideration. Recommended Council Action: Award of Bid and Approval of Agreement for NE 3rd Street, Williams King Ada — Sewer and Water Main Project to GRANITE EXCAVATION, INC for the Not -To -Exceed amount of $489,683.71. Thank you for your consideration. 0 Page 1 Date: 5/22/2014 Fund: 60 Construction: x Project Name: Project Manager: CITY OF MERIDIAN CONTRACT/AGENDA REQUEST CHECKLIST REQUESTING DEPARTMENT Public Works Department: 3490/3590 GL Account: 95000 Project# _ PSA: Task Order: NE 3RD, WILLIAMS KING ADA STREET - WATER AND SEWER MAIN JOHN BOYD Contractor/Consultant/Design Engineer: Budget Available (Attach Report): Will the project cross fiscal years? YES Department Representative: JOHN BOYD GRANITE EXCAVATION, INC / CIVIL SURVEY CONSULTANTS Contract Amount: $489,683.71 Yes No X Budget Information: FY Budget: 2014 Enhancement #: Grant If: Other: Type of Grant: CONTRACT CHECKLIST BASIS OF AWARD Low Bidder x Highest Rated Master Agreement (Bid Results Attached) Yes (Ratings Attached) (Category) Typical Award Yes X No If no please state circumstances and conclusion: 10 Day Waiting Period Complete: June 26, 2014 PW License# C-16558 Current? (attach printout) Corporation Status (Attach Print out): Goodstandin¢ Insurance Certificates Received (Date): Payment and Performance Bonds Received (Date): Builders Risk Ins. Req'd: Yes No x Date Submitted to Clerk for Agenda: Issue Purchase Order No. Issue Notice of Award: Date: June 24, 2014 June 26, 2014 Date Issued: Date Award Posted: June 16, 2014 10394.a Yes Correct Category? Rating: A+ June 24, 2014 Rating: A+ If yes, has policy been purchased? Approved by Council WH5 submitted NTP Date: FROM: John Boyd Engineering Project Manager DATE: 5/21/2014 SUBJECT: AUTHORIZE CONSTRUCTION OF THE NE 3RD STREET-WILLIAMS-KING- ADA SEWER/WATER MAIN CONSTRUCTION FOR A NOT TO EXCEED AMOUNT OF $517,312.90. PLEASE PLACE ON NEXT AVAILABLE CONSENT AGENDA I. DEPARTMENT CONTACT PERSONS John Boyd, Engineering Technician II...............................................................................489-0364 Clint Dolsby, Asst. City Engineer......................................................................................489-0341 Warren Stewart, PW Engineering Manager.......................................................................489-0350 John McCormick, Deputy Director of Public Works.........................................................489-0378 Tom Barry, Director of Public Works................................................................................489-0372 II. DESCRIPTION A. Background The Public Works Department continually strives to increase reliability of the sewer collection and water distribution systems by improving efficiency through regular maintenance and expansions. B. Proposed Ptject This project combines sewer and water construction and rehabilitation projects to use available funding as effectively as possible and consists of the following: Sewer — Construction of approximately 500 LF of new 8" sewer main in NE 3rd Street between E. Williams and E. Ada Streets and the connection of approximately 12 homes to the new sewer mains. Water — Construction of approximately 700 linear feet of now water main in each of Williams, Ada and King Streets from NE 3rd Street to Main Street, C. Contractor Selection Bids will be opened for this project on June 13, 2014. Public Works Department . 33 E. Broadway Avenue, Suite 200, Meridian, ID 83642 Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org III. IMPACT A.Service/Delivery Impact: The construction of these sewer and water mains will update an older section of the downtown area and this approval will enable the construction to commence this fiscal year. B. Strategic Impact: This project meets our mission requirements to identify and prioritize work to anticipate, plan and provide public services and facilities that support the needs of our growing community and ensure modem reliable facilities while maintaining financial stewardship. C. Fiscal Impact: Available Project Funding The project will be funded with existing City funds from the following accounts. Sewer Line Replacements (60 -3590 -95000) ................................................... $220,000.00 Water Line Replacements (60 -3490 -95000) ................................................... $297.312.90 TotalFunding.................................................................................................. $517,312.90 IV. LIST OF ATTACHMENTS A. Purchase Order Requisition B. Engineering Estimate APPROVED FOR BID / AWARD PROCESS LO / arren Stewa , PE — Engineering Manager Date Page 2 of 2 AGREEMENT FOR INDEPENDENT CONTRACTOR SERVICES NE 3RD STREET - WILLIAMS, KING AND ADA STREETS SEWER AND WATER MAIN REPLACEMENT PROJECT - CONSTRUCTION PROJECT # 10394.A THIS AGREEMENT FOR INDEPENDENT CONTRACTOR SERVICES is made this 1 ST day of July, 2014, and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "CITY", 33 East Broadway Avenue, Meridian, Idaho 83642, and Granite Excavation, Inc, hereinafter referred to as "CONTRACTOR", whose business address is 23 Warm, Lake HwV, Cascade, ID 83611 and whose Public Works Contractor License # is C-16558- Unitd-2-4. INTRODUCTION Whereas, the City has a need for services involving NE 3RD STREET - WILLIAMS KING AND ADA STREETS SEWER AND WATER MAIN REPLACEMENT PROJECT - CONSTRUCTION; and WHEREAS, the Contractor is specially trained, experienced and competent to perform and has agreed to provide such services; NOW, THEREFORE, in consideration of the mutual promises, covenants, terms and conditions hereinafter contained, the parties agree as follows: TERMS AND CONDITIONS Scope of Work: 1.1 CONTRACTOR shall perform and furnish to the City upon execution of this Agreement and receipt of the City's written notice to proceed, all services and work, and comply in all respects, as specified in the document titled "Scope of Work" a copy of which is attached hereto as Attachment "A" and incorporated herein by this reference, together with any amendments that may be agreed to in writing by the parties. 1.2 All documents, drawings and written work product prepared or produced by the Contractor under this Agreement, including without limitation electronic data files, are the property of the Contractor; provided, however, the City shall have the right to reproduce, publish and use all such work, or any part thereof, in any manner and for any purposes whatsoever and to authorize others to do so. If any such work is copyrightable, the Contractor may copyright the same, except that, as to any work which is copyrighted by the Contractor, the City reserves a royalty -free, non-exclusive, and irrevocable license to reproduce, publish and use such work, or any part thereof, and to authorize others to do so. NE 3rd Street -Williams, King And Ada Streets Sewer And Water Main Replacement Project -Construction Project 10394.A page 1 of 12 1.3 The Contractor shall provide services and work under this Agreement consistent with the requirements and standards established by applicable federal, state and city laws, ordinances, regulations and resolutions. The Contractor represents and warrants that it will perform its work in accordance with generally accepted industry standards and practices for the profession or professions that are used in performance of this Agreement and that are in effect at the time of performance of this Agreement. Except for that representation and any representations made or contained in any proposal submitted by the Contractor and any reports or opinions prepared or issued as part of the work performed by the Contractor underthis Agreement, Contractor makes no other warranties, either express or implied, as part of this Agreement. 1.4 Services and work provided by the Contractor at the City's request under this Agreement will be performed in a timely manner in accordance with a Schedule of Work, which the parties hereto shall agree to. The Schedule of Work may be revised from time to time upon mutual written consent of the parties. 2. Consideration 2.1 The Contractor shall be compensated on a Not -To -Exceed basis as provided in Attachment B "Payment Schedule" attached hereto and by reference made a part hereof for the Not -To -Exceed amount of $489,683.71. 2.2 The Contractor shall provide the City with a monthly statement and supporting invoices, as the work warrants, of fees earned and costs incurred for services provided during the billing period, which the City will pay within 30 days of receipt of a correct invoice and approval by the City. The City will not withhold any Federal or State income taxes or Social Security Tax from any payment made by City to Contractor under the terms and conditions of this Agreement. Payment of all taxes and other assessments on such sums is the sole responsibility of Contractor. 2.3 Except as expressly provided in this Agreement, Contractor shall not be entitled to receive from the City any additional consideration, compensation, salary, wages, or other type of remuneration for services rendered under this Agreement including, but not limited to, meals, lodging, transportation, drawings, renderings or mockups. Specifically, Contractor shall not be entitled by virtue of this Agreement to consideration in the form of overtime, health insurance benefits, retirement benefits, paid holidays or other paid leaves of absence of any type or kind whatsoever. 3. Term: 3.1 This agreement shall become effective upon execution by both parties, and shall expire upon (a) completion of the agreed upon work, (b) or unless sooner terminated as provided in Sections 3.2, 3.3, and Section 4 below or unless some other method or time of termination is listed in Attachment A. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 2 of 12 3.2 Should Contractor default in the performance of this Agreement or materially breach any of its provisions, City, at City's option, may terminate this Agreement by giving written notification to Contractor. 3.3 Should City fail to pay Contractor all or any part of the compensation set forth in Attachment B of this Agreement on the date due, Contractor, at the Contractor's option, may terminate this Agreement if the failure is not remedied by the City within thirty (30) days from the date payment is due. 3.4 TIME FOR EXECUTING CONTRACT AND LIQUIDATED DAMAGES Upon receipt of a Notice to Proceed, the Contractor shall have 90(ninety) calendar days to complete the work as described herein. Contractor shall be liable to the City for any delay beyond this time period in the amount of $500.00 (five hundred fifty dollars) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. See Milestones listed below for Substantial Completion. Substantial Completion shall be accomplished within 75 (seventy-five) calendar days from Notice to Proceed. This project shall be considered Substantially Complete when the Owner has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, and only minor incidental work, corrections or repairs remain for the physical completion of the total contract. Contractor shall be liable to the City for any delay beyond this time period in the amount of $250.00 (two hundred fifty dollars) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. ANTICIPATED PROJECT SCHEDULE May 26, 2014 June 6, 2014 June 9, 2014 June 10, 2014 June 13 2014 July 1, 2014 July 2, 2014 July 3, 2014 September 15, 2014 September 30, 2014 4. Termination: Bid Advertised Pre -Bid Conference Last Date to submit questions Addendum Issued (if needed) Bid Opening Council Award Notice to Proceed Pre -Construction Conference Milestone 1 — Substantial Completion Milestone 2 —Final Completion 4.1 If, through any cause, CONTRACTOR, its officers, employees, or agents fails to fulfill in a timely and proper manner its obligations under this Agreement, violates NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 3 of 12 any of the covenants, agreements, or stipulations of this Agreement, falsifies any record or document required to be prepared under this agreement, engages in fraud, dishonesty, or any other act of misconduct in the performance of this contract, or if the City Council determines that termination of this Agreement is in the best interest of CITY, the CITY shall thereupon have the right to terminate this Agreement by giving written notice to CONTRACTOR of such termination and specifying the effective date thereof at least fifteen (15) days before the effective date of such termination. CONTRACTOR may terminate this agreement at any time by giving at least sixty (60) days notice to CITY. In the event of any termination of this Agreement, all finished or unfinished documents, data, and reports prepared by CONTRACTOR under this Agreement shall, at the option of the CITY, become its property, and CONTRACTOR shall be entitled to receive just and equitable compensation for any work satisfactorily complete hereunder. 4.2 Notwithstanding the above, CONTRACTOR shall not be relieved of liability to the CITY for damages sustained by the CITY by virtue of any breach of this Agreement by CONTRACTOR, and the CITY may withhold any payments to CONTRACTOR for the purposes of set-off until such time as the exact amount of damages due the CITY from CONTRACTOR is determined. This provision shall survive the termination of this agreement and shall not relieve CONTRACTOR of its liability to the CITY for damages. 5. Independent Contractor: 5.1 In all matters pertaining to this agreement, CONTRACTOR shall be acting as an independent contractor, and neither CONTRACTOR nor any officer, employee or agent of CONTRACTOR will be deemed an employee of CITY. Except as expressly provided in Attachment A, Contractor has no authority or responsibility to exercise any rights or power vested in the City and therefore has no authority to bind or incur any obligation on behalf of the City. The selection and designation of the personnel of the CITY in the performance of this agreement shall be made by the CITY. 5.2 Contractor, its agents, officers, and employees are and at all times during the term of this Agreement shall represent and conduct themselves as independent contractors and not as employees of the City. 5.3 Contractor shall determine the method, details and means of performing the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specified in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of Contractor in fulfillment of this Agreement. If in the performance of this Agreement any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction and supervision and control of the Contractor. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 4 of 12 6. Indemnification and Insurance: 6.1 CONTRACTOR shall indemnify and save and hold harmless CITY from and for any and all losses, claims, actions, judgments fordamages, or injury to persons or property and losses and expenses and other costs including litigation costs and attorney's fees, arising out of, resulting from, or in connection with the performance of this Agreement by the CONTRACTOR, its servants, agents, officers, employees, guests, and business invitees, and not caused by or arising out of the tortious conduct of CITY or its employees. CONTRACTOR shall maintain, and specifically agrees that it will maintain, throughout the term of this Agreement, liability insurance, in which the CITY shall be named an additional insured in the minimum amounts as follow: General Liability One Million Dollars ($1,000,000) per incident or occurrence, Automobile Liability Insurance One Million Dollars ($1,000,000) per incident or occurrence and Workers' Compensation Insurance, in the statutory limits as required by law.. The limits of insurance shall not be deemed a limitation of the covenants to indemnify and save and hold harmless CITY; and if CITY becomes liable for an amount in excess of the insurance limits, herein provided, CONTRACTOR covenants and agrees to indemnify and save and hold harmless CITY from and for all such losses, claims, actions, or judgments for damages or injury to persons or property and other costs, including litigation costs and attorneys' fees, arising out of, resulting from , or in connection with the performance of this Agreement by the Contractor or Contractor's officers, employs, agents, representatives or subcontractors and resulting in or attributable to personal injury, death, or damage or destruction to tangible or intangible property, including use of. CONTRACTOR shall provide CITY with a Certificate of Insurance, or other proof of insurance evidencing CONTRACTOR'S compliance with the requirements of this paragraph and file such proof of insurance with the CITY at least ten (10) days prior to the date Contractor begins performance of it's obligations under this Agreement. In the event the insurance minimums are changed, CONTRACTOR shall immediately submit proof of compliance with the changed limits. Evidence of all insurance shall be submitted to the City Purchasing Agent with a copy to Meridian City Accounting, 33 East Broadway Avenue, Meridian, Idaho 83642. 6.2 Any deductibles, self-insured retention, or named insureds must be declared in writing and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles, self-insured retentions or named insureds; or the Contractor shall provide a bond, cash or letter of credit guaranteeing payment of losses and related investigations, claim administration and defense expenses. 6.3 To the extent of the indemnity in this contract, Contractor's Insurance coverage shall be primary insurance regarding the City's elected officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City or the City's elected officers, officials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with Contractor's insurance except as to the extent of City's negligence. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 5 of 12 6.4 The Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 6.5 All insurance coverages for subcontractors shall be subject to all of the insurance and indemnity requirements stated herein. 6.6 The limits of insurance described herein shall not limit the liability of the Contractor and Contractor's agents, representatives, employees or subcontractors. 7. Bonds: Payment and Performance Bonds are required on all Public Works Improvement Projects per the ISPWC and the City of Meridian Supplemental Specifications & Drawings to the ISPWC, which by this reference are made a part hereof. Warranty: All construction and equipment provided under this agreement shall be warranted for 2 years from the date of the City of Meridian acceptance per the ISPWC and the Meridian Supplemental Specifications & Drawings to the ISPWC and any modifications, which by this reference are made a part hereof. All items found to be defective during a warranty inspection and subsequently corrected will require an additional two (2) year warranty from the date of City's acceptance of the corrected work. 9. Notices: Any and all notices required to be given by either of the parties hereto, unless otherwise stated in this agreement, shall be in writing and be deemed communicated when mailed in the United States mail, certified, return receipt requested, addressed as follows: CITY City of Meridian Purchasing Manager 33 E Broadway Ave Meridian, ID 83642 208-888-4433 CONTRACTOR Granite Excavation, Inc Attn: Josh Davis, President 35 Warm Lake Hwy Cascade, ID 83611 Phone: 208-382-4188 Email: ioshc@ciraniteexcavation.com Idaho Public Works License #C-16558 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 10. Attorney Fees: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorneys' fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate contract between the parties and shall survive any default, termination or forfeiture of this Agreement. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 6 of 12 11. Time is of the Essence: The parties hereto acknowledge and agree that time is strictly of the essence with respect to each and every term, condition and provision hereof, and that the failure to timely perform any of the obligations hereunder shall constitute a breach of, and a default under, this Agreement by the party so failing to perform. 12. Assignment: It is expressly agreed and understood by the parties hereto, that CONTRACTOR shall not have the right to assign, transfer, hypothecate or sell any of its rights under this Agreement except upon the prior express written consent of CITY. 13. Discrimination Prohibited: In performing the Work required herein, CONTRACTOR shall not unlawfully discriminate in violation of any federal, state or local law, rule or regulation against any person on the basis of race, color, religion, sex, national origin or ancestry, age or disability. 14. Reports and Information: 14.1 At such times and in such forms as the CITY may require, there shall be furnished to the CITY such statements, records, reports, data and information as the CITY may request pertaining to matters covered by this Agreement. 14.2 Contractor shall maintain all writings, documents and records prepared or compiled in connection with the performance of this Agreement for a minimum of four (4) years from the termination or completion of this or Agreement. This includes any handwriting, typewriting, printing, photo static, photographic and every other means of recording upon any tangible thing, any form of communication or representation including letters, words, pictures, sounds or symbols or any combination thereof. 15. Audits and Inspections: At any time during normal business hours and as often as the CITY may deem necessary, there shall be made available to the CITY for examination all of CONTRACTOR'S records with respect to all matters covered by this Agreement. CONTRACTOR shall permit the CITY to audit, examine, and make excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 16. Publication, Reproduction and Use of Material: No material produced in whole or in part under this Agreement shall be subject to copyright in the United States or in any other country. The CITY shall have unrestricted authority to publish, disclose and otherwise use, in whole or in part, any reports, data or other materials prepared under this Agreement. 17. Compliance with Laws: In performing the scope of work required hereunder, CONTRACTOR shall comply with all applicable laws, ordinances, and codes of Federal, State, and local governments. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 7 of 12 1 S. Changes: The CITY may, from time to time, request changes in the Scope of Work to be performed hereunder. Such changes, including any increase or decrease in the amount of CONTRACTOR'S compensation, which are mutually agreed upon by and between the CITY and CONTRACTOR, shall be incorporated in written amendments which shall be executed with the same formalities as this Agreement. 19. Construction and Severability: If any part of this Agreement is held to be invalid or unenforceable, such holding will not affect the validity or enforceability of any other part of this Agreement so long as the remainder of the Agreement is reasonably capable of completion. 20. Waiver of Default: Waiver of default by either party to this Agreement shall not be deemed to be waiver of any subsequent default. Waiver or breach of any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of the terms of this Agreement unless this Agreement is modified as provided above. 21. Advice of Attorney: Each party warrants and represents that in executing this Agreement. It has received independent legal advice from its attorney's or the opportunity to seek such advice. 22. Entire Agreement: This Agreement contains the entire agreement of the parties and supersedes any and all other agreements or understandings, oral of written, whether previous to the execution hereof or contemporaneous herewith. 23. Order of Precedence: The order or precedence shall be the contract agreement, the Invitation for Bid document, then the winning bidders submitted bid document. 24. Public Records Act: Pursuant to Idaho Code Section 9-335, et seq., information or documents received from the Contractor may be open to public inspection and copying unless exempt from disclosure. The Contractor shall clearly designate individual documents as "exempt" on each page of such documents and shall indicate the basis for such exemption. The CITY will not accept the marking of an entire document as exempt. In addition, the CITY will not accept a legend or statement on one (1) page that all, or substantially all, of the document is exempt from disclosure. The Contractor shall indemnify and defend the CITY against all liability, claims, damages, losses, expenses, actions, attorney fees and suits whatsoever for honoring such a designation or for the Contractor's failure to designate individual documents as exempt. The Contractor's failure to designate as exempt any document or portion of a document that is released by the CITY shall constitute a complete waiver of any and all claims for damages caused by any such release. 25. Applicable Law: This Agreement shall be governed by and construed and enforced in accordance with the laws of the State of Idaho, and the ordinances of the City of Meridian. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 8 of 12 26. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. CITY OF MERIDIAN GRANITE EXCAVATION, INC Dated: --7" 1 — / `7 Approved by Council Attest: .y JA HO AN, CITY BY:✓� JO kDAIS, President Dated: OL16 201 q AUp� i s oma, EF�IDIAN*-- SEAL I Purchasing Approval rf R BY: KEIT T , Purchasing Manager Dated:: TRT WAfRREl`jSTE%KAFfT, Engineering Mana Dated:: ZA41 I NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 9 of 12 Attachment A REFER TO INVITATION TO BID PW -14-10394.A ALL ADDENDUMS, ATTACHMENTS, AND EXHIBITS included in the Invitation to Bid Package # PW -14-10394.A, are by this reference made a part hereof. This project consists of the construction of approximately 500 LF of new 8" sewer main in NE 3rd Street between E. Williams and E. Ada Streets and the connection of approximately 12 homes to the new sewer mains and the construction of approximately 700 LF of new water main in each of Williams, Ada and King Streets from NE 3rd Street to Main Street. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 10 of 12 Attachment B MILESTONE / PAYMENT SCHEDULE A. Total and complete compensation for this Agreement shall not exceed $489,683.71. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 11 of 12 EfEauL-- Milestone 1 Substantial Completion 75 (seventy-five) days Milestone 2 Final Completion 90 (ninety) days - Contract includes furnishing all labor, materials, equipment, and incidentals as required for the NE 3RD STREET - WILLIAMS, KING AND ADA STREETS SEWER AND WATER MAIN REPLACEMENT PROJECT -CONSTRUCTION per IFB PW -14-10394.A Total Bid Schedule 1 ...................$489,683.71 CONTRACT TOTAL ....................... $489.683.71 CONTRACT IS A NOT TO EXCEED AMOUNT. LINE ITEM PRICING BELOW WILL BE USED FOR INVOICE VERIFICATION AND ANY ADDITIONAL INCREASES OR DECREASES IN WORK REQUESTED BY CITY. Item No Item Description Qty Unit Unit Price 205.4.1.B.1. Dewatering 1 LS $1.00 303.4.1.A.1. Exploratory Excavation (Pre -Approval Required) 16 HR $280.00 306.4.1.D.1. Imported Trench Backfill, Type A (Pre -Approval 2,736 Required) TON $16.34 307.4.1.E.1. Type C Surface Restoration 311 Sy $11.11 307.4.1.G.1.A Type P Surface Restoration — NE 3rd St. 1,240 Sy $37.33 307.4.1.G.1.B Type P Surface Restoration — Williams, King and Ada 2,313 Streets Sy $31.26 401.4.1.A.1.A 6" PVC, AWWA C900, DR18, Water Main 45 LF $29.50 401A.1.A.1.6 8" PVC, AWWA C900, DR18, Water Main 2,022 LF $25.85 402.4.1.A.1.A. 6" Gate Valve 2 EA $1,165.00 402.4.1.A.1.8 8" Gate Valve 12 EA $1,460.00 403.4.1.A.1. Fire Hydrant Assembly 2 EA $2,412.00 404.4.1.A.1.A 3/4"0 standard water service connection 1 EA $1,655.00 404.4.1.A.1.6 1"0 Water Service Connection 41 EA $1,734.62 404.4.1.A.1.0 2"0 Water Service Connection 2 EA $3,636.00 404.4.1.A.1.D 2"0 Modified Water Service Connection 3 EA $2,356.00 501.4.1.13.1. 8" PVC, ASTM D3034, DR35, Sewer Main 634 LF $47.56 NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 11 of 12 502.4.1.A.1. 48" Sewer Manhole, Type A 5 EA $2,756.00 503.4.1.A.3. 4" Sewer Service Cleanout 12 EA $122.50 504.4.1.A.1. 4" PVC, ASTM D3034, Sewer Service Pipe 732 LF $37.00 504.4.1.D.1. 4" Sewer Service Connection To Main 9 EA $226.00 706.4.1.G.1. Concrete Repair 139 SY $55.00 1001.4.2.A.1. Staging Area 1 EA $2,760.00 1003.4.1.6.1. Straw Wattle 280 LF $2.35 1006.4.1.0.1. Inlet Protection 14 EA $60.70 1103.4.1.A.1. Traffic Control 1 LS $7,250.00 2010.4.1.A.1. Mobilization 1 LS $23,900.00 SP -1 Lawn Sod Restoration 3,494 SF $0.53 SP -2 Abandon Existing Sewer Service Line 14 EA $126.30 SP -3 Abandon Existing Sewer Main 2 EA $670.00 SP -4 Abandon Existing Water Service 45 EA $287.00 SP -5 Hot Tap Existing Water Main 2 EA $919.00 SP -6 Abandon Existing Water Main 10 EA $159.00 SP -7 Connect Existing Water Lines To New Water Service 44 EA $102.30 SP -8A Vehicular Traffic Area Vault And Lid 5 EA $534.00 SP -8B Vehicular Traffic Area Vault And Lid — Concrete Driveway 1 EA $1,115.00 SP -9 Connect Existing Water Service To New Water Main 1 EA $375.00 SP -10 Sewage By -Pass Pumping 1 LS $1.00 SP -11A Plumbing Permit— Water And Sewer Connection 1 EA $50.00 SP -11B Plumbing Permit— Sewer Connection 10 EA $38.00 SP -11C Plumbing Permit— Water Connection 44 EA $38.00 SP -12 Install New Water Service Line (Meter To Building) 400 LF $8.53 Travel expenses, if applicable, will be paid at no more than the City of Meridian's Travel and Expense Reimbursement Policy. NE 3rd Street - Williams, King And Ada Streets Sewer And Water Main Replacement Project - Construction Project 10394.A page 12 of 12 Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: Approval of Agreement to Apex Integrated Security Systems for the "Access Control System Equipment and Installation at Fire Stations 1-5' Project for a Not -To -Exceed Amount of $50,197.58 MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Memo To: Jaycee L. Holman, City Clerk, From: Keith Watts, Purchasing Manager CC: Jacy Jones, Mark Niemeyer Date: 6/26/2014 Re: July 1, 2014 City Council Meeting Agenda Item The Purchasing Department respectfully requests that the following item be placed on the July 1" City Council Consent Agenda for Council's consideration. Approval of Award of Independent Contractor Services Agreement to Apex Integrated Security Systems for the "Access Control System Equipment and Installation at Fire Stations 1 — 5 " proiect for a Not -To -Exceed amount of $50,197.58. Recommended Council Action: Approval of Award of Agreement to Apex Integrated Security Systems for the Not -To -Exceed amount of $50,197.58. Thank you for your consideration • Page 1 CITY OF MERIDIAN CONTRACT/AGENDA REQUEST CHECKLIST Date: 6/13/2014 REQUESTING DEPARTMENT IT Fund: 1 Department: 2210 GL Account: 94410 Project# Construction: PSA: x Task Order: Project Name: Lenel Security Upgrades Fire Stations 1- 5 Project Manager: David Tiede Department Representative: Contractor/Consultant/Design Engineer: Apex Integrated Security Systems Budget Available (Attach Report): yes Contract Amount: $50,197.58 Will the project cross fiscal years? Yes No Budget Information: FY Budget: FY14 Enhancement#: Grant#: Other: Amendment Type of Grant: CONTRACT CHECKLIST BASIS OF AWARD Low Bidder Highest Rated (Bid Results Attached) (Ratings Attached) Typical Award Yes No Bid No: If no please state circumstances and conclusion: Professional Services - Sole Source Master Agreement (Category) Bid Opening Date: 10464 10 Day Waiting Period Complete: Date Award Posted: PW License # C-16018 Current? (attach print out) yes Correct Category? Corporation Status (Attach Print Out): Goodstanding Insurance Certificates Received (Date): lune 19, 2014 Rating: A++ Payment and Performance Bonds Received (Date): Builders Risk Ins. Req'd: Yes No x June 19, 2014 Rating: A- lf yes, has policy been purchased? Date Submitted to Clerk for Agenda: June 26, 2014 Approved by Council Issue Purchase Order No, Date Issued: WH5 submitted Issue Notice of Award: Date: NTP Date: AGREEMENT FOR INDEPENDENT CONTRACTOR SERVICES ACCESS CONTROL FOR FIRE STATIONS 1 - 6 PROJECTS # 10464 THIS AGREEMENT FOR INDEPENDENT CONTRACTOR SERVICES is made this _day of June, 2014, and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "CITY", 33 East Broadway Avenue, Meridian, Idaho 83642, and Apex Integrated Security Systems, hereinafter referred to as "CONTRACTOR", whose business address is 109 South 4th Street, Boise, ID 83702 and whose Public Works Contractor License # is PWC -C-16018. INTRODUCTION Whereas, the City has a need for services involving Access Control System Equipment and Installation at Fire Stations 1 - 5; and WHEREAS, the Contractor is specially trained, experienced and competent to perform and has agreed to provide such services; NOW, THEREFORE, in consideration of the mutual promises, covenants, terms and conditions hereinafter contained, the parties agree as follows: TERMS AND CONDITIONS Scope of Work: 1.1 CONTRACTOR shall perform and furnish to the City upon execution of this Agreement and receipt of the City's written notice to proceed, all services and work, and comply in all respects, as specified in the document titled "Scope of Work" a copy of which is attached hereto as Attachment "A" and incorporated herein by this reference, together with any amendments that may be agreed to in writing by the parties. 1.2 All documents, drawings and written work product prepared or produced by the Contractor under this Agreement, including without limitation electronic data files, are the property of the Contractor; provided, however, the City shall have the right to reproduce, publish and use all such work, or any part thereof, in any manner and for any purposes whatsoever and to authorize others to do so. If any such work is copyrightable, the Contractor may copyright the same, except that, as to any work which is copyrighted by the Contractor, the City reserves a royalty -free, non-exclusive, and irrevocable license to reproduce, publish and use such work, or any part thereof, and to authorize others to do so. Access Control — For Fire Stations 1 - 5 page 1 of 23 Project 10464 1.3 The Contractor shall provide services and work under this Agreement consistent with the requirements and standards established by applicable federal, state and city laws, ordinances, regulations and resolutions. The Contractor represents and warrants that it will perform its work in accordance with generally accepted industry standards and practices for the profession or professions that are used in performance of this Agreement and that are in effect at the time of performance of this Agreement. Except for that representation and any representations made or contained in any proposal submitted by the Contractor and any reports or opinions prepared or issued as part of the work performed by the Contractor under this Agreement, Contractor makes no other warranties, either express or implied, as part of this Agreement. 1.4 Services and work provided by the Contractor at the City's request under this Agreement will be performed in a timely manner in accordance with a Schedule of Work, which the parties hereto shall agree to. The Schedule of Work may be revised from time to time upon mutual written consent of the parties. 2. Consideration 2.1 The Contractor shall be compensated on a Not -To -Exceed basis as provided in Attachment B "Payment Schedule' attached hereto and by reference made a part hereof for the Not -To -Exceed amount of $50.197.58. 2.2 The Contractor shall provide the City with a monthly statement and supporting invoices, as the work warrants, of fees earned and costs incurred for services provided during the billing period, which the City will pay within 30 days of receipt of a correct invoice and approval by the City. The City will not withhold any Federal or State income taxes or Social Security Tax from any payment made by City to Contractor under the terms and conditions of this Agreement. Payment of all taxes and other assessments on such sums is the sole responsibility of Contractor. 2.3 Except as expressly provided in this Agreement, Contractor shall not be entitled to receive from the City any additional consideration, compensation, salary, wages, or other type of remuneration for services rendered under this Agreement including, but not limited to, meals, lodging, transportation, drawings, renderings or mockups. Specifically, Contractor shall not be entitled by virtue of this Agreement to consideration in the form of overtime, health insurance benefits, retirement benefits, paid holidays or other paid leaves of absence of any type or kind whatsoever. Access Control — For Fire Stations 1 - 5 page 2 of 23 Project 10464 3. Term: 3.1 This agreement shall become effective upon execution by both parties, and shall expire upon (a) completion of the agreed upon work, (b) or unless sooner terminated as provided in Sections 3.2, 3.3, and Section 4 below or unless some other method or time of termination is listed in Attachment A. 3.2 Should Contractor default in the performance of this Agreement or materially breach any of its provisions, City, at City's option, may terminate this Agreement by giving written notification to Contractor. 3.3 Should City fail to pay Contractor all or any part of the compensation set forth in Attachment B of this Agreement on the date due, Contractor, at the Contractor's option, may terminate this Agreement if the failure is not remedied by the City within thirty (30) days from the date payment is due. 3.4 TIME FOR EXECUTING CONTRACT AND LIQUIDATED DAMAGES Upon receipt of a Notice to Proceed, the Contractor shall have 90 (ninety) calendar days to complete the work as described herein. Contractor shall be liable to the City for any delay beyond this time period in the amount of three hundred dollars ($300.00) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. 4. Termination: 4.1 If, through any cause, CONTRACTOR, its officers, employees, or agents fails to fulfill in a timely and proper manner its obligations under this Agreement, violates any of the covenants, agreements, or stipulations of this Agreement, falsifies any record or document required to be prepared under this agreement, engages in fraud, dishonesty, or any other act of misconduct in the performance of this contract, or if the City Council determines that termination of this Agreement is in the best interest of CITY, the CITY shall thereupon have the right to terminate this Agreement by giving written notice to CONTRACTOR of such termination and specifying the effective date thereof at least fifteen (15) days before the effective date of such termination. CONTRACTOR may terminate this agreement at any time by giving at least sixty (60) days notice to CITY. In the event of any termination of this Agreement, all finished or unfinished documents, data, and reports prepared by CONTRACTOR under this Agreement shall, at the option of the CITY, become its property, and CONTRACTOR shall be entitled to receive just and equitable compensation for any work satisfactorily complete hereunder. Access Control — For Fire Stations 1 - 5 page 3 of 23 Project 10464 4.2 Notwithstanding the above, CONTRACTOR shall not be relieved of liability to the CITY for damages sustained by the CITY by virtue of any breach of this Agreement by CONTRACTOR, and the CITY may withhold any payments to CONTRACTOR for the purposes of set-off until such time as the exact amount of damages due the CITY from CONTRACTOR is determined. This provision shall survive the termination of this agreement and shall not relieve CONTRACTOR of its liability to the CITY for damages. Independent Contractor: 5.1 In all matters pertaining to this agreement, CONTRACTOR shall be acting as an independent contractor, and neither CONTRACTOR nor any officer, employee or agent of CONTRACTOR will be deemed an employee of CITY. Except as expressly provided in Attachment A, Contractor has no authority or responsibility to exercise any rights or power vested in the City and therefore has no authority to bind or incur any obligation on behalf of the City. The selection and designation of the personnel of the CITY in the performance of this agreement shall be made by the CITY. 5.2 Contractor, its agents, officers, and employees are and at all times during the term of this Agreement shall represent and conduct themselves as independent contractors and not as employees of the City. 5.3 Contractor shall determine the method, details and means of performing the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specified in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of Contractor in fulfillment of this Agreement. If in the performance of this Agreement any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction and supervision and control of the Contractor. Indemnification and Insurance: 6.1 CONTRACTOR shall indemnify and save and hold harmless CITY from and for any and all losses, claims, actions, judgments for damages, or injury to persons or property and losses and expenses and other costs including litigation costs and attorney's fees, arising out of, resulting from, or in connection with the performance of this Agreement by the CONTRACTOR, its servants, agents, officers, employees, guests, and business invitees, and not caused by or arising out of the tortious conduct of CITY or its employees. CONTRACTOR shall maintain, and specifically agrees that it will maintain, throughout the term of this Agreement, liability insurance, in which the CITY shall be named an additional insured in the minimum amounts as follow: General Liability One Million Dollars ($1,000,000) per incident or occurrence, Automobile Liability Insurance One Million Dollars ($1,000,000) per incident or occurrence and Workers' Compensation Insurance, in Access Control — For Fire Stations 1 - 5 page 4 of 23 Project 10464 the statutory limits as required by law.. The limits of insurance shall not be deemed a limitation of the covenants to indemnify and save and hold harmless CITY; and if CITY becomes liable for an amount in excess of the insurance limits, herein provided, CONTRACTOR covenants and agrees to indemnify and save and hold harmless CITY from and for all such losses, claims, actions, or judgments for damages or injury to persons or property and other costs, including litigation costs and attorneys' fees, arising out of, resulting from , or in connection with the performance of this Agreement by the Contractor or Contractor's officers, employs, agents, representatives or subcontractors and resulting in or attributable to personal injury, death, or damage or destruction to tangible or intangible property, including use of. CONTRACTOR shall provide CITY with a Certificate of Insurance, or other proof of insurance evidencing CONTRACTOR'S compliance with the requirements of this paragraph and file such proof of insurance with the CITY at least ten (10) days prior to the date Contractor begins performance of it's obligations under this Agreement. In the event the insurance minimums are changed, CONTRACTOR shall immediately submit proof of compliance with the changed limits. Evidence of all insurance shall be submitted to the City Purchasing Agent with a copy to Meridian City Accounting, 33 East Broadway Avenue, Meridian, Idaho 83642. 6.2 Any deductibles, self-insured retention, or named insureds must be declared in writing and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles, self-insured retentions or named insureds; or the Contractor shall provide a bond, cash or letter of credit guaranteeing payment of losses and related investigations, claim administration and defense expenses. 6.3 To the extent of the indemnity in this contract, Contractor's Insurance coverage shall be primary insurance regarding the City's elected officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City or the City's elected officers, officials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with Contractor's insurance except as to the extent of City's negligence. 6.4 The Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 6.5 All insurance coverages for subcontractors shall be subject to all of the insurance and indemnity requirements stated herein. 6.6 The limits of insurance described herein shall not limit the liability of the Contractor and Contractor's agents, representatives, employees or subcontractors. 7. Bonds: Payment and Performance Bonds are required on all Public Works Improvement Projects per the ISPWC and the City of Meridian Supplemental Access Control — For Fire Stations 1 - 5 page 5 of 23 Project 10464 Specifications & Drawings to the ISPWC, which by this reference are made a part hereof. 8. Warranty: All construction and equipment provided under this agreement shall be warranted for 2 years from the date of the City of Meridian acceptance per the ISPWC and the Meridian Supplemental Specifications & Drawings to the ISPWC and any modifications, which by this reference are made a part hereof. All items found to be defective during a warranty inspection and subsequently corrected will require an additional two (2) year warranty from the date of City's acceptance of the corrected work. Notices: Any and all notices required to be given by either of the parties hereto, unless otherwise stated in this agreement, shall be in writing and be deemed communicated when mailed in the United States mail, certified, return receipt requested, addressed as follows: CITY CONTRACTOR City of Meridian Apex Integrated Security Systems Purchasing Manager Attn: Bill Atkinson 33 E Broadway Ave 109 South 4'" Street Meridian, ID 83642 Boise, ID 83702 208-888-4433 Phone: (208) 378-9650 Email: bill@apexboise.com Idaho Public Works License # PWC -C-16018 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 10. Attorney Fees: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorneys' fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate contract between the parties and shall survive any default, termination or forfeiture of this Agreement. 11. Time is of the Essence: The parties hereto acknowledge and agree that time is strictly of the essence with respect to each and every term, condition and provision hereof, and that the failure to timely perform any of the obligations hereunder shall constitute a breach of, and a default under, this Agreement by the party so failing to perform. 12. Assignment: It is expressly agreed and understood by the parties hereto, that CONTRACTOR shall not have the right to assign, transfer, hypothecate or sell any of its rights under this Agreement except upon the prior express written consent of CITY. Access Control — For Fire Stations 1 - 5 page 6 of 23 Project 10464 13. Discrimination Prohibited: In performing the Work required herein, CONTRACTOR shall not unlawfully discriminate in violation of any federal, state or local law, rule or regulation against any person on the basis of race, color, religion, sex, national origin or ancestry, age or disability. 14. Reports and Information: 14.1 At such times and in such forms as the CITY may require, there shall be furnished to the CITY such statements, records, reports, data and information as the CITY may request pertaining to matters covered by this Agreement. 14.2 Contractor shall maintain all writings, documents and records prepared or compiled in connection with the performance of this Agreement for a minimum of four (4) years from the termination or completion of this or Agreement. This includes any handwriting, typewriting, printing, photo static, photographic and every other means of recording upon any tangible thing, any form of communication or representation including letters, words, pictures, sounds or symbols or any combination thereof. 15. Audits and Inspections: At any time during normal business hours and as often as the CITY may deem necessary, there shall be made available to the CITY for examination all of CONTRACTOR'S records with respect to all matters covered by this Agreement. CONTRACTOR shall permit the CITY to audit, examine, and make excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 16. Publication, Reproduction and Use of Material: No material produced in whole or in part under this Agreement shall be subject to copyright in the United States or in any other country. The CITY shall have unrestricted authority to publish, disclose and otherwise use, in whole or in part, any reports, data or other materials prepared under this Agreement. 17. Compliance with Laws: In performing the scope of work required hereunder, CONTRACTOR shall comply with all applicable laws, ordinances, and codes of Federal, State, and local governments. 18. Changes: The CITY may, from time to time, request changes in the Scope of Work to be performed hereunder. Such changes, including any increase or decrease in the amount of CONTRACTOR'S compensation, which are mutually agreed upon by and between the CITY and CONTRACTOR, shall be incorporated in written amendments which shall be executed with the same formalities as this Agreement. 19. Construction and Severability: If any part of this Agreement is held to be invalid or unenforceable, such holding will not affect the validity or enforceability of any other Access Control — For Fire Stations 1 - 5 page 7 of 23 Project 10464 part of this Agreement so long as the remainder of the Agreement is reasonably capable of completion. 20. Waiver of Default: Waiver of default by either party to this Agreement shall not be deemed to be waiver of any subsequent default. Waiver or breach of any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of the terms of this Agreement unless this Agreement is modified as provided above. 21. Advice of Attorney: Each party warrants and represents that in executing this Agreement. It has received independent legal advice from its attorney's or the opportunity to seek such advice. 22. Entire Agreement: This Agreement contains the entire agreement of the parties and supersedes any and all other agreements or understandings, oral of written, whether previous to the execution hereof or contemporaneous herewith. 23. Order of Precedence: The order or precedence shall be the contract agreement, the Invitation for Bid document, then the winning bidders submitted bid document. 24. Public Records Act: Pursuant to Idaho Code Section 9-335, et seq., information or documents received from the Contractor may be open to public inspection and copying unless exempt from disclosure. The Contractor shall clearly designate individual documents as "exempt" on each page of such documents and shall indicate the basis for such exemption. The CITY will not accept the marking of an entire document as exempt. In addition, the CITY will not accept a legend or statement on one (1) page that all, or substantially all, of the document is exempt from disclosure. The Contractor shall indemnify and defend the CITY against all liability, claims, damages, losses, expenses, actions, attorney fees and suits whatsoever for honoring such a designation or for the Contractor's failure to designate individual documents as exempt. The Contractor's failure to designate as exempt any document or portion of a document that is released by the CITY shall constitute a complete waiver of any and all claims for damages caused by any such release. 25. Applicable Law: This Agreement shall be governed by and construed and enforced in accordance with the laws of the State of Idaho, and the ordinances of the City of Meridian. 26. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. End of text. Signatures to follow on next page. Access Control — For Fire Stations 1 - 5 page 8 of 23 Project 10464 Signature Page Access Control for Fire Stations 1 — 5 Project 10461 Apex Integrated Security Systems, Inc L91 MONAJJI=10111F-11kil i Dated: 1- -IL1 Approved by Purchasing BY: KEIT ATTS, Pur a Ing Manager Dated:: Dated: G�If le 'Z" aiy or 5 \` IPle llp i SEAL Dei Dated:: (,- Z y -/y Access Control — For Fire Stations 1 - 5 page 9 of 23 Project 10464 IC. Attachment A 1,1616]»014rdX0714 Provide and install Lenel OnGuard Access Control System to Fire Station 1 - 5 buildings. Each station will receive a new Lenel OnGuard Access Control head -end which includes a Lenel Intelligent System Contorller, Power Supplies and Reader Interface Modules. Headend Location(s): Upper Level Communication/Storage Room. City of Meridian will supply the network connectivity to the Lenel controllers. Fire Stations are primarily hard -lid areas so some Wire Mold and/or Conduit will be used. FIRE STATION #1 (Franklin Rd); 4 Doors with Mullion Mounted Card Readers and Surface Mounted Electric Strikes. FIRE STATIONS 2, 3 AND 4: Each station will have three Doors with Mullion Mounted Card Readers and Surface Mounted Electric Strikes. FIRE STATION 5: 3 Doors with Mullion Mounted Card Readers and Surface Mounted Electric Strikes. 1 Door (Police Sub -station) with a wall mounted reader and a Cut -in Style electric strike Other included services Cable for a Surface Mounted Emergency "911" exterior phone at the front door and an Exterior Camera watching front door and emergency phone will be included in the base price and pulled at the same time as the access control components. Current push button locks will remain in place and de -programmed by the City of Meridian. Access Control — For Fire Stations 1 - 5 page 10 of 23 Project 10464 Fire Station # 1 Oty Description Installed Price Fire Station #1 Base Head -end Location (Controls Two ® Intelligent Dual Reader Conboller -12 VDC or 24 VDC @ 700mA, size ( 6" (152mm) W x 8' (203mm) L x 1" (25mm)H), (5 year lithium battery or 3 months full run) 6 MB standard cardholder flesh memory, 50,000 of Event memory, maximum of 32 devices, On -board Ethernet, onboard two door control, eight inputs, four outputs, cabinet tamper and power fault input monitors. RoHS, CE, (3 -Tick and UL 294 1 Leviton LV -61346005E _► eXtreme 6+ SlimUne Patch Cord, CAT 6, 5-W length, black 1 LifeSafety Power FPO750100DOPE4M LENEL - Multi -function all -inane system specifically engineered to power multi -door Lenel-based access systems. Supports up to 4 Doors (2x LNL-1320). PS/Charger and B100 provide two power outputs, one at 24VDC, the other at 12VDC. 4AN2V & 2A/24V. 2 Power Sonic IM -1270 12v 7A Hour Backup Battery Base Head -end Location (Controls Two Doors) Total., $3,092.45 Door 41: Front Door Front Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location. 125 Genesis WG -31151112 it - 16/4 Stranded Plenum 125 Genesis WG -32061112 - it - 22f6 Stranded OAS Plenum Data Cable 250 Genesis WG -51022106 It - CAT 6- 2314 C6 Plus CMP BI (Camera and Emergency Phone) 1 HES 960010401 Surface Mount strike (12f24v) 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand interrace,75 bit PIV [will also read cards encoded through OnGuard; Segue Mifare] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door V., Frond Door Total., $1,916.40 Access Control — For Fire Stations 1 - 5 page 11 of 23 Project 10464 4 r r $:fRr7V1� # 1 Kitchen Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied In Base Head -end Location. 200 Genesis WG -31151112 - it -1614 Stranded Plenum 200 Genesis WG -32061112 -- It - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12r24v) 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegsnd interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifare] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory - Wiremold Accessory Pack, Metal, Ivory 1 Wiremold 9-9-10-11 ,A* Wiremold Accessory Pack, Metal, Ivory Door #2., Kitc/ren Door Total: $1,749.40 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - ft- 1614 Stranded Plenum 125 Genesis WG -32061112 - ft - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-1300 Single Reader Interface Module (Series 2 - Supports OSDP Readers) 12124 VDC, 1Reader interface, WIM, 2 inputs and 2 outputs relays (one of each, 2A and SA) and cabinet tamper pigtail, RoHS, CE, C -Tick and UL294 certi5ed. Door #3: Back Door (Apparatus) Total: $2,139.22 Access Control — For Fire Stations 1 - 5 page 12 of 23 Project 10464 1 Lenel LNL-CONY-4 Adapter plate to mount up to 4 LNL-1300s in any CTX enclosure, Maximum two per LNL-CTX enclosure 1 Lenel LNL-MT11 Multi Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mkars] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 - Wiremold Accessory Pack, Metal, Ivory Door #3: Back Door (Apparatus) Total: $2,139.22 Access Control — For Fire Stations 1 - 5 page 12 of 23 Project 10464 Door *4: Ergine Bay Back Door Engine Bay Back Door with a Mullion Reader and Surface Mounted Strike 150 Genesis WG -31151112 - t-1814 Stranded Plenum Door #4: Engine Bay Back Door Total., $2,190.23 Fire Station #1 Total: $11,086.70 Access Control - For Fire Stations 1 - 5 page 13 of 23 Project 10464 150 Genesis WG -32061112 It - 22/6 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-1300 Single Reader Interface Module (Series 2 - Supports OSOP Readers) 12124 VOC, 1Reader interface, WIM, 2 inputs and 2 outputs relays (ane of each, 2A and 5A) and cabinet tamper pigtall , RoHS, CE, C -Tick and UL294 certified. 1 Lenel LNL-CONV-4 Adapter plate to mount up to 4 LNL-13009 in any CTX enclosure, Maximum two per LNL-CTX enclosure 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wisgand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mtarel 2 Wlremol5Foo Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 - Wiremold Accessory Pack, Metal, Ivory Door #4: Engine Bay Back Door Total., $2,190.23 Fire Station #1 Total: $11,086.70 Access Control - For Fire Stations 1 - 5 page 13 of 23 Project 10464 Fire Station #2 Fire Station #2 Installed Price Base Head -end Location (Controls Two Doors) Intelligent Dual Reader Controller - 12 VDC or 24 VDC @ 700mA, size 16" (152mm) W x 8' (203mm) L x 1" (25mm)H), (5 year lithium battery or 3 months full run) 6 MB standard cardholder flash memory, 50,000 of Event memory, maximum of 32 devices, On -board Ethernet, onboard two door control, eight inputs, four outputs, cabinet tamper and pourer fault input monitors. RoHS, CE, C -Tick and UL 294 1 Leviton LV -61346005E eXtreme 6+ SlimLine Patch Cord, CAT 6, 5 -foot length, black Front Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location. {'�/' 125 Genesis WG -31151112 - ft -18/4 Stranded Plenum 1 LlfeSafety Power FPO75B100D9PE4M - LENEL - Mulfi-function all -in -one system specifically engineered to power multi -door Lenel-based access systems. Supports up to 4 Doors (2x LNLA 320). PS/Charger and B100 provide two power outputs, one at 24VDC, the other at 12VDC. 4A/12V & 2A/24V. 2 Power Sonic IM -1270 12v 7A Hour Backup Battery 1 Lenel LNL-MT11 Base Head -end Location (Controls Two Doors) Total: $3,092.45 Door 91: Front Door Front Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location. {'�/' 125 Genesis WG -31151112 - ft -18/4 Stranded Plenum 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door Al., Front Door Total: $1,916.40 Access Control — For Fire Stations 1 - 5 page 14 of 23 Project 10464 125 Genesis WG -32061112 - It - 2216 Stranded OAS Plenum Data Cable 250 Genesis WG -51022106 it - CAT 6- 2314 C6 Plus CMP BI (Camera and Emergency Phone) 1 HES 960010401 Surface Mount Strike (12r24v) 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifere) 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door Al., Front Door Total: $1,916.40 Access Control — For Fire Stations 1 - 5 page 14 of 23 Project 10464 Door #2: Kitchen Door Kitchen Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied In Base Head -end Location. 200 Genesis WG -31151112 - k-1814 Stranded Plenum Door Q., K/[chert Door Total., $1,816.86 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - 200 Genesis WG -32061112 - R - 2216 Stranded OAS Planum Data Cable --- 1 HES 960010401 Surface Mount Strike (1224v) 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Slack; Wisgand Intarface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mhare) 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory UL294 certified. 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door Q., K/[chert Door Total., $1,816.86 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - ft- 1814 Stranded Plenum 125 Genesis WG -32061112 --- it - 22J6 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (1224v) 1 Lane[ LNL-1300 Single Reader Interface Module (Series 2 - Supports OSDP Readers) 1224 VDC, 1 Reader interface, W1M, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and cabinet tamper pigtail, RoHS, CE, C -Tick and UL294 certified. 1 Lenel LNL-CONV-4 Adapter plate to mount up to 4 LNL-1300o in any CTX enclosure, Maximum two per LNL- :TX enclosure 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand Interface;75 bit PIV (will also read cards encoded through OnGuard; Secure Mifarel 2 Wiremold B-1 Wiremold 5 Fact Wire Channel, Ivory 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door #3: Back Door (Apparatus) Total., $2,138.22 Fire Station #2 Total: $8,963.93 Access Control - For Fire Stations 1 - 5 page 15 of 23 Project 10464 Fire Station #3 Fire Station #3 Base Head -end Location (Controls Two ® Intelligent Dual Reader Controller - 12 VDC or 24 VOC C 700mA, adze ( 6" (152mm) W x 8" (203mm) L x 1" (25mm)H), (5 year lithium battery or 3 months full run) 6 MB standard cardholder flash memory, 56,000 of Event memory, maximum of 32 devices, On -board Ethernet, on -board two door control, eight inputs, four outputs, cabinet tomper and power Paull Input monitors. RoHS, CE, C -Tick and UL 294 1 Leviton LV-6D46005E �11ae eXtreme 6+ SIImUne Patch Cord, CAT 6, 5 -foot length, black ® 1 LifeSafety Power FPO75810008PE4M tENEL - Multi -function all -in -one system specifically engineered to power multi -door Lenel-baced access systems. Supports up to 4 Doors (2x W L-1320). PS/Charger and B100 provide two power outputs, one at 24VDC, the other at 12VDC. 4AI12V & 2A/24V. . 2 Power Sonic IM -1270 12v 7A Hour Backup Battery Base Head -end Location (Controls Two Doors) Total: $3,092.45 Door #1: Front Door Front Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location, 125 Genesis WG -31151112 - It -18/4 Stranded Plenum Door #1: Front Door Total: $1,916.49 Access Control — For Fire Stations 1 - 5 page 16 of 23 Project 10464 125 Genesis WG -32061112 - it - 2216 Stranded OAS Plenum Data Cable 250 Genesis WG -51022106 t - CAT 6- 23/4 C6 Plus CMP BI (Camera and Emergency Phone) 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-MT11 Multi -Technology Mullion Reeder. Designed to be mounted to a door mullion; Black; Wiegand interface -,75 bit PIV [will also read cards encoded through OnGuerd; Secure Mtare] 2 Wiremold 0-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door #1: Front Door Total: $1,916.49 Access Control — For Fire Stations 1 - 5 page 16 of 23 Project 10464 Door #2: Kitchen Door Kitchen Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location. 201) Genesis WG -31151112 "'A- ft -1814 Stranded Plenum 1 Wiremold 8-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door Q., Kitchen Door Total; $1,749A0 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - ft- 1814 Stranded Plenum 200 Genesis WG -32061112 - ft- 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiagsnd inWace;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifare] 2 Wiremold 8-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold 8-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door Q., Kitchen Door Total; $1,749A0 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - ft- 1814 Stranded Plenum Door #1 Back Door (Apparatus) Total: $2,138.22 Fire Station #3 Total: $6,896.47 Access Control - For Fire Stations 1 - 5 page 17 of 23 Project 10464 125 Genesis WG -32061112 - It - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12f24v) 1 Lenel LNL-1300 Single Reader Interface Module (Series 2 - Supports OSOP Readers) 12124 VOC, 1Reader Interface, Wkd, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and cabinet tamper pigtail , RoHS, CE, C -Tick and UL294 certified. 1 Lenel LNL-CONY-4 Adapter plate to mount up to 4 LNL-13009 in any CTX enclosure, Maximum two per LNL-CTX enclosure 1 Lenel LNL-MT11 MuXi-Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Milaro] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold 8-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door #1 Back Door (Apparatus) Total: $2,138.22 Fire Station #3 Total: $6,896.47 Access Control - For Fire Stations 1 - 5 page 17 of 23 Project 10464 Fire Station #4 Qty Description Installed Price Fire Station #4 Base Head -end Location (Controls Two Doors) ® Intelligent [)us] Reader Controller -12 VDC or 24 VDC @ 700ffA size ( 6" (152mm) W x 8' (203mm) L x 1" (25mm)H), (5 year lithium battery - or 3 months full run) 6 MB standard cardholder flash memory, 50,000 of Event memory, maximum of 32 devices, On -board Ethernet, on -board two door control, eight inputs, four outputs, cabinet tamper and power fault input monitors. RoHS, CE, C -Tick and UL 294 1 Leviton LV-6D46005E eXtreme 6+ SlimLine Patch Cord, CAT 6, 5 -foot length, black 1 LifeSafety Power FP075B100D8PE4M LENEL- Multi -function all -in -one system specifically engineered to power multi -door Lone[ -based access systems. Supports up to 4 Doors (2x LN41320). PS/Charger and B100 provide two power outputs, one at 24VDC, the other at 12VDC. 4AN2V 8 2A/24V. . 2 Power Sonic IM -1270 12v 7A Hour Backup Battery "--. Wiremold Accessory Pack, Metal, Ivory Base Head -end Location (Controls Two Doors) Total: $3,092.45 Door #1: Front Door Front Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location. 125 Genesis WG -31151112 - It -1814 Stranded Plenum 125 Genesis WG -32061112 - ft- 2216 Stranded OAS Plenum Data Cable 250 Genesis WG -51022106 it - CAT 6- 2314 C6 Plus CMP BI (Camera and Emergency Phone) 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-MT11 Muti-Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegond inledace;75 bit PIV [will also read cards encoded through OnGuard; Secure Milare) 2 Wiremold 8-1 Wiremold 5 Fool Wire Channel, Ivory 1 Wiremold 8-9-10-11 "--. Wiremold Accessory Pack, Metal, Ivory Door 91: Front Door Total: $1,916.40 Access Control - For Fire Stations 1 - 5 page 18 of 23 Project 10464 Door #2: Kitchen Door Kitchen Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied In Base Head -end Location. 200 Genesis WG -31151112 R- 1814 Stranded Plenum Door #2., Kitchen Door Total., $1,749.40 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - R - 1814 Stranded Plenum 200 Genesis WG -32061112 -- R - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12J24v) 1 Least LNL-MT11 Mufti -Technology Mullion Reader. Designed to be mounted to a door mullion; Black ; Wk*and interface;75 It PIV [will also read cards encoded through OnGuard; Secure Mifare] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Lenel LNL-CONV-4 1 Wiremold B-9-10-11 Y., Wiremold Accessory Pack, Metal, Ivory Door #2., Kitchen Door Total., $1,749.40 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - R - 1814 Stranded Plenum Door#3: Back Door (Apparatus) Total: $2,138.22 Fire Station #4 Total: $8,898.47 Access Control — For Fire Stations 1 - 5 page 19 of 23 Project 10464 125 Genesis WG -32061112 - R - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface hound Strike (12124v) 1 Lenel LNL-1300 Single Reader Interface Module (Series 2- Supports OSOP Readers) 1224 VDC, 1 Reader interface, W/M, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and eabkrat tamper pigtail , RoHS, CE, C -Tick and UL294 certified. 1 Lenel LNL-CONV-4 Adapter plate to mount up to 4 LNL-1300s in any CTX enclosure, Maximum two per LNL-CTX enclosure 1 Lenel LNL-MT11 MuIO-Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand intedace;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifare] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9.10-11 Wiremold Accessory Pack, Metal, Ivory Door#3: Back Door (Apparatus) Total: $2,138.22 Fire Station #4 Total: $8,898.47 Access Control — For Fire Stations 1 - 5 page 19 of 23 Project 10464 Fire Station #5 Fire Station #5 Base Head -end Location (Controls Two Doors) ® Intelligent Dual Reader Controller -12 VDC or 24 VDC Q 700mA, size - (6 n (152mm) W x 6' (203mm) L x 1" (25mm)H), (5 year lithium battery or 3 months full run) 6 MB standard cardholder (lash memory, 50,000 of /4 Event memory, maximum of 32 devices, On -board Ethernet, on -board two door control, eight inputs, four outputs, cabinet tamper and power fault input monitors. RoHS, CE, C -Tick and UL 294 1 Leviton LV -61346005E �^r eXtreme 6+ SlimDne Patch Cord, CAT 6, 5 -foot length, black 1 LifeSafety Power FP075B100D8PE4M LENEL - Multi -function all -In -one system specifically engineered to power mulbdoor Lanai -based access systems. Supports up to 4 Doors (2x W L-1320). PS/Chsrger and 6100 provide two power outputs, one at 24VDC, the other at 12VDC. 4Afl2V 8 2A/24V. . 2 Power Sonic IM -1270 12v 7A Hour Backup Battery Base Head -end Location (Controls Two Doors) Total., $3,092.45 Door #1: Front Door Front Door wilh Mullion Reader and Surface Mounted Electric Strike. Controller supplied in Base Head -end Location, 125 Genesis WG -31151112 .00A N- 1814 Stranded Plenum Door #1: Front Door Total: $1,916.40 Access Control — For Fire Stations 1 - 5 page 20 of 23 Project 10464 125 Genesis WG -32061112 - R - 22f6 Stranded OAS Plenum Data Cable 250 Genesis WG -51022106 /4 ft - CAT 6- 2314 C6 Plus CMP BI (Camera and Emergency Phone) 1 HES 960010401 Surface Mount Strike (12124v) 1 Lanai LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wh gaud inlerface;75 bit PIV twig also read cards encoded through OnGuard; Secure Mifare] 2 Wiremold B-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 Wiremold Accessory Pack, Metal, Ivory Door #1: Front Door Total: $1,916.40 Access Control — For Fire Stations 1 - 5 page 20 of 23 Project 10464 Ii 1 Door #2: Kitchen Door Kitchen Door with Mullion Reader and Surface Mounted Electric Strike. Controller supplied In Base Head -end Location. / 200 Genesis WG -31151112 - R - 1814 Stranded Plenum Door #2., Kltchan Door Total: $1,749,40 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - R- 18/4 Stranded Plenum 200 Genesis WG -32061112 - R - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-MT11 Mulli-Technology Mullion herder. Designed to be mounted to a door 1 Lenel LNL-1300 mullion; Black; WkWnd interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifare] z Wiremold 8-1 Wiremold 5 Foot Wire Channel, Ivory 1224 VDC, lReader interface, W1M, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and cabinet tamper pigtail , RoHS, CE, C -Tick and 1 Wiremold B-9-10-11 UL294 certified. Wiremold Accessory Pack, Metal, Ivory Door #2., Kltchan Door Total: $1,749,40 Door #3: Back Door (Apparatus) Back Door with Mullion Reader and Surface Mounted Electric Strike 125 Genesis WG -31151112 - R- 18/4 Stranded Plenum Access Control — For Fire Stations 1 - 5 Project 10464 Door #3: Back Door (Apparatus) Total: $2,138.22 page 21 of 23 125 Genesis WG -32061112 - R - 2216 Stranded OAS Plenum Data Cable 1 HES 960010401 Surface Mount Strike (12124v) 1 Lenel LNL-1300 Single Reader Interface Module (Series 2 - Supports OSDP Readers) 1224 VDC, lReader interface, W1M, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and cabinet tamper pigtail , RoHS, CE, C -Tick and UL294 certified. 1 Lenel LNL-CONV4 Adapter plate to mound up to 4 LNL-13099 in any CTX enclosure, Maximum two per LNL-CTX enclosure 1 Lenel LNL-MT11 Multi -Technology Mullion Reader. Designed to be mounted to a door mullion; Black; Wiegand interface;75 bit PIV [wig also read tarda encoded through OnGuard; Secure Miran] 2 Wiremold 0-1 Wiremold 5 Foot Wire Channel, Ivory 1 Wiremold B-9-10-11 Wiremold Accessory Peck, Metal, Ivory Access Control — For Fire Stations 1 - 5 Project 10464 Door #3: Back Door (Apparatus) Total: $2,138.22 page 21 of 23 Door 94: Police Sub -Station Interior Door with a Wall Mounted Reader and Cutin Electric Strike 1 HES 100630443 HES 1006 Complete Strike. Includes the following faceplates: J, K. KM and KD 1 HES 1DD620571 E Faceplate Option - 630 Finish 1 Lenel LNL-1300 Single Reader Interface Module (Series 2 - Supports OSDP Readers) 12124 VDC, 1 Reader interface, WIM, 2 inputs and 2 outputs relays (one of each, 2A and 5A) and cabinet tamper piglall , RoHS, CE, C -Tick and UL294 certified. 1 Lenel LNL-CONV-4 Adapter plate to mount up to 4 LNL-1300s in any CTX enclosure, Maximum two per LNL-CTX enclosure 1 Lenel LNL-MT15 Mutti-Technology Single Gang Reader. Medium-sized reader designed to be mounted on a wall over a single gang junction box; Black; Wisgand interface;75 bit PIV [will also read cards encoded through OnGuard; Secure Mifare) Door 94: Police Sub-Sration Total: $1,67547 Fire Station #5 Total: $10,571.94 Project Total: $48,415.51 Misc. Costs: Shipping and Handling Fees $320.00 Performance and Payment Bond $1,462.07 Misc. Costs Total $1,782.07 Access Control — For Fire Stations 1 - 5 page 22 of 23 Project 10464 Attachment B MILESTONE / PAYMENT SCHEDULE A. Total and complete compensation for this Agreement shall not exceed $50,197.58. Milestone 1 Substantial Completion 20(twenty) days Milestone 2 Final Completion 90 (ninety) days Contract includes furnishing all labor, materials, equipment, and incidentals as required for the ACCESS CONTROL FOR FIRE STATIONS 1 — 5 project CONTRACT TOTAL ....................... ='I� Description Price Fire Station No 1 $11,086.70 Fire Station No 2 $8.963.93 Fire Station No 3 $8,896.47 Fire Station No 4 $8,896.47 Fire Station No 5 $10,571.94 Shipping & Handling Fees $320.00 Payment and Performance Bonds 1,462.07 FIRES TIONS1 —5 TOTAL $50,197.58 Travel expenses, if applicable, will be paid at no more than the City of Meridian's Travel and Expense Reimbursement Policy. Access Control — For Fire Stations 1 - 5 page 23 of 23 Project 10464 Client#: 1127978 APEXINT1 ACORDTn CERTIFICATE OF LIABILITY INSURANCEDATE(MMIDDIYYYY) 6/18/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER USI Idaho, Kibble & Prentice 3295 Elder Street Boise, ID 83705 208 393-5212 CONTACT NAME: PHONE 208 3935212 FAX Ell: FAXNo): E-MAIL., ADDRESS: INSURER(S) AFFORDING COVERAGE NAICN INSURER A: Philadelphia Indemnity Insuranc 18058 INSURED INSURER B: Idaho State Insurance Fund NONAIC Apex Integrated Security 109 South 4th Street INsuRERc:. EACH�OCCCURRENCE $1,000,000 Boise, ID 83702 INSURER D: _ INSURERS: INSURE RF.: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD- INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,' EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. _ LTR TYPE OF INSURANCE IN RLSUB two POLICYNUMBER MMIDDIYEYYF MMIDDIYEYYY LIMITS A GENERAL LIABILITY x PHPK7111884 D1101112014 011011201E EACH�OCCCURRENCE $1,000,000 PREMISES Eaoccue0ence $100000 X COMMERCIALGENERALLIABILITY _. CLAIMS -MADE OCCUR M ED EXP (Any one person) $5,000 PERSONAL B ADV INJURY $1,000,000 - GENERAL AGGREGATE $2,000,000'. GEN'LAGGREGATE LIMIT APPLIES PER: PRODUCTS -COMPIOP AGO $2,000,000 X POLICY PRO LOC ECT $ A AUTOMOBILE LIABILITY x PHPK1111884 1101/2014 01/01/201 EaMardtlentSINGLE LIMIT 1,000,000 BODILY INJURY (Per person) $ ANY AUTO JX ALL OWNED SCHEDULED AUTOS AUTOS ,. BODILY INJURY (Per ardtlenQ S PROPERTY DAMAGE $ Peraccldenl HIRED AUTOS X NON-0WNED AUTOS (, E UMBRELLA LIAR OCCUR EACH OCCURRENCE $ _ AGGREGATE $ _ EXCESS LIAB CLAIMS -MADE DED I I RETENTION$ $ _ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITYUM1SER ANY PROPRIETORRARTNERIEXECUTIVEY/N OFFICERIMEMBER EXCLUDED? N]NIA (Mandatory In NH) 593154 110112014 01101/201E X WCSTATU- OTH- E. L. EACH ACCIDENT $1000000 E.L. DISEASE - EA EMPLOYEE $1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE -POLICY LIMIT $ DESCRIPTION OF OPERATIONS LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) Certificate holder is added as additional insured per contract with Apex Integrated Security Solutions, Inc. on general liability and auto liability. Ci of Meridian SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVEREDIN 33 E Broadway Ste 106 ACCORDANCE WITH THE POLICY PROVISIONS. -. Meridian, ID 83642 ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010105) 1 of 1 The ACORD name and logo are registered marks of ACORD #S12710804/M12434600 TATJV I AIA Document A312 TM .2010 Performance Bond CONTRACTOR: (Name, legal status and address) Apex Integrated Security Solutions, Inc 109 South 4th Street Boise, Idaho 83702 OWNER: (Name, legal status and address) City of Meridian 33 E. Broadway Ave Meridian, Idaho 83642 CONSTRUCTION CONTRACT Date: June , 2014 Amount: $50,197.58 SURETY: (Name, legal status and principal place of business) Indemnity Company of California Five Centerpointe, Suite 530 Lake Oswego, Oregon 97035 Description: (Name and location) Access control for Fire Stations 1-5 Projects #10464 BOND Date: June 2014 (Not earlier than Construction Contract Date) Amount: $50,197.58 Modifications to this Bond: ® None ❑ See Section 16 CONTRACTOR AS PRINCIPAL SURETY Company: (Corpora( eal) Company: (Corp Apex Integrate a ur' SoJutj Indemnity Company f California Signature: `' Signature: Name Lti�f7 �%f1%�q/ Name Karyl Ricr, Atton and Ti e: and and Title: (Arty addrlional signatures appear on the last page of this Performance Bond.) (FOR INFORMATION ONLY— Name, address and telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE: Allied Bonding (Architect, Engineer or other party:) 5605 Overland Rd. Boise, ID 83705 Phone(208)345-4177 Fax(208)384-1677 Bond No. 755890P This document has important legal consequences. Consultation wilh an attorney Is encouraged with resped to its completion or modi0cadon. Any singular reference to Contractor, Surety, Owner or other party shall be considered Plural where applicable. AIA Document A312-2010 combines two separate bonds, a Performance Bond and a Payment Bond, Into one form. This Is not a single combined Performance and Payment Bond. 411110s1Y SEAL * -eeeeeer# lDAHO InIL MA aOeumsnt A712--2010. The American lnsatute of Awhbcts. oetnu § 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. § 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except when applicable to participate in a conference as provided in Section 3. § 3 If there is no Owner Default under the Construction Contract, the Surety's obligation under this Bond shall arise atter 1 the Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor and Surety to discuss the Contractor's performance. If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner's notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Section 3.1 shall be held within ten (10) business days of the Surety's receipt of the Owner's notice. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; .2 the Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; and .3 the Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract. § 4 Failure on the part of the Owner to comply with the notice requirement in Section 3.1 shall not constitute a failure to comply with a condition precedent to the Surety's obligations, or release the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice. § 5 When the Owner has satisfied the conditions of Section 3, the Surety shall promptly and at the Surety's expense take one of the following actions: § 5.1 Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract; § 5,2 Undertake to perform and complete the Construction Contract itself, through its agents or independent contractors; § 5.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Section 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or § 5.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable atter the amount is determined, make payment to the Owner; or .2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial. § 5 If the Surety does not proceed as provided in Section 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Section 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. Ink. AIA Document A312--2010. The Am flcan Inataut9 of Amhaeeb. 2 § 7 If the Surety elects to act under Section 5.1, 5.2 or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication, for .1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; .2 additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Section 5; and .3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. § 81f the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety's liability is limited to the amount of this Bond. § 8 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors and assigns. § 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 11 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or pan of the work is located and shall be instituted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears. § 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. § 14 Definitions § 14.1 Balance of the Contract Price. The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract. § 142 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents. § 14.3 Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material tern of the Construction Contract. § 14.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. § 14.5 Contract Documents. All the documents that comprise the agreement between the Owner and Contractor. § 15 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. Inn. ALA Document A312--2010. The American IncONte of A,oh"nects. § 16 Modifications to this bond are as follows: None (S)7ace is provided below for additional signatures ofadded parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Signature: Name and Title: Address Signature: Name and Title: Address CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. Init. AIA Document A312-- 2010. The American lnaffho W Architects. -- 4 #A1A Document A312 TM .2010 Payment Bond SURETY Bond No. 755890P CONTRACTOR: SURETY: Indemnity Compa (Name, legal status and address) (Name, legal status and principal place Name ��,4M��r� J 7tur Name Ka I A of business) and Title: Apex Integrated Security Solutions, Inc Indemnity Company of California A 109 South 4th Street Five Centerpointe, Suite 530 1 ' This document has Important legal Boise, Idaho 83702 Lake Oswego, Oregon 97035 consequences. Consultation with OWNER: an attorney Is encouraged with (Name, legal status and address) respect to Its completion or modification. City of Meridian Any singular reference to 33 E. Broadway Ave Contractor, Surety, Owner or Meridian, Idaho 83642 other party shell be considered CONSTRUCTION CONTRACT plural where applicable. Date: June ,2014 AIADocument A312-2010 combines two separate bonds, a Amount: $50,197.58 Performance Bond and a Payment Bond, into one form. Description: This Is not a single combined (Name and location) Access control for Fire Stations 1-5 Performance and Payment Bond. Projects #10464 BOND Date: June , 2014 (Not earlier than Construction Contract Date) Amount: $50,197.58 Modifications to this Bond: ® None O See Section IS CONTRACTOR AS PRINCIPAL SURETY Company: (Corpora Company: Apex Integrated S ri lutioo Indemnity Compa Si S1 Name ��,4M��r� J 7tur Name Ka I A and Title: �4Sip✓% and Title: (Any additional signatures appear on the last page of this Paymei (FOR /NFORMAT/ON ONLY— Name, address and telephone)4s1ar"IN1814 AGENT or BROKER: OWNER'S REPRESENTATIVE: � o' ultiry J see Allied Bonding (Architect, Engineer or other, party:) 5605 Overland Rd. a' *?Okollp Boise, ID 83705 4 Phone (208) 345-4177 f F 4Pe410 Fax (208) 384-1677 SEAL rw. ol\ InR AIA Doeumerd Asl2' - 2010. The Am rican lnetHute of Arehsecb. 01110 § 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference, subject to the following terms. § 2 If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond. § 3 If there is no Owner Default under the Construction Contract, the Surety's obligation to the Owner under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety (at the address described in Section 13) of claims, demands, liens or suits against the Owner or the Owner's property by any person or entity seeking payment for labor, materials or equipment famished for use in the performance of the Construction Contract and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety. § 4 When the Owner has satisfied the conditions in Section 3, the Surety shall promptly and at the Surety's expense defend, indemnify and hold harmless the Owner against a duly tendered claim, demand, lien or suit. § 5 The Surety's obligations to a Claimant under this Bond shall arise after the following: § 5.1 Claimants, who do not have a direct contract with the Contractor, .1 have famished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied or for whom the labor was done or performed, within ninety (90) days after having last performed labor or last furnished materials or equipment included in the Claim; and .2 have sent a Claim to the Surety (at the address described in Section 13). § 5.2 Claimants, who are employed by or have a direct contract with the Contractor, have sent a Claim to the Surety (at the address described in Section 13). § 5 If a notice of non-payment required by Section 5. 1.1 is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant's obligation to furnish a written notice of non-payment under Section 5.1.1. § 7 When a Claimant has satisfied the conditions of Sections 5.1 or 5.2, whichever is applicable, the Surety shall promptly and at the Surety's expense take the following actions: 17.1 Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and § 7.2 Pay or arrange for payment of any undisputed amounts. § 7.3 The Surety's failure to discharge its obligations under Section 7.1 or Section 7.2 shall not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement. If, however, the Surety fails to discharge its obligations under Section 7.1 or Section 7.2, the Surety shall indemnify the Claimant for the reasonable attorney's fees the Claimant incurs thereafter to recover any sums found to be due and owing to the Claimant. § 8 The Surety's total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney's fees provided under Section 7.3, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. § 9 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the Contractor famishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. Init AIA Document A2[2--2010. The American Insatute of Architects. § 10 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make payments to, or give notice on behalf Of, Claimants or otherwise have any obligations to Claimants under this Bond. § 11 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. § 12 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which the project that is the subject of the Construction Contract is located or after the expiration of one year from the date (1) on which the Claimant sent a Claim to the Surety pursuant to Section 5.1.2 or 5.2, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. § 13 Notice and Claims to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which thein signature appears. Actual receipt of notice or Claims, however accomplished, shall be sufficient compliance as of the date received. § 14 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. § 15 Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made. § 16 Definitions § 16.1 Claim. A written statement by the Claimant including at a minimum: .1 the name of the Claimant; .2 the name of the person for whom the labor was done, or materials or equipment furnished; .3 a copy of the agreement or purchase order pursuant to which labor, materials or equipment was furnished for use in the performance of the Construction Contract; .4 a brief description of the labor, materials or equipment furnished; .5 the date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the Construction Contract; .6 the total amount earned by the Claimant for labor, materials or equipment furnished as of the date of the Claim; .7 the total amount of previous payments received by the Claimant; and .6 the total amount due and unpaid to the Claimant for labor, materials or equipment furnished as of the date of the Claim. § 16.2 Claimant An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic's lien or similar statute against the real property upon which the Project is located. The intent of this Bond shall be to include without limitation in the terms `labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were famished. § 16.3 Construction Contract The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and all changes made to the agreement and the Contract Documents. lnit AIAuocument A312"'-2010. The Amedcan lnst0ute of Architects. § 18.4 Owner Debut Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. § 18.8 Conked Documents. All the documents that comprise the agreement between the Owner and Contractor. § 17 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be doomed to be Subcontractor and the term Owner shall be deemed to be Contractor. § 18 Modifications to this bond are as follows: None (Space is provided below for additional signatures ofadded parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Signature: Name and Title: Address Signature: Name and Title: Address CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. Inb. AIA Deoununt A312�- 2010. The Ma= lnaaWb of Mehaaah. POWER OF ATTORNEY FOR DEVELOPERS SURETYAND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725, IRVINE, CA 92623 (949) 263-3300 KNOWALL BY THESE PRESENTS thatexcept as expressly limited, DEVELOPERS SURETYAND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each hereby make, constilule and appoint: ***Karyl A. Richter, Janet K. Holthaus, jointly or severally*** as their true and lawful Altorney(symn Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of surety- ship giving and granting unto said Attaney(s)-in-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and all of the acts of said Attorney(s)-in-Fact, pursuant to these presents, are hereby rafified and confirmed, This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January 1st, 2008. RESOLVED, that a combination of any two of the Chairman of the Board, the President, Executive Vice -President, Senior Vice -President or any Vice President of the corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attorney(s) named in the Power of Attorney to execute, on behalf of the corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of [hem hereby is, authorized to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any. certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF, DEVELOPERS SURETYAND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective officers and attested by their respective Secretary or Assistant Secretary this November 21, 2013. By: Daniel Young, SeniorVce-President a �,rvQ KY"ypD 7%F`" pO�pgo VO,c �v�/ > "i S BATF ;$y i h-� v0P // CSG ewi OCT. 2 OCT By: c a `3 1 9 3 6 ,+3 a O n 1987 �. 2 Mark J. Lansdon, Vice -President ? ? �,_ State of California County of Orange "" . moos• On November 21 2013 before me, Antonio Alvarado Nn'-- Public Dale Here Insert Name and Title of the Officer personally appeared ming and Mark J. Lansdon Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that hershe/they executed the same in hislherhheir authorized capacity(ies), and that by hislherltheir signature(s) on the instrument the person(s), or the entity upon behalf of ANT010AAWARADO which the person(s) acted, executed the inslmment. COMM. A 20335 g NOTARY FSLIC - I certity under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is ORANC4E y true and correct. AlyoMml e�MesAug Q 2012 - - WITNESS my hand and official seal. Place Notary Seal Above Signature Antonio Nvarado, Notary Public CERTIFICATE The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney are in force as of the dale of this Certificate. e This Certificate is executed in the City of Irvine, California, this day oljf � V„4 , a'00 By:�7W Cassie J. Bemsfe V , sistent Secretary V- ID.1380(Rev11113) Untitled Page Login, Public Contractor Search PERMITS LICENSE PUBLIC WORKS VIOLATIONS ELEVATORS Page 1 of 1 'fk'+vr`fldir}a�'�I Public Works Search i> Search Again Download Results Printable View Company Name License Number Work Catenorv(s) License Type I License CI; ;Apex Integrated Security Solutions, Inc. PWC -C-16018 13850, 16700, 16800 4 S First Prov - Page: 1 of 1 Hex[ LEt&t i Details - License Number: PWC -C-16018 Lic 11 Fees $900.00 Registration#: PWC -C-16018 Issue: 5128/2014 Expire: 5/31/2015 Type: PUBLIC WORKS Sub -Type: B Status: ACTIVE Comp/Name: Apex Integrated Security Solutions, Inc. Addressl: 109 S. 41h St. City, State, Zip: BOISE, ID 83702 Phone: (208) 378-9650 Cell: Pager: Fax: (208) 378-9660 Owner Name: Home I CONTACT US P�pnnr https://data.dbs.idaho.gov/etrakit2/ldaho PublieWorksSearchRslts.aspx 6/26/2014 ragc 1 ui 1 IDAHO SECRETARY OF STATE Search Results Ben Ysursa, Secretary of State Search Result Summary [ New Search ] Search Results 1 through 1 ( APEX INTEGRATED SECURITY SOLUTIONS, INC.... APEX INTEGRATED SECURITY SOLUTIONS, INC. ) APEX INTEGRATED SECURITY SOLUTIONS INC [view Details Organizational ID / Filing number: C153539 Filed 10 Mar 2004 CORPORATION 109 S 4TH BOISE, ID 83702 GOODSTANDING Idaho Secretary of State's Main Page State of Idaho Home Page Comments, questions or suggestions can be emailed to: sosinfoCalsos.idaho gov http://www.accessidaho.org/public/sos/corp/search.html 6/26/2014 Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: Items Moved from Consent Agenda MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: Woodburn West Sub No. 2 FP 14-027 Final Plat approval consisting of 48 building lots and 7 common/other lots on 25.75 acres of land in the R-8 zoning district by Northside Management - north of W. Ustick Road and east of N. Linder Road MEETING NOTES OAW)_j fo--7//�// Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER - PROJECT NUMBER: AZ 14-007 ITEM TITLE: Public Hearing: Sugarman Subdivision by George Sugarman Located 1450 W. Ustick Road Request: Annexation and Zoning of 5.04 Acres of Land with a C -C Zoning District MEETING NOTES Ali PH 11 r U1 Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS DATE: Jul Meridian City Council Meeting 1, 2014 ITEM NUMBFR- PROJECT NUMBER: SHP 14-001 ITEM TITLE: Public Hearing: Sugarman Subdivision by George Sugarman Located 1450 W. Ustick Road Request: Short Plat Approval Consisting of Four (4) Building Lots on 3.99 Acres of Land in a Proposed C -C Zoning District MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN CITY COUNCIL PUBLIC HEARING SIGN-UP SHEET DATE July 1, 2014 ITEM # 713 & 7C PROJECT NUMBER AZ 14-007 and SHP 14-001 PROJECT NAME Sugarman Subdivision PLEASE PRINT NAME CITY CLERKS O FOR I AGAINST I NEUTRALI Ic Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMRFR- ITEM TITLE: Public Hearing: Southern Highlands Real Property Exchange MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION IC DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS SUMMARY OF ACTION TAKEN REGARDING INTENT TO EXCHANGE REAL PROPERTY AND NOTICE OF PUBLIC HEARING SUMMARY OF ACTION TAKEN: On January 7, 2014, the City Council of the City of Meridian approved the Decision and Order approving the Annexation and Zoning and Preliminary Plat for the Southern Highlands Subdivision, located at the NW corner of S. Eagle Road and E. Taconic Drive, Case Numbers AZ -13-016 and PP -13-033. As part of that Decision and Order, the City Council declared its intent to grant the Applicant's request to trade 9,207 square feet of real property owned by the developer adjacent to the City's existing well lot with an equal amount of real property owned by the City nearby where a sewer lift station has been located. The Applicant has submitted a lot line adjustment application with the City to achieve the proposed property exchange and the City Council is prepared to hold a public hearing for the purpose of determining whether the terms and conditions of the proposed real property exchange are in the City's best interest. SUMMARY OF PROPOSED REAL PROPERTY EXCHANGE: The property to be disposed of as surplus property by the City is a parcel of approximately 9,207 square feet of land located on E. Taconic Drive in the City of Meridian, Parcel Number R0988260167. In exchange, the City would acquire real property of equivalent size and value by way of a lot line adjustment that would increase the size of the City's existing water well lot located at 2730 E Taconic Drive, Ada County Parcel number R0988260242. NOTICE IS HEREBY GIVEN pursuant to the Ordinances of the City of Meridian and the Laws of the State of Idaho (including but not limited to Idaho Code section 50- 1402), that the City Council of the City of Meridian will hold a public hearing at the Meridian City Hall, 33 East Broadway Avenue, Meridian, Idaho, at the hour of 6:00 p.m. on Tuesday, July 1, 2014 for the purpose of considering and approving the proposed real property exchange. For further information, please contact the City Clerks Office at 888-4433. Publish: 16th day of June, 2014 JAYCEE L. HOLMAN, CITY CLERK ----- LEGMD w.wl, wxm„ .�-=Ml; arw�w, e rl RUIRMM '�°� amo a,vrm m wRl 'a, �I'x"^n umro R wmr w nw o,l� w wP rRY,-rwYY t 9— 71 w �4w.'r uime xunle LLo: Men4 0.,axrou�N He.:Y,rAn.'Id' er r✓am •w w'u? o u �eK'�W�'tw.u.T•s µsu x•enu x nnxp p.v YYnnm us I WrYSb �W q wY� Na u� euw hmdv.a�w rein• pr w�� ,� vnr n nunx• w vers RlIl1YlGTF OF 3{IRYFYOP , Ga sM',.,x4:?i� 3rnn remou.n:. e.r„[.:a um r•wµ vn die, • W.y^�v rsmmu •• •mu vny m.: w u. [��.awp�r .. .e WM4en a p„ %. * wn p ,Yx .r m...w rMu. Ye`.bl, .wry s.. Nn•. '” SURPLUS PARCEL L CITY OF MERIDIAN CITY COUNCIL PUBLIC HEARING SIGN-UP SHEET DATE July 1, 2014 ITEM # 7D PROJECT NUMBER PROJECT NAME Southern Highlands Real Property Exchange I PLEASE PRINT NAME I FOR I AGAINST I NEUTRALI CITY OF w� FIB Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: Pegasus Planning & Development: Economic Development and Fields District Recommendations and Findings MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS -f �y .; a4 AUU2Ll10 f 'OA[ Ilii) MEr PEGASUS Appendix Contents • Community Data • Community Business Owner Survey Resu Its • Target Industry and Occupation Analysis • Case Studies • Meridian Fiscal Impact Model • Resources • Resolution Appendix Community Data Population PEGASUS Meridian, ID Regional Context PEGASUS December*' =13 37 Appendix Community Data Population Growth - Tremendous growth in last 3 decades - Growth will remain high, though as prices rise and the AOCI shrinks, development may be pushed to other communities (Star, Caldwell) PEGASUS Population Projection 100,480 138,000 (COMPASS) (COMPASS) 75,092 65,000 Current 77,936 10,000 1990 2007 2010 2020 2035 Sources: City of Meridian; 2010 Census; COMPASS Appendix Community Data Benchmarking - Growth in Ex-urban/Rural areas of Treasure Valley has exploded in recent decades - Competitive communities are more mature, older communities so growth has slowed Population Growth (`00212) 750,000 500,000 • 250,000 hoc• ea0e 2000 ■ 2012 • Annual Growth PEGASUS 8.00% 7.00% 5.00% 4.00% 3.00% °? 2.00% G) 1.00% 0 0.00% Sources: 2010 Census, 2000 Census, 2012 ACS 1 -year estimates, 2010-2012 American Community Survey 3 -Year Estimates Population III I Year Meridian Nampa Caldwell Boise Eagle Star Salt Lake City Seattle Beaverton, OR Everett, WA Idaho u5 2000 34,919 51,867 25,967 185,787 11,085 1,795 181,743 563,374 76,129 91,488 1,293,953 281421906 2010 75,092 81,557 46,237 205,671 19,908 5,793 186,440 608,660 89,803 103,019 1567 582 308,745,538 Growth 115% 57% 78% 11% 80% 223% 3% 8% 18% 12.6% 21% 10% Annual Growth 1 8.0% 4.6% 1 5.9% 1.0% 1 6.0% 12.4% 0.3% 0.8% 1.7% 1.26% 1.9% 0.9% 2010 75,092 81,557 46,237 205,671 19,908 5,793 186 440 608,660 89,803 103,019 1567 582 308,745,538 2012 77,936 83,932 47,130 209,292 19,952 5,745 186 740 612,916 90,245 103,135 1,567,803 309 138 711 Growth 4% 3% 2% 2% 0% -1% 0% 1% .3% 0% 0% 0% Annual Growth Rate 00-12 6.9% 4.1% 5.1% 1.0% 5.0% 10.2% 0.2% 0.7% 1.4% 0% 1.6% 0.8% Sources: 2010 Census, 2000 Census, 2012 ACS 1 -year estimates, 2010-2012 American Community Survey 3 -Year Estimates Appendix Community Data Population Growth Source: Cumulative Estimates of the Components of Resident Population Change for Counties, 2000-2009, 2010-2013, US Census Bureau PEGASUS 11 International Domestic Population Change Natural lncrease Migration Migration Ada County, Idaho 24,099 36% 10% 54% Canyon County, Idaho 9,948 59% 3% 38% Lane County, Oregon 4,497 17% 48% 35% Washington County, Oregon 25,284 55% 22% 23% Salt Lake County, Utah 50,066 78% 16% 6% King County, Washington 113,187 36% 35% 29% Spokane County, Washington 8,177 70% 29% 1% Idaho 251,846 46% 9% 45% Ada County, Idaho 83,750 36% 7% 58% Canyon County, Idaho 55,172 35% 6% 60% Lane County, Oregon 28,130 22% 18% 60% Washington County, Oregon 91,970 48% 24% 28% Salt Lake County, Utah 136,577 104% 34% -39% King County, Washington 179,394 60% 58% -18% Spokane County, Washington 50,745 35% 11% 54% Source: Cumulative Estimates of the Components of Resident Population Change for Counties, 2000-2009, 2010-2013, US Census Bureau PEGASUS 11 Appendix Community Data PEGASUS Growth has been absorbed in greenfields and active farmland 2007 Percent Loss Boise 80,333 43,672 83.9% Canyon 391,050 260,247 50.3% Owyhee 752,032 569,305 32.1% Ada 232,879 191,477 21.6% Gem 197,176 190,757 3.4% Elmore 353,528 346,550 2.0% Source: US Aericultural Census. 1992 & 2007 PEGASUS Appendix Community Data - Main sources of growth: Domestic migration + Natural Increase Po ulotion Growth Qualitative interviews from Meridian indicate people are moving in p from surrounding areas in the Treasure Valley (housing affordability) - International migration is not a significant source of population growth as it is in other competitive communities Components of Population Growth Population 2010-2013 Change 24,099 9,948 4,497 25,284 50,066 113,187 8,177 100% ® ZEN 90% 80% 16% •'. 29% 70% 22% 60% o. 50% � 35% 40% 48 30% 55% 20% 10% • Ada County, Canyon County, Lane County, Washington Salt Lake King County, Spokane Idaho Idaho Oregon County, Oregon County, Utah Washington County, Washington A Natural Increase International Migration ■ Domestic Migration Source: Cumulative Estimates of the Components of Resident Population Change for Counties, 2010-2013, US Census Bureau Appendix Community Data Migration Patterns from Idaho TOP INFLOW Net 3,721 County Inflow Outflow Net 1Canyon County 3,721 4,585 -864 2 Valley County 729 73 656 3Twin Falls County 690 339 351 413annockCounty 462 666 -204 51-atah County 442 326 116 6Gem County 373 514 -141 7 Elmore County 356 257 99 8 Madison County 349 125 224 9Jerome County 338 26 312 10 Bonneville County 337 459 -122 TOTAL 7,797 7,370 427 TOP OUTFLOW County Inflow 1 Canyon County 2 Bannock County 3 Gem County 4 Bonneville County 5Twin Falls County 6 Latah County 7 Nez Perce County 8 Elmore County 9 Kootenai County 10 Bingham County TOTAL 4,585 666 514 459 339 326 309 257 229 216 7 PEGASUS Outflow Net 3,721 -864 462 -204 373 -141 337 -122 690 351 442 233 150 -159 356 99 314 85 92 -124 6,937 -846 Source: US Census County -to -County Migration Flows: 2007-2011 ACS Appendix Community Data Migration Patterns from Outside Idaho TOP INFLOW County Inflow Outflow Net 1 Los Angeles County, CA 644 181 4 21(ing County, WA 600 403 1 3Juneau City, AK 434 42 3 4Marico pa County, AZ 432 501 - 5Salt Lake County, UT 404 667 -2 6Clark County, NV 383 159 2 7Anchorage Muni, AK 370 47 3 8San Diego County, CA 357 421 - 9Clark County, WA 346 162 1 1OMatanuska-Sustina, AK 341 21 3 PEGASUS TOP OUTFLOW County Inflow Outflow Net 1Salt Lake County, UT 667 404 -263 2 Maricopa County, AZ 501 432 -69 3 Multnomah County, OR 484 160 -324 4San Diego County, CA 421 357 -64 5 King County, WA 403 600 197 6 Washington County, OR 386 175 -211 7 Clackamas County, OR 334 132 -202 8 Utah County, UT 299 128 -171 9San Bernadino County, CA 256 67 -189 10Spokane County, WA 241 257 16 TOTAL 3,992 2,712 -1,280 Source: US Census County -to -County Migration Flows: 2007-2011 ACS Its] Appendix Community Data Migration Patterns, Net TOP NET INFLOW (ALL COUNTIES) Net County 1Valley County, ID 2Los Angeles County, CA 3Juneau City, AK 4Twin Falls County, ID 5Anchorage City, AK 6Jerome County, ID 7Madison County, ID 8Clark County, WA 9King County, WA 10Clark County, NV TOTAL Migration 65 463 392 351 323 312 224 224 197 184 3,326 PEGASUS TOP NET OUTFLOW (ALL COUNTIES) Net County Migration 1Canyon County, ID 2Multnomah County, OR 3Salt Lake County, UT 4Washington County, OR 5 Lane County, OR 613annock County, ID 7Clackamas County, OR 8San Bernadino County, CA 9Harris County, TX 10Utah County, UT TOTAL -864 -324 -263 -211 -208 -204 -202 -189 -178 -171 -2,814 Source: US Census County -to -County Migration Flows: 2007-2011 ACS 11 PEGASUS Appendix Community Data Age Demographics Meridian 9% 27% 19% 16% 210% 90% Nampa 10% 26% 22% 13% 19% 10% Caldwell 11% 24% 25% 12% 18% 10% Boise 6% 19% 249/6 13% 26% 12% Eagle 4% 29% 10% 15% 31% 12% Star 11% 31% 19% 17% 17% 6% Salt Lake City 8% 18% 31% 14% 20% 10°% Seattle 5% 13% 30% 16% 25% 11% Beaverton, OR 7% 20% 24% 15% 25% 10% Everett, WA 8% 17% 26% 14% 25% 10% Idaho 8% 22% 20% 12% 25% 13% us 7% 20% 20% 13% 26% 13% Sources: 2008-2012 American Community Survey 5 -Year Estimates 12 PEGASUS Appendix Community Data Age Demographics Meridian 9% 27% 19% 16% 210% 90% Nampa 10% 26% 22% 13% 19% 10% Caldwell 11% 24% 25% 12% 18% 10% Boise 6% 19% 249/6 13% 26% 12% Eagle 4% 29% 10% 15% 31% 12% Star 11% 31% 19% 17% 17% 6% Salt Lake City 8% 18% 31% 14% 20% 10°% Seattle 5% 13% 30% 16% 25% 11% Beaverton, OR 7% 20% 24% 15% 25% 10% Everett, WA 8% 17% 26% 14% 25% 10% Idaho 8% 22% 20% 12% 25% 13% us 7% 20% 20% 13% 26% 13% Sources: 2008-2012 American Community Survey 5 -Year Estimates 13 Appendix Community Data Age Demographics - Young communities: - Star - Caldwell - Nampa - Older communities: - Eagle - Boise - Seattle - Meridian is in the middle of the bell curve Retirement age + Elderly Agi ng—L Workforce LYoungand le rce Children + Future Workforce Sources: 2oo8-2012 American Community Survey 5 -Year Estimates PEGASUS Age by Cohort 100% 90°, 80% 70% 60% 50% 40% 30% 20% 10% II. 0% � e ¢ e Under 5 ■ 5 to 19 ■ 20 to 34 ■ 35 to 44 ■ 45 to 64 ■ 65 and over 14 Appendix Community Data Age Demographics "In terms of attraction, [the lack of diversity] becomes an issue... You bring in some people from parts of Asia and they wonder 'is this a place forme?"' Area employer, Meridian PEGASUS L Meridian Racial Diversity Caldwell Boise i00% Star Salt Lake City Seattle Everett, WA Beaverton, OR Idaho Total Population 75,210 80% 47,130 209,292 19,952 5,745 60% 612,916 103,135 90,254 1,567,582 40% White 72,543 76,505 43,418 20% 19,250 5,395 151,589 459,117 0% 65,182 1,396,487 236,362,158 African American 1,241 a� �`,g• tea& Sia P a a JS 15 ecaac aa�Qa � `�`,C1 Samoa `4 EO caro 1,976 15,737 41,945,466 American Indian 544 1,958 453 ■ White ■ African American ■ American Indian 3,443 13,145 ■ Asian ■ Two or More Races ■ Some Other Race 5,049,092 L Meridian Nampa Caldwell Boise Eagle Star Salt Lake City Seattle Everett, WA Beaverton, OR Idaho Total Population 75,210 83,932 47,130 209,292 19,952 5,745 186,740 612,916 103,135 90,254 1,567,582 309,138,711 White 72,543 76,505 43,418 193,534 19,250 5,395 151,589 459,117 83,802 65,182 1,396,487 236,362,158 African American 1,241 843 518 3,874 207 15 6,728 56,147 6,392 1,976 15,737 41,945,466 American Indian 544 1,958 453 3,776 285 117 3,443 13,145 2,722 1,071 36,899 5,049,092 Asian 1,513 1,373 1,023 9,633 407 141 10,185 101,700 10,112 10,791 29,822 17,285,143 Two or More Races 1,763 2,995 1,376 5,671 508 71 5,028 29,970 5,752 3,099 39,180 8,296,291 Some Other Race 1,096 3,770 2,033 2,853 320 118 15,978 11,510 4,552 7,843 39,332 16,417,278 Hispanic or Latino 5,243 17,785 16,550 14,498 777 414 40,007 37,880 14,134 14,310 175,512 50,545,275 Not Hispanic or Latino 69,967 63,882 29,679 193,834 19,175 5,331 146,733 575,036 86,067 75,944 1,392,291 258,593,436 15 Sources: 2oo8-2o12 American Community Survey 5 -Year Estimates Appendix Community Data Demographics - Low Hispanic population in Meridian - Though this population is expected to be one of the fastest growing groups for the next 2 decades Meridian Nampa Total Population 77,936 83,932 White 72,543 76,505 African American 1,241 843 American Indian 544 1,958 Asian 1,513 1,373 Two or More Races 1,763 2,995 Some Other Race 1,096 3,770 Hispanic or Latino 5,243 17,785 Not Hispanic or Latino 69,967 63,882 PEGASUS Hispanic Population 100°% 80% 60% 40% 20°% 0%° z�`ocOQ \acro J� 41 �° "px ■ Hispanic or Latino ■ Not Hispanic or Latino Everett, Beaverton, WA OR Idaho us 103,135 90,254 1,567,582 309,138,711 Salt Lake 65,182 Caldwell Boise Eagle Star City Seattle 2,722 209,29 36,899 5,049,092 10,112 10,791 47,130 2 19,952 5,745 186,740 612,916 43,418 193,534 19,250 5,395 151,589 459,117 518 3,874 207 15 61728 56,147 453 3,776 285 117 3,443 13,145 1,023 9,633 407 141 10,185 101,700 1,376 5,671 508 71 5,028 29,970 2,033 2,853 320 118 15,978 11,510 16,550 14,498 777 414 40,007 37,880 29,679 193,834 19,175 5,331 146,733 575,036 Sources: 2008-2012 American Community Survey 5 -Year Estimates Everett, Beaverton, WA OR Idaho us 103,135 90,254 1,567,582 309,138,711 83,802 65,182 1,396,487 236,362,158 6,392 1,976 15,737 41,945,466 2,722 1,071 36,899 5,049,092 10,112 10,791 29,822 17,285,143 5,752 3,099 39,180 8,296,291 4,552 7,843 39,332 16,417,278 14,134 14,310 175,512 50,545,275 86,067 75,944 1,392,291 258,593,436 16 Appendix Community Data Quality of Life - Meridian boasts higher incomes and wages for workers compared to most of the Treasure Valley and competitive communities PEGASUS Meridia Caldwel INCOME & WAGES Seattl Everett, IIIII Median Earnings for Workers 111111 Median Household Income Eagle Star OR 3 us 0 WA Median Household Income $64,107 $40,835 $39,302 $49,182 ����������������������������������������������������������������IIIA ............................ °- 5) Idaho nnnnnnninnnnnnnnnnnnnnnnnnnnnnnnnnnin $40,360 $31,589 $25,727 $38,298 3 13 Beaverton, OR nnnnnnninnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn,�nnnnnnnnnnnnnnnnnn 156,533,20 Everett, WA W I +n a 6.8% °°. 9.30% Seattle Salt Lake City i Star �������������������������������������������������������������������������������������������� nnnnnnninnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn i Eaglennnnnnninnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnni B nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnniinnnnnnnnnnnnnnnnni Boise Caldwell nnnnnnninnnnnnnnnnnnnnnnnnnnnnnnnnuuuuu nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnlnnnnnnnnnnni Nampa Meridian nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnjnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnni I $0 $20,000 $40,000 $60,000 $80,000 Meridia Caldwel Salt Lake Seattl Everett, Nampa Boise Eagle Star OR n I City a WA Median Household Income $64,107 $40,835 $39,302 $49,182 $80,324 $63,790 $44,510 $63,470 $47,491 Median Earnings for $32,811 $22,082 $20,062 $26,446 $40,360 $31,589 $25,727 $38,298 $30,586 Workers 50,706 763,99 156,533,20 Civilian Labor Force 37,473 37,506 21,586 116,685 9,033 2,531 105,534 382,506 53,688 Unemployment Rate 8.70% 12.00% 13.80% 8.70% 6.40% 7.30% 8.10% 6.70% 6.8% Sources: 2008-2012 American Community Survey 5 -Year Estimates Beaverton, Idaho us OR $56,123 $47,01 $53,046 5 $31,748 $24,61 $30,376 2 50,706 763,99 156,533,20 1 5 6.8% 8.50% 9.30% 17 Appendix Community Data Quality of Life - Treasure Valley remains highly affordable compared to competitive communities - Housing affordability is a draw for young families and is a key to upward mobility Boise, ID 95.3 Salt, Lake, City, UT 96.3 Seattle, WA 115.9 Portland, OR 112.3 Source: ACCRA Cost of Living Index, 2012, BVEP The HPI is a broad measure of the movement of single-family house prices. The HPI is a weighted, repeat -sales index, meaning that it measures average price changes in repeat sales or refinancings on the same properties. This information is obtained by reviewing repeat mortgage transactions on single-family properties whose mortgages have been purchased or securitized by Fannie Mae or Freddie Mac since Jan u ary 1975. PEGASUS Housing Price Index Metropolitan Statistical Areas 350 300 , 250 200 150 / 100 50 0 N V lv1 N N V lvl N N V lvl N N V lvl N Cf Cf Cf Cf Cf 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N —Boise City -Meridian -Nampa, ID —Portland -Vancouver -Beaverton, OR -WA —Salt Lake City, UT Seattle -Tacoma -Bellevue, WA Western US Source: Federal Housing Finance Agency M Appendix Community Data Quality of Life - Treasure Valley remains highly affordable - Housing affordability is a draw for young families - Utilities expenses are higher in the Boise - Meridian -Nampa MSA PEGASUS Cost of Living Indexes 140 120 100 80 60 40 200 Composite Housing Transportation Utilities Health Care ■ Boise -Meridian -Nampa, MSA Salt Lake City MSA, UT ■ Seattle, WA ■ Everett, WA ■ Port lant-Va ncouve r -Beaverton, OR 19 Health Misc Goods Composite Housing Utilities Transportation Care Groceries & Services Boise, ID 95.3 84 96.9 98.4 102.9 97.1 102.0 Salt Lake City, UT 93.6 89.2 81.4 98.0 94.5 96.1 98.8 Seattle, WA 115.9 135.8 89.6 109.0 118.3 111.2 110.8 Everett, WA 109.4 125.4 88.0 111.5 128.8 104.3 100.9 Portland, OR 115.2 134.4 103.2 120.5 117.2 102.3 105.3 Source: ACCRA Cost of Living Index, 2012, BVEP 19 Appendix Community Data Quality of Life - Meridian's school district is very competitive and high -performing - Many specialized programs, 2+2 programs, and Dual enrollment options to usher students into higher learning PEGASUS Standardized Testing Performance by School District 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% _ o% � Meridian Nampa Caldwell Boise ■1 01.5 2 02.5 03 03.5 04 T Meridian Nampa Caldwell Boise Meridian Nampa Caldwell Boise Average Star Weighted Weighted Weighted Weighted 3.3 3.2 2.8 3.6 Percent Avg Percent Avg Percent Avg Percent Avg Rating 4 9 0.36 S 0.2 S 0.2 9 0.36 Average Points 63.5 63.3 57.3 69.4 3.5 7 0.245 7 0.245 4 0.14 7 0.245 (from 100) 3 s3 1.S9 so 1.S 43 1.29 S4 1.62 Source: Star Rating Statewide Summary, Idaho Department of 2.5 Education 9 0.225 9 0.225 8 0.2 7 0.175 2 16 0.32 20 0.4 30 0.6 19 0.38 1.5 2 0.03 S 0.075 4 0.06 2 0.03 1 3 0.03 4 0.04 6 0.06 3 0.03 GPA (Weighted Average) 2.8 2.685 2.55 2.84 Source: Idaho Performance Data, Idaho Department of Education Note: Eagle and Stars hare school district with Meridian T Appendix Community Data Workforce Summary EDUCATIONAL ATTAINMENT • Meridian is very competitive within the Valley for educational attainment • 33.3% of the population has attained a Bachelor's degree or higher INCOME & WAGES • Meridian households and workers earn high wages • Wa es for workers go even further when considering lower cost of living and housing affordability PEGASUS EDUCATION & WORKFORCE DEVELOPMENT • Local strengths: • Health Sciences • K-121 Ag + Voc Tech • Regional Strength • High Tech (BSU) • Materials Science (BSU) • Ag+Voc Tech 21 PEGASUS Appendix Community Data Educational Attainment Educational Attainment sooro ➢ Higher skilled High Skilled populations: solo ➢ Seattle 6oi0 Mid -Skilled ➢ Eagle 40% ➢ Beaverton 2oio ➢ Lower skilled Low Skilled oro populations: a\ao �Qa Caldwell d we I I a�y� o`ye ale S�a� �,� ale �p �P aaco Jh ➢ �¢O �a `a� ➢ Nampa ■ Less than 12thgrade, no diploma ■ High School graduate ➢ Eve rett ■ Some College or Associate's degree ■ Bachelor's degree or higher Population 25 years and over 45,501 46,567 26,154 138,550 12,768 3,203 118,718 447,569 67,740 60,261 986,172 204,336,017 Less than 12th grade, no diploma 6.0% 16.8% 21.5% 6.5% 4.4% 3.1% 14.2% 7.1% 14.0% 7.5% 11.4% 14.3% High School graduate 22.3% 30.4% 34.0% 21.3% 14.1% 22.3% 17.7% 11.9% 27.0% 16.8% 28.0% 28.2% Some College or Associate's degree 38.4% 35.5% 31.8% 34.8% 32.5% 49.5% 27.3% 24.6% 38.8% 31.7% 35.9% 29.0% Bachelor's degree or higher 33.3% 17.3% 12.6% 37.4% 49.0% 25.1% 40.8% 56.5% 20.2% 46.4% 24.7% 28.5% Sources: 2008-2012 American Community Survey 5 -Year Estimates /4a Appendix Community Data Higher Education ➢ Local ➢ Idaho State University — Health Science Center ➢ Regional ➢ College of Western Idaho ➢ Boise State University ➢ University of Idaho �RSITj, J® J w� Z O's ..o \889/ IdahoRtt TY 23 Appendix Community Data Higher Education Institutional Strength ➢ Tech ➢ Entrepreneurship ➢ Materials Science ➢ Ag (Statewide) ➢ Animal Sciences (Caine Center) ➢ Water Center ➢ Academic study & Research ➢ Engineering, Life Sciences, Multidisciplinary PEGASUS ➢ Voc/Tech CCW➢ Professional degrees and College of Westem Idoho certificates ➢ Pharmacy ➢ Anatomy & Physiology ➢ Nutrition & Dietary Science Appendix Community Data Meridian Independent School District#" ➢ ADA Professional Technical Center (Formerly RENAISSANCE HS) ➢ Health Science Magnet ➢ Pre -Engineering Magnet Renaissance HS students can graduate with an Associate of Arts in General Studies ➢ Professional Technical Center ON PINE AVE ➢ Agriculture, Welding & Fabrication, and Natural Resource Magnet .r RIFlIR Strongest FFA Program in the state! PEGASUS ➢ DENNIS TECHNICAL CENTER ➢ Electronics ➢ Renewable Energy ➢ Precision Machining ➢ Sm Business Ownership 25 Appendix Community Data Regional Specialized Programs ➢ College of Western Idaho — Micron Professional Technical Center ➢ College of Western Idaho — AgCo Regional Training Center ➢ ISU Center — Skaggs Pharmacy Complex ➢ Boise Venture College ➢ University of Idaho—Food Technology Center ➢ University of Idaho—Caine Veterinary Teaching Center PEGASUS 26 Appendix Community Data Regional Specialized Programs PEGASUS Degrees & Certificates Offered (Sample) HORTICULTURE MACHINE TOOL TECHNOLOGY WELDING & METALS FAB. HEAVY EQUIPMENT WELDING HEAVY EQUIPMENT TECHNICIAN WEB DEVELOPMENT NETWORK ADMINISTRATION INFORMATION SECURITY ELECTRONICS TECHNOLOGY Ewa MEN IR. M�00� 27 Appendix Community Data Regional Specialized Programs PEGASUS CWI Enrollment & Degrees Awarded 2000 1,221 ,718 1,564 0 722 835 775 FY2009 FY2010 FY2011 FY2012 FY2013 —Degrees/Certificates Awarded (Profecssional Technical) —Degrees/Certificates Awarded (Academic) —Annual Unduplicated Enrollment Headcount (Professional Technical) —Annual Unduplicated Enrollment Headcount (Academic) Source: College of Western Idaho Performance Measurement Report Appendix Community Data Industry Workforce Collaboration Area higher education stakeholders stated... • Programs are created based on State Department of Labor Statistics • They are then designed and approved by the Department of Education There is no formal/institutionalized connection between local employers and education + training programs PEGASUS Appendix Community Data Workforce Demographics ME D I AN A G E Caldwell 29 Star 29 Nampa 30 Salt Lake City 31 Meridian 33 Everett 34 Beaverton 35 Boise 36 Seattle 37 Eagle 41 Idaho 35 us 37 Site Selector Target 32 PEGASUS Sources: 200&2012 American Community Survey 5 -Year Estimates 30 Percent "Young and Restless" Meridian 30.7% Nampa 28.3% Caldwell 28.3% Boise 28.8% Eagle 21.5% Star 33.2% Salt Lake City 33.7% Seattle 37.1% Everett 30.6% Beaverton 32.3% Idaho 25.6% us 26.7% 0,1111 5% 10% 15% 20% 25% 30% 35% 40% Sources: 200&2012 American Community Survey 5 -Year Estimates 30 Everett, Bea Meridian Nampa Caldwell Boise Eagle Star Salt Lake City Seattle WA mmm i Total Population 75,210 81,667 46,229 208,332 19,952 5,745 186,740 612,916 103,135 89,803 1,567,803 309,138,711 _ Median Age 33 30 29 36 41 29 31 36 34 35 35 37 25to 34years 10,942 12,189 7,761 32,192 1,374 915 37,634 129,312 17,692 15,842 208,468 41,184,290 Pr 35to44years 12,166 10,913 5,311 27,800 2,906 992 25,328 98,116 13,922 13,742 192,581 41,227,505 Young and Restless 23,108 23,102 13,072 59,992 4,280 1,907 62,962 227,428 31,615 29,584 401,049 82,411,795 Young and Restless 30.7% 28.3% 28.3% 28.8% 21.5% 33.2% 33.7% 37.1% 30.6% 32.3% 25.6% 26.7% Household Size 2.88 2.95 2.93 2.38 2.78 3.31 2.44 2.06 2.39 2.47 2.66 2.61 Households with individuals under 18years 12,213 12,082 6,846 25,231 2,883 927 20,712 56,106 12,529 11,279 206,713 38,324,455 Households with individuals under 18years 47.00% 44.60% 44.50% 29.30% 40.10% 53.60% 27.70% 19.70% 30.5% 31.0% 35.80% 33.30% Households with individuals 65 years and over 4,517 5,538 3,340 17,236 1,788 247 14,123 50,921 7,666 6,603 137,796 28,676,599 Households with individuals 65 years and over 17.40% 20.50% 21.70% 20.00% 24.90% 14.30% 18.90% 17.80% 18.5% 18.2% 23.90% 24.90% Sources: 200&2012 American Community Survey 5 -Year Estimates 30 Appendix Community Data Quality of Life Idaho Utah Washington Yes Yes No Boise, ID 95.3 Salt, Lake, City, UT 96.3 Seattle, WA 115.9 Source: ACCRA Cost of Living Index, 2012, BVEP PEGASUS Economic Data, 2012 90,000 15.00% 75,000 60,000 10.00% 45,000 30,000 5.00% 15,0000 I I W111 0.00% Lac .Lk �e co J5 0 .sad yeah \aa yah' -Median HH Income sessions Median Wages for Workers -Unemployment Rate Salt Lake Meridian Nampa Caldwell Boise Eagle Star City Seattle Idaho US Median Household Income 64,107 40,835 39,302 49,182 80,324 63,790 44,510 63,470 47,015 53,046 Median Wages for Workers 32,811 22,082 20,062 26,446 40,360 31,589 25,727 38,298 24,612 30,376 Civilian Labor Force 37,473 37,506 21,586 116,685 9,033 2,531 105,534 382,506 763,991 156,533,205 Unemployment Rate 8.70% 12.00% 13.80% 8.70% 6.40% 7.30% 8.10% 6.70% 8.50% 9.30% Sources: 2008-2012 American Community Survey 5 -Year Estimates 31 PEGASUS Appendix Community Data Higher Ed and Workforce Development CONSTRAINTS •WORKFORCE DEVELOPMENT CHALLENGES/ OPPORTUNITIES • State has a program for industry/sector grants • Struggle to recruit engineers but Quality of life keeps them here • Difficulty of recruiting agronomists here relative to other US centers for Ag research • Challenge to recruit Ag -Bio scientific talent, need for in-house training to meet demand • Importance of College of Western Idaho • Perception of private sector having to take on brunt of developing talent, not the universities • "Good schools are out there, like Minnesota and Cornell ... and in Europe" • A lot of foreign nationals working at the IT companies, buying homes here. • Youth issues -- difficulty of getting young people into farming. However, FFA program at Meridian HS is the largest in the State. •RESEARCH FUNDING TO DRIVE TECHNOLOGY COMMECIALIZATION • Commercialization pipeline is driven by the research funding; combined level in Idaho for the 3 universities is low: $140 million • Ag research at the university has not led to startups -- it mostly is licensed to industry via the University Research Office (Tech Transfer): for potatoes, wheat, bean varieties 32 Appendix Community Data GDP per Capita Resilience - The Boise MSA witnessed greater volatility than competitive MSAs - Bigger boomers, bigger busts - but volatility has diminished in recent years PEGASUS Percent Change Real GDP Per Capita Growth 12 10 8 6 4 2 o- ------ --- - ----- -- - '4 -2 A, 4tcP yo° tio° tio° ti°° ticf' v°° ti yo yo -6 -United States Metropolitan Portion - Boise City, I DMSA) Portl a nd-Va ncouver-H iI Isboro, CQ -WA (MSA) -Salt I-ake City, UT (MSA) -Seattle-Tacoma-Bellevue, WA (MSA) Area 2001-2002 2002-2003 2003-2004 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-20112011-2012 Boise City, ID (MSA) -0.8 0.26 9.28 7.91 -3.89 0.86 -3.34 -3.99 2.16 -1.12 0.48 Eugene, OR (MSA) 4.71 1.3 4.89 0.84 3.81 1.8 0.63 -11.24 2.22 1.8 0.97 Portland -Vancouver - Hillsboro, OR-WA(MSA) 1.05 1.53 8.98 2.57 10.23 3.12 4.72 -3.12 5.95 3.52 3.73 Provo -Orem, UT (MSA) 0.1 2.84 1.85 2.82 3.92 2.41 -2.7 -4.37 -0.83 1.7 2.52 Salt Lake City, UT (MSA) -0,57 -1.37 1.08 4.26 4.14 3.52 0.61 -2.45 -0.21 1.74 2.54 Seattle -Tacoma -Bellevue, WA (MSA) -0.74 0.69 1.01 3.24 3.44 4.93 -0.43 -4.97 2.09 1.86 3.04 United States Metropolitan Portion 0.66 1.13 2.37 1.91 1.77 0.82 -1.72 -4.3 1.44 0.83 1.59 Sources: Bureau of Economic Analysis, GDP by Metropolitan Area; Pegasus Planning and Development 33 Appendix Community Data Total Employment ➢ Note: smaller economies tend to experience stronger fluctuations in %-change of employment than larger economies with larger populations ➢ Overall, employment growth has recovered Boise's current job growth is stronger than US PEGASUS Total Employment Growth 8.00% 6.00% 4.00% 2.00% 0.00% X_.goo 2002 03 -2.00% 2003-2004 2004-2005 20052006 2006-2007 07- 2006-2009 20 10 2010.2011 2011-2012 -4.00% -6.00% -8.00% -10.00% Boise -Meridian -Nampa MSA -Salt Lake City MSA -Seattle-Tacoma-Bellevue MSA -US Boise -Meridian -Nampa MAIII 199,301 199,101 206,295 217,949 232,205 237,113 230,304 211,303 209,574 212,421 217,996 Salt Lake City Io 464,889 458,088 465,775 486,729 512,857 535,872 536,692 504,121 501,501 513,137 533,363 Seattle -Tacoma -Bellevue Io 1,308,808 1,297,310 1,313,319 1,353,945 1,407,033 1,457,203 1,466,900 1,383,440 1,363,645 1,395,159 1,435,386 107,065,55 107,577, 281 3 108,490,066 110,611,016 112,718,858 114,012,221 113,188,643 106,947,104 106,201,232 108,184,795 110, 645,869 % Change of Employment Boise -Meridian -Nampa ME -0.10% 3.61% 5.65% 6.54% 2.11% -2.87% -8.25% -0.82% 1.36% 2.62% Salt Lake City ME -1.46% 1.68% 4.50% 5.37% 4.49% 0.15% -6.07% -0.52% 2.32% 3.94% ttle-Tacoma-Bellev -0.88% 1.23% 3.09% 3.92% 3.57% 0.67% -5.69% -1.43% 2.31% 2.88% -0.48% 1.33% 1.95% 1.91% 1.15% -0.72% -5.51% -0.70% 1.87% 2.27% Source: BLS, Annual Average, Quarterly Census of Employment and Wages a] PEGASUS Appendix Community Data 1,000 Industry Analysis Utilities EmploymentBusiness - 6,500 - 1,500 St Lukes Health Systems 6,000 Health Services Micron Technology 5,000 - 5,500 Manufacturing Meridian Joint School District #2 4,000 - 4,500 Local Government, Education St Alphonsus Regional Medical Center 4,000 - 4,500 Health Care Boise Independent School District 3,500-4,000 Local Government, Education Albertsons (SuperValu) 2,500 - 3,000 Retail Trade Wal-Mart 2,000 - 2,500 Retail Trade Hewlett-Packard Co 2,000-2,500 Manufacturing Nampa School District #131 1,500 - 2,000 Local Government, Education JR Simplot Co 1,500 -2,000 Manufacturing State of Idaho Department of Health and Welfare 1,000 - 1,500 State Government Idaho Power Co 1,000 - 1,500 Utilities DirecTV 1,000 - 1,500 Administrative & Waste Services Wells Fargo Bank NA 1,000 - 1,500 Financial Activities WDS Global 1,000 - 1,500 Administrative & Waste Services Fred Meyer Stores 1,000 - 1,500 Retail Trade Darmody Enterprises LTD - McDonalds 1,000 - 1,500 Food Services Source: Boise Valley Economic Partnership, 2013 Appendix Community Data Regional Cluster Employment ➢ There is a blend of white and blue collar employment in the region ➢ Largest employers in business, IT, and Financial Services (most in Ada County communities) ➢ Ag + Food processing still very strong in the area (Canyon County) PEGASUS Cluster Employment for Boise -Meridian - Nampa Economic Area, 2010 0 2000 4000 6000 8000 10000 12000 14000 Business Services - Information Technology - Financial Services Agricultural Products - Processed Food - Distribution Services - Heavy Construction Services Education and Knowledge Creation - Hospitality and Tourism - Transportation and Logistics - Source: zoto LEHD Origin Destination Employment Statistics 36 Appendix Community Data Regional Sub -Cluster Employment ➢ Within the major employer industry categories, sub -cluster strengths in: ➢ Ag products ➢ Farm Management ➢ Electronic components ➢ Professional services Agricultural Products Cluster Agricultural Products 3110 Farm Management... 1657 Irrigation Systems ■ 295 Wine & Brandy 1 130 0 1000 2000 3000 4000 Business Services Cluster Professional Organizations...- 5243 Engineering Services 1998 Computer Services 1900 Computer Programming 1472 Management Consulting M 895 Facilities Support Services ■ 445 Marketing Related Services 1 194 0 100020003000400050006000 PEGASUS Analytical Instruments Cluster Electronic... - 99' Process Instruments M 140 Optical Instruments 1 60 Search and... 1 10 0 500 1000 Information Cluster Electronic Components... - 3925 Peripherals 3760 Communications Services = 877 Software 1 244 Fiber Optic Cable 10 0 2000 4000 Source: zoto LEHD Origin Destination Employment Statistics 37 PEGASUS Appendix Community Data Regional Location Quotients, 2010 0 1 z 3 4 5 Regional Location Agriculture, Forestry, Fishing and Hunting _ Quotients Utilities Construction ➢ Meridian's Strengths based Manufacturing on past trends and current Wholesale Trade employment � Retail Trade i Transportation and Warehousing Information Finance and Insurance Administration & Support, Waste... Educational Services Health Care and Social Assistance Accommodation and Food Services r ■ Boise ■ Caldwell ■ Nampa ■ Meridian Source: Bureau of Labor Statistics 2012, Pegasus Planning and Development 38 I Appendix Community Data PEGASUS Regional Location Quotients, 2010 0 1 z 3 4 5 6 Reglonpl LOCgtlonAgriculture, Forestry, Fishing and Hunting 6. Quotients ➢ Regional strength in construction, trade, finance, and education ➢ Economic strengths characteristic of regions with high population growth Utilities Construction = Manufacturing Wholesale Trade Retail Trade i Transportation and Warehousing Information Finance and Insurance Administration & Support, Waste... Educational Services Health Care and Social Assistance Accommodation and Food Services r ■ Boise ■ Caldwell Nampa ■ Meridian Source: Bureau of Labor Statistics zoiz, Pegasus Planning and Development 39 Appendix Meridian Business and Economic Development Survey Where is your business located? How long has your business been located in Meridian? Response Response 31.3% Answer Options Percent Count Answer Options Meridian 75.4% 89 0-5 years Outside of Meridian 8.5% 10 6-10 years We have locations in Meridian and elsewhere 16.1% 19 11-15 years answered question 118 15+ years skipped question 1 Where is your business located? ■ Meridian ■ Outside of Meridian PEGASUS Response Response Percent Count 31.3% 36 24.3% 28 15.7% 18 28.7% 33 answered question 115 skipped question 4 How long has your business been located in Meridian? ■ 0-5 years ■ 6-10 years ❑ 11-15 years ❑ 15+ years Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 40 Appendix Meridian Business and Economic Development Survey Which best describes the industry focus of your company? PEGASUS Which best describes the industry focus of your ■Rea company? l Estate ■ Education ❑ Health Care ❑ Arts/Entertainment ■ Construction ■ Manufacturing ■Agriculture, Forestry or Fishing ❑ Finance/Insurance ■ Legal ■Accounting ❑ Engineering ■ Professional Services Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 41 Respons Answer Options e Respons a Count P Percent Real Estate 4.2% 5 Education 5.9% 7 Health Care 6.7% 8 Arts/Entertainment 1.7% 2 Construction 4.2% 5 Manufacturing 5.0% 6 Agriculture, Forestry or Fishing 0.8% 1 Finance/Insurance 21.0% 25 Legal 0.8% 1 Accounting 1.7% 2 Engineering 0.8% 1 Professional Services 11.8% 14 Utilities 0.0% 0 Retail Trade 5.0% 6 Food Service 5.9% 7 Other (please specify) 24.4% 29 answered question 119 skipped question 0 PEGASUS Which best describes the industry focus of your ■Rea company? l Estate ■ Education ❑ Health Care ❑ Arts/Entertainment ■ Construction ■ Manufacturing ■Agriculture, Forestry or Fishing ❑ Finance/Insurance ■ Legal ■Accounting ❑ Engineering ■ Professional Services Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 41 Appendix Meridian Business and Economic Development Survey What is the approximate number of people employed by your business in Meridian ONLY? Answer Options Response Response Percent Count Less than 10 50.0% 57 10-24 22.8% 26 25-49 10.5% 12 50-99 10.5% 12 100-499 4.4% 5 500-999 1.8% 2 1000 or more 0.0% 0 114 answered question 117 5 skipped question 2 What is the approximate number of people employed by your business in Meridian ONLY? ❑ Less than 10 ■ 10-24 ❑ 25-49 ❑ 50-99 ■ 100- 499 ❑ 500- 999 ■ 1000 or more PEGASUS What is the approximate TOTAL number of people employed by your business (Meridian and elsewhere)? Answer Options Response Response Percent Count Less than 10 37.6% 44 10-24 17.9% 21 25-49 8.5% 10 50-99 12.0% 14 100-499 12.8% 15 500-999 3.4% 4 1000 or more 7.7% 9 114 answered question 117 5 skipped question 2 What is the approximate TOTAL number of people employed by your business (Meridian and ❑ Less than 10 ■ 10-24 ❑ 25-49 ❑ 50-99 ■ 100- 499 ❑ 500- 999 ■ 1000 or more Source: Pegasus Planningand Development Business and Economic Development Survey, 2014 Appendix Meridian Business and Economic Development Survey What was the primary reason your business was founded or located in Meridian? Answer Options Response Response Percent Count Proximity to customers/suppliers Quality of life Low business costs Transportation access Availability of skilled workers Infrastructure 46.9% 38 33.3% 27 8.6% 7 7.4% 6 0.0% 0 3.7% 3 answered question 81 skipped question 38 What was the primary reason your business was founded or located in Meridian? ■ Proximity to customers/suppliers ■ Quality of life ❑ Low business costs ❑Transportation access ■Availability of skilled workers ■ Infrastructure PEGASUS Over the next 2 years, do you expect the number of employees in your business to increase, decrease, or stay the same? Over the next 2 years, do you expect the number of employees in your business to increase, decrease, or stay the same? ❑ Increase ■ Decrease ❑ Stay the same Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 43 Response Response Answer Options Percent Count Increase 69.2% 54 Decrease 1.3% 1 Stay the same 29.5% 23 answered question 78 skipped question 41 Over the next 2 years, do you expect the number of employees in your business to increase, decrease, or stay the same? ❑ Increase ■ Decrease ❑ Stay the same Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 43 PEGASUS Appendix Meridian Business and Economic Development Survey Please rate your level of satisfaction level with each factor Answer Options Very dissatisfied Dissatisfied Neutral Satisfied VerySatisfied N/A Rating Average Response Count Effective entrepreneurship support services 4 10 34 23 7 5 3.24 83 Ability to find adequately trained workers locally 4 14 19 38 4 4 3.30 83 Ability to attracttalent to the area 2 13 27 24 14 4 3.44 84 Regional Transportation Infrastructure 9 19 28 21 3 3 2.88 83 Level of Taxation 5 12 23 36 4 3 3.28 83 Cost of Doing Business 2 4 27 43 7 0 3.59 83 Business expansion services 2 9 31 27 5 7 3.32 81 Effectiveness of local incentives 4 13 30 22 5 8 3.15 82 Quality of four-year colleges and academic institutions in the area 0 7 12 40 15 9 3.85 83 Quality of community/technical school 0 4 17 34 18 11 3.90 84 Quality of K-12 school district (Meridian School Districtfi2) 1 11 17 25 22 8 3.74 84 Cost of Living 1 6 19 43 13 1 3.74 83 Opportunities for business -university partnerships 0 10 26 27 11 9 3.53 83 Overall assessment of Meridian as a place foryour business to succeed 1 2 15 43 23 0 4.01 84 answeredquestion 85 skippedquestion 34 Please rate your level of satisfaction level with each factor: Opportunities for business -university partnerships Quality of community/technical school Business expansion services Regional Transportation Infrastructure Effective entrepreneurship support services 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 44 Appendix Meridian Business and Economic Development Survey What should be the top focus areas for economic development in Meridian? Answer Options Response Response Percent Count Improving K-12 education systems 18.3% 15 Lifestyle amenities (food, entertainment, N O recreation) 23.2% 19 Retail amenities 9.8% 8 Keeping and expanding existing local businesses 54.9% 45 Attracting new businesses 32.9% 27 Small business and entrepreneurship C O ON y N development 45.1% 37 Highways expansion 22.0% 18 Commuter rail access 14.6% 12 Strengthening the Downtown 47.6% 39 Improving or expanding community 13.4% 11 colleges/universities c oo Other (please specify) o 16 1.0.0% 0.0% PEGASUS What should be the top focus areas for economic development in Meridian? C N N C N O N H O L Y ♦+ Y N N E O C O ON y N y L C E o v c p v c oo o = u E a answered question 82 skipped question 37 Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 45 Appendix Meridian Business and Economic Development Survey What are the City of Meridian's biggest challenges for economic development? (Please select your top 3) Answer Options Availability of diverse housing options Air service Availability of 'shovel ready' industrial or commercial sites Availability of 'ready to lease' commercial or industrial buildings' Development regulations and processes (eg'red tape') Access to educational institutions (community/technical schools and universities) Public education system (K-12) Keep young talent in the City Attracting new talent Availability and access to of recreational or tourism amenities Diversifyingthe economy Improving Downtown Meridian Collaboration and cooperation across public and private sector Outside perceptions of Meridian Limited tools for economic development at the local level Additional comments Response Response Percent Count 12.0% 10 10.8% 9 7.2% 6 8.4% 7 28.9% 24 4.8% 25.3% 32.5% 24.1% 13.3% 30.1% 45.8% 24.1% 14.5% 24.1% 4 21 27 20 11 25 38 20 12 20 9 answered question 83 skipped question 36 PEGASUS Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 46 What are the City of Meridian's biggest challenges for economic development? (Please select your top 3) 50.0% 45.0% 40.0% 35.0% 30.0% 25.0% 20.0% 15.0% 10.0% 5.0% 0.0% o o = ac E m E m c c O O 3 >O N U 41 YT+ N N O c by 0 C m O E Y i U O O > a 0 _ O '6 v Y Y a •L Y •6 > a J a> Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 46 Appendix Meridian Business and Economic Development Survey In the next 2 years, by how much do you plan to increase investment in your business (via employment, capital improvements, or other)? Answer Options Response Response Percent Count I do not plan to increase investment. 0-5% 6-10% 11-20% 21% or more Comments (optional) PEGASUS What is the approximate skill breakdown for workers in your business.) Answer Options 5.2% 4 29.9% 23 % Management/Professional 26.0% 20 % Technical/Research 19.5% 15 %Sales/Marketing 19.5% 15 %Administrative 5 % Agricultural production (if relevant) answered question skipped question In the next 2 years, by how much do you plan to increase investment in your business (via employment, capital improvements, or other)? ■ I do not plan to increase investment. ■0-5% 06-10% C311-20% 021% or more Response Response Response Average Total Count 36.06 2,777 77 33.92 1,289 38 32.53 1,952 60 25.72 1,492 58 1.18 20 17 77 answered question 79 42 skipped question 40 What is the approximate skill breakdown for 40.00 workers in your business? 35.00 30.00 25.00 20.00 15.00 10.00 5.00 .00 a�a�ac�Q`oKa4 °I°�e�c a`\�es +�a`¢z\�a`� dQPa�`c`5�� ♦ aJ� c\Y`¢\¢ c � 0\9 J J� Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 47 PEGASUS Appendix Meridian Business and Economic Development Survey How would you evaluate the following workforce factors within the Treasure Valley region? Answer Options Very dissatisfied Dissatisfied Neutral Satisfied Very Satisfied Rating Average Response Count Education/Training 0 12 26 36 2 3.37 76 Experience 1 13 21 38 3 3.38 76 Workethic 5 10 25 30 6 3.29 76 Skills related to the job 1 12 26 33 3 3.33 75 answeredquestion 76 skippedquestion 43 How would you evaluate the following workforce factors within the Treasure Valley region? Skills related to the job Work ethic Experience Education/Training 3.24 3.26 3.28 3.30 3.32 3.34 3.36 3.38 3.40 Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 48 Appendix PEGASUS Meridian Business and Economic Development Survey Has your business ever utilized any existing workforce training institutions in the area? Answer Options ResponsePercent Response Count Yes 24.1% 19 No 75.9% 60 If yes, which institution(s)/programs? 14 answered question 79 skipped question 40 Has your business ever utilized any existing workforce training institutions in the area? ❑ Yes ■ No Source: Pegasus Planning and Development Business and Economic Development Survey, 2014 49 Appendix Target Industry Analysis Regional Target Industries 1111111110 State of Idaho Treasure Valley 1. Aerospace 1. Food Processing 2. Advanced and Agribusiness Manufacturing 2. Technology 3. High Tech 3. Manufacturing 4. Health Care 4. Back Office + 5. Energy Shared Services 6. Recreation 5. Recreation Technology Technology Meridian 1. Health Care, Services 2. Manufacturing 3. Professional Services, Headquarters 4. Ag/Bio-Tech PEGASUS Source: BVEP, Idaho Departmentof Labor, Pegasus Planning and Development 411 Appendix PEGASUS Target Industry Analysis Agricultural Clusters and Component Industries Food Services Agricultural Services Agricultural Machinery Agricultural Research and Instruments Primary Agriculture Cluster Example: 51 1111 Oilseed and grain farming 111 1111 1112 Vegetable and melon farming 111 1112 1113 Fruit and tree nut farming 111 1113 1114 Greenhouse and nursery production 111 1114 1119 Other crop farming 111 1119 1121 Cattle ranching and farming 112 1121 1122 Hog and pig farming 112 1122 1123 Poultry and egg production 112 1123 1124 Sheep and goat farming 112 1124 1125 Aquaculture 112 1125 d 1129 Other animal production 112 1129 M1131 Timber tract operations 113 1131 o: 1132 Forest nursery and gathering forest products 113 1132 1133 Logging 113 1133 1141 Fishing 114 1141 1142 Hunting and trapping 114 1142 1151 Support activities for crop production 115 1151 1152 Support activities for animal production 115 1152 1153 Support activities for forestry 115 1153 51 Appendix Target Industry Analysis Agricultural Clusters and Component Industries -Cont. Sources: "Unlocking Rural Competitiveness: The Role of Regional Clusters," 2007; "Defining Clusters of Related Industries," 2013; Pegasus Planning and Development culture Cluster PEGASUS Research and Instruments 333314 Optical instrument and lens manufacturing 333 3333 Navigational, measuring, electromedical, and control 3345 instruments manufacturing 334 3345 4 Automatic environmental control manufacturing for S334512 residential, commercial, and appliance use 334 3345 b 0 334516 Analytical laboratory instrument manufacturing 334 3345 518 Data processing, hosting and related services 518 518 u5417 Scientific research and development services 541 5417 54133 Engineering services 541 5413 h a 54136 Geophysical surveying and mapping services 541 5413 54138 Testing laboratories 541 5413 5415 Computer systems design and related service 541 5415 54162 Environmental consulting services 541 5416 d 54169 Other scientific and technical consulting services 541 5416 Research and development in the physical, engineering, 52 PEGASUS Appendix Target Industry Analysis All Agricultural Industries Data processing, hosting and Soil preparation, planting, and Frozen fruit, juice, and vegetable related services Support activities for forestry cultivating manufacturing Other snack food manufacturing Pesticide, fertilizer, and other agricultural chemical Oilseed and grain farming manufacturing Crop harvesting, primarilyby machine Frozen specialty food manufacturing Coffee and tea manufacturing Navigational, measuring, electromedical, and control Postharvest crop activities (except Flavoring syrup and concentrate Vegetable and melon farming instruments manufacturing cotton ginning) Fruit and vegetable canning manufacturing Farm product raw material Dried and dehydrated food Mayonnaise, dressing, and other Fruit and tree nut farming merchant wholesalers Farm labor contractors and crew leaders manufacturing prepared sauce manufacturing Greenhouse and nursery Computer systems design and production related service Farm management services Fluid milk manufacturing Spice and extract manufacturing Scientific research and Perishable prepared food Other crop farming development services Dog and cat food manufacturing Creamery butter manufacturing manufacturing Water supply and irrigation All other miscellaneous food Cattle ranching and farming systems Other Animal Food Manufacturing Cheese manufacturing manufacturing Dry, condensed, and evaporated dairy Hog and pig farming Metal valve manufacturing Flour milling product manufacturing Ice manufacturing Agricultural implement Ice cream and frozen dessert Poultry and egg production manufacturing Rice milling manufacturing Breweries Farm and garden machinery and Sheep and goat farming equipment merchant wholesalers Malt manufacturing Animal (except poultry) slaughtering Wineries Farm supplies merchant Aquaculture wholesalers Wet corn milling Meat processed from carcasses Glass container manufacturing Rendering and meatbyproduct Food product machinery Other animal production Engineering services Other oilseed processing processing manufacturing Geophysical surveying and Optical instrument and lens Timber tract operations mapping services Fats and oils refining and blending Commercial bakeries manufacturing Automatic environmental control Forest nursery and gathering Frozen cakes, pies, and other pastries manufacturing for residential, forest products Testing laboratories Breakfast cereal manufacturing manufacturing commercial, and appliance use Analytical laboratory instrument Logging Environmental consulting services Sugarcane mills Cookie and cracker manufacturing manufacturing Other scientific and technical Flour mixes and dough manufacturing Grain and field bean merchant Fishing consulting services Cane sugar refining from purchaed Flour wholesalers Research and development in the physical, engineering, and life Chocolate and confectionery Hunting and trapping sciences manufacturing from cacao beans Dry pasta manufacturing Livestock merchant wholesalers Support activities for crop Confectionery manufacturing from production Packaging and labeling services purchased chocolate Tortilla manufacturing Support activities for animal Nonchocolate confectionery Roasted nuts and peanutbutter production Cottonginning manufacturing manufacturing Sources: "Unlocking Rural Competitiveness: The Role of Regional Clusters," 2007; "Defining Clusters of Related Industries," 2013; Pegasus 53 Planning and Development Appendix a MORE URBAN RURAL - URBAN INDEX 4� h; (MORE RURAL Target Industry Analysis $$$ LESS JOBS & ECONOMIC OPPORTUNITY INDEX MORE $$ $ OPPORTUNITY OPPORTUNITYs s Sources: Point Consulting PEGASUS 54 K-12 EDQ -••--_- BENCH , HIGHER -ED O ® RESEARCH .___. VOC/TECH EDUCATION ------ STATE GOV. - NON_PROFRTRADE COMMERCIAL O If-_ _FEDERALGOV__ KITC_HEN/LAB _ IN CU BAT OF ----_--------___-__-_--._. AGRI-TOURISM •_-.-.-_-•------. O HIGHLY ORCHARDS, SPECIALIZED EXOTICS NUTS, VINEYARDS ------------------ FARM FR ! R& INNOVATIVE VEGETABLES FARM IMPLEMENTS MACHINERY I NPPUTSIRS--____-_--_. FOOE PROCESSING FIELD RESEARCH ------------- ----------------- DIAGN IC SERVICES O VET SERVICES SEED PRODUCTION & PRODUCTS r______________ ____ ROW CROPS ANIMALAG. ------------ — — $$$ LESS JOBS & ECONOMIC OPPORTUNITY INDEX MORE $$ $ OPPORTUNITY OPPORTUNITYs s Sources: Point Consulting PEGASUS 54 PEGASUS Appendix Target Industry Analysis Primary Market Trade Area Advanced Manufacturing Beverage and tobacco product manufacturing Wood product manufacturing Chemical manufacturing Fabricated metal product manufacturing Computer and electronic product manufacturing Miscellaneous manufacturing Utility system construction Power and Communication System Construction Other heavy construction All Other Heavy Construction Boiler, tank, and shipping container mfg. Metal Tank (Heavy Gauge) Manufacturing Engineering Services Management and technical consulting services Environmental Consulting Services Wood product manufacturing Computer and electronic product manufacturing =L Utility system construction Other heavy construction All Other Heavy Construction Architectural and engineering services Research and Development in Physical, Engineering and Life Sciences Engineering Services Management and technical consulting services Environmental Consulting Services Scientific research and development services Research and Development in Physical, Engineering and Life Sciences Sources: Bureau of Labor Statistics Quarterly Census of Employment and 55 Wages; BLS Employment Projections; Pegasus Planning and Development Appendix Target Industry Analysis First Round of Tareet Analvsis High Tech Semiconductor and Other Electronic Component ' Manufacturing Professional and Commercial Equipment and Supplies Wholesalers Data Processing and Related Services Other information services PEGASUS Professional and Commercial Equipment and Supplies Wholesalers Data Processing and Related Services Other information services Internet Publishing & Broadcasting & Web Search Portals Internet Publishing & Broadcasting & Web Search Portals Architectural, Engineering, and Related Services Management, Scientific, and Technical Consulting Management, Scientific, and Technical Consulting Services Services Scientific Research and Development Services Management of Companies and Enterprises Health Care Ambulatory Health Care Services Hospitals Nonscheduled air transportation Aerospace Nonscheduled Chartered Passenger Air Transportation Support activities for air transportation Ablechnical and trade schools JL Sources: Bureau of Labor Statistics Quarterly Census of Employment and Wages; BLS Employment Projections; Pegasus Planning and Development Scientific Research and Development Services Management of Companies and Enterprises Electronic and Precision Equipment Repair and Maintenance Ambulatory Health Care Services Hospitals Nonscheduled air transportation Nonscheduled Chartered Passenger Air Transportation Support activities for air transportation Technical and trade schools A 41 PEGASUS Appendix Target Industry Analysis First Round of Target Analysis Advanced Manufacturing Energy High Tech Beverage and tobacco product manufacturing Chemical manufacturing Fabricated metal product manufacturing Computer and electronic product manufacturing Environmental Consulting Services Other Scientific and Technical Consulting Services Research and Development in Biotechnology Research and Development in Physical, Engineering, and Life Sciences Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing Data Processing and Related Services Computer and electronic product manufacturing Engineering Services Geophysical Surveying and Mapping Services Testing Laboratories Environmental Consulting Services Other Scientific research and Technical Consulting services Research and Development in Biotechnology Research and Development in Physical, Engineering and Life Sciences Data Processing and Related Services Management, Scientific, and Technical Consulting Services Management, Scientific, and Technical Consulting Services Scientific Research and Development Services Scientific Research and Development Services Sources: Bureau of Labor Statistics Quarterly Census of Employment and Wages; BLS Employment Projections; Pegasus Planning and Development MERIDIAN ECONOMIC DEVELOPMENT AUDIT Appendix Agricu PEGASUS Itural Supercluster: StronrT Tr^sure Valley Industries Treasure Valley Indu 1112 Vegetable and melon farming 1113 Fruit and tree nut farming 1119 Other crop farming Agriculture and Forestry 1121 Cattle ranching and farming 1129 Other animal production 1153 Support activities for forestry 3111 Animal food manufacturing 3114 Fruit and vegetable preserving and specialty 3121 Beverage manufacturing Food Services 3113 Sugar and confectionery product manufacturing 3116 Animal slaughtering and processing 4245 Farm product raw material merch. whls. Agricultural Services 1151 Support activities for crop production 2213 Water, sewage and other systems 3253 Agricultural chemical manufacturing 3329 Other fabricated metal product manufacturing Agricultural Machinery 3332 Industrial machinery manufacturing 4238 Machinery and supply merchant wholesalers 4249 Misc. nondurable goods merchant wholesalers 518 Data processing, hosting and related services 5417 Scientific research and development services Agricultural Research and Instruments 5413 Architectural and engineering services 5416 Management and technical consulting services 5619 Other support services Sources: Bureau of Labor Statistics Quarterly Census of Employment and 58 Wages; BLS Employment Projections; Pegasus Planning and Development Appendix PEGASUS Target Industry Analysis Agricultural Supercluster: Strong Ada County Industries Ada County Industry 1119 Other crop farming Agriculture 1121 Cattle ranching and farming and Forestry 1153 Support activities for forestry 3114 Fruit and vegetable preserving and specialty 3113 Sugar and confectionery product manufacturing Food Services 3116 Animal slaughtering and processing 3272 Glass and glass product manufacturing 3329 Other fabricated metal product manufacturing Agricultural 3332 Industrial machinery manufacturing Machinery 4238 Machinery and supply merchant wholesalers 4249 Misc. nondurable goods merchant wholesalers 518 Data processing, hosting and related services Agricultural 5417 Scientific research and development services Research and 5413 Architectural and engineering services Instruments 5416 Management and technical consulting services 5619 Other support services Sources: Bureau of Labor Statistics Quarterly Census of Employment and 59 Wages; BLS Employment Projections; Pegasus Planning and Development PEGASUS Appendix Target Industry Analysis Target Industry Selections and Major Characteristics (Outpatient care centers 6214 754 31% $36,583 1.02 935 1811 Sources: U5 Bureau of Labor Statistics, Idaho Department of Labor, Pegasus Planning and Development Industries with Strongest Regional Indicators NAICS 2012 Average State Income Relative to Projected Jobs Projected Jobs Description MJ BVEP Target Code Employment Change, 2008-2012 Income State Average 2020, Total 2020, Net All Industries (Idaho) 503,774 -5% $35,882 1 Scientific research and development services Technology 5417 346 48% $81,951 2.28 473 127 Other hospitals 6223 1,353 43% $54,456 1.52 1,803 450 Management and technical consulting Back Office/Shared services Services 5416 1,799 24% $48,777 1.36 2,141 342 Medical and diagnostic laboratories Technology 6215 296 15% $48,738 1.36 330 34 Boiler, tank, and shipping container mfg. Manufacturing 3324 275 61% $41,390 1.15 402 127 Grocery and related Food Processing and product wholesalers Agribusiness 4244 1,683 10% $37,851 1.05 1,822 139 (Outpatient care centers 6214 754 31% $36,583 1.02 935 1811 Sources: U5 Bureau of Labor Statistics, Idaho Department of Labor, Pegasus Planning and Development PEGASUS Appendix Target Industry Analysis Occupations Estimates for Target Industries: Method • Identify major occupations associated with industry using Bureau of Labor Statistics data on industry composition • Assemble Idaho Department of Labor job growth projections for occupations, and allocate proportion of new growth to Meridian and Treasure Valley based on relative workforce size • Estimate occupational growth projections for occupations within target industries alone, using BLS data • Determine major benefits of each target industry for economic development and group occupations together Appendix Target Industry Analysis Core Occupations for Targeted Industries SCIENTIFIC RESEARCH AND DEVELOPMENT SERVICES Physical scientists Business operations specialists m Life, physical, and social science technicians a ,3 Computer occupations X O Life scientists Engineers PEGASUS 0 5 10 15 20 National Growth Projections(%), 2012-2022 Core Occupations for Scientific research and development services NAICS Code 541700 Top Occupations sm Percentage of National Growth Rate industry Projection Engineers 17-2000 13 18.2 Life scientists 19-1000 10.5 14.8 Computer occupations 15-1100 10.5 12.6 Life, physical, and social science technicians 19-4000 8.1 12.7 Business operations specialists 13-1000 7.9 15.5 Physical scientists 19-2000 6 12.4 Sources: US Bureau of Labor Statistics Occupation -Industry Bridge, Idaho Department of Labor Employment Projections, Pegasus Planning and Development 62 PEGASUS Appendix Target Industry Analysis Core Occupations for Targeted Industries GROCERY AND RELATED PRODUCT WHOLESALERS Management occupations Material recording, scheduling,... 0 a Sales representatives, wholesale and... X Material moving workers Motor vehicle operators 0 2 4 6 8 10 12 14 16 National Growth Projections(%), 2012-2022 Core Occupations for Grocery and related product wholesalers NAICS Code 4244 Top Occupations National Growth Rate Percentage of Industry Projection Motor vehicle operators 53-3000 22.5 13.7 Material moving workers 53-7000 18 5.4 Sales representatives, wholesale and manufacturing 41-4000 12.8 13.7 Material recording, scheduling, dispatching, and distributing workers 43-5000 8.7 6.7 Management occupations 11-0000 5 13.4 Sources: US Bureau of Labor Statistics Occupation -Industry Bridge, Idaho Department of Labor Employment Projections, Pegasus Planning and Development Appendix Target Industry Analysis ry Description Medical and diagnostic laboratories Code 6215 Top Occupations Jerks 43-4000 Management occupations 11-0000 7.6 30 5.1 36.9 PEGASUS ndustry Description Other hospitals VAICS Code 6223 Tor) Occupations Health diagnosing and :reating practitioners 29-1000 38 53.5 Healthcare support occupations 31-0000 15.2 52.7 Health technologists and technicians 29-2000 11.2 47.6 Core Occupations for Outpatient care centers NAICS Code 6214 Tor) Occupations Health diagnosing and treating practitioners Percentage Growt -ommunity and social service occupations of Industry Projecti Health technologists and 29-2000 13.4 :echnicians 29-2000 37.2 39.4 Healthcare support 43-4000 5.5 occupations 31-0000 15 37.2 nformation and record 43-6000 5.3 Jerks 43-4000 Management occupations 11-0000 7.6 30 5.1 36.9 PEGASUS ndustry Description Other hospitals VAICS Code 6223 Tor) Occupations Health diagnosing and :reating practitioners 29-1000 38 53.5 Healthcare support occupations 31-0000 15.2 52.7 Health technologists and technicians 29-2000 11.2 47.6 Core Occupations for Outpatient care centers NAICS Code 6214 Tor) Occupations Health diagnosing and treating practitioners 29-1000 23.9 -ommunity and social service occupations 21-0000 18.7 Health technologists and technicians 29-2000 13.4 Healthcare support occupations 31-0000 10.3 nformation and record clerks 43-4000 5.5 Management occupations 11-0000 5.3 Secretaries and administrative assistants 43-6000 5.3 Sources: US Bureau of Labor Statistics Occupation -Industry Bridge, Idaho Department of Labor Employment Projections, Pegasus 58.7 42 56.5 58.5 43.9 51 60.1 and Development PEGASUS Appendix Target Industry Analysis Occupational Projections Idaho, Estimated Idaho, Projected Percent Total Annual Openings for Openings for Occupa ' Employment 2010 Employment 2020 Growth Rate Change Openings Meridian Treasure Valley Architecture and engineering occupations 13,549 15,824 1.6 16.8 530 26 151 Assemblers and fabricators 5,831 6,833 1.6 17.2 210 10 60 Business and financial operations occupations 22,671 26,980 1.8 19.0 899 44 257 Business operations specialists 13,031 15,806 1.9 21.3 532 26 152 Community and social service occupations 11,318 14,015 2.2 23.8 519 25 148 Computer and mathematical occupations 13,792 16,794 2.0 21.8 568 28 162 Computer occupations 55 73 2.9 32.7 3 0 1 Engineers 8,380 9,985 1.8 19.2 362 18 103 Health diagnosing and treating practitioners 21,307 28,572 3.0 34.1 1,143 56 326 Health technologists and technicians 12,041 15,772 2.7 31.0 618 30 176 Healthcare support occupations 18,875 25,579 3.1 35.5 944 46 269 Information and record clerks 28,811 34,150 1.7 18.5 1,355 66 387 Life scientists 2,205 2,370 0.7 7.5 61 3 17 Life, physical, and social science occupations 9,987 10,801 0.8 8.2 406 20 116 Management occupations 40,840 45,425 1.1 11.2 1,318 65 376 Material moving workers 16,170 18,467 1.3 14.2 713 35 203 Material recording, scheduling, dispatching, and distributing workers 14,800 15,152 0.2 2.4 460 23 131 Metal workers and plastic workers 6,144 7,429 1.9 20.9 251 12 72 Motor vehicle operators 22,895 25,920 1.2 13.2 748 37 213 Other installation, maintenance, and repair occupations 12,218 14,244 1.5 16.6 470 23 134 Other office and administrative support workers 19,751 22,763 1.4 15.2 669 33 191 Other production occupations 10,710 11,647 0.8 8.7 327 16 93 Physical scientists 1,525 1,707 1.1 11.9 63 3 18 Sales representatives, wholesale and manufacturing 7,835 8,934 1.3 14.0 294 14 84 Secretaries and administrative assistants 12,176 13,459 1.0 10.5 291 14 83 TOTAL 346,917 408,701 13,754 675 3,92 Sources: Idaho Department of Labor, Pegasus Planning and Development PEGASUS Appendix Target Industry Analysis Target Industries, State Target Sector, and Growth Job Growth, 2015-2020 (Including Jobs from State Target Industries growth and replacement) Advanced High Rec Growth State Growth Openings for Openings for Manufacturing Agriculture Energy Health Tech Tech Occupation Rate 2015-2020 Treasure Valley Meridian X X Architecture and engineering occupations 1.6 2,650 756 130 X X Assemblers and fabricators 1.6 1,050 300 52 X X X Business and financial operations occupations 1.8 4,495 1,283 220 X X X X Business operations specialists 1.9 2,660 759 130 X Community and social service occupations 2.2 2,595 740 127 X X X Computer and mathematical occupations 2.0 2,840 810 139 X X X X Computer occupations 2.9 15 4 1 X X X X Engineers 1.8 1,810 516 89 X Health diagnosing and treating practitioners 3.0 5,715 1,631 280 X Health technologists and technicians 2.7 3,090 882 152 X Healthcare support occupations 3.1 4,720 1,347 232 X X X X Information and record clerks 1.7 6,775 1,933 332 X X X X Life scientists 0.7 305 87 15 X X X X Life, physical, and social science technicians 0.8 2,030 579 100 X X X X X Management occupations 1.1 6,590 1,880 323 X Material moving workers 1.3 3,565 1,017 175 Material recording, scheduling, dispatching, and X distributing workers 0.2 2,300 656 113 X X Metal workers and plastic workers 1.9 1,255 358 62 X Motor vehicle operators 1.2 3,740 1,067 183 Other installation, maintenance, and repair X X occupations 1.5 2,350 671 115 X X X Other office and administrative support workers 1.4 3,345 954 164 X X Other production occupations 0.8 1,635 467 80 X X X X Physical scientists 1.1 315 90 15 Sales representatives, wholesale and X manufacturing 1.3 1,470 419 72 0 X X X X Secretaries and administrative assistants 1.0 1,455 415 71 6 16 17 6 12 7 TOTAL 68.770 19.623 3.373 Appendix Target Industry Analysis PEGASUS Occupational Growth for Target Industries: Health Care Anchors Ten Year Growth in Top Occupations for Target Industries Major Job Creators Percentage of Industry New Starts for Meridian New Starts for Treasure Valle Medical and diagnostic laboratories Health technologists and technicians 37.2 10 60 Healthcare support occupations 15 4 24 Information and record clerks 7.6 3 15 Management occupations 5.1 1 8 Total 18 107 Outpatient care centers Health diagnosing and treating practitioners 23.9 23 134 Community and social service occupations 18.7 16 92 Health technologists and technicians 13.4 12 67 Healthcare support occupations 10.3 9 54 Information and record clerks 5.5 6 35 Management occupations 5.3 4 23 Secretaries and administrative assistants 5.3 2 11 Total 71 415 Other hospitals Health diagnosing and treating practitioners 38 16 91 Healthcare support occupations 15.2 6 35 Health technologists and technicians 11.2 4 23 Total 26 149 TOTAL 115 671 Sources: US Bureau of Labor Statistics Occupation -Industry Bridge, Idaho Department of Labor Employment Projections, Pegasus Planning and Development PEGASUS Appendix Target Industry Analysis Occupational Growth Projections for Target Industries: Agribusiness Anchors- Jobs + Sales Taxes Projected Ten Year Growth in Top Occupations for Target Industries Percentage of New Starts for New Starts for Sales Tax Generators Industry Meridian Treasure Valle Grocery and related product wholesalers Motor vehicle operators 22.5 16 92 Material moving workers 18 10 61 Sales representatives, wholesale and manufacturing 12.8 7 44 Material recording, scheduling, dispatching, and distributing workers 8.7 4 24 Management occupations 5 3 15 Total 40 235 Boiler, tank, and shipping container mfg. Metal workers and plastic workers 30.2 2 11 Other production occupations 12 1 5 Assemblers and fabricators 9.2 1 3 Other installation, maintenance, and repair occupations 6.9 0 3 Architecture and engineering occupations 5.2 1 3 Management occupations 5.1 1 4 ,Total 5 29 TOTAL 45 264 Sources: US Bureau of Labor Statistics Occupation -Industry Bridge, Idaho Department of Labor Employment Projections, Pegasus Planning and Development PEGASUS Appendix Target Industry Analysis Occupational Growth Projections for Target Industries: Innovation and "I"" Projected Ten Year Growth in Top Occupations for Target Industries Innovation and Entrepreneurship Percentage of Industry New Starts for Meridian New Starts for Treasure Valley Scientific research and development services Engineers 13 10 59 Life scientists 10.5 7 42 Computer occupations 10.5 0 0 Life, physical, and social science technicians 8.1 29 167 Business operations specialists 7.9 3 18 Physical scientists 6 4 24 Total 53 309 Management and technical consulting services Business and financial operations occupations 29 20 115 Computer and mathematical occupations 10.7 11 62 Management occupations 10.4 8 49 Information and record clerks 6 10 58 Life, physical, and social science technicians 5.6 13 75 Secretaries and administrative assistants 5.5 3 16 Other office and administrative support workers 5.2 6 32 Total 70 407 TOTAL 123 717 Sources: US Bureau of Labor Statistics Occupation -Industry Bridge, Idaho Department of Labor Employment Projections, Pegasus Planning and Development PEGASUS Appendix Target Industry Analysis Occupational Growth in Idaho Fastest Growing Idaho Occupations that Require an Associates Degree or Higher Percent Median Hourly Mean Hou = SOCCode Occupational Wages 2010 Employment 2020 Employment Net Change Annual Openings Change Wage Wage Education Level '29-2032 Diagnostic Medical Sonographers 235 368 133 17 57% 31.95 32.59 Associate's degree '29-1126 Respiratory Therapists 424 634 210 29 50% 25.55 25.9Associate's degree CardiovascularTechnologists and '29-2031 Technicians 206 308 102 13 50% 25.97 24.6 Associate's degree '31-2021 Physical Therapist Assistants 274 409 135 18 49% 21.43 21.42 Associate's degree '31-2011 Occupational Therapist Assistants 96 142 46 7 48% 27.04 27.83 Associate's degree Veterinary Technologists and '29-2056 Technicians 462 675 213 29 46% 12.57 12.69 Associate's degree '21-1091 Health Educators 280 396 116 18 41% 21.97 21.59 Bachelor's degree '29-1123 Physical Therapists 1029 1453 424 54 41% 34.27 35.06 Doctoral or professional degree Medical and Public Health Social '21-1022 Workers 489 690 201 32 41% 22.1 23.12 Master's degree M a rket Resea rch Ana lysts a nd '13-1161 M a rketing Specia l ists 1052 1479 427 71 41% 23.39 27.22 Bachelor's degree '29-1111* Registered Nurses 11527 16188 4661 675 40% 28.24 30.13 Associate's degree '13-1121 Meeting and Convention Planners 188 264 76 12 40% 16.89 17.37 Bachelor's degree '13-1081 Logisticians 320 449 129 19 40% 31 31.73 Bachelor's degree Radiologic Technologists and '29-2037 Technicians 1000 1399 399 56 40% 24.46 24.61 Associate's degree '17-2161 Nuclear Engineers 277 387 110 17 40% 50.69 56.71 Bachelor's degree '29-2053 Psychiatric Technicians 337 465 128 19 38% 13.85 14.66 Postsecondary non -degree '29-1122 Occupational Therapists 438 601 163 24 37% 32.24 30.12 Master's degree '49-9062 Medical Equipment Repairers 246 337 91 16 37% 21.94 22.27 Associate's degree '21-1014 Mental Health Counselors 601 816 215 35 36% 20.33 20.7 Master's degree '15-1141 Database Administrators 242 327 85 12 35% 31.8 33.53 Bachelor's degree '29-1124 Radiation Therapists 56 75 19 3 34% 35.18 36.57 Associate's degree '27-3091 Interpreters and Translators 223 298 75 14 34% 16.35 16.42 Bachelor's degree '29-2055 Surgical Technologists 509 678 169 26 33% 18.46 19.3 Postsecondary non -degree Emergency Medical Technicians and '29-2041 Paramedics 851 1124 273 44 32% 14.67 17.94 Postsecondary non -degree 29-1131 Veterinarians 479 627 148 25 31% 33.87 37.82 Doctoral or professional degree Sources: Idaho Department of Labor Pegasus Planning and Development 70 Appendix PEGASUS Case Studies Center for Agricultural Science & Heritage -- Indianapolis •23 Acres •Opposite State Fairgrounds •Educational experiences: Past, Present & Future •Business & Education Complex •Services to diverse agricultural organizations, including HQs 71 Appendix Case Studies Center for Advanced Energy Studies (CAES) • Est: 2005-2006 • Building Size: 55,600 SF • Directly adjacent to INL in Idaho Falls • 3 Universities: • ISU, BSU, U of I The CAES organization mission states that it "delivers innovative, cost effective, credible energy research leading to sustainable technology-based economic development. " PEGASUS Owner: State of Idaho, Idaho State University Location: Idaho Falls, ID Building Type: Office and Laboratory Size: 55,600 SF Completion Data: August 2008 Utilities: Idaho Falls Power, Intermountain Gas Company Architect: G S B S A rch ite cts Mechanical Engineer: Colvin Engineering Electrical Engineer: Spectrum Engineers Design -Build Contractor: Big -D Construction Region: Mountain West ICC Zone: 5B �a Appendix Case Studies Center for Advanced Energy Studies (CAES) • Cost -Benefit of LEED Certification funded by a grant from US Dept of Energy • "This project was unique because it was the first endeavor on the part of an agency or university in Idaho to design and build a LEED building." ENERGY AND FINANCIAL RNRLYSIS Project Construction Budget: $15,000,000 Building Price / SF: $269 PEGASUS Photic credit: Christopher Meek & Kevin Van Den Wynnelenbeo_i r - Center for Advanced Energy studies Exterior Operating Expenses: Energy- Modeled annual energy cost savings -$59,000. As compared to baseline (ASH RAE 90.1) 7:3 PEGASUS Appendix Case Studies Center for Advanced Energy Studies (CAES) What is its mission? The center is committed to conducting research to address the country's and Idaho's energy challenges, with emphasis on nuclear. It also is charged with addressing the looming nuclear energy work -force shortage. What kind of research does CAES conduct? CAES' research is focused on nuclear science and engineering, advanced materials science, bioenergy, carbon management/geothermal energy, energy policy, modeling and simulation and energy efficiency. So how is the research conducted at CAES different than at INL or the universities? CAES' research is designed to complement the work being done at each for the partner institutions. For exampke, CAES might conduct bench -scale versions of research and development that INL could then take to full scale. All CAES research and development involves the collaboration of at least two of its partners. Appendix Case Studies Conner Park Prairie Interactive History Park Fishers Indiana (NE of Indianapolis) *Animal Encounters *Conner Homestead •1936 Prairie Village *Civil War Journey •1859 Balloon Voyage *Nature Walk *And More! PEGASUS 4 '" I c..., wr io,.v. ®krv. vus ®caw...anw�..a �' � t..uw •.1.n cr.p a CR.t. Ca.wn ® V40" ►OWP Q. M 1M . , IWr r•9 NM r...�. ~ ® � (nw W, O IM 9~ Wr." O* C,A Co...w T 75 Appendix Kentucky Ag -Heritage Center Case Studies Exhibit Hall/Museum Building PEGASUS Overview of funding and costs: Funding • $10 million Commonwealth of Kentucky • Other: individuals, corporations and agricultural membership organizations. • Building = 85,000x300 = $26mil • Exhibits = 40,000x400 = $16mil • FFE = $2mil • Site (farm) _ $5mil • Fees = $6mil • Contingency = $11mil • TOTAL = $66 mil Sources: Point A Consulting L li or %� Campus Overview Visitor's Entrance Energy Agri -Research Building 76 Case Studie A similar local "model" Harris Ranch, Boise • 1,300 acres, east Boise • Pedestrian -friendly, master planned • 2,800 homes, trails, restaurants, shops, preserve green space and wildlife habitat PEGASUS 77 Appendix Meridian Fiscal Impact Model FISCAL IMPACT STUDY CITY OF MERIDIAN, IDAHO AGRICULTURE -BASED REAL ESTATE DEVELOPMENT JUNE 2014 0 &71 IDAHO ` SMART GROWTH EALENA 0NSULTING Idaho Smart Growth brings people together to create great places to live_ PEGASUS m PEGASUS Appendix Meridian Fiscal Impact Model SECTION I. Introduction Smart Growth is a set of principles that guides development into more compact, interconnected, mixed use patterns. This pattern produces more vibrant communities, healthier land and has proven to be more sustainable. Smart Growth development has been shown to reduce the number of miles that people travel by vehicle every day and it has also proven to use less energy overall than more sprawling communities. Smart Growth provides: • Diverse choices in housing and transportation; • Great places to do business; • Healthy air, water and quality of life; • Efficient use of taxes and lower costs of services; and • Farm, ranch and landscape preservation. Compact development does not mean exclusively high-rise or even uniform high density. It does mean higher average densities from a mix of housing types. Compact development features a mix of land uses, strong population and employment centers, interconnected streets, and design of both structures and public realm at a human scale. Idaho Smart Growth (ISG) is committed to supporting the development and sustainability of lasting, balanced and vibrant Idaho communities. In 2012, ISG received a grant from the Intermountain Funders Network to promote smart growth by helping Idaho cities better understand the costs of different types of growth. The scope of the grant included a partnership with Galena Consulting to model the fiscal impacts of a proposed development for two Idaho cities. As one of the fastest growing cities in the State, the City of Meridian was an obvious choice for participation in this project. Meridian had retained the services of BBC Research & Consulting and Galena Consulting in 2007 to apply a similar model to their Comprehensive Plan at build -out in both a traditional lower -density land use model as well as a higher density transit -oriented land use model. Based on the assumptions of used in the 2007 study, the lower density model was projected to produce a net deficit of $62.8 million, while the higher density model was projected to produce a net surplus of $16.5 million. ISG offered the services of Galena Consulting to update Meridian's 2007 fiscal impact model and apply the model to a development of the City's choice. Concurrently, Meridian had retained the services of Pegasus Planning and Development to provide an economic IW'] PEGASUS Appendix Meridian Fiscal Impact Model development analysis for the City. Among other recommendations in its Fields District Strategy report dated June 2014, Pegasus promotes farming -focused real estate development incorporating a mix of residential, commercial, agricultural and civic uses. The City requested that ISG and Galena Consulting update their fiscal impact model specifically to analyze the potential fiscal impacts of a 500 acre Ag -Based real estate development compared to a more traditional subdivision. The fiscal impact model estimates current marginal costs and marginal revenues for all City General Fund Departments, and applies them to both the Ag -Based Development Model proposal as well as a similarly -sized traditionally developed parcel of land on a per unit or per square foot basis to determine the net fiscal impact to the City. The fiscal impact model is dynamic— assumptions can be adjusted to reflect a range of possible fiscal impacts. HSI PEGASUS Appendix Meridian Fiscal Impact Model SECTION II. Summary of Findings Ag -Based Development Model What does the fiscal impact model suggest about the net fiscal impact of Ag -Based Development Model on the City's General Fund budget? Residential development. At full development, the 500 acre Ag -Based Development is envisioned to include 1,011 residential units as follows': • 450 high density single-family residential units with an estimated present day market value of $150,000; • 250 moderate density single-family residential units with an estimated present day market value of $180,000; • 11 low density single-family residential units with an estimated present day market value of $200,000; • 150 multi -family townhomes with an estimated present day market value of $150,000; and • 150 multi -family apartments with an estimated present day market value of $150,000; Non-residential. The proposed development includes the construction of 80,000 square feet of office development, and 70,000 square feet of retail development. These land uses were valued at $220 per square foot. Farmland. The proposed development includes a 40 acre Community Supported Agriculture (CSA) farm; a 20 acre incubator farm; and a 100 acre working farm. These land uses were valued at $1,200 per acre based on assessed values of irrigated agricultural land in the area. Exhibit II -1 below reflects the annual net fiscal impacts of each type of land use planned for the proposed Ag -Based Development Model. Fail PEGASUS Appendix Meridian Fiscal Impact Model Exhibit II -1. Fiscal Impact by Type of Land Use - Ag -Based Development Model As indicated in the above exhibit, at the per unit market valuation assumptions used in the model, residential and commercial development would result in the following annual net fiscal impacts: • Residential units would produce an annual surplus of approximately $127-302 per unit; • The office development would produce an annual surplus of approximately $0.16 per square foot; and • Retail development would produce an annual surplus of approximately $0.16 per square foot. In addition, the proposed farms would produce a minimal annual surplus. The model further indicates that the cumulative surplus from all residential development in the development at full build outz would be approximately $840,207. The cumulative surplus of all commercial development (including the farm land) at full build -out would be approximately $123,149, resulting in a net cumulative surplus of approximately $963,366. At present value (PV), this net cumulative surplus is approximately $623,635. Present Value reflects the concept that potential future surpluses for the City should be valued less in today's dollars due to both the potential for inflation over time and uncertainty about twenty years of development projections. This surplus has been calculated based on assumptions about revenue generation and marginal costs. To account for the variability in these assumptions, we have conducted a sensitivity analysis on the model's calculations to identify how anticipated impacts could change if assumptions about revenues, expenditures, or property values were to change. RA Total Total Fiscal Types of Land Use Other Revenue + Property Tax = Revenue/Unit - Expense/Unit = Impact/Unit Single -Family High Density $383.66 $319.41 $703.07 $576.07 $127.00 Single -Family Moderate Density $383.66 $409.19 $792.85 $576.07 $216.78 Single -Family Low Density $383.66 $494.37 $878.03 $576.07 $301.95 MultiFamilyTownhomes $383.66 $319.41 $703.07 $576.07 $127.00 MultiFamily Apartments $383.66 $319.41 $703.07 $576.07 $127.00 Office $0.09 $0.94 $1.02 $0.86 $0.16 Retail $0.09 $0.94 $1.02 $0.86 $0.16 As indicated in the above exhibit, at the per unit market valuation assumptions used in the model, residential and commercial development would result in the following annual net fiscal impacts: • Residential units would produce an annual surplus of approximately $127-302 per unit; • The office development would produce an annual surplus of approximately $0.16 per square foot; and • Retail development would produce an annual surplus of approximately $0.16 per square foot. In addition, the proposed farms would produce a minimal annual surplus. The model further indicates that the cumulative surplus from all residential development in the development at full build outz would be approximately $840,207. The cumulative surplus of all commercial development (including the farm land) at full build -out would be approximately $123,149, resulting in a net cumulative surplus of approximately $963,366. At present value (PV), this net cumulative surplus is approximately $623,635. Present Value reflects the concept that potential future surpluses for the City should be valued less in today's dollars due to both the potential for inflation over time and uncertainty about twenty years of development projections. This surplus has been calculated based on assumptions about revenue generation and marginal costs. To account for the variability in these assumptions, we have conducted a sensitivity analysis on the model's calculations to identify how anticipated impacts could change if assumptions about revenues, expenditures, or property values were to change. RA Appendix Meridian Fiscal Impact Mode PEGASUS Based on a 10 -year analysis period, Exhibit II -2 below displays a range of potential fiscal impacts from a high scenario of a $967,273 present value (PV) surplus to a low scenario of a $331,138 PV surplus. It is important to note that these figures represent the cumulative impact to the City over 10 years, not annual impacts. Exhibit II -2. Ag -Based Development Model Sensitivity Analysis Low Baseline High Performance Performance Performance High Cost Variability $331,138 $367,931 $404,724 Baseline Cost Variability $561,271 1 $623,635 $685,998 Low Cost Variability $791,405 $879,339 $967,273 Note: (1) `Baseline Performance' assumes the revenues as calculated in the model. The "High Performance" increases annual revenues by 10 percent, while "Low Performance" reduces annual revenues by 10 percent. (2) `Baseline Cost Variability" assumes variability of expenditures as calculated in the model. "High Cost Variability" increases annual amount of variable expenditures by 10 percent, while "Low Cost Variability' reduces annual amount of variable expenditures by 10 percent. What factors could lead to the high scenario or a better performing development? These include higher than expected residential and commercial valuations for property tax purposes, higher sales tax collections and lower per unit service delivery costs3. The opposite factors could lead to the low scenario or a less -well performing development: lower than expected valuations, less sales tax and higher per unit costs. Traditional Subdivision Model But how does the fiscal impact of Ag -Based Development Model compare to a more traditional approach to developing the same 500 acre parcel of land? For these purposes, Pegasus Planning and Development identified a Traditional Subdivision Model and Galena Consulting applied the same fiscal impact analysis process to its land uses. The Traditional Subdivision Model consists of moderate and low density residential development, office and retail uses as follows: FIN Appendix Meridian Fiscal Impact Model PEGASUS Residential development. • 400 moderate density single-family residential units with an estimated present day market value of $160,0004; • 230 low density single-family residential units with an estimated present day market value of $180,000; Non-residential. The proposed development includes the construction of 80,000 square feet of office development, and 70,000 square feet of retail development, both valued at $220 per square foot, identical to the Ag -Based Development Model. No farm land was preserved in the Traditional Subdivision Model, no high density single family homes were included, and no high density or multifamily housing was included. Exhibit II -3 below reflects the annual net fiscal impacts of each type of land use identified in the Traditional Subdivision Model. Exhibit II -3. Fiscal Impact by Type of Land Use—Traditional Subdivision Model While office and retail land uses produce the same fiscal impact as the Ag -Based Development Model, the annual net fiscal impacts of the residential units in the Traditional Subdivision Model are $85-$93 lower than those of the Ag -Based Development Model because of the noted assumption of lower market values of these units. In addition, there are 381 fewer housing units in the same number of acres. This lower market value per unit and lower density per acre contributes to a lower surplus to the City at build -out than the Ag -Based Development Model. The cumulative surplus from all residential development in the development at full build out would be approximately $563,745. The cumulative surplus of all commercial development at full build -out would be approximately $134,138, resulting in a net cumulative surplus of approximately $697,883. This is $265,483 less than the net cumulative surplus in the Ag -Based Development Model of $963,366. At present value (PV), the Traditional Subdivision Model's net cumulative surplus is approximately $453,487. Based on a 10 -year analysis period, Exhibit II -4 below displays a range of potential fiscal impacts from a high scenario of a $692,303 present value (PV) surplus to a low scenario of a $249,846 PV surplus. s� Total Total Fiscal Types of Land Use Other Revenue+ Property Tax= Revenue/Unit- Expense/Unit= Impact/Unit Single -Family Moderate Density $383.66 $324.01 $707.67 $576.07 $131.60 Single -Family Low Density $383.66 $409.19 $792.85 $576.07 $216.78 Office $0.09 $0.94 $1.02 $0.86 $0.16 Retail $0.09 $0.94 $1.02 $0.86 $0.16 While office and retail land uses produce the same fiscal impact as the Ag -Based Development Model, the annual net fiscal impacts of the residential units in the Traditional Subdivision Model are $85-$93 lower than those of the Ag -Based Development Model because of the noted assumption of lower market values of these units. In addition, there are 381 fewer housing units in the same number of acres. This lower market value per unit and lower density per acre contributes to a lower surplus to the City at build -out than the Ag -Based Development Model. The cumulative surplus from all residential development in the development at full build out would be approximately $563,745. The cumulative surplus of all commercial development at full build -out would be approximately $134,138, resulting in a net cumulative surplus of approximately $697,883. This is $265,483 less than the net cumulative surplus in the Ag -Based Development Model of $963,366. At present value (PV), the Traditional Subdivision Model's net cumulative surplus is approximately $453,487. Based on a 10 -year analysis period, Exhibit II -4 below displays a range of potential fiscal impacts from a high scenario of a $692,303 present value (PV) surplus to a low scenario of a $249,846 PV surplus. s� Appendix Meridian Fiscal Impact Model Exhibit II -4. Traditional Subdivision Model Sensitivity Analysis Note: Low Baseline High Performance Performance Performance High Cost Variability $249,846 $277,606 $305,367 Baseline Cost Variability $408,138 $453,487 $498,835 Low Cost Variability $566,430 $629,367 $692,303 PEGASUS (1) "Baseline Performance" assumes the revenues as calculated in the model. The "High Performance" increases annual revenues by 10 percent, while "Low Performance" reduces annual revenues by 10 percent. (2) "Baseline Cost Variability" assumes variability of expenditures as calculated in the model. "High Cost Variability" increases annual amount of variable expenditures by 10 percent, while "Low Cost Variability" reduces annual amount of variable expenditures by 10 percent. As these exhibits show, the Ag -Based Development Model "outperforms" the Traditional Subdivision Model from a fiscal impact perspective. When equal residential property values are assumed for both models, the fiscal impact is nearly identical. The Ag -Based Development Model, with its increased number and more diverse types of housing, plus revenue producing farmlands, may have additional non -fiscal benefits for the City as well, as indicated in the Fields District Strategy report from Pegasus Planning and Development. M Appendix Meridian Fiscal Impact Model PEGASUS SECTION III. Methodology and Technical Description This section provides a general overview of the methodology used to develop the fiscal model. The technical description then goes into more detail about the particular assumptions that were used to develop a fiscal impact model of the proposed development. This technical description provides an overview of how the model can be utilized in the future to determine the fiscal impact of a variety of potential development types. General Background The fiscal impact model estimates current marginal costs and marginal revenues — costs and revenues that would change as a result of a proposed development - for the City's General Fund.' After estimating marginal costs and revenues, the model applies them to projected new development on a per unit or per square foot basis, and compares them to estimated net new revenues. Exhibit III -1 below provides a basic outline of the methodology used in this model. Exhibit III -1. Basic Model Methodology Projected new residential Current marginal costs and New City costs and units or non-residential X revenues (per residential unit or = revenue square feet non-residential square foot) Developments that generate ongoing surpluses produce City revenues that exceed the costs of the services they require. These excess revenues could be used to offset deficits from other developments, to augment the City's fund balance, or to improve service standards. Developments that produce ongoing deficits require service costs in excess of the revenues they generate. These deficits could be offset by surpluses from other developments, they could be mitigated out of fund balance, they could be mitigated by the developer, or they could require the Cityto decrease service levels. To the extent that actual revenues and expenditures vary from the estimates provided within these interviews, the results of the model will vary from reality. The model is designed to illustrate the potential fiscal impact of new development, but it is not anticipated that the impacts estimated in the model will precisely mirror those that actually occur. ER PEGASUS Appendix Meridian Fiscal Impact Model Assumptions The calculations in the fiscal model are based on two sets of assumptions: • Assumptions about the size, type and value of the proposed development to be analyzed by the model; and • Assumptions about the service delivery patterns of City functions, including the expenditures that are variable in regards to growth and the types of development that cause increases in those expenditures. The technical description of the model is divided into two sections based on those sets of assumptions. Development Assumptions Two pieces of information are required about a projected development in order to calculate its likely fiscal impact: • The development schedule for each projected residential unit type or non-residential land -use; and, • The property value of each unit type or land -use. The fiscal impact model for the proposed development is designed to assess the four land -use types proposed: residential, office, retail, and farmland development. Exhibit III -2 below summarizes the land -use assumptions for the development which we have used the fiscal model to analyze. This data can be modified to represent changes in land use assumptions in the proposed development, or land uses in any future development under consideration in the City of Meridian. Exhibit III -2. Development Land Use Assumptions Land Use Type Value and Phasing Single Family High Density Residential 450 new units at a cost of $150,000 per unit absorbed equally over 10 years Single Family Moderate Density Residential 250 new units at a cost of $180,000 per unit absorbed equally over 10 years Single Family Low Density Residential 11 new units at a cost of $200,000 per unit absorbed equally over 10 years Multi Family Townhomes 150 new units at a cost of $150,000 per unit absorbed equally over 10 years Multi Family Apartments 150 new units at a cost of $150,000 per mit absorbed equally over 10 years Office 80,000 square feet at a cost of $220 per square foot mit absorbed equally over 10 years Retail 70,000 square feet at a cost of $220 per square foot mit absorbed equally over 10 years CSA Fame 40 acres, valued at $1,200 per acre producing 1,011 CSA shares per year as well as produce to be sold at an on -property farm stand Incubator Farm 20 acres, valued at $1,200 per acre Working Farm 100 acres, valued at $1,200 per acre FA PEGASUS Appendix Meridian Fiscal Impact Model Other data required from the user of the model includes: • Number of years being analyzed • Year project construction begins • Absorption rate of each land use type (specific or equally spaced) • Total number of residential units or non-residential square footage • Market value per unit or square foot • Property tax assessment ratio • General Fund mill levy • Sales tax rate and sales tax realization factor Many of these assumptions are based on estimates based on current market values, land use distribution ratios, etc. All of the assumptions above can be manually adjusted by the user to analyze alternative results. Using the information provided in Exhibit III -2, the model then develops a year -by -year cumulative absorption schedule that is used in the calculation of total costs and revenues. In the case of the proposed Ag -Based Development Model, we have assumed equal absorption over 10 years. Once property values and projected absorption have been defined, the model will calculate the impacts of a particular development based on a number of departmental expenditure assumptions. Departmental Expenditure Assumptions Fiscal impacts of proposed developments are calculated by developing per unit and per square foot revenue and expenditure amounts and applying these to a projected development schedule. Three steps are involved in calculating general fund expenditures required by any development being analyzed by the model. These steps are explained further based on our process analyzing the fiscal impacts of the proposed Ag -Based Development Model. Step 1. Estimating Fixed and Variable Expenditures. For every department, budgeted FY2014 expenditures were split between fixed and variable costs based on interviews with City staff and our past experience. Fixed costs are those that would not increase in order to support new development (i.e., the budget for the City Council would not significantly increase because of new development). Variable costs are those that would need to increase in order to support new development (i.e., the budget for the Police Department would increase by a factor more closely related to the increase in population and new square footage). Step 2. Estimating Residential/Non-Residential Expenditures. A second step involved splitting the total variable costs for each City function into two groups: those sensitive to residential growth and those sensitive to non-residential growth. As with Step 1, these estimates were obtained through interviews with City staff and our past experience. Various theories were used to estimate these PEGASUS Appendix Meridian Fiscal Impact Model allocations, including calls for service, percent of assessed valuation, or "pure plays" (functions that are primarily devoted to one land -use type, such as parks in regards to residential development, or economic development in regards to non-residential development). Step 3. Per Unit/Square Foot Allocation. After developing total variable residential and non-residential expenditures for each City function, these totals were divided by the current total residential units and non-residential square feet in the City. These calculations generated current marginal costs per residential unit or non-residential square foot for each department. Steps 1 through 3 are illustrated in Exhibit III -3 below. Using the Public Works Department as an example, the process for determining per unit/square foot variable expenditures by land use type is demonstrated.6 Highlighted data indicates model inputs developed through discussions with department staff or our past experience. The model can easily be modified by adjusting these inputs. Exhibit III -3. Fire Department Allocations Fire Meridian Agritopia Fiscal Impact Model Percent Percent Percent Non - Fire FY2014 Percent Variable' Fixed Variable Costs Fixed Costs Residential Residential Administration $ 2,340,010 5% 95% $ 117,001 $ 2,223,010 57% 43% Capital $ 1,049,463 25% 75% $ 262,366 $ 787,097 57% 43% Operations $ 6,643,537 75% 25% $ 4,982,653 $ 1,660,884 57% 43% Fire Safelrouse $ 90.093 25% 75% $ 22.523 $ 67.570 57% 43% TOTAL $ 10,123,103 $ 5,384,542 $ 4,738,561 Total Variable Costs $ 5,384,542 53% Total Fixed Costs $ 4,738,561 47% In Percent In Dollars Residential Expense Allocation 57% $ 3,069,189 Commercial Expense Allocation 43% $ 2,315,353 Residential Commercial Per Unit Expense $ 127.09 $ 0.23 PEGASUS Appendix Meridian Fiscal Impact Model Exhibit III -4 below summarizes total calculated per unit/square foot expenditures for all general fund departments. Exhibit III -4. Summary of Expenditure Calculations As shown in Exhibit III -4, general fund expenditures total $576 per residential unit and $0.86 per non-residential square foot. Later in the fiscal impact model these per unit and per square foot costs were multiplied by the previously described development schedules to generate the total cost of a projected development. Revenue Calculations Revenues were calculated in a manner similar to expenditures: per residential unit and per non-residential square foot revenues are estimated and then applied to the projected development schedule. The process used to develop per unit and per square foot revenue amounts varies between property tax revenue, sales tax revenue, and all other revenue. Variable Expenses by General Fund Expenditures Total Department Total Fixed Total Variable Residential Commercial Administration $ 5,943,366 $ 4,491,174 $ 1,452,192 $827,749 $ 624,443 Expense Allocation (percent) 57% 43% Expense Per Unit or Square Foot $34.28 $0.06 Community Development $ 3,366,676 $ 757,927 $ 2,273,782 $ 1,296,056 $ 977,726 Expense Allocation (percent) 57% 43% Expense Per Unit or Square Foot $53.67 $0.10 Parks & Recreation $ 7,577,288 $ 4,275,613 $ 3,301,675 $ 2,971,508 $ 330,168 Expense Allocation (percent) 90% 10% Expense Per Unit or Square Foot $123.04 $0.03 Police $ 18,329,489 $ 8,245,857 $ 10,083,632 $ 5,747,670 $ 4,335,962 Expense Allocation (percent) 57% 43% Expense Per Unit or Square Foot $238.00 $0.44 Fire $10,123,103 $ 4,738,561 $ 5,384,542 $ 3,069,189 $2,315,353 Expense Allocation (percent) 57% 43% Expense Per Unit or Square Foot $127.09 $0.23 Total General Fund Expenditures $45,339,922 $22,509,132 $22,495,823 $13,912,172 $8,583,651 Total Per -Unit Expenditures $576.07 $0.86 As shown in Exhibit III -4, general fund expenditures total $576 per residential unit and $0.86 per non-residential square foot. Later in the fiscal impact model these per unit and per square foot costs were multiplied by the previously described development schedules to generate the total cost of a projected development. Revenue Calculations Revenues were calculated in a manner similar to expenditures: per residential unit and per non-residential square foot revenues are estimated and then applied to the projected development schedule. The process used to develop per unit and per square foot revenue amounts varies between property tax revenue, sales tax revenue, and all other revenue. Appendix Meridian Fiscal Impact Model PEGASUS Property tax revenue. Using the per unit and square foot market values given in Exhibit III -2, a per unit property tax revenue amount was calculated by multiplying the market valuation by the City's General Fund FY14milI levy of 0.004258855. However, the market value for all residential units was first adjusted for the 50% homeowner's exemption (up to $83,920 asset by the State of Idaho). Using a high density residential unit as an example, Exhibit III -5 demonstrates how this calculation resulted in $127 property tax revenues per unit. Exhibit III -5. Property Tax Calculation Example High Density Residential Unit Assessment Ratio Assessed Value Per Unit General Fund Mill Levy Property Tax Revenue per Unit Property Tax $150,000 50% $75,000 .004258855 $319.41 We calculated property tax revenues for all other residential and nonresidential land uses in a similar fashion. Other Revenues. Finally, all other revenues were calculated in a fashion similar to expenditures. All FY14 budgeted revenues sources excluding property tax were allocated among those that were fixed (revenue sources that would not significantly increase due to growth, such as interest) and those that were variable (revenue sources that are directly tied to growth, such as permit fees). Total variable revenues were then allocated based on sensitivity to commercial or residential development. Finally, variable residential and commercial revenues were divided by total existing residential units or non-residential square feet to estimate marginal revenues. Exhibit III -6 below illustrates this calculation. 91 Appendix Exhibit 111-6. Other Revenue Calculations PEGASUS Meridian Fiscal Impact Model General Fund Revenues FY2014 Percent Variable* Variable Fixed Revenues Property Tax $ 22,008,232 Calculated independently Sales Tax $ 3,300,000 100% 0% $ 3,300,000 $ - Franchise Fees $ 1,230,000 95% 5% $ 1,168,500 $ 61,500 Licenses & Permits $ 125,000 95% 5% $ 118,750 $ 6,250 Charges for Services $ 766,000 50% 50% $ 383,000 $ 383,000 Fines & Forfeitures $ 455,000 25% 75% $ 113,750 $ 341,250 Liquor Tax $ 573,855 25% 75% $ 143,464 $ 430,391 Contracts/Grants $ 1,590,000 5% 95% $ 79,500 $ 1,510,500 Impact Fees $ 1,473,321 Interest $ 152,000 5% 95% $ 7,600 $ 144,400 Miscellaeous $ 13,250 5% 95% $ 663 $ 12,588 TOTAL $ 31,686,658 $ 2,015,226 $ 2,889,879 Total Variable Revenues $ 2,015,226 Total Fixed Revenues $ 2,889,879 In Percent In Dollars Residential Revenue Allocation 57% $1,148,679 Commercial Revenue Allocation 43% $866,547 Residential Commercial Per -Unit Revenue $383.66 $0.09 As indicated by this exhibit, each new residential unit proposed in the Ag -Based Development Model is projected to generate approximately $384 per unit in other revenue, in addition to their specific property tax generation as indicated in Exhibit III -5. Commercial development would generate approximately $0.09 in other revenue per square foot, in addition to any property tax revenue. Summary Using the various data points presented above, the model calculates the net fiscal impacts on the General Fund from any proposed development. In the example we have used above, marginal expenditures are multiplied by the development projections to generate total project expenditures. Marginal revenues are multiplied by those same projections to produce total project revenues.7 In every year of the analysis, these figures are then compared to estimate net annual and cumulative development impacts. The cumulative net fiscal impact of all residential development proposed within the development is presented in Exhibit III -7 below. WPA Appendix PEGASUS Meridian Fiscal Impact Model Exhibit III -7. Cumulative Net Fiscal Impact— Residential Development in Proposed Ag -Based Development Model Other Revenue Residential $ 2,133.343 Total Residential Revenues $ 4,043.473 Residential Expenditures Administration $ 10 Year Community Development $ Cumulative Property Tax Revenue $ 684,185 Single -Family High Density $ 790,550 Single -Family Moderate Density $ 562,637 Single -Family Low Density $ 29,909 MultiFamilyTownhomes $ 263,517 MultiFamily Apartments $ 263.517 Subtotal Property Taxes $ 1,910,130 Other Revenue Residential $ 2,133.343 Total Residential Revenues $ 4,043.473 Residential Expenditures Administration $ 190,588 Community Development $ 298,415 Parks & Recreation $ 684,185 Police $ 1,323,392 Fire $ 706,676 Total Residential Expenditures $ 3,203,256 Cumulative Residential Surplus (Deficit) $ 840,217 The cumulative net fiscal impact of all commercial development proposed within the development is presented in Exhibit III -8 below. 93 Appendix Meridian Fiscal Impact Model PEGASUS Commercial Expenditures Administration $ 52,946 10 Year Exhibit III -8. 82,901 Parks & Recreation Cumulative Cumulative Net Fiscal Impact — Property Tax Revenue $ 367,645 Fire CSA Farm S 1,124 Commercial Development in Proposed Incubator Farmlands $ 562 Ag -Based Development Model Working Farms $ 2,811 Office $ 412,257 Retail $ 360,725 Subtotal Property Taxes $ 777,480 Other Revenue Commercial $ 73,474 Total Commercial Revenues $ 850,954 Commercial Expenditures Administration $ 52,946 Community Development $ 82,901 Parks & Recreation $ 27,995 Police $ 367,645 Fire $ 196,318 Total Commercial Expenditures $ 727,805 Cumulative Commercial Surplus (Deficit) $ 123,149 As indicated by Exhibits III -7 and 111-8, the cumulative surplus from all residential development at full build out would be approximately $840,217. The cumulative surplus of all commercial development (office and retail) would be approximately $123,149, resulting in a net cumulative surplus of approximately $963,366. At present value (PV), the net cumulative surplus is approximately $623,635. This surplus has been calculated based on assumptions about revenue generation and marginal costs. To account for the variability in these assumptions, we have conducted a sensitivity analysis on the model's calculations to identify how anticipated impacts could change if assumptions about revenues, expenditures, or property values were to change. The results of this analysis are shown in Exhibit II -2 of this report. An identical modeling process was conducted on a more traditional subdivision model for the same parcel of land, following each of the steps described above. The results of that analysis are presented in Section II of this report. PEGASUS Appendix Meridian Fiscal Impact Model Endnotes: 1. Assumptions regarding residential and commercial market values were made based on market research and recent analysis provided by the City of Meridian. Assumptions are conservative. Variations in actual market value will produce different net surplus/deficits. 2. For the purpose of modeling, we have assumed a 10 -year equal absorption rate. 3. Infill development, for example, costs less to serve per unit because necessary infrastructure and other resources (i.e., fire stations) are already in place, whereas new development away from existing infrastructure and resources requires additional expense to serve. 4. Market values for the residential units in the Ag -Based Development Model are $20,000 higher than the market values used in the Traditional Model to reflect research showing residential units adjacent to agricultural/open space has a higher property valuation than those not adjacent to these land uses. These assumptions can be revised within the model to test different price points and outcomes. See New York Times article, "Organic Farms as Subdivision Amenities" June 30 2009: http://www.nyti mes.com/2009/07/01/business/energy-environment/0lfarm.html?_r=0 5. Other funds, such as utility funds, have a cost recovery philosophy that ensures that they will break even, and are therefore not addressed in this report. 6. Similar exhibits for all City departments are included in the full fiscal analysis model provided to the City. 7. Exhibit II -1 of this report represents the annual net fiscal impact of each type of residential and commercial development. 95 Appendix Resources PEGASUS Catalyst Projects Ag -Experience Center • "Knowledge Clusters and Entrepreneurship: Experiential Tourism in the Flint Hills of Kansas" a White Paper by the Center for Business and Economic Development, Emporia University: http://www.emporia.edu/dotAsset/c655f6d4-5544-478e-9382- 1816f46c7b7c.pdf • "Utilizing Tourism to power Local Economic Development: An Introduction" by Lorton Consulting. http://tourismplanningprofessionals.com/?p=306 • "Tourism Trends: Tourism, Culture, and Cultural Routes" by Greg Richards: http://www.coe.int/t/dg4/cultureheritage/culture/routes/StudyCR en.pdf • "The New Age of Tourism and the New Tourist" by Dr Aparna Raj: http://www.indianmba.com/Faculty Column/FC565/fc565.html • "Agritourism" by M. Sznajder, L. Przezborska, and Scrimgeour, F (2013) Published by CAB International, Oxford • "Place as Product: A Place -based Approach to Cultural Tourism" by Steven Thorn. Published by Creative City. http://www.creativecity.ca/database/files/library/steven thorne place product.pdf Venture Meridian Campus • Winter and Pickman, IEDC Economic Development Journal, Winter 2014: http://www.iedconline.ore/clientuploads/directory/docs/EDJ 14 Winter Pickman.pdf • Revitalizing Regional Economies by Accelerating Entrepreneurial Success: http://www.iedconline.org/documents/members- only/revitalizing-regional-economies-bv-accelerating-entrepreneurial-successes/ • The Coming Era of Sustainability: Directives for competitive communities: http://www.iedconline.org/documents/members- only/the-comi ng -era -of -s ustai nab it ity-d irectives-for-com petitive-com mun ities/ • BSU Venture College, Our Philosophy: http://venturecollege.boisestate.edu/philosophy/ Strategies Talent and Innovation Ecosystem Cultivation • Idaho Business for Education Report, "Educated Workforce: The Lifeblood of Idaho Business". May 2014. http://www.idahobe.org/wp-content/uploads/2014/05/WORKFORCE-STUDY-FlNAL.pdf • The Future of Jobs: http://www.iedcon line. org/documents/members-only/the-future-of-lobs/ 101 Appendix Resources PEGASUS • Workforce Workforce Workforce: http://www.economicmodeling.com/2014/04/25/workforce-workforce-workforce-how-tip- strategi es-visua lizes-emsi-emp loyment-d ata/?utm_sou rce=Receives+Updates& utm_campaign=4998788512- The_Desktop_Economist_M ay_20145_2_2014& utm_med i um=e ma iI&utm_term=0_aef51caefa-4998788512-86730921 • Winter and Pickman, IEDC Economic Development Journal, Winter 2014: http://www.iedconline.org/clientuploads/directory/docs/EDJ 14 Winter Pickman.pdf • Revitalizing Regional Economies by Accelerating Entrepreneurial Success: http://www.iedconline.org/documents/members- only/revitalizing-regional-economies-by-accelerating-entrepreneurial-successes/ • The Coming Era of Sustainability: Directives for competitive communities: http://www.iedconline.org/documents/members- only/the-comi ng-era-of-sustai nab it ity-d irectives-for-competitive-communities/ • Failure to Launch: Structural Shit and the New Lost Generation: http://cew.georgetown.edu/failuretolaunch • Research University Commercialization and Entrepreneurship: http://www.huronconsultinggroup.com/library/ReasearchUniv WhitePaper.pdf • Technology Innovation Management Review Lecture Series: Ecosystem Approach to the Commercialization of Technology Products and Services: http://timreview.ca/article/138 Strengthen Downtown • Downtown and Quality of Place by Bill Ryan: http://fvi.uwex.edu/downtowneconomics/files/2012/07/downtown-revitalization- and-enhancing.pdf • Downtown Tenino Pamphlet of Concepts for DT: http://www.ci.tenino.wa.us/wp-content/uploads/2013/01/Planning-Commission- downtownplan pamphlet 1.Pdf • Organizing a Successful Downtown: http://Preservewa.org/FileLibrary/file/Main%20Street/Organizing%20A%20Successful%20DT-- Online%20VersionC.pdf • Downtown Planning for Small and Midsized Communities: http://www.rurdev.usda.gov/SupportDocuments/TN-RDCon-Walker.pdf 02 PEGASUS Appendix Resources Strengthen Quality of Place • Wetherby Edible Forest: http://www.backyardabundance.org/AbundantLandscapes/WetherbyEdibleForest.asi)x • Sustainable Berea, Edible Streets Project: http://sustainableberea.org/projects/the-edible-streets-project/ • "The Exotic Edible Street Buffet" buy EdibleFeast.com: http://ediblefeast.com/article/exotic-edible-street-tree-buffet • Walkscore.com • Tendensor, and Nordic Cities and Regions Project. Austin Case Study by Jeremy Tama nini: http://www.austinchamber.com/the- chamber/opportunity-austin/files/TAM%20Case%20study-Austin,%20Texas.pdf • Urban Land Magazine (Official magazine of ULI), Richard Florida "What Draws Creative People? Quality of Place", Oct 11, 2012: http://urbanIand.uIi.org/industry-sectors/what-draws-creative-people-quality-of-place/ • "America in 2013: A ULI Survey of Views on Housing, Transportation, and Community" (May 2013) http://uli.org/wp- content/uploads/ULI-Documents/America in 2013 web.pdf • Austin Case Study: http://www.austinchamber.com/the-chamber/opportunity-austin/files/TAM%20Case%20study- Austin,%20Texas.pdf • Talent Attraction Crash Course for Economic Developers: http://www.slideshare.net/aboutdci/econ-dev-talent-attraction-webinar • Downtown and Quality of Place by Bill Ryan: http://fvi.uwex.edu/downtowneconomics/files/2012/07/downtown-revitalization- and-enhancing.Pdf • Downtown Tenino Pamphlet of Concepts for DT: http://www.ci.tenino.wa.us/wp-content/uploads/2013/01/Planning-Commission- downtownplan pamphlet 1.pdf DPI Appendix CITY OF MERIDIAN BY THE CITY COUNCIL Resolution RESOLUTION NO. BIRD, BORTON, CAVENER MILAM, ROUNTREE, ZAREMBA PEGASUS A RESOLUTION OF THE MAYOR AND COUNCIL OF THE CITY OF MERIDIAN, IDAHO ADOPTING THE MERIDIAN ECONOMIC DEVELOMENT AUDIT AND STRATEGY. WHEREAS, on July 02, 2014 the Meridian Community and Economic Development Director presented the Economic Development Audit and Strategy to the Meridian City Council; WHEREAS, the purpose of the Economic Development Audit and Strategy of the City of Meridian is help diversify the economy of Meridian; WHEREAS, the Economic Audit and Strategy is meant to provide the City of Meridian and the Community Development Commission with a comprehensive planning document that provides an in-depth audit of Meridian's economic assets and opportunities; WHEREAS, specific economic development strategies and catalyst projects along with steps to achieve them are found within the Economic Development Audit and Strategy; WHEREAS, the Meridian Business -Ready Team created by the City has provided feedback and guidance to the consultant team and city staff, WHERAS, the Fields District Strategy has been incorporated into the Economic Development Audit and Strategy; and WHEREAS, the Mayor and City Council of the City of Meridian have approved the adoption of the Meridian Economic Development Audit and Strategy. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF MERIDIAN, IDAHO: Section 1. The City Council of the City of Meridian hereby adopts the Meridian Economic Development Audit and Strategy as set forth in Exhibit A, as attached. ADOPTED by the City Council of the City of Meridian, Idaho, this _ day of ---,2014. APPROVED by the Mayor of the City of Meridian, Idaho, this day of __, 2014. F I E L Ds DI S T R I C 1 RE P O R 1 An agricultural economic development initative for the City of Meridian Presented by Pegasus Planning and Development and Point A Consulting FA CITY OF MERIDIAN, IDAHO Acknowledgements .................................... 0000000 M M M 000000000 M M M 0000 CLIENT CITY OF MERIDIAN Mayor Tammy DeWeerd Community Development Department Public Works City Finance Department As well the helpful guidance and input from.... THE ADVISORY COMMITTEE MERIDIAN CHAMBER OF COMMERCE MERIDIAN DEVELOPMENT CORPORATION IDAHO SMART GROWTH Anne Wescott CONSULTANTS Pegasus Planning and Development Austin, Texas Point Consulting Louisville, Kentucky FIELDS DISTRICT REPORT • 3 CITY OF MERIDIAN, IDAHO Table of Contents .................................... 0000000 M M M 000000000 M M 00000 Executive Summary........ VA Background................................................................................................... 9 Findings........................................................................................................ 9 Fields District Strategy.................................................................................. 17 StrategyAt -a Glance................................................................................ 19 • Recommendation 1: Ag -Focused ................................................... 20 Talent Development & Industry Partnership Initiative • Recommendation 2: Agritourism Strategy ...................................... 22 • Recommendation 3: ..................................................................... 27 Ag -based Real Estate Development NextSteps.................................................................................................... 33 Resources...................................................................................................... 34 FIELDS DISTRICT REPORT • 5 CITY OF MERIDIAN, IDAHO Executive Summary ....................................00000000000000000000000000 Meridian has rapidly grown to become the 3rd largest city in Idaho, and is projected to continue to be one of the nation's fastest growing cities. Meridian is also home to some of the richest farmland in the country — much of which has been lost over the last 10 years to residential subdivisions. These subdivisions have attracted many families and some single professionals to live in Meridian, thereby helping spur the City's de- velopment as a retail center serving the entire region. The healthcare sector and office development have also grown at correspondingly rapid rates within Meridian during this time. Yet, low-density residential growth coupled only with commercial development is an unbal- anced model that is not sustainable for the long term. City leaders therefore recognize that they must plot a new path to more aggressively promote diversification of Meridian's economy. Meridian is thus at a crossroads in its growth trajectory. One path continues to grow residential, retail, health- care and office development and also continues the loss of agricultural lands to the North and West of current city limits. The other path is one that fosters a purpose- ful growth that is more financially and environmentally sustainable. This second path is the road less travelled by most cities in the United States, but it is a path that Meridian must take in its effort to grow sustainably and diversify its economy. Crisis, change and opportunity bring about a call for ac- tion. Meridian's call for action is driven by the follow- ing issues identified and validated through this project: • Lack of economic diversification • Weak business -education -workforce collaboration • Small share of 25-35 year olds (relative to Boise and Meridian's regional and national competition) • Weak entrepreneurship culture and lack of business innovation infrastructure • Loss of agricultural lands, and • Lack of housing choice/diversity FIELDS DISTRICT REPORT • 7 The recommendations found in this report are strongly aligned with those of the City's formal Economic Devel- opment Strategy. Within the framework of this over- arching Strategy and its focus on various target indus- tries, continued strengthening and development of Meridian's agricultural cluster is viewed as the City's premier economic development opportunity. To drive this forward, three separate but highly complementary signature initiatives are proposed -- designed to solidify and promote Meridian's competitive advantage for agri- cultural economic development: 1. Ag -Innovation Campus —An agricultural -focused "Talent and Industry Partnership Initiative" tied to a physical location that is designed to promote collaboration between agribusinesses, farming and K-20 educational institutions. The campus will help build a pipeline for the next generation of agricultural workforce and serve as a proving ground for ag-innovation and ag-entrepreneurs. 2. Agri -Tourism — A set of initiatives to create new agriculturally -focused tourism assets and to market and position Meridian as an Agr-Tourism destination 3. Ag -based real estate development —An innovative model based on the concept of clustering residential development around a working farm. These initiatives are immediately implementable and can be pursued in a phased and coordinated fashion -- based on a detailed implementation roadmap that is yet to be developed. Projects building on each of these scenarios have been successful in communities across the US, as demonstrated by case studies with this report. As concepts, they have been well received by the many stakeholders involved in this study process over the last year. Outside resources will be required to implement several of these initiatives; however there is support regionally and within the State of Idaho for Meridian to pursue these new pathways to economic competitiveness and prosperity. /A CITY OF MERIDIAN, IDAHO Background .............................................................. In September 2013, The City of Meridian hired the team of Pegasus Planning and Development in collaboration with Point A Consulting, to answer the question, "Can Meridian diversify its economy while building upon its agricultural heritage?" As a point of departure, the consultant team was asked to vet a set of opportunities and assets identified in an existing White Paper that had been internally developed by the City, and that proposed a range of potential agriculturally -focused economic de- velopment strategies for Meridian. After examining this question from the perspectives of data analysis, diverse stakeholder input, and professional knowledge of na- tional best practices and trends, the consultant's answer to this question was a definitive "YES", and possible preliminary directions were identified. At issue then, for further exploration, was "How?" Phase I involved extensive interviews with key stake- holders identified by the City, including education and community leaders, agri-businesses and farmers. It also involved in-depth analysis of city and regional socio-eco- nomic data, and a careful review of previous reports and plans (transportation, land use, downtown and others). Phase I of the study effort was designed to conclude FIELDS DISTRICT REPORT • 9 with a "Go/No-Go" decision -point was set as its objec- tive. The consultants determined from our analysis of data and from initial stakeholder support that a second Phase of study was warranted in order to define more specific strategies and tactics for development of the "Fields District"—the geographic area in northwest Meridian and Ada County targeted for this study. Phase II began in February of 2014 and built on find- ings and the preliminary directions identified in Phase I, with a goal of defining an overarching Strategy for the Fields District. This report represents a culmina- tion of both the Phase I and II study efforts. All of the quantifiable and qualitative analysis is incorporated into this Draft Final Report and its recommended strategies. In parallel the City of Meridian engaged the consultant team to perform an Economic Audit and to recommend an Economic Development Strategy for Meridian. The Fields District strategy and initiatives found herein have therefore been folded into this overall Economic Development Strategy for the City of Meridian. Findings .............................................................. Consultant's Approach in Brief Beginning with the preliminary recommendations devel- oped during the Fields District Phase I study, the con- sultants conducted further qualitative and quantitative analysis to refine and articulate the potential for major agricultural -related economic development initiatives in Meridian. Positioning Meridian at the forefront of advanced agribusiness development was a guiding theme in this research. Stakeholders across the spectrum of agribusiness, academia, land development, and govern- ment contributed their perspectives and feedback to the process. This rich collection of experience and expertise was combined with an investigation of industry employ- ment and growth data. This quantitative research pro- vided a more rigorous test of feasibility, ensuring that a range of specific local industries could be drawn into and benefit from the Fields' recommendations. Qualitative Analysis Overview The consultant findings drew heavily on qualitative analysis to understand the area's strengths and op- portunities in agricultural production, agricultural education and academic research, and within the agribusiness sector generally. Many assets or competi- tive advantages identified through our investigation are geographically dispersed across the state and some even are located in surrounding states. To understand the opportunities for leveraging assets locally, sive interviews were conducted; stakeholders were engaged throughout the study effectivell an informal type of advisory group for the pd 10 ' CITY OF MERIDIAN. IDAHO o Interviews were conducted with key stakeholders and leaders across a range of sectors, including the following: • City Officials: Mayor's office, Community Development (Economic Development, Planning & Zoning, Urban Design), City Finance, Public Works • Economic Development Organizations: Meridian Chamber of Commerce, Meridian Development Corporation (MDC), Boise Valley Economic Partnership (BVEP), The CORE • Academia/School District: University of Idaho College of Agriculture and Life Sciences; Boise State University, Division of Research and Economic Development; Idaho State University, Meridian Health Science Center; College of Western Idaho; Meridian Joint School District No.2 • Business Community: Approximately 20 personal interviews with businesses in Meridian and regional employers in Health Care, Agribusiness, Finance & Insurance, Agricultural Production, Land Development, and Manufacturing. o Focus Groups were held, during which preliminary findings were presented. Stakeholders then had an opportunity to provide further input regarding their level of interest in future collaboration, and gave feedback and refinement on recommendations from the following sectors. Focus Groups conducted included the following main groupings: • Agribusiness • Academia/Workforce Development • Advisory Group/Ready Team (three meetings) • Meridian Chamber of Commerce (Executive Board, Legislative Committee) • Meridian Development Corporation o Site Visits were conducted by the consultants to view major regional economic development assets and facilities and to learn about their capabilities. Among these were: • College of Western Idaho - Micron Center for Professional Technical Education • Meridian / Idaho State University Health Science Center • Meridian High School, Professional and Techical Center • University of Idaho Caine Veterinary Teaching Center • Idaho National Laboratory Qualitative Analysis Overview The quantitative analysis performed in Phase I was comprised of intensive community and economic data analysis and preliminary industry analysis. Due largely to the qualitative findings, the data analysis shifted during Phase II focused on labor analysis and the determination of industry targets (see Appendix). Target Industries were studied at a high level of specificity (4 -digit NAICS codes) to determine those industries that both A) showed core strengths in the Treasure Valley and B) perform favorably in the national market as a whole, based on employment growth and Bureau of Labor Statistics projections.The Treasure Valley as a whole was chosen for analysis as well as Ada County because industry strengths in the whole region represent opportunities for development in Meridian. For the Fields analysis, major attention was given to the agriculture "supercluster." Based on literature review this included an array of industries related to farming, farm machinery, food manufacturing and wholesaling, and advanced research and devices relevant to 21st century agriculture. Additional analysis focused on regional target industries. Initial projections were made regarding occupational profiles of agricultural and other target industries, but these should be refined with further qualitative and quantita- tive analysis [see Next Steps]. College of Western Idaho, Micron Center - home to AgCo Training facility College of Western Idaho's AgCo training facility currently in Nampa. This facility is used extensively by students and industry to train workforce in the repair and use of high-tech machinery. Factors of analysis included the following data: o Regional industry employment and employment growth over a recent five-year study period. o Local competitive advantage revealed by location quotient and shift -share analysis, established techniques for community economic planning. o National industry growth projections. o Relationship of industries to broad sectoral targets determined by the State of Idaho, Boise Valley Economic Partnership (BVEP), and project scope. o Average industry salaries compared to state averages. Summary of Stakeholder Viewpoints Phase I & II Phase I concluded by identifying a list of potential scenarios to promote agricultural economic development of Meridian and the surrounding region. This list was narrowed to three (3) that have been more fully developed through the Phase II process, and that form the basis for the recommendations contained in this report. Through focus groups and one-on-one interviews with key stakeholders, extensive feedback was collected on the relevance and potential for success of these three initiatives within the Meridian, Treasure Valley and Idaho environments. A high level summary of Stakeholder viewpoint is pre- sented below, organized by industry or interest group, which points the way toward the recommended Strategy and its supporting initiatives. This is supplemented by a business survey found in the Economic Audit & Strategy. FIELDS DISTRICT REPORT • 11 Agribusiness Agribusiness stakeholders reported a significant need for a stronger workforce pipeline covering the entire spectrum of skill levels, from entry-level to advanced scientific positions. They would also like to see more robust capabilities for professional development of existing employees. Stakeholders in this sector value the work ethic that graduates from the region's Ag technical programs and FFA students possess, but call attention to the fact that information technology skills are increasingly critical. One interviewee identified the ideal worker as "a kid that grew up his whole life on a farm, and he can rebuild a tractor engine, but who also knows computer science and can write code just as easily." In the course of introducing agribusiness representatives to these proposed initiatives, all were interested and excited about creating stronger workforce develop- ment capabilities in the region. Agri -tourism also was seen as an opportunity to cultivate a renewed interest in the area's agricultural heritage and to attract future worker to the industry. Academia While all of the Meridian and Idaho academic institu- tions whom we interviewed (high school, community college and university) have some form of relationships with individual agribusinesses, these do not appear to have been focused at the level of defining industry- wide needs. Nor are they structured with the level of institutionalization required for a well-functioning tal- ent -business collaborative to satisfy workforce demand (at all talent levels). And the opportunity to create a stronger foundation for commercializing university - developed research and technology inventions was an exciting prospect to all stakeholders interviewed. Through the focus group discussions, questions arose regarding implementation, e.g. the nature and quality of "workforce demand" at the level of specific occupa- tional categories. While this study included a prelimi- nary analysis of occupational categories, it was limited in scope as this is an implementation issue that should be addressed in depth through further study directly with the industry and academic stakeholders, wor in tandem. (See Next Steps). 41,2111 12 • CITY OF MERIDIAN. IDAHO Farmers Active farmland in the Meridian area is highly coveted for real estate development as subdivisions and shopping centers. Regrettably, much of it is already under contract with developers and/or zoned for residen- tial development -- therefore limiting the scope of pulbic policy intervention that is possible from a "farmland preservation" standpoint. This suggests that developers are the key actors for partnerships to cultivate the types of recommendations and catalyst projects advised for the types of recommendations advsied for the Fields. There was notable pessimism about prospects for inte- grating active farmland with future urban developments. This pessimism appears rooted in the realities of the last twenty years of Greenfield development and urban expansion into the western parts of the Boise Valley. The historic pattern of expansion has been rapid and scattershot, often creating conflicts between farmers and residents who are new to the area. Many agricul- tural production activities are viewed by newcomers as nuisances despite the decades of ownership and active farming in these areas. Ag -based Real Estate Development models that are being pioneered across the country use innovative urban design concepts to balance active agricultural uses with mixed-use development (both residential and commer- cial, and possibly including institutional uses such as schools, etc.). Effective design can mitigate conflicts between rural and urban uses, and encourage a mix of farmland preservation, small-scale farming for local foods, and commercial farming tailored to Meridian's unique climactic assets. Meridian community Focus groups and feedback sessions conducted during the study revealed a strong interest and support for the proposed Strategy and its three key initiatives from residents, local business owners, and city officials. Many acknowledged a need for more diverse entertainment options and a balanced approach to integrating the old with the new. The City appears poised to push for more inclusive, sustainable land use and development policies that would help secure Meridian's future quality of live and attractiveness as a place to live, work and play. The level of interest expressed by diverse community leaders with whom we met demonstrates a high level of willing- ness to support and participate in future implementa- tion efforts. Some Meridian residents who participated in feedback sessions echoed the concerns expressed by farmers about the challenge of integrating active farm uses with residential development. Education about way in which these initiatives differ from traditional real estate developments will be an important element for the City to carry forward, as part of its coalition build- ing to implement these initiatives. Target Industry Analysis Findings Additionally, two sets of analysis were undertaken to identify industry strengths in the Meridian region. First, industries associated with the agriculture "su- percluster" were identified from literature review. A ratings system was developed that took into account major characteristics of each industry locally and nationally, including national growth projection rates. Agriculture industries with the highest performance for Ada County and Treasure Valley were found.These industries are prime targets for incorporation into workforce, entrepreneurship, and business development strategies in the context of the Fields initiative. The results of the first level of analysis are as follows: Additionally, two sets of analysis were undertaken to identify industry strengths in the Meridian region. First, industries associated with the agriculture "su- percluster" were identified from literature review. A ratings system was developed that took into account major characteristics of each industry locally and nationally, including national growth projection rates. Agriculture industries with the highest performance for Ada County and Treasure Valley were found.These industries are prime targets for incorporation into workforce, entrepreneurship, and business development strategies in the context of the Fields initiative. The results of the first level of analysis are as follows: FIELDS DISTRICT REPORT • 13 Source: Pegasus Planning and Development;{ Treasure Valley Ada County Industry Cluster NAILS Description NAICS Description Code Code 311 Food manufacturing 311 Food manufacturing 312 Beverage & tobacco product 424 Merchant wholesalers, nondurable manufacturing goods Food Services 424 Merchant wholesalers, 327 Nonmetallic mineral product nondurable goods manufacturing 327 Nonmetallic mineral product manufacturing Agricultural Services 115 Agriculture and forestry support activities 221 Utilities 221 Utilities 325 Chemical manufacturing 325 Chemical manufacturing Agricultural Machinery 332 Fabricated metal products and 332 Fabricated metal products and manufacturing manufacturing 423 Merchant wholesalers, durable 423 Merchant wholesalers, durable goods goods 334 Compuer and electronic product 334 Compuer and electronic product manufacturing manufacturing 518 Data processing, hosting and 518 Data processing, hosting and related related services services Agricultural Research & Instruments 541 Professional and technical 541 Professional and technical services services Administrative and support 561 561 Administrative and support services services 111 Crop Production 111 Crop Production Primary Agriculture Animal Production and 112 112 Animal Production and aquaculture aquaculture Fruit and vegetable preserving and 3111 Animal food manufacturing 3114 specialty Food Service Fruit and vegetable preserving Sugar and confectionery product 3114 3113 and specialty manufacturing 3121 Beverage Manufacturing 3116 Animal slaughtering and processing Source: Pegasus Planning and Development;{ 14 • CITY OF MERIDIAN. IDAHO Treasure Valley Ada County Industry Cluster Industry Description Industry Description Code Code Agricultural Research and Instruments Primary Agriculture Animal slaughtering and processing 3116 Food Services 4238 merchandise, wholesale 4245 Agricultural Services 1151 production 2213 Water, sewage, and other systems 3253 Agricultural chemical 3329 Agricultural 518 Machinery 4238 Agricultural Research and Instruments Primary Agriculture Animal slaughtering and processing Industrial machinery manufacturing Farm product raw material 4238 merchandise, wholesale Support activities for crop wholesalers production 4249 Water, sewage, and other systems Agricultural chemical 3332 manufacturing 518 Other fabricated metal product 4238 manufacturing Scientific research and 3329 Other fabricated metal product manufacturing 3332 Industrial machinery manufacturing 4249 4238 Machinery and supply merchant wholesalers 4249 Misc.nonburable goods merchant wholesalers 518 Data processing and other systems 518 5417 Scientific research and 5417 development services 5413 Architectural and engineering 5413 services 5416 Management and technical 5416 consulting services 5619 Other support services 5619 1112 Vegetable and melon farming 1119 1113 Fruit and tree nut farming 1121 1121 Cattle ranching and farming 1153 1119 Other crop farming 1129 Other animal production 1153 Support activities for forestry Industrial machinery manufacturing Machinery and supply merchant wholesalers Misc.nonburable goods merchant wholesalers Data processing and other systems Scientific research and development services Architectural and engineering services Management and technical consulting services Other support services Other crop farming Cattle ranching and farming Support activities and forestry Source: Pegasus Planning and Development; BEA.gov After integrating both the first and second levels of analy- sis, the industry sectors recommended for targeting by Meridian are as follows: 1. Ag Tech: Composite category including research, devel- opment, production, and sales of agricultural machinery, measuring devices, and medical foods. 2. Scientific Research and Development: Original investi- gation or application of research for the creation of new products. 3. Management, Scientific and Technical Consulting Ser- vices: Firms that influence how business, governments, and institutions make decisions by delivering services in the form of knowledge, experience, special skills, or creativity. 4. Boiler, Tank, and Shipping Container Manufacturing: Service Ag Supply chain and transportation needs. 5. Grocery and related product Wholesalers: Non -durable goods wholesalers; in this case, includes distributors of foods and specialized agricultural products. 6. Medical & Diagnostic Laboratories: Providing analytic or diagnostic services to the medical profession. 7. Outpatient Care Centers: Mental Health & Substance Abuse; Family Planning. 8. Other Hospitals: Specialty hospitals; treatment to inpa- tients with a specific type of condition. These industries represent clear examples of the region's core strengths in agriculture, professional services, and healthcare. They reinforce the basic thrust of the strate- gies proposed for the Fields District coupled with those recommended by the Economic Development Audit & Strategy. FIELDS DISTRICT REPORT • 15 Core Themes These Core Themes are high-level statements that help form the base for the Fields Strategies and have been generated by the quantitative and quantitative analysis described above: • The tradition of Agriculture in Meridian and South western Idaho differentiates this area within its State, Regional and U.S. context. Agriculture - oriented activities will continue to serve as a strong base for the Meridian economy for the foreseeable future. • The ability to attract and retain qualified workers is of equal importance as the ability to recruit new companies. • By building on the foundation of a strong initiative for Education / Business Partnerships, there is an opportunity to integrate R & D from the State's universities and its leading companies, and to promote commercialization of new technologies. This will allow Meridian and the Treasure Valley region to evolve from a reliance on its traditional industries and to develop new business opportunities based on emerging technologies. • Strengthening Meridian's entrepreneurial ecosystem and providing strong support to rapidly growing small businesses is key to developing an innovation economy across the entire region • Local leaders must strongly commit to economic development, both in policy making and resource allocation, to reach the long-term goals and opportunities identified by this study. These Core Themes form a basis for the recommenda- tions found in the following pages. 16 ' CITY OF MERIDIAN. IDAHO FIELDS DISTRICT REPORT • 17 Fields District Strategy .................................... 00 E E E 0000000...... 0 0 0 0 0 0 0 a Diversify Meridian's economy by cultivating talent, developing an innovation ecosystem, and continuing to improve quality of place to keep and attract talent -- all while building upon its agricultural heritage. Meridian has been described as being located "at the intersection of agriculture and technology." The City of Meridian has a strong economic and cultural heritage in agriculture. Development pressures and structural shifts in the agriculture industry have led to significant declines in agriculture usage in Ada County.At the same time, the Treasure Valley region has become a burgeon- ing center of technology—from its industry growth to talent development programs. Research on Meridian's assets and opportunities was combined with in-depth analysis of this "Ag -Tech" intersection. Agriculture, like most American industries, faces a new frontier where integrating new technology is fundamen- tal to remaining competitive and profitable. Advanced manufacturing and biomedical development are salient examples, but agriculture too has arrived at a nexus merging traditional skills and markets with advanced production and distribution technologies. Robotics, GPS, drones, remote sensors, and modified seeds and crop varieties will be necessary to meet the global demands and adapt to a more chaotic climate. According a recent study by Idaho Business for Education (IBE)... • Idaho has the lowest rate of graduates immediately matriculating after graduation in the country. • Currently only 41% of Idaho workers between 25-34 years old have a work- y ready certificate or higher (only 26% hold at least a Bachelor's degree or higher) • By 2020, 61% of workers will need a certificate or higher at 43% of those worker will need at least a Bachelor's degree The implications for development of the future agricul- tural workforce are tremendous. Today, a work -ready certificate is a bare minimum for high quality employ- ment, and demands for degree -holding workers in the Science, Technology, Engineering, and (advanced) Manufacturing fields are high and growing. This is why the first of our primary recommendations is focused on strengthening partnerships between business and ed- ucational institutions (K-20) to meet industry needs today and to drive innovation further tomorrow. TOP 5 Degree Areas Emerging in the Next 5 Years for Southwest Idaho 1. Computer Science and Technology 2. Business and Economics 3. Engineering 4. Health Science 5. Communications (IBE,"24 Core Initiative As agriculture continues to embrace and become more integrated with technology, increased opportunities for new services and products are emerging. Two brick - and -mortar initiatives are recommended to meet this demand. • Create an Ag and Technology focused workforce development program that partners education providers and industry.The program's campus will serve as an anchor to the overall innovation eco system. It will directly link high school students to work -ready certificates and associates deg Links to higher education will be incorpon this campus can usher in the next generati 18 ' CITY OF MERIDIAN, IDAHO talent to meet industry's needs and provide com petitive jobs for the short and longer term. Simultaneously, establish "Venture Meridian" as an entrepreneurial incubator that will provide capacity to rapidly conceptualize and launch new business ventures to meet emerging opportunities and demands for agricultural services and products. Designed in tandem, these initiatives are first steps that will lay the foundation for higher level research and development that must be present before resource intensive research facilities and programs can be established. They will establish strong partnerships expediting the steps toward R&D, technology transfer, and commercialization of innovations. A city's investment in an education and innovation in- frastructure is critical for economic development, but it does not guarantee the retention of a skilled work- force, entrepreneurs, and large businesses necessary for long-term growth. Keeping and attracting talent requires holistic planning that augments Meridian's high quality of life with strong "quality of place."This goes beyond investments in downtown or particular projects, referring to the uniqueness, attractiveness, inclusiveness, and connectedness of the built environ- ment.These characteristics are crucial to attracting the next generation of creative talent, as well as resi- dents and workers across the demographic spectrum. One can easily see how innovation as a principle goes hand in hand with thinking about how we use space and the concept of quality of place. Innovation is driven by two unique forces interacting and building something new, better, and different. Quality of place means providing a space for that and the sense that this change is good and welcome! Supporting Initiatives Two additional initiatives are recommended to further diversify the economy, create jobs, and promote desir- able and sustainable land uses. These also serve to improve quality of place by adding amenities, making the area more attractive to existing residents, newcom- ers and visitors: • A hub for agritourism -- a Meridian Ag Experience Center • An Ag -based real estate development strategy Nationally, Agri -tourism is a rapidly growing industry segment. It is tightly linked to learning about local food culture and developing an understanding of local culture and heritage. Regionally, agricultural and rural tourism amenities abound and Meridian has a great opportunity to position itself as a central hub or take -off point for exploring these cultural assets by creating an Ag -Expe- riential Tourism Destination. The last initiative is the Ag -based real estate develop- ment model: an approximately 500 acre development planned after the same design principles of a golf - course community, with active food production and lo- cal -food focused amenities as the central feature among a clustered residential and mixed-use development. Together these initiatives can strongly enhance the Quality of Place in Meridian.They will make major contributions to economic fundamentals in terms of workforce and entrepreneurial infrastructure. They will also add considerable value to existing real estate and generate attractive amenities for existing and prospec- tive city residents.They will help cultivate, retain, and attract the young, creative, technically -sophisticated workforce of tomorrow while serving Meridian's resi- dents today. A "Next Steps" sectionfollows these Catalysts and Strategies. It is important to remember that economic development is not a sprint, it is a marathon. Leaders must keep a long-range perspective in mind: adopting this Strategy is only the first step in a long-term economic development pro- gram for the City of Meridian that will involve every department of the City. STRATEGY AT -A -GLANCE To drive the Fields District strategy forward, the consultant team recommends that the City pursue three separate, but related and mutually reinforcing catalytic initiatives detailed below in the recommendations section. Implementation should be staged / phased and coordinated among the three: 1. Ag Innovation Campus where regional educational institutions will partner with business community to create a specialized campus to strength- en the K-20 pipeline to satisfy current and future employment demand inl<eyoccupationsandsl<illssets. Richland Community College & Agribusiness Corridor M V 2. Agritourism Development that will position Meridian as a jumping off point for exploring regional ag-heritage & cultural tourism amenities by the creation of an Ag -Experience Center. Agritopia, Gilbert, AZ 3. Ag -Based Real Estate Development for which the City partners with developers to create a diversified mixed- use neighbohood built around an organic, community -supported farm. Using premier urban design elements will create a harmoni- // ;'/�ous environment at the rural -urban interface. ,V,''�� �T 20 ' CITY OF MERIDIAN. IDAHO Recommendation 1: ESTABLISH AN AGRICULTURAL -FOCUSED TALENT DEVELOPMENT AND INDUSTRY PARTNERSHIP INITIATIVE Context: An innovative community builds institutions and culti- vates a culture open to and supportive of experimenta- tion, education and skills development, and new con- cepts and techniques. This type of high-growth climate cannot be developed ad hoc; rather, it depends on a long process of investing in human capital and relationships. An economically vibrant community depends on an eco- system of agents and organizations, working towards incremental improvement of the local business climate. The first "rung" on the ladder of resilient local growth is the cultivation and retention of high -skill, talented workers in a range of technical and managerial fields. The talent development sphere is the "engine" for deepening skills specialization and industry advance- ment. As the skilled workforce and entrepreneurial communities grow, with constant cooperation with established companies, local investment will increase. This provides the base necessary for industry growth, research and development, and technology commercial- ization that yields major growth in high-quality jobs. The first step on this path to substantial industry devel- opment is the cultivation of a pool of workers matching the skill sets demanded by regional industry, and tying that pool to entrepreneurial programs industry target- ing initiatives. Recommendation IA. Engage Industry with Educa- tional Institutions to Define Concrete Talent Develop- ment Goals, Tactics, Outcomes and Metrics • Utilize Target Industry and Target Occupations Analysis to guide the creation of a Talent Development Initiative • Review the Assumptions and Implications of the Target Industries Show how the signature cluster development strategy for Agriculture — with its three catalytic initiatives -- fits within Meridian's overall E/�' Meridian—Boise Regional AS Innovation Ecosystem Phase J phase t . S. -/ Phase ] Graphic Smmr.. Pegasus economic development strategy. • Initial focus of Talent Development programs should be more narrowly focused than merely "all of Agriculture"; build Talent Development capabilities based on: o priority needs articulated by industry o priorities resulting from Target Industry Occupational Analysis o priority areas identified by Meridian School District No. 2, CWI, and universities Consider focusing the Initial Talent Development, Collaborative Research and Commercialization efforts on "Ag Tech"— Multidisciplinary and emerging application of Information Technology to: o innovative agricultural equipment o cutting-edge ag-production processes (including Unmanned Aerial Vehicle, precision agriculture, environmental assessment, etc.) o bioenergy, biomaterials o water, energy, environmental sciences • Establish specific, measurable goals, e.g. number of graduates in specific degree or certificate programs or fields; goals for internships or experiential education, etc. Recommendation 1B. Establish an "Agricultural Talent Development, Commercialization & Research Campus" at a strategic location within Meridian. [Alternative name: Meridian Ag Innovation Campus -- A Center for Talent Development, Research and Com- mercialization] • The Campus would serve as a nucleus around which various related agricultural initiatives may be developed and would revolve. • The campus should build on Meridian's agricultural heritage and direct agricultural assets, while leveraging the significant agricultural education and research assets that exist within the Treasure Valley. Recommendation 1C. Create a Business Plan for the Ag -focused Talent Development Initiative +Ag Innova- tion Campus • Potential Elements o Virtual (to start) versus Place -based • Rationale — how to evolve from initial virtual to eventual Place -based o Preliminary Site parameters (size, locational criteria) o Preliminary Building parameters (size, function) o Preliminary programming o Preliminary identification of funding sources / options / techniques Walla Walla Community College, Agriculture Center of Excellence, FFA Ag -Technology and Mechanical Systems Careers Contest Spring 2013 FIELDS DISTRICT REPORT - 21 Top 10 Technologies for the future of Agriculture 1. Wearable Computers: such as Google Glass. 2. Next -Wave ISOBUS: communications protocol for farm equipment to ensure all brands of electronics will speak the same language. 3. Electric Motors: swapping manual operations systems for electric drives with high-speed seed metering, variable-rate seeding, and switching between hybrids in the same row. 4. High Voltage Tractors: new forms of power generation, increasing precision, easing connections with implements, providing power to electric motors. 5. Sensors: precision and safety in measuring soil moisture and nutrient detection. 6. Predictive down pressure: combines active down force of implements with anticipatory sensors. 7. Drones/Unmanned aerial systems: providing aerial imagery to identify stressors that may account for variances. Improving zoom and infrared technologies. 8. Robots/Autonomous systems: Some can drive tractors, follow a combine, scout for pests, or plant crops. 9. 3-D Printing: can be used to replicate materials for production such as hood Ornaments or tools, several have been used to make drones. 10. Cloud technologies: whether open -sourced or for individuals, cloud storage will be a useful technology to store "Big Data." Sourer. FarminduslryNevrs.mm • Consider possible synergies by co -locating the proposed "Agricultural Talent Development, Commercialization & Research Campus" with e Recommendation #2 Agritourism and Recommenda tion #3 for Ag -focused land development (E.g. = related to costs of land assembly and infrastructure, marketing / visibility, critical mass, etc.) Recommendation #1D: Create a structure for the Ag - focused Talent Development - Initiative s As part of longer-term implementation of the Ini- tiatives and Business Plan outlined above, create an umbrella leadership structure, whose purpose and potential benefits include: o engage key stakeholders o cement public-private partnership o provide strategic planning direction on an ongoing basis o help establish regional foundations o support fundraising efforts o raise visibility and create a brand 22 • CITY OF MERIDIAN. IDAHO Recommendation 2: CREATE A COMPREHENSIVE AGRI-TOURISM STRATEGY CENTERED ON MERIDIAN AS THE "AG -DESTINATION HUB OF THE TREASURE Context: Though farmland loss is occurring nation-wide, the magnitude of this trend in Ada County cannot be over- stated. In the last five years Ada County has seen a loss of farmland greater than that of the previous 15 years! It is a critical time, when more political will must be harnessed to change or mitigate the rolling tide into the Greenfield. Agri -Tourism will not only work to improve Quality of Place; it will increase awareness and stimu- late an interest in agriculture for the next generation. The first "rung" on the ladder of resilient local growth is the cultivation and retention of high -skill, talented workers in a range of technical and managerial fields. The talent development sphere is the "engine" for deepening skills specialization and industry advance- ment. As the skilled workforce and entrepreneurial communities grow, with constant cooperation with established companies, local investment will increase. This provides the base necessary for industry growth, research and development, and technology commercial - Loss of Farmland in Acres County 1992 2007% 2012 cn% (92-07) (07-12) Ada 232,879 191,477 -21.6% 190,009 -25% Canyon 391,050 260,247 -50.3% 303,836 ♦17% Gem 197,176 190,757 -3.4% 178,984 -6% Elmore 353,528 346,550 -2.0% 344,820 0% Source: US Agriculture census ization that yields major growth in high-quality jobs. Agri -Tourism can be thought of as "experiential tour- ism"— that is, tourism that is less passive and focused on interacting with the local way of life or environment. While once considered a niche market, it is becoming a major industry segment and is the fastest growing form of tourism in the world. Agri -Tourism is focused on learning about and experiencing farming and agricul- tural recreation. It is inherently regional and it relies entirely on local authenticity—linked to an area's local food culture. Agri -Tourism as a form of recreation can be traced back to the 1800s when the city gentry would visit pastoral landscapes to escape the summer swelter of urban areas. More recently it has become commercial- ized, with some parts of the world almost totally reli- ant on this for economic vitality. Treasure Valley has the soil quality to support nearly 200 different types of agricultural products.This kind of diversity can be featured and build a greater appreciation of local resi- dents for the rareness and fragility of this landscape. The multiple elements of the overall Agri -Tourism strategy should fit within the framework of Meridian's Economic Development Strategic Plan, and should be mutually reinforcing with other economic development and Fields District recommendations. Agriculture and Agri -Tourism should be included as key elements in the city's future economic development and comprehen- sive planning efforts. This recommendation includes a signature initiative but its success is very much linked to an understanding of the region's cultural heritage. It is a jumping off point to experiencing the unique agriculture heritage of the Treasure Valley. It is the "first tier" attraction to a wide array of cultural assets a a 3 and experiences. Tourism is often seasonal and can be cyclical, but its limitations do not mean it should be ignored.Tourism can generate sales tax, seasonal employment and ameni- ties for locals, and visibility to attract new residents and talent.This initiative will create a deeper sense of place, will have local and regional benefits, and will build ad- ditional support for Meridian's other initiatives in the ED Audit/Action Plan, including highway expansion. It will be important for planning groups to adequately represent the interests of all stakeholders in Agri -Tourism develop- ment. Agri -Tourism Details Sub classifications: ecotourism, garden tourism, guest ranches, wine tourism, dairy tourism, and rural tour- ism (related to experiencing the lifestyle of living in the country, its culture, religion, and building an ethnograph- ic understanding of rural human activity) Market: The largest market segment for Agri -Tourism is Baby Boomers followed by Mil lennials, though these types of activities are typically friendly to all age groups. The PLACE is the product, and all the related experi- ences native to the place. By 2020, US/Canadian Baby Boomers (between ages 55 to 74) will number over 84 million.They are the most affluent and educated genera- tion of retirees in the history of either country.They are Left and Below: Kiyokawa Family Orchard, Parkdale, OR Apple picking and Slow Food Feast 800 600 400 200 A FIELDS DISTRICT REPORT • 23 Total Value of Agritourism Recreational Services on Farmland in the US (in millions) 2002 2007 2012 Source: US Agriculture Censusl sophisticated travelers interested in more than conven- tional attractions. They seek an experience and a sense of place. Recommendation 2A. Convene local stakeholders as a Meridian Agri -Tourism Steering Committee to carry out strategic planning and guide implementation efforts • Before major initiatives are pursued, strategic planning must provide the staging ground. • Because Agri -Tourism is naturally a regional initiative, Meridian needs to organize locally to ensure that products and outcomes of developing regional tourism can be directly linked to local efforts. • The City should lead an effort to convene interested developers, land owners, the Chamber of Commerce (the lead organiza tion for Tourism marketing), and a cross- section of the community in strategic planning.The Committee will create a strategy plan and bylaws for the purpose of placing Meridian as a hub (not an all-inclu sive environment or stand-alone attraction) for exploring Agri -Tourism and cultural heritage in the region.The region's Agri - Tourism development thereby becomes a mutually enforcing effort: the more that the region's agriculture base is improved, preserved, and made amenable to tourists and locals, Meridian's centrality and prominence will rise. Recommendation 2B. Convene regional Agri -Tourism stakeholders to form aTreasure Valley Regional Agri - Tourism entity (Note: these recommendations are well -supported by the University of Idaho College report on Agri -Tourism at the Rural -Urban Inter 24 • CITY OF MERIDIAN. IDAHO • Comprised of: County officials, Rural Development administrators, City represent tatives, land/farm owners, dairy owners, producer groups, Chambers of commerce, tourism marketing entities, and local residents • Entity can serve to: o Provide a regional basis of support for developing local strategies to promote ag-heritage oriented tourism or Agri - Tourism o Conduct a cultural heritage asset mapping that can inform the local Agri - Tourism steering committee of additional resources and experiences (see Appendix) o Design themed routes for cultural tourism cohorts (ex: Ag Architecture, Historic Barn Tour, Wine Tourism, Small farmstead trail) o Create an Agri -Tourism marketing fund o Lobby for creation of "agriculture promotion districts" for conservation and preservation of ag uses o Advocate for changes to State policies related to state highway signage for marketing • Meridian should support and integrate existing regional tourism plans and initia- tives as "spokes" with Meridian's new initiatives placing the city at the center (promoting connectivity) o Treasure Valley Scenic Byways initiative o The Sunny Slope Wine Trail o Meridian's Wine Coop on Main Street Relocation of the Garden City Fairgrounds— which is immanentthough a longer -range proposition that depends on building consensus among regional stakeholders— could be integrated with the local Agri - Tourism strategic plan. Meridian could position itself as the ideal location for the fairground's relocation the potential to be come a "Southwest Idaho" State Fair. Recommendation #2C: Create a high profile, Ag -fo- cused "destination attraction" in Meridian that provides a unique and complementary amenity for the Boise and Treasure Valley region. • Provide a visitor experience that appeals both to existing residents as a weekend, sea- sonal or occasional activity; with sufficient National Wine Tourism Site, Bitner Vineyards, Part of the Sunny Slope Wine Trail scale and critical mass to provide a draw for visitors from beyond the region, or those who are "passing through" but seeking an expanded range of tourist offerings. • Purpose: tourism amenities for the city, educating the region about the unique as sets of the valley and the need to preserve them, develop an interest in ag and local food culture • Build on precedents / models for such a "destination attraction" from other states such as Oregon, Indiana, Kentucky and Texas • The City of Meridian should not lead the planning process but should be a part of the strategic planning entity and assist in implementation by way of partnerships and fast-track permitting. CORE ELEMENTS SHOULD INCLUDE: 1. The Ag Heritage Center (Sustainable building) • Exhibit Hall with opportunities to observe and learn about Idaho's agricultural history, present and future • ILLUSTRATIVE Programming o Permanent Idaho Agriculture Museum, including interactive exhibits and revolving changing exhibits o Learning Center to help advance Idaho agriculture through education o Agriculture Library and Media Center with latest high-tech equipment linking to universities and other sites o Agriculture Hall of Fame — recognizing past and current families and individuals as well as major corporate leaders o Virtual Farm Experiences within the museum, including operating large farm machinery, live animals o Seed, Soil, Sun: from seed to table o An "Idaho Preferred" Center for Farms and Food — Education about importance of land to table movement o Food Science -plants, animal, and value- added products o Horsepower -- how farming has changed from plow to state-of-the-art o Potatoes and Key Crops -- history and usage o Agricultural antiques • Energy Pavilion o Center and campus could be designed to produce 100 percent of energy required through combined use of wind, solar and geothermal power. o Harvest Skies -power of solar, wind, biomass, weather — o Sustainable/ Alternative Energy technologies o Water as a Resource • MeetinglfradeShow/Assembly Area o Multi -media 250 -seat Theater, plus up to 1000 -seat auditorium o Communications Center/Learning Lab o Meeting space for agricultural and non- agricultural groups FIELDS DISTRICT REPORT • 25 Interim Concept name: "Treasure Valley Ag Experience Center" • 50 acre site (minimum recommended), with "working farm" exhibits • Estimated investment for Phase I: approxi- mately $20 million • Example Activities o Farm Tours o Farmers Market o Seasonal Experiences: Pumpkin Patch Fun; Corn Mazes; Christmas tree cutting o Restaurants and retail o Local Craft and Holiday Store o Petting Zoo o Movie Nights o Summer farm camps, chef camps for kids Precedents From these, demonstrate "Order of Magnitude" data for Sites, Buildings and Funding • Kentucky Ag Heritage Center (in planning) • Huber Orchard, Winery and Vineyards http://www.huberwinery.com • Fair Oaks Farms http://www.fofarms.com • Chaney's Dairy Barn • Bob Bullock Texas State History Museum, Austin, TX • Connor Prairie, Fishers, IN • Texas Agricultural Education and Heritage Center, Seguin, TX • The Barn: Center for Agricultural Science and Heritage, Indianapolis, IN • The Sage Center fthttp://www.visitsage.com A • Info Desk for Agri -Tourism -- advice for other things to see and do in the region (including recreational Tourism) • Show Barn (12,000 sq. ft) • Farm Store • Restaurant/Dining + Commercial Kitchen 26 ' CITY OF MERIDIAN. IDAHO 2. Variation/Additional Elements A: Wine Region Visitor Experience / Center • May be included as display, information center within the Ag Heritage Center facility 3. Variation/ Additional Elements B: Working Dairy Farm —A "Visitor Experience" • Includes production area for cheese and ice cream making, and visitor participation activities 4. Variation/ Additional Elements C: U -Pick - Em Fruits and Vegetables (working fruit and vegetable farm section) Recommendation 2C.1 Site Selection Recommenda- tions • Priority Site Selection criteria: located off - Highway 16 for connection to Scenic By ways and Sunny Slope Wine Trail • Evaluate publicly -owned land that could be used • Near major East-West corridor: • Shorter term ideal alternative: Ten Mile Interchange o Already has necessary infrastructure o Highly visible from I-84 o Closer to Meridian's remaining ag production area (south of I-84) o Nearer to Downtown Meridian • Longer term, secondary option: Fields District Area o Challenge: will require connecting wastewater; much of the land is already spoken for by many developers; connectivity to the rest of the city is a longer -range proposition (Highway 16 +20/26 improvements) o Opportunities: • Depending on location of innovation campus and Ag -focused real estate community, could have more land options to co -locate • Could encourage the creation of a "community activity node" in the Northwest corridor and encourage denser development practices for long-range planning Fair Oak Farms, dairy farm experience center Fair Oaks, Indiana • Proximity to Can -Ada border may help leverage regional support for relocating the Garden City Fair grounds to this region and make the case for a Southwest Idaho Fair =i Recommendation 2C.2 Strategic and Business Plan Recommendation • Business Plan elements/ Supporting Issues will need to be addressed o ORGANIZATIONAL Recommendations: ensure representation by land owners; Agri -Tourism operators; agribusinesses; producer groups; potential philanthropic organizations; developers; local, regional, and state entities o NEED for Champion[s];/ Partnerships and Buy -in o Role of State Government will need to be defined o Sources and Uses of Funds • State, philanthropy, local (could come in \ non -fiduciary terms), or even a grassroots membership base FIELDS DISTRICT REPORT . 27 Recommendation 3: CREATE AN AG -BASED REAL ESTATE DEVELOPMENT INCORPO- RATING A MIX OF RESIDENTIAL, COMMERCIAL, AGRICULTURAL, AND CIVIC USES. VALLEY" Context Ada County lost 25% of its farmland from 2007 to 2012. Canyon County lost 50% of its farmland from 1992 to 2007. Much of the land in Meridian city limits that used to be farmland has been converted to subdivi- sions which have provided needed housing in the region. The price of land in Meridian has increased substan- tially as these "greenfield" sites for new subdivisions become scarce amidst the incredible population growth in the region. Stakeholder interviews revealed that prices of farmland were $5,000/acre in 1990 and are now well above $100,000/acre. As farmers in the Ada/Canyon County area age, and the next generation is not interested in taking on the farms, the offers from developers that farmers are receiving are appealing. By most accounts, a majority of the land in Ada County (some of which will become part of the City of Meridian through annexation) has already been "spoken for" by developers who have rights -to -purchase contracts for these lands. Very little water or sewer exists in the Fields Dis- trict; urban development would require significant infrastructure investment. This area and the Ten -Mile vicinity to the south, can benefit from the wastewater reclamation project of the City of Meridian, and re- ceive reclaimed water at reduced or free prices. As a result of the need that developers will have for infrastructure in the Fields area, and with the inter- est the City has in preserving agricultural heritage, the City should embrace a program to foster a new type of subdivision called we term as an Ag -based land development. This is not a new concept. This type of hamlet development is an Old World development pat- tern brought from Europe where homes are clustered, agricultural land is preserved and commercial services are walkable to residents. Development scholar at the Urban Land Institute, Ed McMahon stated that as of 2012 there are close to 200 of such developments currently exist in the United States, and many are in planning or under develop - Illustrative examples of how to gradually Integrate urbani and rural uses through a land development code that applies a "transect"model. 2 Left: General Transect Models Below: Transect -based Land Plan for Southlands, Tsawwassen, BC, Canada �_J _ l ' 6. a 28 ' CITY OF MERIDIAN. IDAHO ment. The concept is simple: cluster homes; substitute a community garden in place of a large recreational ame- nity such as a golf course; and make the commercial services walkable to most residents. Nearly every US case has been examined for the Fields District Strategy and the three that are most relevant for Meridian are presented on this and the following pages. The following recommendations are not in a particu- lar order, and in fact several should be done concur- rently and are complimentary to each other. Recommendation 3A. Grow Meridian Sustainably • Consultants compared the Ag -based Land Development model to a traditional residential subdivision (see pg 30-31), based on the impact both developments would have on the city's budget over ten years. This fiscal impact analysis used per capita and per square foot values for local public expenditures and tax receipts for the different land uses represented in each model. • The Ag -based Land Development model would contribute a much larger surplus to Meridian over ten years than a traditional development. The net present value of the Ag -based Land Development surplus is $623,635, compared to $453,487 for the traditional development, an increase of almost 40%. • The Ag -based Land Development is a smart investment for the region: it preserves active farm land (30% of the total acreage), promotes housing market diversity, facilitates more walking and biking, and generates more value per acre for both developers and the city. • The City should establish and use a Fiscal Impact Analysis Model for all developments, as a matter of policy • Maintaining to the City's 10 -year and then Annual CIP will save the City and its taxpayers millions over a 10 -year period. • City should establish and maintain an approval, permit and utility outlay system that maintains to the City's Comprehensive Plan and Capital Improvements Plan • The City should actively market its green and sustainable initiatives including this Fields Initiative, and also the Water Reclamation project with the city's wastewater treatment facility. E/�S Recommendation 3B. Convene a stakeholders work- ing group comprised of developers, landowners, plan- ners, bankers brokers and builders. • The City needs to lead this initiative with support from the County and other associations and appropriate stakeholder support. • City should hold several in-house/staff only sessions with experts to determine how best Meridian can and should execute this concept. • Develop a true model for an Ag -based land development that addresses every aspect from the public and private side that can be identified • Create a presentation that clearly articulates the vision and the benefits • Create an outreach strategy and "buzz" about this concept, before advertising a discussion or meeting about this concept. This can help developers see the buzz and interest among the community. • Bring together interested parties to discuss the model that Meridian will be fostering, including: developers, landowners, planners, bankers, brokers, and builders. • The goal is to educate, create excitement and generate marketing exposure regionally and nationally for what Meridian is trying to do Recommendation 3C. Create a Land Use mechanism to foster Ag -based Real estate development(s) • The current Future Land Use Map and Plan and Zoning Map and Plan may accommodate Ag -based development.An internal staff team should determine what changes (if any need to be made) • If staff determines that current code may not ac- commodate this innovative development patter, then the City should examine modifications would be necessary. • Consideration to a form -based code should be given. If not for the whole City, form -based code could be a good mechanism for the Fields District. The form -based code will provide the predicable environment the community and the development community seek. • Some of the ag-based development proposals may best be implemented through the use of a public- private finance mechanism called a Community Improvement District (CID), as was done in Boise with the Harris Ranch development. Recommendation 3D. Work with a developer to create a Model Ag -based real estate development in Meridian • Through the course of implementing 3A above, some will be more interested than others. • Meridian should identify 1-2 developers who have the most interest and who have site control to work with to create a model. • Visit several of these Case Study sites together, visiting with the developers and the public entities involved. • Work with the developer(s) to create conceptual and then site plans for a model. • Once implemented perform evaluations and impact analyses to determine the net impacts. FIELDS DISTRICT REPORT • 29 30 ' CITY OF MERIDIAN. IDAHO F� ISCal Impact Analysis of Development Types Source: Anne Wescott, Idaho Smart Growth; Pegasus Planning and Development, June 2014 Methodology The fiscal impact model estimates marginal costs and revenues for the City's General Fund that would change as a result of a proposed development. The model applies them to projected new development on a per unit or per square foot basis, and compares them to estimated net new revenues.To the extent that actual revenues and expenditures vary from the estimates provided within these interviews, the results of the model will vary from reality.The model is designed to illustrate the potential fiscal impact of new development, but it is not anticipated that the impacts estimated in the model will precisely mirror those that actually occur. Developments that generate ongoing surpluses produce City revenues that exceed the costs of the services they require. These excess revenues could be used to offset deficits from other developments, to augment the City's fund balance, or to improve service standards. Developments that produce ongoing deficits require service costs in excess of the revenues they generate.These deficits could be offset by surpluses from other developments, they could be mitigated out of fund balance, they could be mitigated by the developer, or they could require the City to decrease service levels. PROJECTED NEW RESIDENTIAL UNITS OR NON-RESIDENTIAL YS a W Aga Aga A A CURRENT MARGINAL COSTS & REVENUES (PER RESIDENTIAL UNIT OR NON-RESIDENTIAL SQUARE FOOT) NEW CITY COSTS & REVENUES, Assumptions The calculations in the fiscal model are based on two sets of assumptions: • Assumptions about the size, type and value of the proposed development to be analyzed by the model; and • Assumptions about the service delivery patterns of City functions, including the expenditures that are variable in regards to growth and the types of development that cause increases in those expenditures. Development Assumptions Two pieces of information are required about a projected development in order to calculate its likely fiscal impact: • The development schedule for each projected residential unit type or non-residential land -use; and, • The property value of each unit type or land -use. The fiscal impact model for the proposed development is designed to assess the four land -use types proposed: residen- tial, office, retail, and farmland development. The Development Land Use Assumptions chart summarizes the assump- tions which we have used the fiscal model to analyze. This data can be modified to represent changes in land use assumptions in the proposed development, or land uses in any future development under consideration in the City of Meridian. Residential* Farm -related* Single Family New Units Cost per unit Acres Cost per acre High Density 450 $150,000 Community -Supported (CSA)** 40 $1,200 Moderate Density 250 $180,000 Incubator Farm 20 $1,200 Low Density 11 $200,000 Working Farm 100 $1,200 Multi -Family Townhomes 150 $150,000 Apartments 150 $150,000 Commercial* Square Feet Cost per sq ft Office 80,000 $220 Retail 70,000 $220 q1El_-ASUS * Costs absorped equally over 10 years **Producing 1,011 CSA shares per year as well as produce to be sold at an on -property farm stand FIELDS DISTRICT REPORT • 31 Fiscal Impact Analysis of Development Types Development Assumptions Continued a TRADITIONAL DEVELOPMENT A traditional residential development is dominated by single-family housing with large lots, low street connectivity, and small amounts of green space. Commercial uses and green space are limited. Transportation is focused on automobiles, and neighbor- hood design limits the practicality of walking, biking, or using transit services. Large amounts of space are taken up for housing, putting development pressure on adjacent farmland. AG -FOCUSED REAL ESTATE DEVELOPMENT This type of development features a strong mix of commercial and agricultural uses. There is a greater diversity of housing types, including multiple sizes of single-family home and some apartments and townhomes near the development core. Retail and office space is integrated into urban design and helps create a distinct "center." Urban Q design makes it practical and enjoyable to walk, bike instead of rely exclusively on automobiles. Substantial farmland and greenspace are preserved, serving both local residents and commercial markets into perpetuity. Net Fiscal Impact: Traditional vs.Ag-Based Real Estate Development Surplus Net Present Value Cumulative Surplus Commercial Surplus Residential Surplus $0 $400,000 $800,000 $1,000,000 Ag -Based Development Source Anne WexnD,Idaho Smart G,00vd; _Pegasus PNnning and De+elopmenl, June 2014 Traditional Development Results Two real estate development models were considered in terms of their fiscal impact for the city of Meridian. One model is a conventional residential subdivision, comprised of moderate and low density single family housing. The second mod- el is an ag-focused real estate development, modeled according to best practices and based on case studies of existing communities around the country (in particular, in the West).These models were analyzed in terms of the expenditures they require from Meridian city services, and the revenues they generate in local taxes.This analysis included review of city budgets, determination of fixed and variable costs for city departments, adjustments based on local property mar- kets, and projection of tax value over a ten year period. The results show a dramatic fiscal benefit to the ag-based real estate development. Despite preserving a third of its land for agriculture and providing a host of amenity and health benefits, the ag-based real estate development generates over $170,000 more net surplus than the traditional development on the same acreage. This equates to a fiscal of almost �� 40% for the city of Meridian. This analysis demonstrates that ag-based real estate development is a smart development model for Meridian. 1� OCase Study: Bucking Horse, Fort Collins, CO This is development located in a highly urbanized area designed with a "modern farmhouse aesthetic." The project is guided by the principles of ag-heritage, healthy living, and a social connectivity. From the developer: "We want to return to a time 50 years ago when there was a sense of community."This idea goes right down to their design principles. While the architectural styles of the homes is very flexible, all homes will sit on smaller lots, have large front porches, and no privacy gates. Highights o Total Acres: 240 o 205 single family homes; 78Townhomes; 300 condos & apartments o Anticipating sales at 20-25% above AMV o Currently selling at 100% above AMV o Commercial: 30,000 sf including 19,000 sf flex production building and 2,500 sf farm -to -table restaurant o 3.6 acre organic Community Supported - Agriculture Farm o 1,000 sf winery; a distillery and microbrewery are also planned o Rehabing dozens of existing structures and using old farm equipment as art installations through out the development. Right: Restoration plans for farm -to -table Restaurant Next Steps .............................................................. The Fields District recommendations contained in this report represent an ambitious strategy -- one that once implemented will differentiate Meridian within the Treasure Valley region, within the State of Idaho and across the northwestern United States. It positions Meridian as an innovative City, one led by innovative leaders, that is able to integrate community develop- ment, economic development and land planning in a manner that is fiscally sustainable and respects commu- nity values and culture. The Fields District Strategy's three major initiatives —Ag -Innovation Campus for Talent Development and Industry Partnerships, Agri -Tourism, and Ag -based Real Estate Development— build upon the foundation already set in place by Meridian's leaders. All of the catalyst initiatives found within this Fields Strategy have been incorporated into an overall Economic Development Strategy for the City of Meridian, which has more detail in the Next Steps than does this Fields Strategy. The building blocks for the Talent Development and Innovation initiative have the potential to serve as link- ages to the elements of the Ag -tourism initiative. An Ag -based Real Estate Development initiative in Merid- ian can provide a solution that is market -supported and will allow Meridian to promote itself to the creative class. These initiatives can stand alone on their own merits, but as an integrated strategy will help Meridian diversify its economy and position itself in the region as the "Intersection of Technology and Agriculture". FIELDS DISTRICT REPORT • 33 Next steps that the City of Meridian needs to take to implement the Fields District Strategy include: • City Council adoption of the Fields District Strategy • Focus on implementation of these Fields initiatives through the Economic Development Strategy (sepa rate document) and an "implementation roadmap" also found in the Economic Development Strategy • Communicate with partners and stakeholders on steps Meridian will take to move these initiatives forward.This should entail a sophisticated education and public relations campaign on the Fields Strategy and Economic Development Strategy. Key to this campaign will be identification and buy -in of Meridian -based and regional private sector • Create Organizational Structures for catalyst projects and develop Business Plans for the Fields Initiatives Lead and participate in a more detailed occupational and industry analysis City Council adoption of a Resolution which designates the Economic Development Strategy as a policy document for incorporation within the City's business strategy 34 • CITY OF MERIDIAN. IDAHO E/ S MER R DIAN SING Q CULTIVATING A NEW FUTURE A FIVE YEAR ECONOMIC DEVELOPMENT STRATEGY FOR THE CITY OF MERIDIAN JUNE 1 Presented by Pegasus Planning and Development and Point A Consulting z • City of Meridian, Idaho Economic Development Audit & Action Plan • 3 Acknowledgements ....0000aa0000..0000a0000...000 a 0000...... 0 a a a 00...... 0 a a a 0000 CLIENT CITY OF MERIDIAN Mayor Tammy DeWeerd Community Development Department Public Works City Finance Department As well the helpful guidance and input from.... THE ADVISORY COMMITTEE MERIDIAN CHAMBER OF COMMERCE MERIDIAN DEVELOPMENT CORPORATION IDAHO SMART GROWTH Anne Wescott CONSULTANTS Pegasus Planning and Development Austin, Texas Point A Consulting Louisville, Kentucky PEGASUS q • City of Meridian, Idaho Economic Development Audit & Action Plan • 5 Table of Contents ........................ 0000 a 0......00000000000000000000000000 Executive Summary.........................................................................................7 Background.....................................................................................................10 Methodology & Findings..................................................................................10 Strategy..........................................................................................................16 Catalyst Projects..... W. • Ag -Innovation Campus....................................................................18 • Ag -Experience Center.....................................................................21 • Ag -focused Real Estate Development .............................................. 26 • Downtown Conference Center......................................................... 32 • Venture Meridian Campus...............................................................34 Strategy 1: Talent and Innovation Ecosystem Development ...........................36 Strategy 2: Business Expansion...................................................................37 Strategy3: Tourism.....................................................................................40 Strategy 4: Infrastructure and Transportation...............................................42 Strategy 5: Downtown................................................................................ 44 Strategy 6: Quality of Place........................................................................46 NextSteps.......................................................................................................49 Appendix..........................................................................................................54 Methodology Community Data Business Owner Survey Case Studies Target Industry & Occupational Analysis Resources Resolution �-PE� wws IV eridia 0 25 50 75 100 Miles Sources: ESRI; Pegasus Planning and Review Economic Development Audit & Action Plan • 7 Executive Summary Economic development is the process a public sector entity takes to cultivate private sector invest- ment. Infrasmicture investments, incentives such as fee waivers, marketing collateral to bring atten- tion to Meridian - all of these are forms of economic development. .............................................................. Over the past three decades, the City of Meridian ex- perienced a rate of population and employment growth that would be considered exceptional for any U.S. city. Furthermore, the regional dynamics that fueled this There is truth in the saying, "If you always do what you always did, you always get what you always got". Growth is an indicator of success, but it frequently is accompa- nied by significant costs or growing pains. In the face of rapid growth suggest that the City and regional trajec- these, adopting a philosophy of actively managing the tory is likely to continue for the foreseeable future. City's growth through strategic investments and policies Forecasts by Compass, the region's transportation planning agency, strongly support this assumption. Given these trends, Meridian's governmental and civic leaders therefore face a critical inflection point. The question before them is not"will Meridian grow?" but rather "how will Meridian grow?"Above all, can Meridian's leaders proactively shape an economic development strategy that will promote the type of growth its citizens' desire? This Economic Development Audit and Strategy is a response to that question. It charts a path toward sustainable growth by focusing on diversification of the City's economy and recommendations to strengthen Meridian's entrepreneurial and innovation ecosystem. In 1990, Meridian was a rural community of approxi- mately 10,000 people. Its current population of 80,000 is projected to climb to at least 100,000 by 2020. The City abuts Boise and is now the 3rd largest municipality in Idaho. Meridian's economic base has diversified through growth in the healthcare and retail sectors, in addition to a burgeoning office sector. Meridian has accomplished this remarkably rapid expansion with just one staff person (FTE) formally designated to carry out the City's economic develop- ment agenda, and with a budget that is half that committed by cities half its size. However, as other communities have found, managing a community's growth strategically --to direct it in specific directions versus merely reacting to events and external dynamics -- may require additional personnel resources, and most likely different skill sets than those that have worked well in the past. represents an opportunity for continued improvement. In seeking to address Meridian's current realities and opportunities, this Economic Development Strategy is built on the following key findings from the Economic Audit: • City revenues (to provide essential services) are too dependent on growth of the retail sector; the economic base is not sufficiently diversified. • There is insufficient collaboration among business/ education/workforce providers • Despite strong population growth, the community is not especially appealing to"Millennials"—a key demographic for businesses, particularly in sectors such as technology. PEGASUS 8 • City of Meridian, Idaho • Past "Qua lity of Place" investments have been focused largely on the needs and activities of families, and need to be broadened to appeal to all demographics. • There is a lack of identifiable tourism assets and companion tourism marketing initiatives. • Farmland in the region is facing increasing pressure from suburban development, threatening key economic and cultural assets. • Insufficient programs, capabilities and resources are committed to developing the community's entre- preneurial and innovation ecosystems. • To sustain Meridian's future business competitiveness and quality of life, there is a need for targeted and proactive economic development efforts supported by additional resources. The following Catalyst Projects therefore are designed to jumpstart implementation of this Strategy: 1 4. Ag Innovation Campus: Create a campus setting where the regions' educational institutions (K-20) can partner with the Agribusiness and farming community to strengthen the talent pipeline matched to key occupations and skill requirements emerging in Agricultural -related industries; the Campus may also function as a center for academic -industry collaboration on research and technology commercialization. Agritourism Development: Establish an "Ag Experience Center" that positions Meridian as a hub and jumping off point for visitors to explore the region's Ag -heritage and Agri -Tourism amenities. Ag -based Real Estate Development ("Agrarian Urbanism"): Partner with developers to create diversified mixed-use neighborhoods built around an organic, community -supported farm. Cutting edge urban design elements will create a harmonious environment at the rural -urban interface. Downtown Conference Center: Develop a multi- purpose performing arts and events venue to serve business needs and community desires for a wider range of local entertainment and meeting options, in the heart of Meridian. The center should provide an active space with at least 18 -hour entertainment options. 5. Venture Meridian: Establish a robust entrepre- neurship program in the heart of Downtown Meridian to create an engine for growth through start-up activity, increase the day -time population downtown, and to plant the flag for entrepreneur- ship as a signature element of Meridian's new "corporate culture" and brand. Ideally partnered with a regional entity that has a proven track record for commercializing research and innovative new business ideas. The Catalyst Projects outlined above will be integrated with the following six recommended Strategies: 1. Talent and Innovation Ecosystem 2. Entrepreneurship and Small Business 3. Tourism Development 4. Land Use, Infrastructure and Transportation 5. Downtown 6. Quality of Place The Audit revealed that Meridian has done an excellent job of supporting the needs of its businesses and resi- dents, which has allowed it to attain its current level of economic and population growth. However, this Strategic Plan is focused on the future. It will build upon existing community assets and the outstanding past work of City leaders and staff. And, while its recommendations are designed to support future policy direction and leadership by the City of Meridian, it should also be considered a guiding road- map for the City's key partners in the economic devel- opment enterprise, including the Meridian Chamber of Commerce, Meridian Development Corporation, and the Boise Valley Economic Partnership. All of these (and possibly other) public and private sector stakeholders must play a role in implementing these recommendations, even as the City provides essential leadership and support to the economic development process. 7A Nt� IS MISSED BY'MOST PEOPLE.. --v? BECAUSE IT IS DRESSED IN OVERALLS AND LOOKS LIKE WORK. w S -' REMEMBER THAT ECONOMIC DEVELOPMENT IS NOT A SPRINT, IT IS A MARATHON. MERIDIAN"S LEADERS MUST KEEP A LONG-RANGE PERSPECTIVE IN MIND: ADOPTING THIS STRATEGY IS ONLY THE FIRST STEP IN A LONG-TERM ECONOMIC DEVELOPMENT PROGRAM FOR THE CITY OF MERIDIAN. io • City of Meridian, Idaho Background .................................... 0 a a a 00...... 0 a 000000000000 In January 2014, the City of Meridian contracted with Pegasus Planning and Development to perform an Audit of the City's current economic development policies and practices, and to use the Audit as a basis to develop an Economic Development Strategy.This report summarizes the findings from the Audit and provides a Strategy/Roadmap that will help Meridian leaders diversify its economy with a more sophisticated and proactive approach to economic development. Multiple organizations are involved in Meridian's economic development efforts, including the Chamber of Commerce, Meridian Development Corporation and Boise Valley Economic Partnership. All of these groups work effectively with each other but many efforts take place in silos, without a game plan for how respective efforts work with one another, and what is the ultimate game plan. As one stakeholder said, "we are not all on the same sheet of music." Recognizing the need to have a collective strategy for all groups and a targeted and proactive approach to economic development, City leaders began a process internally of auditing some of their programs as it re- lates to economic development. This process is just the beginning. Given the scope of this project, stakeholders must realize that more work and resources are needed for successful implementation. Methodology & Findings .............................................................. The economic development Audit for Meridian utilized 3 Qualitative Analysis Overview levels of inquiry: literature review, qualitative research, The City of Meridian has been successful in provid- and quantitative analysis. ing excellent quality of life amenities such as parks, high performing schools and a safe environment, while Literature review involved a thorough investigation still maintaining a "small-town feel" among residents. into existing reports, city planning studies and policy Many interviewees noted the community is "a great documents. The qualitative methodology used a mix of place to raise a family" and recent national rankings stakeholder input methods to integrate the perspec- tives and expertise of community members with those of governmental, institutional and business leaders. The quantitative analysis examined relevant demographic and economic variables, regional industries, and occupa- tional employment trends. More details on the details of our analysis can be found in the Appendix seciton. The approach utilizes these inputs and integrates them within this action plan, while prioritizing the goals of the City of Meridian. Figure 1 illustrates the general rnic development areas examined during the Audit. I findings are as follows: confirm the statement. The City serves the region as an affordable place to live that is centrally located. People value that it is "far enough" from the big -city life of Boise and that despite its rapid growth, it is still a great home environment. Echoing these general findings, large employers in the area are happy with their location in Meridian and a majority of businesses stated their primary reasons for locating there were (1) proximity to consumers and suppliers, and (2) qual- ity of life. Large businesses like working with the City and feel they have a good relationship with City staff and officials. Workforce Limitations Whether created locally or recruited, businesses and industry representatives noted the need for a more Figure 1: Components of the Economic Development Audit y NI Economic Development Audit & Action Plan • 11 skilled workforce or for better programs geared to "re- skilling"or"up-skilling"the workforce. This need was particularly acute among agribusinesses. Businesses noted both in-person and via survey that there are opportunities to improve education -industry collaboration. Business Needs Meridian has a strong large business base, but there is a need to build and continue to establish a stronger tool kit of entrepreneurial support resources. Small businesses need assistance in understanding permitting processes and are in great need of technical assistance and training on a consistent basis. While the City's creation of a Small Business Coordinator will specifically addresses capacity needs in understanding the permitting process, additional technical assistance in the areas of business and financial management is needed. The City has strong business parks and office develop- ment, all of which are privately -owned and operated. The exception is a facility (the former City Hall) that has been retrofitted as incubator space downtown. Light Source: Pegasus Planning and Development Industrial space exists and continues to be built, but land and lease prices are higher in Meridian than in other neighboring communities, prices are not competitive with surrounding communities to the west or near the airport. However, the lease/price differential is mitigated when including other ancillary costs and permitting, Meridian still remains competitive for certain types of manufacturing and servicing aspects of the regions supply chain.The lack of a large meeting venue presents a challenge to the business community, and to local residents in search of a greater array of entertainment options. Growing Infrastructure Problems Traffic congestion in the valley was noted as a significant challenge to the City's quality of life and competitiveness as a business location. Long commutes on highways and congestion in local arterial roads are a major frustration for residents. The City has carried out an excellent water reclamation project in Western Meridian, north of the Interstate and impacting the Fields and the 10 -Mile area. Improvements and expanded infrastructure will yield economic benefits for the City. PES GASES iz • City of Meridian, Idaho A comprehensive utility policy is needed to capitalize on these and similar infrastructure investments. Designating targeted development zones can also aid in promoting development patterns that reduce costs and better utilizing the existing infrastructure currently in place. N 2 N'S IL I tj East -bound traffic, 1-84 and Ten Mile Interchange Under -developed Downtown The success of downtown is a critical element to the overall success of the City. Strengthening downtown was consistently recommended by the business community. Many also noted that the City retail environment is dominated by chain restaurants and retailers, business survey respondents would like to see more local, independent businesses. Within the City of Meridian,The Village has been a great success, though there is still pent-up demand for more entertainment and variety of "things to do" for people of diverse backgrounds and stages of life. This has been ac- knowledged by area leadership, and there is already momentum to shift this. Expectations of the develop- ment community focus on working within a predictable City process while understanding how to leverage the investment that will be occurring on adjacent parcels. A fine grain downtown implementation plan is needed to demonstrate the commitment by the City. Main Street, Downtown Meridian 0 Unfocused Identity While the City has grown with exceptional rapidity in the last two decades, diversification is now a concern — diversity of housing, entertainment, jobs and industries are all issues the City must now focus on to ensure its future economic and human vitality. Meridian sometimes appears to be challenged by misperceptions held by residents from the surrounding region. The City is seen by some from outside the community as having a high crime rate, despite the reality of being a very safe, family-oriented community. Regional residents cite as a weakness the perception that there are limited entertainment options (beyond shopping), and a distinctive cultural presence is lacking. A widespread belief exists that the school system as a whole is weak. Consultant's research indicates that some disparity among schools exists—Meridian School District No. 2 produces some of the best and brightest young minds coming into the Treasure Valley workforce, and its programs are exceptional by national standards. However, pockets of rural and urban poverty do ex- ist within the City boundaries and these are reflected by some data. In general, Meridian's regional image is lower than it should be, given its otherwise strong economic and cultural assets. Agriculture is a part of the area's heritage and identity, and represents an opportunity for branding that has the potential to resonate with both long-time community residents and transplants. While agriculture remains a fundamental aspect of Meridian's civic identity and of its economy, agricultural production will continue to decline in the area unless aggressive steps are taken vis-a-vis the Idaho legal context as it relates to agricultural land preservation. (E.g. through local zon- ing and land use policies, innovative easement pro- grams, and/or the scheduling of infrastructure investments.) Efforts to preserve agriculture as a viable sector of the economy will remain a challenge for years to come. Preserving Meridian's ag-heritage as a core competency of the region, however, is feasible, as is pursuing ag-related target industries in the technology sphere. Economic Development Structure and Partners The City of Meridian has one full-time employee focused on economic development and special projects. The Mayor is also actively involved in economic development and special projects. The economic development budget for Meridian is half that of cities similar in size in Idaho. While the City does well in strengthening some key industries, it devotes fewer resources than other cities of comparable size. Competing at the level of the region while continuing to make additional improvements will require added capacity. Consultant's recommendations will require additional capacity to implement signature projects and initiatives. Given the additional economic development focus the City will be undertaking, at least one additional employee should be budgeted, in addition to more resources for marketing and implementing key Economic Development Strategies. Quantitative Analysis Overview The demographic, economic, occupation and industry analysis revealed several key quantifiable issues that have bearing on Meridian's economic success. These were discussed in detail throughout the project, and all data analysis is found in the Appendix. The points below are the most relevant to the Economic Development Strategy. 80 60 40 20 Economic Development Audit & Action Plan • 13 Missing Demographic Most of the growth Meridian has seen has been among families— so, children and 35-45 year old populations have grown substantially, while the Millennials (25-35) have not chosen to move or stay in Meridian, see Figure 2. One could speculate that there is not enough to do in Meridian for this demographic (entertainment choices, urban living, bicycle mobility), but the fact remains that Meridian must become more appealing to this very important demographic. In the next 5-10 years they will comprise the largest portion of the American work- force. Growth within State Impacts Talent Pool Much of Meridian's and the region's growth is migration from within the state and NW US. Several of Meridian's competitors, however, get most of their growth from either natural birth (Salt Lake City) or international migration (Seattle, Portland). The impacts of this for Meridian and Idaho is that unlike the international cities, Meridian's employers will rely on the workforce that has been raised in Idaho and the NW, and consequently, their labor force skills are weak — due to Idaho's poor educational attain- ment levels and poorly funded workforce programs. This issue begs the need to improve the local work- force -business collaboration. Figure 2. Meridian Population Growth: Millennials v.Total (in thousands) 2007 2008 2009 2010 2011 2012 25-34 year olds Total Population PEGASUS 14 • City of Meridian, Idaho Land and Lease Costs Meridian's land prices are more similar to Boise than to Nampa and Caldwell. Every indicator examined as part of this project points to a much higher cost for all uses in Meridian than in Nampa and Caldwell. Those two neighboring communities have also experienced a significant amount more absorption of industrial space than Meridian; while Meridian has experienced a much higher absorption of retail and office space. Industry Targets The Target Industry analysis revealed that Meridian is strong in several sectors but lacks diversity among its businesses. These recommended target industries should be considered in light of the Fields District initiatives and overall economic development efforts, including workforce development and entrepreneurship programs. 111 Ag Tech: Composite category including research, development, production, and sales of agricultural machinery, measuring devices, and medical foods. Scientific Research and Development: Original investigation or application of research for the creation of new products. Management, Scientific and Technical Consulting Services: Firms that influence how business, governments, and institutions make decisions by delivering services in the form of knowledge, experience, special skills, or creativity. 4. Boiler,Tank,and Shipping Container Manufacturing: Service Ag Supply chain and transportation needs. 5. Grocery and related product Wholesalers: Non- durable goods wholesalers; in this case, this includes distributors of foods and specialized agricultural products. 6. Medical & Diagnostic Laboratories: Providing analytic or diagnostic services to medical profession. 7. Outpatient Care Centers: Mental Health & Substance Abuse; Family Planning. 8. Other Hospitals: Specialty hospitals; treatment to inpatients with a specific type of condition. These industries are clear examples of the region's core strengths in agricultural development, professional services, and medical provision. Agriculture's role in the regional economy is of particular importance, and its cultivation will require continued efforts into new innovative contexts and applications. However, all of these target industries will provide a basket of economic development benefits Oe.jobs, property tax, sales tax) to the Meridian region. This reinforces their importance in the context of the economic development catalysts and strategies described in this report. Figure 3.Target Industry Methodology Overview Substantial regional employment Strong Performance (location quotient & shift -share analysis) Industry Target for State Final Set of Target Industries Average Wages are high (compared to state Projected Growth industry average) (Based on Qualitative & Qualitative analysis) Source: Pegasus Planning and Development Economic Development Audit & Action Plan • 15 16 • City of Meridian, Idaho Economic Development Strategy 0aaa00...0000aaa00..0000aaa00M..0000a a s 00 M...... a a a 00 M M M 000 a a a 00 M M.. DIVERSIFY THE ECONOMY BY CULTIVATING TALENT, DEVELOPING AN INNOVATION ECOSYSTEM, AND CONTINUING TO IMPROVE QUALITY OF PLACE TO KEEP AND ATTRACT TALENT. This Economic Development Strategy follows an extensive Audit. The Strategy is focused on detailing steps to implement five (5) Catalyst Projects and six (6) Recommendations. five CATALYST INITIATIVES 1. Ag Innovation Campus: Regional educational institutions can partner with the business community to create a specialized campus to strengthen the K-20 pipeline to satisfy current and future employment demand in key occupations and skills sets. 2. Agritourism Development: Positioning Meridian as a jumping off point for exploring regional ag-heritage & cultural tourism amenities by the creation of an Ag -Experience Center. 3. Ag -focused Real Estate Development: Foster diversified mixed-use neighborhood built around a community -supported farm. 4. Downtown Conference Center: A performing arts and events center to service business needs and community desires for more at-home entertainment options, placed in the heart of the community. 5. Venture Meridian: Placing a BSU-managed entrepreneurship facility in the heart of Downtown Meridian to create an engine for growth through start-up activity, increase day -time population downtown, and link entrepreneurship to the Economic Development Audit S six RECOMMENDATIONS 1. Talent & Innovation Ecosystem Cultivation: Leveraging education - business collaborations, talent development, and entrepreneurship to establish a foundation for making Meridian a capital for high-end research & commercialization activity. 2. Business Expansion: Improving small business, entrepreneurship, and retention and expansion services. Meridian will have increased capacity to pursue target industries, and local economic development organizations will partner with the City to comprehensively address needs for businesses of a variety of sizes industries. 3. Tourism: Providing more and better entertainment options for locals and tourists from a diversity of life -stages and lifestyles. These efforts will also rely heavily on existing regional amenities and establishing Meridian as the hub for Treasure Valley tourism. 4. Land Use, Transportation and Infrastructure: Improving Meridian residents' connectivity within the City and to the surrounding valley through a combination of highway trails, and bil<e infrastructure expansion. Leveraging existing wastewater infrastructure in underdeveloped areas (such as the Ten Mile Interchange) is also an important opportunity. Using infrastructure as a manner of promoting sustainable economic development of Meridian. 5. Downtown: Strengthening the heart of culture and community for the City by improving the public realm, increasing downtown employment and activity, and promoting a strong independent business base for the neighborhood. 6. Quality of Place: Making Meridian's place -based assets attractive, inclusive, and competitive. Sending signals that Meridian has something new, better, and different to offer the valley's talent base. A "Next Steps" section follows these Catalysts and Strategies. It is important to remember that economic development is not a sprint. Economic Development is a marathon, so keep a long -ranged per- spective in mind, and understand that adopting this Strategy and implementing the Recommendations within are the first step in a longer term Economic Development Program for the City of Merid- ian that will involve every department of the City. PEGASUS 18 • City of Meridian, Idaho Catalyst 1: Ag -Innovation Campus QQ One of the most immediate needs of large and advanced industry leaders in agriculture across the H region is workforce, particularly finding workers with both the industry expertise and technical skills in 4J = computing, engineering, and research ++ '� Ag is a core competency of the city, region, and = state (chart to the right illustrates relative strength 4J •� in Idaho) • Industry is supportive of education in Ag already (recently organized to boost state spending on FFA programs) Level of Specialization for Agriculture (NAICS Code 11) 5 4 3 2 1 0 2002 2012 IDAHO Oregon Washington Utah Source: Bureau of Labor Statistics; Pegasus Planning and Development Context: An innovative community builds institutions and cultivates a culture open to and supportive of experi- mentation, education and skills development, and new concepts and techniques. This type of high-growth climate cannot be developed ad hoc; rather, it depends on a long-term process of investing in human capital and relationships. An economically vibrant community depends on an ecosystem of agents and organizations, working towards incremental improvement of the local business climate. A �A% �A� Figure 4. Meridian -Boise Regional Ag Innovation Ecosystem Phase 33 Phase 1 Phase 2 Source: Pegasus Planning and Development iosai rercens or s.ocauon Mar remens or uocanon iosa. rercens or s.ocauon Employment Employmnet Quotient Employment Employmnet Quotient Employment Employmnet Quotient Idaho 20,904 449% 418 22,422 4,45% 4.14 7.3% -.9% -1.0% Oregon 45,053 3.41% 3.17 46,677 3.40% 3.16 3.7% -.3% -.3q Washington 76,394 3.55% 3.3 95,546 4.02% 3.74 25.1% 13.2% 13.3% Utah 4,137 .48% .45 4,898 .49% .45 18.4% 2.1% 0.0% Source: Bureau of labor Statistics; Pegasus Planning and Development Context: An innovative community builds institutions and cultivates a culture open to and supportive of experi- mentation, education and skills development, and new concepts and techniques. This type of high-growth climate cannot be developed ad hoc; rather, it depends on a long-term process of investing in human capital and relationships. An economically vibrant community depends on an ecosystem of agents and organizations, working towards incremental improvement of the local business climate. A �A% �A� Figure 4. Meridian -Boise Regional Ag Innovation Ecosystem Phase 33 Phase 1 Phase 2 Source: Pegasus Planning and Development The first" rung" on the ladder of resilient local growth is the cultivation and retention of high -skill, talented workers in a range of technical and managerial fields. The talent development sphere is the "engine" for deep- ening skills specialization and industry advancement. As the skilled workforce and entrepreneurial communi- ties grow, with constant cooperation with established companies, local investment will increase. This provides the base necessary for industry growth, research and de- velopment, and technology commercialization that yields major growth in high-quality jobs. The first step on this path to substantial industry devel- opment is the cultivation of a pool of workers matching the skill sets demanded by regional industry, and tying that pool to entrepreneurial programs and industry targeting initiatives. Recommendation #1: Integrate the establishment of the Innovation Campus with the efforts of the Fields District Report, Recommendation 1: Recommendation IA. Engage Industry with Educational Institutions to Define Concrete Talent Development Goals, Tactics, Outcomes and Metrics o Utilize Target Industry and Target Occupations analysis to guide the creation of a Talent Development Initative o Review the Assumptions and Implications of the Target Industries o Show how the signature cluster development strategy for Agriculture — with its three catalytic initiatives -- fits within Meridian's overall economic development strategy. o Initial focus of Talent Development programs should be more narrowly focused than merely "all of Agriculture"; build Talent Development capabilities based on: a) priority needs articulated by industry b) priorities resulting from Target Industry Occupational Analysis c) priority areas identified by Meridian School District #2, CWI, and universities o Consider focusing the Initial Talent Develop ment, Collaborative Research and Commercialization efforts on "Ag Tech"— Multidisciplinary and emerging application of Information Technology to: • innovative agricultural equipment • cutting-edge agriculture production Hconomic Development Audit & Action Plan • 19 According a recent study by Idaho No Business for Education (IBE)... • Idaho has the lowest rate of graduates immediately matriculating after graduation in the country. • Currently only 41% of Idaho workers between 25-34 years old have a work - ready certificate or higher (only 26% hold at least a Bachelor's degree or higher) • By 2020, 61% of workers will need a certificate or higher at 43% of those worker will need at least a Bachelor's degree _ processes (including agricultural drones, precision agriculture, environmental assessment, etc.) • bioenergy, biomaterials • water, energy, environmental sciences o Establish specific, measurable goals, e.g. number of graduates in specific degree or certificate programs or fields; goals for internships or experiential education, etc. Recommendation 1B. Establish an "Agricultural Talent Development, Commercialization & Research Campus" at a strategic location within Meridian. • The Campus would serve as a nucleus around which various related agricultural initiatives may be developed and would revolve. • The campus should build on Meridian's agricultural heritage and direct agricultural assets, while leveraging the significant agricultural education and research assets that exist within the Treasure Valley. [Alternative name: Meridian Ag Innovation Campus -- A Center for Talent Development, Research and Commercialization] Richland Community College & Agribusiness Corridor PEGASUS zo • City of Meridian, Idaho Recommendation 1C. Create a Business Plan for the Ag -focused Talent Development Initiative +Ag Innova- tion Campus • Potential Elements o Virtual (to start) versus Place -based • Rationale — how to evolve from initial virtual to eventual Place -based o Preliminary Site parameters (size, locational criteria) o Preliminary Building parameters (size, function) o Preliminary programming o Preliminary identification of funding sources / options / techniques • Consider possible synergies by co -locating the proposed "Agricultural Talent Development, Commercialization & Research Campus" with Recommendation #2 Agritourism and Recommendation #3 for Ag -focused land development (E.g. related to costs of land assembly and infrastructure, marketing /visibility, critical mass, etc.) Recommendation 1D. Create a structure for the Ag - focused Talent Development - Initiative • As part of longer-term implementation of the Initiatives and Business Plan outlined above, create an umbrella leadership structure, whose purpose and potential benefits include: o engage key stakeholders o cement public-private partnership trategic planning direction on an basis iblish regional foundations Fundraising efforts bility and create a brand Catalyst 2: Agritourism Development • Ada County has lost 21.6% of is farmland acreage since 1992. • Need for more young talent to replace older agri- culture producers. • Education will be a tool for making the industry more interesting/attractive • Need for more tourism amenities for residents and visitors in Meridian Average Age of Principal Farm Operators 60 55 50 1995 2000 2005 2010 2015 — Idaho US — ADA COUNTY Context: Agri -Tourism can be thought of as "experiential tour- ism" — that is, tourism that is less passive and focused on interacting with the local way of life or environ- ment. While once considered a niche market, it is becoming a major industry segment and is one of the fastest growing forms of visitor tourism in the world. Agritourism is focused on learning about and experiencing farming and agricultural recreation.I is inherently regional and it relies entirely on local authenticity—linked to an area's local food culture. 800 600 400 200 Total Value of Agritourism Recreational Services on Farmland in the US (in millions) 2002 2007 2012 • Most attractions are located throughout the valley, staging Meridian as the hub utilizes its strategic location in relation to regional attractions • Ag -loss and preservation tools are important issues at the State and local levels — these initiatives are critical The multiple elements of the overall Agri -Tourism strategy should fit within the framework of Meridian's Economic Development Strategic Plan, and should be mutually reinforcing with other economic development and Fields District recommendations. Agriculture and Agritourism should be included as key elements in the city's future economic development and comprehen- t sive planning efforts.This recommendation includes a signature initiative but its success is very much linked to an understanding of the region's cultural heritage. It is a Agritourism as a form of recreation can be traced back to the 1800s when the city gentry would visit pastoral landscapes to escape the summer swelter of urban areas. More recently it has become commercialized, with some parts of the world almost totally reliant on this for economic vitality. Treasure Valley has the soil quality to support nearly 200 different types of agricultural products. This kind of diversity can be featured and build a greater appreciation of local residents for the rareness and fragility of this landscape. jumping off point to experiencing the unique agriculture heritage of the Treasure Valley. It is the "first tier" attraction to a wide array of cultural assets and experiences. Tourism is often seasonal and can be cyclical, but its limitations do not mean it should be ignored. Tourism can generate sales tax, seasonal employment and amenities for locals, and visibility to attract new resi- dents and talent. This initiative will create a deeper sense of place, will have local and regional benefits, and �E/ GASUS zz • City of Meridian, Idaho will build additional support for Meridian's other initiatives in the Strategic Plan, including highway expansion. It will be important for planning groups to adequately represent the interests of all stakeholders in Agri -Tourism development. Agritourism Details Sub classifications: ecotourism, garden tourism, guest ranches, wine tourism, dairy tourism, and rural tourism (related to experiencing the lifestyle of living in the country, its culture, religion, and building an ethnographic understanding of rural human activity) Market: The largest market segment for Agritour- ism is Baby Boomers followed by Millennials, though these types of activities are typically friendly to all age groups.The PLACE is the product, and all the related experiences native to the place. By 2020, US/Canadian Baby Boomers (between ages 55 to 74) will number over 84 million.They are the most affluent and educated generation of retirees in the history of either country. They are sophisticated travelers interested in more than conventional attractions. They seek an experience and a sense of place. Below: Kiyokawa Family Orchard, Parkdale, OR Apple picking and Slow Food Feast 3 Recommendation #2: Create a comprehensive Ag - Tourism strategy centered on Meridian as the "Ag - Destination Hub of the Treasure Valley" Recommendation 2A. Convene local stakeholders as a Meridian Agritourism Steering Committee to carry out strategic planning and guide implementation efforts o Before major initiatives are pursued, strategic planning must provide the staging ground o Because Agritourism is naturally a regional initiative, Meridian needs to organize locally to ensure that products and outcomes of developing regional tourism can be directly linked to local impact. o The City should lead an effort to convene interested developers, land owners, the Chamber of Commerce (the lead organization for Tourism marketing), and a cross-section of the community in strategic planning. The Committee will create a strategy plan and bylaws for the purpose of placing Meridian as a hub (not an all-inclusive environment or stand-alone attraction)for exploring Agritourism and cultural heritage in the region. The region's Agritourism development thereby becomes a mutually enforcing effort: the more that the region's agriculture base is improved, preserved, and made amenable to tourists and locals, Meridian's centrality and prominence will rise. Recommendation 2B. Convene regional Agritourism stakeholders to form a Treasure Valley Regional Agritourism entity (Note: these recommendations are well -supported by the University of Idaho College of Law report on Agritourism at the Rural -Urban Interface) o Comprised of: County officials, Rural Development administrators, City representa- tives, land/farm owners, dairy owners, producer groups, Chambers of commerce, tourism marketing entities, and local residents o Entity can serve to: • Provide a regional basis of support for developing local strategies to promote ag- heritage oriented tourism or Agritourism • Conduct a cultural heritage asset mapping that can inform the local Agritourism steering committee of additional resources and experiences (see Appendix) • Design themed routes for cultural tourism cohorts (ex: Ag Architecture, Historic Barn Tour, Wine Tourism, Small farmstead trail) • Create an Agri -Tourism marketing fund • Lobby for creation of "agriculture promotion districts" for conservation and preservation of ag uses • Advocate for changes to State policies related to state highway signage for marketing o Meridian should support and integrate existing regional tourism plans and initiatives as "spokes" with Meridian's new initiatives placing the city at the center (promoting connectivity). Existing initatives of interest: • Treasure Valley Scenic Byways initiative • The Sunny Slope Wine Trail • Meridian's Wine Coop on Main Street o Relocation of the Garden City Fairgrounds— which is immanent though a longer -range proposition that depends on building consensus among regional stakeholders— could be integrated with the local Agri - tourism strategic plan. Meridian could Economic Development Audit & Action Plan • 23 position itself as the ideal location for the fairground's relocation the potential to be come a "Southwest Idaho" State Fair. Recommendation 2C. Create a high profile, Ag - focused "destination attraction" in Meridian that provides a unique and complementary amenity for the Boise and Treasure Valley region. o Provide a visitor experience that appeals both to existing residents as a weekend, seasonal or occasional activity; with sufficient scale and critical mass to provide a draw for visitors from beyond the region, or those who are "passing through" but seeking an expanded range of tourist offerings. Bitner Vineyards, an Award-winning national attraction only 15 minutes from Meridian, and partof the Sunny Slow Wine Trail of Southwest Idaho. o Purpose: tourism amenities for the city, educating the region about the unique assets of the valley and the need to pre- serve them, develop an interest in ag and local food culture o Build on precedents / models for such a "destination attraction" from other states such as Oregon, Indiana, Kentucky and Texas o The City of Meridian should not lead the planning process but should be a part of the strategic planning entity and assist in implementation by way of partnerships and fast-track permitting. PES EiASl15 2; • Citi ntVIcridi:m. Idaho CORE ELEMENTS SHOULD INCLUDE: 1. The Ag Heritage Center • Exhibit Hall with opportunities to observe and learn about Idaho's agricultural history, present and future • ILLUSTRATIVE Programming o Permanent Idaho Agriculture Museum, including interactive exhibits and revolving changing exhibits o Learning Center to help advance Idaho agriculture through education o Agriculture Library and Media Center with latest high-tech equipment linking to universities and other sites o Agriculture Hall of Fame — recognizing past and current families and individuals as well as major corporate leaders o Virtual Farm Experiences within the museum, including operating large farm machinery, live animals o Seed, Soil, Sun: from seed to table o An "Idaho Preferred" Center for Farms and Food — Education about importance of land to table movement o Food Science -plants, animal, and value-added products o "Horsepower"-- how farming has changed from plow to state-of-the-art o Potatoes and Key Crops -- history and usage o Agricultural antiques =nergy Pavilion o Center and campus could be designed to produce 100 percent of energy required through combined use of wind, solar and geo thermal power. o Sustainable /Alternative Energy technologies o Water as a Resource Meeting/Trade Show/Assembly Area o Multi -media 250 -seat Theater, plus up to 1000 -seat auditorium o Communications Center/Learning Lab o Meeting space for agricultural and non- agricultural groups • Info Desk for Agri -Tourism -- advice for other things to see and do in the region (including recreational Tourism) • Show Barn (12,000 sq. ft), Demonstration garden • Farm Store • Restaurant/Dining, Commercial Kitchen Interim Concept name: "Treasure Valley Ag Experience Center" • 50 acre site (minimum recommended), with "working farm" exhibits • Estimated investment for Phase I: approxi- mately $20 million • Example Activities o Farm Tours o Farmers Market o Seasonal Experiences: Pumpkin Patch Fun; Corn Mazes; Christmas tree cutting o Restaurants and retail o Local Craft and Holiday Store o Petting Zoo o Movie Nights o Summer farm camps, chef camps for kids Precedents From these, demonstrate "Order of Magnitude" data for Sites, Buildings and Funding • Kentucky Ag Heritage Center (in planning) • Huber Orchard, Winery and Vineyards http://www.huberwinery.com • Fair Oaks Farms http://www.fofarms.com • Chaney's Dairy Barn • Bob Bullock Texas State History Museum, Austin, TX • Connor Prairie, Fishers, IN • Texas Agricultural Education and Heritage Center, Seguin, TX • The Barn: Center for Agricultural Science and Heritage, Indianapolis, IN • The Sage Center 2. Variation/ Additional Elements A: Wine Region Visitor Experience / Center • May be included as display, information center within the Ag Heritage Center facility 3. Variation/ Additional Elements B: Working Dairy Farm — A "Visitor Experience" • Includes production area for cheese and ice cream making, and visitor participation activities 4. Variation/ Additional Elements C: U -Pick -Em Fruits and Vegetables (working fruit and vegetable farm section) Recommendation 2C.1 Site Selection Recommendations • Priority Site Selection criteria: o located off of Highway 16 for connection to Scenic Byways and Sunny Slope Wine Trail o Evaluate publicly -owned land that could be used o Near major East-West corridor • Shorter term ideal alternative: Ten Mile Interchange o Already has necessary infrastructure o Highly visible from I-84 o Closer to Meridian's remaining ag production area (south of I-84) o Nearer to Downtown Meridian • Longer term, secondary option: Fields District Area o Challenge: will require connecting wastewater; much of the land is already spoken for by many developers; connectivity to the rest of the city is a longer -range proposition (Highway 16 +20/26 improvements) o Opportunities: • Depending on location of innovation campus and Ag -focused real estate community, could have more land options to co -locate • Could encourage the creation of a "community activity node" in the North- west corridor and encourage denser development practices for long-range planning • Proximity to Can -Ada border may help leverage regional support for relocating the Garden City Fairgrounds to this region and make the case for a Southwest Idaho Fair Economic Development Audit & Action Plan • 25 Recommendation 2C.2 Strategic and Business Plan Recommendation • Business Plan elements / Supporting Issues will need to be addressed o ORGANIZATIONAL Recommendations: ensure representation by land owners; Agri -Tourism operators; agribusinesses; producer groups; potential philanthropic organizations; developers; local, regional, and state entities o NEED for Champion[s]; / Partnerships and Buy -in o Role of State Government will need to be defined o Sources and Uses of Funds o State, philanthropy, local (could come in non -fiduciary terms), or even a grassroots membership base 0 0 Fair Oak Farms, dairy farm experience center; Fair Oaks, Indiana I PEGASUS z6 • City of Meridian, Idaho Catalyst 3: Ag -based Land Development 101 H cn 4J = • Residential growth in Meridian will expand into Ada County and much of Loss of Farmland in Acres the County land will be annexed • Subdivision development patterns County 1992 2007 Chile are not compact and rarely will provide enough tax revenue to pay for Ada 232,879 191,477 -21.6% City services. Canyon 391,050 260,247 • Ag loss in the Treasure Valley -50.3% • Public Works has created a Water Gem 197,176 190,757 -3.4% Reclamation project that can be utilized for this initiative. Elmore 353,528 346,550 -2.0% • Ag -based Land Developments in the US are highly successful • The Fiscal Impact Analysis of a typical subdivision versus an Ag -based Land Development reveals a clear winner in Ag -based Land Development. Context: Ada County lost 25% of its farmland from 2007 to 2012. Canyon County lost 50% of its farmland from 1992 to 2007. Much of the land in Meridian city limits that used to be farmland has been converted to subdivisions which have provided needed housing in the region. The price of land in Meridian has increased substan- tially as these "greenfield" sites for new subdivisions become scarce amidst the incredible population growth in the region. Feedback from stakeholder interviews revealed that prices of farmland were $5,000/acre in 1990 and are now well above $100,000/acre. As farmers in the Ada/Canyon County area age, and their dependents are not interested in taking on the farms, the offers from developers that farmers are receiving is appealing. By most accounts, a majority of the land in Ada County (which will more than likely become part of the City of Meridian through annexa- tion) has already been "spoken for" by developers who have rights -to -purchase contracts for these lands. Very little water or sewer exists in the Fields Dis- trict; urban development would require significant infrastructure investment. This area and the Ten -Mile zolz to iii 144,049 -25% 303,836 +17% 178,984 -6% 344,820 0% Source: US Agriculture Lemus vicinity to the south, can benefit from the wastewater reclamation project of the City of Meridian, and receive reclaimed water at reduced or free prices. As a result of the need that developers will have for in- frastructure investment in the Fields area, and with the interest the City has in preserving agricultural heritage, the City should embrace a program to foster a new type of subdivision that focuses on active farmland as the premier amenity. Ag -based Land Development is not a new concept. This type of hamlet development is an Old World development pattern brought from Europe where homes are clustered, agricultural land is preserved and commercial services are walkable to residents. Development scholar at the Urban Land Institute, Ed McMahon stated that as of 2012 there are close to 200 such developments currently exist in the United States, and many are in planning or under development.The concept is simple: cluster homes; substitute a com- munity garden in place of a large recreational amenity such as a golf course; and make the commercial services walkable to most residents. Nearly every US case has been examined for the Fields District Strategy and the three that are most relevant for Meridian are presented on this and the following pages. Recommendation #3. Grow Meridian Sustainably Recommendation 3A. Use Fiscal Impact Modeling to promote sustainable land development practices. • Consultants compared the Ag -based Land Development model to a traditional residential sub- division, based on the impact both developments would have on the city's budget over ten years. This fiscal impact analysis used per capita and per square foot values for local public expenditures and tax receipts for the different land uses represented in each model. See page 30 for details. • The Ag -based Land Development model would contribute a much larger surplus to Meridian over ten years than a traditional development. The net present value of the Ag -based Land Development surplus is $623,635, compared to $453,487 for the traditional development, an increase of almost 40%. • The Ag -based Land Development is a smart investment for the region: it preserves active farmland (30% of the total acreage), promotes housing market diversity, facilitates more walking and biking, and generates more value per acre for both developers and the city. • The City should perform and a City-wide Fiscal Impact Analysis to analyze and determine if the current development pattern is the best policy for the city moving forward. • The Capital Improvements Plan should be modified based on the citywide fiscal analysis. A ri =71 P -111 is or Economic Development Audit & Action Plan • 27 serious consideration should be given to whether not the City should extend infrastructure to the South of let the southern region of the City continue to maintain its rural character with larger lot subdivisions. • The City should continue to adhere to the City's 10 -year and then Annual CIP. This will allow the City and staff to be more proactive with its investment, which will save the City and its tax- payers millions over a 10 -year period. • City should establish and maintain an approval, permit and utility outlay system that maintains to the City's Comprehensive Plan and Capital Improvements Plan. • The City should actively market its green and sustainable initiatives including this Fields Initiative, and also the Water Reclamation project with the city's wastewater treatment faci I ity. Recommendation 3B. Convene a stakeholders working group comprised of developers, landowners, planners, bankers brokers and builders. • The City needs to lead this initiative with support from the County and other associations and appropriate stakeholder support. • City should hold several in-house/staff only sessions with experts to determine how best Meridian can and should execute this concept. ronnurtonsconxeuxm conn�ox a NY 1 Wbe i0PM9lEPOs GPF Ns 4NOEM5 GNOExs RMF 40P➢Ex GN6fNs zoux, ao�� �sowsa �e.www. is outtre mau.� aoum. iaau"m Illustrative examples of how to gradually Integrate urbani and rural uses through a land development code that applies a "transect" model. 2 Left: General Transect Models Below: Transect -based Land Plan for Southlands,Tsawwassen,BC, Canada d ' �' J x LZ Eli NAV � ;�•- � ` � � a n aar rr PEGASUS z8 • City of Meridian, Idaho • Develop a true model for an Ag -based land development that addresses every aspect from the public and private side that can be identified. • Create a presentation that clearly articulates the vision and the benefits • Create an outreach strategy and "buzz" about this concept, before advertising a discussion or meeting about this concept.This can help developers see the buzz and interest among the community. • Bring together interested parties to discuss the model that Meridian will be fostering, including: developers, landowners, planners, bankers, brokers, and builders. • The goal is to educate, create excitement and generate marketing exposure regionally and nationally for what Meridian is trying to do Recommendation 3C. Create a Land Use mechanism to foster Ag -based Real estate development(s) • The current Future Land Use Map and Plan and Zoning Map and Plan may accommodate Ag - based development. An internal staff team should determine what changes (if any need to be made) • If staff determines that current code may not accommodate this innovative development patter, then the City should examine modifications would be necessary. • Consideration to a form -based code should be given. If not for the whole City, form -based code could be a good mechanism for the Fields District.The form -based code will provide the predicable environment the community and the development community seek. Some of the ag-based development proposals may best be implemented through the use of a public- private finance mechanism called a Community Improvement District (CID), as was done in Boise with the Harris Ranch development. Recommendation 3D. Work with a developer to create a Model Ag -based real estate development in Meridian • Through the course of implementing 3A above, some developers will be more interested than others. • Meridian should identify 1-2 developers who have the most interest and who have site control to work with to create a model. • Visit several of these Case Study sites together, visiting with the developers and the public entities involved. • Learn from mistakes and successes • Work with the developer(s) to create conceptual and then site plans for a model. • Implement the development and perform evaluations and impact analyses throughout the project to determine the net impacts for future develop concepts. OCase Study: ® Agritopia, Gilbert, AZ This is development located in a fast growing suburb southeast of Phoenix, Arizona. As suburban sprawl reached the area in the 1990s, developer Joe Johnson decided to opt for an incrementally grown ag-focused village. Highlights: o Total Acres: 160 acres o 452 single family homes (selling at 10%+ AMV) o 250 luxury apartments under construction o 15 acre organic farm o Commercial: 60,000 sf including o Very focused on community connectivity o Small lots, narrow road ways, rear parking allies front porches, and a community center. o Homes are customizable o Architectural forms are highly customizeable and range from craftsman bungalows to Spanish Eclectic and French Revival OCase Study: ® Bucking Horse, Fort Collins, CO This is development located in a highly urbanized area designed with a "modern farmhouse aesthetic." The project is guided by the principles of ag-heritage, healthy living, and a social connectivity. From the developer: "We want to return to a time 50 years ago when there was a sense of community." This idea goes right down to their design principles. While the architectural styles of the homes is very flexible, all homes will sit on smaller lots, have large front porches, and no privacy gates. H ighights o Total Acres: 240 o 205 single family homes; 78Townhomes; 300 condos & apartments o Anticipating sales at 20-25% above AMV o Currently selling at 100% above AMV o Commercial: 30,000 sf including 19,000 sf flex production building and 2,500 sf farm -to -table restaurant o 3.6 acre organic Community Supported - Agriculture Farm o 1,000 sf winery; a distillery and microbrewery are also planned o Rehabing dozens of existing structures and using old farm equipment as art installations through out the development. Right: Restoration If plans for farm -to -table Restaurant _ 3o • City of Meridian, Idaho FIS' cal Impact Analysis of Development Types Source: Anne Wescott, Idaho Smart Growth; Pegasus Planning and Development, June 2014 Methodology The fiscal impact model estimates marginal costs and revenues for the City's General Fund that would change as a result of a proposed development.The model applies them to projected new development scenarios on a per unit or per square foot basis, and compares them to estimated net new revenues. To the extent that actual revenues and expenditures vary from the estimates provided within these interviews, the results of the model will vary from reality.The model is designed to illustrate the potential fiscal impact of new development, but it is not anticipated that the impacts estimated in the model will precisely mirror those that actually occur. Development scenarios that generate ongoing surpluses produce City revenues that exceed the costs of the services they require.These excess revenues could be used to offset deficits from other developments, to augment the City's fund balance, or to improve service standards. Development scenarios that produce ongoing deficits require service costs in excess of the revenues they generate. These deficits could be offset by surpluses from other developments, they could be mitigated out of fund balance, they could be mitigated by the developer, or they could require the City to decrease service levels. PROJECTED NEW RESIDENTIAL CURRENT MARGINAL COSTS UNITS OR NON-RESIDENTIAL SO & REVENUES NEW CITY COSTS & REVENUES � €O Assumptions The calculations in the fiscal model are based on two sets of assumptions: • Assumptions about the size, type and value of the proposed development to be analyzed by the model; and • Assumptions about the service delivery patterns of City functions, including the expenditures that are variable in regards to growth and the types of development that cause increases in those expenditures. Development Assumptions Two pieces of information are required about a projected development in order to calculate its likely fiscal impact: • The development schedule for each projected residential unit type or non-residential land -use; and, • The property value of each unit type or land -use. The fiscal impact model for the proposed development scenarios is designed to assess the four land -use types proposed: residential, office, retail, and farmland development.The Development Land Use Assumptions chart summarizes the assumptions which we have used the fiscal model to analyze.This data can be modified to represent changes in land use assumptions in the proposed development, or land uses in any future development under consideration in the City of Meridian. Residential* Farm -related* Single Family New Units Cost per unit Acres Cost per acre High Density 450 $150,000 Community -Supported (CSA)** 40 $1,200 Moderate Density 250 $180,000 Incubator Farm 20 $1,200 Low Density 11 $200,000 Working Farm 100 $1,200 Multi -Family Townhomes 150 $150,000 Apartments 150 $150,000 Commercial* Square Feet Cost per sq ft Office 80,000 $220 Retail 70,000 $220 * Costs absorped equally over 10 years **Producing 1,011 CSA shares per year as well as produce to be sold at an on -property farm stand Fiscal Impact Analysis of Development Types Economic Development Audit & Action Plan - 31 Development Assumptions Continued z TRADITIONAL DEVELOPMENT SCENARIO 0 A traditional residential development is dominated by single-family housing with s large lots, low street connectivity, and small amounts of green space. Commercial uses 3 and green space are limited. Transportation is focused on automobiles, and neighbor- hood design limits the practicality of walking, biking, or using transit services. Large amounts of space are taken up for housing, putting development pressure on adjacent farmland. 3 AG -FOCUSED REAL ESTATE DEVELOPMENT SCENARIO This type of development features a strong mix of commercial and agricultural uses. ;= There is a greater diversity of housing types, including multiple sizes of single-family home and some apartments and townhomes near the development core. Retail and c office space is integrated into urban design and helps create a distinct "center." Urban a design makes it practical and enjoyable to walk, bike instead of rely exclusively on a automobiles. Substantial farmland and greenspace are preserved, serving both local residents and commercial markets into perpetuity. Net Fiscal Impact: Traditional vs.Ag-Based Real Estate Development Scenarios Surplus Net Present Value Cumulative Surplus Commercial Surplus Residential Surplus $0 $400,000 $800,000 $1,000,000 Ag -Based Development Suurre:Anne Me .U,IdMo&nurlGruw ; Traditional Development Pegms Plunning and DewInpuenl, June 2014 Results Two real estate development scenarios were considered in terms of their fiscal impact for the city of Meridian. One scenario is a conventional residential subdivision, comprised of moderate and low density single family housing.The second scenario is an ag-focused real estate development, designed according to best practices and based on case stud- ies of existing communities around the country (in particular, in the West).These scenarios were analyzed in terms of the expenditures they require from Meridian city services, and the revenues they generate in local taxes.This fiscal modeling included review of city budgets, determination of fixed and variable costs for city departments, adjustments based on local property markets, and projection of tax value over a ten year period. The results show a dramatic fiscal benefit to the ag-based real estate development scenario. Despite preserving a third of its land for agriculture and providing a host of amenity and health benefits, the ag-based real estate development generates over $170,000 more net surplus than the traditional development scenario on the same acreage.This equates to a fiscal of almost 40% for the city of Meridian. This model demonstrates that ag-based real estate development is a smart development scenario for Meridian. PEGASUS 32 • City of Meridian, Idaho Catalyst 4: Downtown Conference Center Meridian lacks adequate conference space for large business in the area to hold educational workshops or annual meetings. Meridian lacks facilities adequate for meetings of local business and trade associations. _ There is little performance or concert space in Meridian despite its high ++ •— growth rate and family focus. Meridian is losing these activities to Boise and other towns in the region. Context: Essential to establishing a thriving visitor and tour- ism industry is sufficient and diverse types of meeting, conference and convention center space. Meridian should foster the creation of a new multi -use venue; and, ideally such a facility should be located in down- town Meridian. The center must provide for active public spaces. Developed using innovative mixed use concepts, such a facility also could include a residential component and companion retail space. Small shop - fronts can provide an affordable rent rate for local startups. Meeting space is crucial to large firms and associa- tions, as well as supporting the needs of community groups and local arts programs. Basic facilities avail- able for businesses and organizations to hold trainings, meetings, or other events provide valuable flexible in- frastructure to a community. Based on national norms, a moderately-sized city such as Meridian should have at least one event space capable of accommodating several hundred people. A conference center located in downtown Meridian -- with event space and active daytime uses -- can serve a range of stakeholders in the community and allow the City to capture local and regional demand that currently is going elsewhere or is unmet. A confer- nce and events center will help draw active users to he district and spill over into retail and service sales, while providing value to both large businesses and lo- cal civic organizations. Cultural activities anchored by community event space allow a city to engage in import replacement of en- tertainment spending. This economic development technique, called "consumption base development," is particularly valuable for smaller cities and rural towns. Homegrown cultural activities encourage residents to spend entertainment dollars locally rather than travel outside the community. Arts and cultural -related spend- ing tend to have a higher labor component than other industries; thus dollars that are spent on local arts tend to have higher multiplier effects in the local community. (see Markusen) It is important to note that the Greater Boise Audito- rium District has plans to double its convention center space, including addition of a ballroom and commercial kitchen. This is a plus for Meridian because it puts the Treasure Valley more firmly on the map for national conventions and larger scale events. Meridian then could capture new regional demand that is a spin-off from an expanded regional conference center. Competi- tive pricing may help to capture smaller conventions, drawing overnight visitors whose spending will add to the economy. Recommendation #4: Create a Downtown Conference Center to provide space for meetings,trainings, and performing arts o The City and the MDC should partner with a private entity to develop and manage a conference center in the downtown, based on needs of local Economic Development Audit & Action Plan • 33 businesses and the arts community.A vertical residential component could help the project be fiscally viable and add new housing types in the downtown area. o The center should be designed to accommodate performances and concerts, and other cultural and civic events for the Meridian community. o A downtown conference center overlaps with several other ED strategies: • Business Expansion: Provides facilities for peer-to-peer networking and training; other business events • Tourism: Potential for drawing state or regional conventions. • Strengthen Downtown: Adds a significant downtown amenity for both local residents and regional services. • Quality of Place: Provides space for art, culture, and civic events. o The conference center may be integrated in the development of mixed-use or transit -oriented development projects in the downtown. Recommendation 4A. Coordinate conference center/ performance space development with local public and private stakeholders. o Public-private partnerships may offer a viable means of developing a conference center. A large local company, Scentsy, is currently exploring the development of its own on-site conference facility.They should be brought into the facility - planning process to determine interest in coordinating a single shared conference facility in the downtown area. Recommendation 4B. Conduct a feasibility study for conference center/performance space, identify appro priate sources of funds for center development, and build a conference center. o The city should undertake a study to determine hotel demand and access to the downtown and consider the feasibility of linking the proposed conference center to small hotel development. o Identify mechanisms to fund the development o Conference centers tend to be revenue neutral or negative, with boosted revenues coming from hotel sales and through broader support of the business ecosystem.This should be taken into account when considering financing and business PEGASUS 34 • City of Meridian, Idaho Catalyst 5: Venture Meridian Campus Q• Small business assistance and entrepreneurship services are needed in Meridian • Surveys and interviews state there is a hunger for more independent businesses and local alter- natives to chain retail Technological advancement in many target industries will warrant new businesses, services, and aJ = products that existing businesses struggle to create internally. Servicing the growing and increas- ingly advanced supply chain is a major opportunity for new business creation at a Venture Campus. ._ BSU is a leading institution in the State for building entrepreneurship infrastructure from the ground up, from ideation to angel investment and commercialization. Context: While attracting outside businesses remains an impor- tant component of any regional economic development strategy, cultivating homegrown entrepreneurs through "economic gardening" is now universally recognized as an essential foundation for long-term, sustainable growth. Interviews and surveys with Meridian com- panies and civic leaders indicate there is a need to improve support for smaller businesses and start-ups in the area. Coupled with the workforce and talent development strategy, initiatives to strengthen Meridian's entrepreneurial ecosystem can help the City tap into the tremendous opportunities for developing start-ups and promoting business innovation being gen- erated by the region's major information technology Lcompanies and by the strong programs in Computer Ucience and other high technology fields at Boise State niversity (BSU). Indeed, Boise State University already is operating a highly successful business incubator in the region and has launched an innovative "accelerator" program for its students that it has considered replicating at vari- ous locations around the region. For this project, BSU would be a strong candidate with which to partner in developing new entrepreneurial initiatives in Meridian. Regional models such as The Watercooler and others would be helpful models to consider emulating, as well. These types of programs can offer xperienced staff help to access mentors who can ssist innovators and entrepreneurs in formulating their ideas and business plans based on best practices for launching a successful venture.They can also provide a safer, standardized pipeline between area an- gel investors and start-ups. This catalyst project should be nurtured as other parts of the innovation ecosystem (see strategy 1) take shape over the course of the five year strategic plan. Recommendation #5: Develop a Venture Meridian Campus to promote and anchor local entrepreneurship. Recommendation 5A. Have the city's existing Small Business Coordinator (Community Development Depart- ment), Meridian Development Corporation, and Cham- ber of Commerce assist in the relocation of businesses in the Vila Consultants Building at 33 E Idaho Ave into new office spaces throughout the Downtown. • Given that their existing clientele is already accustomed to coming downtown to use their services, it is wise to try and keep them centrally located. These existing businesses would all be good candidates for generating downtown daytime activity. Recommendation 5B. Lease the space to a leading entity, such as BSU or The Water Cooler, for the cre- ation of a new Venture and Start-up campus for local residents of all ages. • BSU's Venture College is a key model to consider implementing the communtiy.They are currently targeting enrolled students, but they have noted their program is something that is transferable to a community-based model as opposed to their current campus -based model. • The campus will ideally feature start-up training and business management skill mastery courses available for audit by the broader business community. Recommendation 5C. Partner with the lead entity to find new local Angel investors to have local representa- tion on the Angel Investment Advisory team • This investment could overlap with target indus tries or training needs identified by the Talent Development -Industry Partnership entity created for the Ag -Innovation Campus. Recommendation #5D: Lead efforts to provide an abundance of opportunities for start-ups, the existing business community, and consumers to interact, col- laborate and innovate. • This could take shape in the form of featured events, providing more meeting places and building a thriving cafe culture in the Downtown. • Pop-up events could also be a cost effective way to draw interest into the downtown area and help existing retailers. Examples include Viva Streets, pop-up putt -putt and temporary parklets. Recommendation #5E: Assist in connecting the Ven- ture campus and entrepreneurs to funding sources at the Department of Labor, Idaho Tech Council, and the Idaho Small Business Development Council. Economic Development Audit & Action Plan • 35 PEGASUS '6 :itX ul AIc1idi:m. Id:Jiu STRATEGIES FOR ECONOMIC DEVELOPMENT The following six general strategies provide a programmatic context for deployment of catalyst projects, as well as other economic development policies and initiatives. They provide a general framework for moving forward and ty- ing Meridian's future to core foundations of economic growth and resilience. The Catalyst projects are folded into these six strategies: Strategy 1: Talent & Innovation Ecosystem Cultivation Key Catalyst Projects: o Ag Innovation Campus o Venture Meridian Campus Context: An innovative community builds institutions and culti- vates a culture open to and supportive of experimenta- tion, education and skills development, and new con- cepts and techniques. This type of high-growth climate cannot be developed ad hoc; rather, it depends on a long-term process of investing in human capital and relationships. An economically vibrant community depends on an ecosystem of agents and organizations, working towards incremental improvement of the local business climate. The first rung on the ladder of resilient local growth is the cultivation and retention of high -skill, talented workers in a range of technical and managerial fields. The talent development sphere is the engine for deepen- ing skills specialization and industry advancement. As the skilled workforce and entrepreneurial communities grow, with constant cooperation with established com- panies, local investment will increase.This provides the base necessary for industry growth, research and development, and technology commercialization that yields major growth in high-quality jobs. The first step on this path to substantial industry devel- opment is the cultivation of a pool of workers matching the skill sets demanded by regional industry, and tying that pool to entrepreneurial programs industry targeting initiatives. The first step on this path to substantial industry devel- opment is the cultivation of a pool of workers matching the skill sets demanded by regional industry, and tying that pool to entrepreneurial programs industry target- ing initiatives. Strategic Recommendation #1: Establish a Talent Development -Industry Partnership initiative Recommendation IA. Implement Catalyst Initiatives to provide infrastructure for talent and entrepreneurs. Promote these institutions as beacons of Meridian's entrepreneurial spirit. Recommendation 1B. Provide targeted assistance to specialized firms in target industries who might be interested in cultivating entrepreneurs or "intra-pre- neurs" to service their ancillary or supply -chain needs. Recommendation 1C. Feature local start-ups in marketing pieces for the city. Recommendation 1D. Provide opportunities for en- trepreneurs and start-ups to pitch concepts in public, interactive settings such as "5 minute pitch" showcases, The world is rapidly changing. Nothing is as it was 10 years ago, and we can only imagine what will be in 10 years and that includes changing economic conditions. This means the economic development field needs to consider new economic development tools to deal with a new reality. One of those tools is the Do -/t - Yourself Economy, an economy built on a foundation of small, locally -owned, diverse businesses. The Internationa Economic Development Council, 2014 or "Meet the Start-up" events for youth groups. Invite similar entrepreneurs from around the area to present opportunities for interaction and continued innovation. Recommendation 1E. Track talent development - industry partnerships with strong data sharing to establish alumni networks to track talent for retention and attraction. Recommendation 1E Maintain close connections with all sides of the partnership to plan for necessary expansion or additional infrastructure and funding needs. Economic Development Audit & Action Plan . 37 Recommendation 1G. Track state and national spending for workforce and entrepreneurship programs and provide evidence of City support in grant applications. Recommendation 1H. Encourage at -risk youth to join vo- cational training programs or internships at an early age. Some schools speak to students of these opportunities as early as the 5th grade. Role of the City: The City of Meridian should be a leading partner in or- ganizing and implementing the two key catalyst projects related to this strategy, along lines described in those sections. Strategy 2: Business Expansion Q • Online survey results: business expansion, small business assistance and entrepreneurship services are top biggest needs (in addition to Downtown) • Basic population increase is a major economic driver, leading to strengths in professional and N financial services _ There is a need among the business community for development assistance .6..& .. • Several core industries demonstrate both national and regional strength, and serve as _cc = appropriate targets for promotion and development: these are focused around medical Z E industries, business and scientific services, and production and distribution related to W agricultural products Key Catalyst Projects: o Ag -Focused Talent and Innovation Center o Downtown Conference Center o Venture Meridian Complex Context: Business retention, development, and attraction are the prime movers of local economic development. Local government action can reduce structural barriers for new business development and growth, and promote the synergies that lead to positive externalities for local business growth. While attracting larger firms is a key element of business expansion strategies, most new jobs are created by small businesses. Small business support and development services are important elements in a thriving business ecosystem. Most long-term job growth in the United States comes from a relatively small set of high -impact companies. These firms are characterized by doubling their revenue and employment in 4 years, and are found at all sizes and across all industries. They are 25 years old on average, with 95% of high -impact firms over 5 years of age.They contribute almost all the private sector employment growth in the US. Companies that are high performing can be identified with local knowledge of the business ecosystem.These firms are more suited to strong expansion, and should be targeted for programs to determine barriers or impediments to their growth. Business attraction targets should contribute to the development of clusters that provide key benefits to the community (high wages, expanded tax base, etc.). Cluster based development allows communities to draw 38 • City of Meridian, Idaho Meridian Business Owner Survey Conducted Summer 2014 114 Complete Responses Question: "What should be the main focus areas (choose 3) for economic development in Meridian?" 50% 40% 30% 20% 10% 0% 1 1 L No MEN MEN N7 MENEM on the positive externalities that come from business- es in similar or complementary industries located in close proximity.This includes opportunities for collab- orative research and development and the cultivation of a high-quality, specialized market for labor and business services. Clusters appropriate to the Me- ridian area include the following: agribusiness/food production and processing/agricultural research and development, health care; and professional services. Small businesses are the lifeblood of the American economy, providing 66% of net new jobs since the 1970s. Meridian has a strong small business com- munity, but lacks any substantial programming for development or technical support. Meridian's high rate of population growth creates an environment suitable for goods and services focused on residents. These include professional and personal services, medical services, food and beverage establishments, and home -oriented retail. These industries are well suited to small business entrepreneurship and growth. Target industries include sectors that are appropriate for small business development, including profession- al and business services, some medical development, onal services. Other target industries with -ms may function as anchors for purchasing services from small firms in the area. Some industries also contribute to the develop - districts that support firms of a range of sizes, including small offices; medical industry development is a good example of this. Strategic Recommendation #2: Expand and enhance a range of business development strategies based on Peer -based Retention, Attraction and Mentoring programs, and proactive small business support and import replacement tied to strong local industry targets. Recommendation 2A. The City of Meridian Economic Development staff should lead the development of a Business Retention and Expansion team, with support from the Chamber of Commerce.These efforts will be led by the Economic Development Coordinator. They will determine key members from the local business community and undertake proactive efforts to approach local businesses and help them resolve barriers to sustainable growth.This effort will require assistance outside of permitting and will include: technical as- sistance and training; assistance with sourcing capital; where appropriate, building up and promoting growth in an industry's supply chain for more local growth. Recommendation 2B. The City should add one addi- tional full-time staff person assigned for administrating special projects laid out in this report and to assist in coordination of business expansion efforts. Because the Economic Development Department will be taking on additional responsibilities and a£ d A.°1. u '= rnu A � u A w w a V J y on the positive externalities that come from business- es in similar or complementary industries located in close proximity.This includes opportunities for collab- orative research and development and the cultivation of a high-quality, specialized market for labor and business services. Clusters appropriate to the Me- ridian area include the following: agribusiness/food production and processing/agricultural research and development, health care; and professional services. Small businesses are the lifeblood of the American economy, providing 66% of net new jobs since the 1970s. Meridian has a strong small business com- munity, but lacks any substantial programming for development or technical support. Meridian's high rate of population growth creates an environment suitable for goods and services focused on residents. These include professional and personal services, medical services, food and beverage establishments, and home -oriented retail. These industries are well suited to small business entrepreneurship and growth. Target industries include sectors that are appropriate for small business development, including profession- al and business services, some medical development, onal services. Other target industries with -ms may function as anchors for purchasing services from small firms in the area. Some industries also contribute to the develop - districts that support firms of a range of sizes, including small offices; medical industry development is a good example of this. Strategic Recommendation #2: Expand and enhance a range of business development strategies based on Peer -based Retention, Attraction and Mentoring programs, and proactive small business support and import replacement tied to strong local industry targets. Recommendation 2A. The City of Meridian Economic Development staff should lead the development of a Business Retention and Expansion team, with support from the Chamber of Commerce.These efforts will be led by the Economic Development Coordinator. They will determine key members from the local business community and undertake proactive efforts to approach local businesses and help them resolve barriers to sustainable growth.This effort will require assistance outside of permitting and will include: technical as- sistance and training; assistance with sourcing capital; where appropriate, building up and promoting growth in an industry's supply chain for more local growth. Recommendation 2B. The City should add one addi- tional full-time staff person assigned for administrating special projects laid out in this report and to assist in coordination of business expansion efforts. Because the Economic Development Department will be taking on additional responsibilities and implementing five complex projects and signature initiatives. The City of Meridian has many diverse businesses, and coordination and administration of expansion efforts must be improved to meet all of the demand for growth assistance. The City should be seen as a conduit for growth, not a barrier to it. Recommendation 2C. Some of the largest employers in Meridian are homegrown, with strong commitments to the City.The City should continue to work with them to insure basic infrastructural and workforce needs are met. Recommendation 2D. Meridian should continue to cul- tivate, define, and empower its "Business Ready -Team" with a coherent message for companies considering locating to Meridian. Recommendation 2E. The Chamber of Commerce should support small business development through peer-to-peer trainings, mentoring, information ex- change, and networking events. It should focus on in- dustries that serve its rapidly growing population and/or complement industries targeted to be ripe for continued growth when appropriate. Recommendation 2E The Chamber of Commerce should offer member -exclusive advertising services on its website and through other media. Recommendation 2G. The City should encourage the Chamber to lead small business support services, while supporting the business community through developing a "one-stop shop" to assist firms in navigating regula- tions and codes and identifying potential sources of public funding or procurement opportunities. It should also support infrastructure projects that support entre- preneurship and the small business community, such as the catalyst projects identified in this report. Economic Development Audit & Action Plan • 39 Recommendation 2H. Implement the Catalyst projects Recommendation 2I. Initiate a "Made in Meridian" campaign • Meridian can encourage residents to "buy local" through basic branding and promotions, including "buy local" days. • The campaign can grow to promote local goods and services outside Meridian itself, with branding targeted to larger regions. This should focus on industry specializations tied to Meridian's core industries, including food and farm related products. • Many cities and states develop focused programs to encourage local firms to source goods and services from other local firms. This involves more focused efforts to map out the supply chains of local companies, and identify supplies and inputs that could be provided by other companies in the region.This supply chain replacement tactic offers strong potential for furthering a resilient local economy. Role of City: The City of Meridian should lead in business retention and attraction programs, including the development of a retention and attraction committee and the addition of a staff person for special projects in Economic Development. The City should support the Chamber's efforts for small business technical support services and assistance in sourcing financing, while it takes a lead in implement- ing catalyst projects in infrastructure and workforce development that further small business development. ONE S 40 • City of Meridian, Idaho Strategy 3: Tourism Agritourism, nature tourism and heritage tourism are the fastest growing tourism segments in Qthe O US. Meridian is in one of the nation's fastest growing wine regions. • Several Scenic Byways lie just outside Meridian, and are not connected to each other. H Highway 16 could serve as the connection to the Scenic Byways tours. W _ • A special convention center tax district exists for Boise, and extends to the East side of .4•+•. Eagle Road. tv @• There is insufficient meeting and conference space in Meridian. • • Downtown Boise is about to expand their Convention Center space. • Most public -funded convention or conference centers remain in need of constant subsidy • A Public-private conference center may be a more viable option for Meridian. Key Catalyst Projects: o Downtown Conference Center o Ag -Experience Center Context: Tourism is a segment of the economy in Meridian that has not grown, due largely to there not being any real tourism assets in Meridian, besides local community parks, downtown and retail. However, Meridian is also in the middle of a very rich tourism region, with vineyards, skiing, hiking, down- town Boise, and many other tourist assets all just outside of Meridian. Meridian should position itself as the launching point for experiencing tourism in the region. To do this, Me- ridian will need to develop more tourism assets locally, develop a public relations and marketing campaign on tourism and build more infrastructure including the Scenic Byways connection and an Ag Tourism Center. If followed, these strategies will help to diversify the economy of Meridian, provide more for residents to do, and bring more external dollars into Meridian little. Meridian is a missing link in a connected ring of 4 regional byways including the Lower Payette River Heritage Byway, Snake River Canyon Byway, and the Western Heritage Historic Byway, among others located throughout Southwest Idaho.The hightway 16 expan- sion could overlap with this effort to boost tourism to these amenities. Go to Visitldaho.org for more infortmation. Strategic Recommendation #3: Adopt Tourism as an industry segment to grow in Meridian Recommendation 3A. Convene a meeting with the Chamber of Commerce leadership and Meridian to dis- cuss a Tourism Strategy. Recommendation 3B. Develop aTourism Strategy Recommendation 3C. Convene a meeting with State and Local tourism experts to discuss Meridian's tourism goals Recommendation 3D. Implement the Catalyst Projects. Recommendation 3E. Determine if a special assess- ment district or tax is appropriate for Meridian to cre- ate and use for tourism efforts. Recommendation 3E Develop marketing collateral that is focused on specific target markets for tourism. Economic Development Audit & Action Plan • 41 Recommendation 3G. Convene a Scenic Byways meet- ing with all those involved (state, regional, public, pri- vate) to determine how to better coordinate and market the Scenic Byways, and if there is a role for Meridian. Recommendation 31H. Advocate for Highway 16 to be the Scenic Byways connector. Role of the City: The City of Meridian should be a leading partner in organizing and implementing the two key catalyst projects related to this strategy, along lines described in this section. The Chamber of Commerce should lead most tourism initiatives for Meridian, and be supported as appropriate. PES GASUS 42 • City of Meridian, Idaho Strategy 4: Land Use, Transportation, and Infrastructure Meridian land prices, and consequently the building lease prices are high in the Boise - Q, Meridian -Nampa region. Water scarcity in Idaho has impacted water laws, including irrigation and canal districts, both of which are very relevant to the Fields District. H Meridian has a state of the art water reclamation program at their wastewater treatment Q) C center. +•' •� Byproducts (including free commercial water) from this water reclamation system should be seen as economic development tools for the City. •� Congestion on I-84 during rush hours (am/pm) have steadily worsened. Transportation solutions identified include: Highway 16, Regional Commuter Rail, Bicycle Lanes, and Denser Development. • Meridian has a good bicycle lane improvement program. • Development patterns of sprawl that Meridian has largely experienced are not fiscally sustainable. Key Catalyst Projects: o Ag Heritage Center o Ag -focused Real Estate Development o Coordinated Land Use, Transportation and Infrastructure Policies Context: For busnesses and site selectors, inexpensive utilities and inexpensive yet well -located land and buildings are major priorities --second only to quality workforce. Connectivity and efficient/predictable transportation systems are essential for a region's labor force, busi- nesses, and logistics operators. Meridian does fairly well in this category because It is in an ideal location for �conomic development: part of the state's largest major metropolitan area; along an interstate; and with lots of land to grow. Much of the vacant land in Meridian is either about to be developed or still being farmed, but more than likely to be developed in 10-20 years. Land prices in Meridian are just under those of Boise, but higher than Nampa and Caldwell. There are relatively few locations for industrial development in Meridian and the land is expensive for that use. However, office development, retail, light industrial and some warehousing/mixed-use will continue to be strong markets for Meridian. Meridian and the Boise have tremendous growth pres- sures on their land, water and wastewater resources. This growth is also evident during the morning and afternoon hours as commuters flow in/out of Boise from other fast-growing communities. State and local entities have created a vision for a regional commuter rail system, which would utilize the existing Union Pacific rail line to connect suburbs to Boise downtown.A well designed public realm with the use of connectivity promotes alternative transportation choice. One of the major decisions the creative class look for in choosing a place to live is the availably to alternative transportation. Meridian can be the lead- ing city the region with appropriate investment in land use policy and transportation infrastructure. The State and regional stakeholders have also identified Highway 16 as a new highway that would alleviate some of the regional traffic. This new highway would roughly on top of the existing McDermott Road in Meridian — passing north -south through the Fields District area. Chinden Boulevard (or 20/26) should also be expanded Chinden, or 20/26, should also be widened to have four lanes with a center turn lane, bicycle lanes, and side- walks. Strategic Recommendation 4: Integrate Sustainable Land Use practices with Transportation Improve- ments and Infrastructure Investments. Recommendation 4A. City staff should convene an internal discussion about this Strategy. The goal of the discussion should be to develop specific internal process- es that will need to be further developed and approved before implementing. Planned extension of Highway 16 along McDermott Rd, Meridian Recommendation 4B. Implement the Ag -Heritage and Ag -Focused Real Estate Catalyst projects Recommendation 4C. The City should perform a City- wide Fiscal Impact Analysis to analyze and determine if the current development pattern is the best policy for the city moving forward. Recommendation 4D. The Capital Improvements Plan should be modified based on the citywide fiscal anal- ysis. A serious consideration should be given to whether or not the City should extend infrastructure to the South or let the southern region of the City continue to maintain its rural character with larger lot subdivisions. Recommendation 4E. The City Council should maintain to the City's 10 -year and then Annual CIP. This will allow the City and Staff to be proactive with its invest- ment, which will save the City and its taxpayers millions over a 10 -year period. Recommendation 4E City should establish and main- tain an approval, permit and utility outlay system that maintains to the City's Comprehensive Plan and Capital Improvements Plan. Recommendation 4G. The City should actively market its green and sustainable initiatives including this Fields Initiative, and also the Water Reclamation project with the city's wastewater treatment facility. Recommendation 41H. Aggressively implement the bicycle program, in collaboration with Meridian's trans- portation partners. Recommendation Q. Engage, or re-energize the dis- cussion in the region for Regional Commuter Rail. Recommenation 4J. Implement the Regional Commuter Rail. Economic Development Audit & Action Plan • 43 • Preserve a station platform at the downtown location in Meridian for the Regional Commuter Rail. • Consider a second Commuter Rail Station platform at the 10 -Mile Area. • Identify a potential joint bus network with the university. Recommendation 4K. Continue to utilize the City's wastewater by-products as economic development tools. Recommendation 4L. Develop an incentive policy uti- lizing the wastewater by-products as economic development incentives. Recommendation 4M. Complete the Chinden improve- ments by widening Highways 20 and Highways 26. Recommendation 4N. Complete Highway 16. • Continue to Work with other communities in the Region, and the State, to push this project forward and secure funding (whether that is just public or utilizing innovative public-private tools). • Work to access ramps so as to preserve larger tracts of land, and increase traffic flow on Highway 16. • Secure federal and foundation funding to develop Ag -Heritage Center along Highway 16 • Push forward the notion (along with regional partners — see "Tourism" section) that Highway 16 should be the continuation of the Scenic By ways — thus connecting the many disparate yet existing Scenic Byways in the region. Role of the City The City of Meridian should be a leading partner in organizing and implementing the two key catalyst projects related to this strategy. Recognizing the limitations of authority in Idaho, Meridian does not control the roads or rail. Water and wastewater through annexation are the City's main carrots to use in growth management. Implement an involuntary annexation strategy as part of a targeted development strategy in areas where infrastructure exists. By adhering to a fiscal tool -based planning, capital im- provements and utility outlay/extension policy, Meridian can grow into the remainder areas of Ada County in a sustainable manner that is proactive, thoughtful and smart policy for the City and its taxpayers. That being said, the City should also continue to play a strong advocate role regionally and at the State for the Commuter Rail Highway 16 and 20/26 (or Chinden) improvements, and continue to partner with regional and location transportation providers. 1 GA5U qq . City of Meridian, Idaho Strategy 5: Strengthen Downtown Q• Online survey results: business community finds this to be a preeminent challenge but a very important priority for ED. H Aside from The Village, poor options for clusters of 3rd spaces and amenities for younger people. '0 CM The city has invested heavily in quality Downtown street improvements, need to leverage those ClJ �= and ongoing activities. Should transit/light rail become an option, Downtown will warrant a stop and increasing density 7 �= around the stop will improve quality of life and ROI on the investment. Key Catalyst Projects: o Downtown Conference Center o Venture Meridian Campus Context: Downtown is the key hub for quality of place. It is the heart of a community — it represents both heritage and new local alternatives. Downtowns are typically the city's civic center and house community services, con- necting them to every resident. A vibrant downtown —or the lack of one—affects the community's ability to attract and retain residents, businesses and institutions, jobs, and investment that enable a town to endure and thrive. Downtowns generally have the skeleton of strong urban design, accommodating a range of business and resi- dential scales and types. They are typically walkable, bikeable, and accessible to a diversity of people. It is important that Downtowns offer a range of amenities and characteristics attractive to the diversity of needs and tastes in their communities. Street life should be active, vibrant, accessible, and multigenerational, and otherwise representative of the city as a whole. 0 0 's v a 3 s Meridian has made Downtown as a priority area for the city's economic future.This set of recommendations will serve to refine and articulate avenues for Downtown investment that optimize the quality of interventions without demanding excessive quantity of intervention. Strategic Recommendation #5: Undertake a range of interventions to enhance the urban amenities of Downtown Meridian for residents, workers compa- nies, and tourists. Recommendation 5A. Work with the Meridian De- velopment Corporation (MDC) to clarify their role in Economic Development. • The MDC's role on managing the Urban Renewal District and corresponding TIF financing makes them a key entity for partnering in the city's eco- nomic development efforts. • The Urban Renewal District should be leveraged for greater overall impact within the Downtown and for the City writ large. • Consider the expansion of urban renewal and TIF financing by the strategic addition of one or more new urban renewal districts, particularly with the new districts would provide incentives for business recruitment. Recommendation 5B. Make Quality of Place a guiding light for all aesthetic and structural improvements to the downtown • Quality of Place is a city-wide strategy with Historic Radio City Wayfinding scheme, Ferndale, CA specific implications for the Downtown. Downtown should be a place of unique landmarks, iconic spaces and restaurants, the uniqueness and character of a community. Develop distinct, creative markers in Meridian's eminent wayfinding initiative, utilized in the Downtown as well as other major community nodes. Draw passersby to unique spaces and major landmarks. Recommendation 5C. Increase Employment in the Downtown by leveraging City -owned properties • Establish the BSU Venture Meridian Center in the Downtown and integrate it into the streetscape and wayfinding. • Support relocation of existing small businesses into new buildings and facilities in the downtown. • Develop a small business coworking space with small offices, floating desk space, shared conference/kitchen/common spaces. • Emphasize the city's appreciation for its independent businesses. Recommendation 5D. Increase recreation, entertain- ment, and dining options in the Downtown. • Undertake blight removal for downtown blocks. Consider changing grant programs for fagade i improvements to loan deals structured with community lenders to accommodate larger struc- tural improvement grants. • Cultivate "third spaces" in the Downtown area that facilitate collaborative work (Examples: coffee shops, brewpubs). • Host downtown events, including consistent weekly summer programming. (Examples: live music from a variety of styles). • Develop a regular farmers market or artisans market in the Downtown, or explore potential of moving Village farmers market to the Downtown. Recommendation 5E. Increase livability of the Downtown • Work to stabilize neighborhoods adjacent to the Downtown. Examine HUD's Neighborhood stabilization program which provides funding and resources for this type of stabilization effort. • Promote the development of condos, lofts, live - Economic Development Audit & Action Plan • 45 work establishments, and mixed-use development through zoning and investment support. • Connect downtown Main Street to immediately surrounding neighborhoods through streetscape and infrastructure improvements. • Small investments in public art would have dramatic improvements on local feel of the community. Recommendation 5E. Improve Downtown transpor- tation & connectivity • Increase focus on implementation of the city's bike plan, and develop supportive programs and education. Programs may include a bike -share s similar to Boise's. Education may include bike - focused events such as city -biking days, bike -to - work days, weekly social rides, and races. • Connect Downtown to area nodes and regional trails via bike lanes. Connect the Village to Downtown via Pine Street. Encourage the use of regional trails for bike commuting. • If connection to commuter rail transit is feasible, plan for a major stop to be in the Downtown. Role of the City: The City of Meridian will assist in strengthening the MDC's implementation strategy. PEGASUS 46. "n of VIcridian. Idaho Strategy 6: Strengthen Quality of Place • Surveys and interviews indicate there is an interest in a greater diversity of entertainment options and independent businesses. Q, There is low street -life activity and daytime population in Meridian's most walkable areas, H particularly the downtown. '0 CM • Visitors find it difficult to navigate the city due to a lack of landmarks commercial space focused along highways. • There are insufficient walkable areas in Meridian. According to WalkScore.com - an Z �C organization who tracks walkability of cities of all sizes across the US - Meridian's Walk Score Ais only 21 on a scale of 0-100 (least to most walkable). Boise = 55; Nampa = 26; L Caldwell = 23; Salt Lake = 55; Bellvue, WA = 38; Beaverton, OR = 55 _ A Key Catalyst Projects: o Ag -based Real Estate Development o Ag -Experience Center Context: Placemaking increases a city's overall competitiveness — it's about creating the right environment for the talent pool of today and tomorrow. Quality of Place is distinct from Quality of Life, a major strength for Meridian. It means a city promotes a diversity of options for its com- munity to enjoy a stimulating setting, diverse people, and vibrant, visible street life. Many communities focus on their attributes for living and for working, but Quality of Place includes a focus on access to "Third Spaces" pr places outside of work or home that involve recreation, engagement, aesthetics and play.Typically Quality of Place is built over time, a tightly woven fabric con- structed incrementally. Richard Florida describes (ULI) 3 Dimensions of Qual- ity of Place: (1) What's there, or the coherence and quality of the built and natural environment, (2) Who's there, people of diverse national, ethnic, religious backgrounds or sexual and gender identities, (3) What's going on, or a visible presence of people interacting with the environment in a number of modes and a places. Quality of Place refers to the history and culture of a geography while encour aging new development that builds on that authentic heritage. Strategic Recommendation 6: Promote Quality of Place through arts and entertainment programs, wayfinding and signage, and streetscape improve- ments that draw upon Meridian's agricultural heritage. Recommednation 6A. Provide a greater variety of entertainment venues and events in walkable areas. • Tactical Urbanism: Begin with temporary and pop- up initiatives such as a Better Block Program (http://betterblock.org/) that could lead to more permanent changes to the built environment. Focus on placing them in areas that are pedestrian and bike friendly and close to or in Downtown. Recommendation 6B. Host more city-wide events (street fairs, music festivals, local vendor exhibitions) at a variety of times and with vendors, live music, and amenities that cater to a diversity of residents and visitors. The "Better Block" project is a demon- stration tool that rebuilds an area using grassroots efforts to show the potential to create agreat walkable, vibrant neighbor- hood center. The project acts as a living charrette so that communities can actively engage in the "complete streets" buildout process and develop pop-up businesses to show the potential for revitalized econom- ic activity in an area. Bette rBlock.org Recommendation 6C. Launch an Art in Public Places program. • Build upon existing efforts of the city to place statues in public square. Art in Public Places is a concept that encourages the blending of the arts into the urban fabric rather than standing out as a feature. Iconic statues in plazas and at terminal views are important, but we recommend more interactive pieces wher the public can engage with them. Invite artists to create pieces (in a variety of media from painting to sculpture with reclaimed materials) in or on existing space in the public realm, such as in parks, on utility boxes, benches, street lamps, or building facades. These should be created on a rolling basis so that the space is constantly interactive, appealing, and inspiring. The Meridian Mill (next to City Hall) would be an excellent opportunity to utilize a well-placed, iconid landmark for placement of art or signage that informs people they are in the heart of the city. Bench piece, Bend, OR Art the Box, Eurgene, OR Economic Development Audit & Action Plan • 47 Recommendation 6D. Ensure authentic, place -based design of city Wayfinding and signage • Create a Citizens Advisory Committee with a diverse representation (age, sex, nation of origin, religion, lifestyle, term of residency) to assist with deciding final design elements that speak the city's character or that create a sense of place. • Signage should direct people to the Downtown. Recommendation 6E: Improve the city's Walkability: the most walkable areas are the downtown and the Vil- lage, however these are walkable islands in an overall car -dependent city. • Use Main Street as the trunk of connected path ways expansion. Main Street has excellent amenities, but east -west corridors have excellent heritage structures for reinvestment. • Design from the user's experience so that more space is utilized, connections are intuitive, and the pedestrian perspective is prioritized. Recommendation 6E Integrate the community's ag heritage into the public realm in creative, interactive ways.This will integrate well into agritourism development. • Incorporate fruit and nut trees into street tree programs. (Ex:: a volunteer -led initiative that led to the planting of 10 unique street trees • Develop edible landscaping and community orchards within public parks rPE� GA5U5 48 • City of Meridian, Idaho Role of City: The City of Meridian should be the torch bearer for quality of place in any intervention that affects how Me- ridian's character is being portrayed and always advo- cate for authenticity, character, and inclusiveness. Sour Orange Row, San Diego, CA Wetherby, Iowa Edible Forest, San Diego, CA Economic Development Audit & Action Plan • 49 Next Steps .................................... 00000000000000000000 M M a 000 The Economic Development Audit revealed that Meridian has done an excellent job laying the ground- work for economic development success. The healthcare, retail and office development that has proliferated in Meridian - just in the last five years – is growth that any city would like to have.Yet, the Audit also revealed that there is a lack of economic diversity and that Meridian can definitely put in place several strategies to increase that diversity and chart a path for a sustained pattern of growth. The Fields District is a plan that now enters a Phase 3 of refined planning and implementation. The Economic Development Strategy is an initial strategy that sets the course for Meridian's economic development efforts, yet there are still several areas that will need to be further refined. Integrating all of the Fields District strategies into this Economic Development Strategy yields one Implementation Plan for Meridian to follow. Both the Fields District and Economic Development Strategy are ambitious, and once implemented will dif- ferentiate Meridian in the region, State and NW United States as an innovative community that truly integrates community development, economic development and land planning in a manner that is fiscally sustainable and respectful of the community Meridian once was and the mature city it is becoming. Several of the major initiatives will require regional and state support and participation, as well as support from many education, workforce and business leaders. Communication and public relations for these special projects will take a targeted approach with sufficient resources. The Next Steps the City of Meridian needs to take to implement the Economic Development Strategy are: — • City Council adopt the Fields District Strategy. • City Council adopt a Resolution which will put in place the Economic Development Strategy as a policy document for the city to incorporate into its business strategy. • Seek assistance with aligning Meridian's economic development organizations with this Economic Development Strategy. Given the additional scope of economic development with this Strategy, ALL economic development organizations will need to align their staffing and resources to this plan. • The Meridian Development Corporation should embrace their role as an economic development entity. The MDC Board should give serious consideration to expanding by creating new urban renewal districts similar to how Twin Falls has done for purposes of economic development. • Communicate with partners and stakeholders involved in this project what steps Meridian will take to move these initiatives forward. This should entail a sophisticated education and public relations campaign on the Fields Strategy and Economic Development Strategy. Key to this campaign will be identification and buy -in of Meridian -based and regional private sector. • Create Organizational Structures for catalyst projects and develop Business Plans for those initiatives that require more detailed planning • Utilize BUSINESS READYTEAM (the steering committee created for this ED Audit project to serve as a Steering Committee for implementation of this plan and "Greeting Committee" for new business prospects. • Lead and participate in a more detailed occupational and industry analysis • City Council adoption of a Resolution which designates the Economic Development Strategy as a policy document for incorporation within the City's business strategy • Aggressively implement this Strategy, by following the Implementation Matrix on the following pages. • Implement the following organizational and marketing strategies: • Marketing- this is an area that needs a separate strategy, but that is very important to undertake. The Meridian Development PES G WS jo • City of Meridian, Idaho Corporation is beginning a branding strategy for Downtown, yet an overall City wide Marketing Strategy and brand should be created that encompasses downtown, business recruitment/attraction and tourism. • City Staff -Additional resources will need to be immediately added to implement all the strategies and catalyst projects described herein. Business expansion, Downtown, Small Business and Entrepreneurship are the top priorities among businesses surveyed as part of this project. The Chamber will take a larger role in small business training, and a new lead entity will be the head entrepreneurship development with their new presence downtown. The City is not only the lead implementer on all of the Catalyst projects, but also facilitating this entire strategy. All of this will take significant resources, beyond the current resource allocation for economic development in Meridian. Given all of this, the following City Economic Development Team is recommended to be formed. (Note, that this new formation will require one additional full-time employee who can assist economic development efforts but also on special projects (e.g., catalyst projects). The City's economic development team should consist of: o Mayor of Meridian —the Mayor should play a support role to the Economic Development team; represent the City at major events; participate in business prospect visits to Meridian; and advocate for Meridian's catalyst projects o Economic Development Manager—the ED Manager will manage all Economic Development efforts and staff, represents the City at business retention visits, trade shows; leads all business prospect visits; serves as primary implementer and convener for the Meridian Business Ready Team and participates in developer meetings o Economic Development Assistant — full-time staff person devoted solely to ED; manages and executes on business retention sur - tracks progress of catalyst projects and economic development strategy implementation; and coordinates the Business Ready Team Analyst/Assistant—shared staff in Community Development (1/4 to 1/2 time to ED); assists with prepara- tion of analysis for economic develop-ment efforts, catalyst proj ects and marketing efforts The implementation table in the following pages further iterates the necessary phasing as well as partnerships necessary for implementation. It is important to remember that the City will lead as a convener of stakeholders and champion of these initiatives, though not always the lead implementer. Economic Development Audit & Action Plan • 51 Catalyst 1: 1A. Engage Industry with Educational Institutions to Ag -Innovation Campus y Define Concrete Talent Development Goals, Tactics, Recommendation #1:Inte- Outcomes and Metrics. grate the establishment of the Innovation Campus with the efforts ofthe FieldsDistrict 1B. Establish an "Agri culturalTalent Development dationlReport,Recommen- Commercialization & Research Campus" at a strategic - location within Meridian. 1C. Create a Business Plan for the Ag -focused Talent _ Development Initiative + Ag Innovation Campus. 1D. Create a structure for the Ag - focused Talent Development Initiative Catalyst 2: Agritourism Development 2A. Convene local stakeholders as a Meridian Agritourism Steering Committee to carry out strategic Downtown Conference planning and guide implementation efforts Recommendation #2: Create a comprehensive Ag - 4B. Conduct a feasibility study for conference center/ performance space; identify appropriate sources of Tourism strategy centered on 2B. Convene regional Agritourism stakeholders to form Meridian as the "Ag- a Treasure Valley Regional Agritourism entity Destination Hub of the Trea- sure Valley" 2C. Create a high profile, Agfocused "destination attraction" in Meridian that provides a unique and _ complementary amenity for the Boise and Treasure Valley region. Catalyst 3: 3A. Use Fiscal Impact Modeling to improve fiscal Ag -based Land Development sustainability of development. Recommendation #3: Grow Meridian Sustainably 3B: Convene a stakeholders working group comprised _ of developers, landowners, planners, bankers brokers and builders. 3C. Create a Land Use mechanism to foster Ag -based Real estate development(s) 2D: Work with a developer to create a Model Ag -based real estate development in Meridian Catalyst 4: 4A. Coordinate conference center/performance space Downtown Conference development with local public and private stakeholders. Center Recommendation #4: Cre- ate a Downtown Conference 4B. Conduct a feasibility study for conference center/ performance space; identify appropriate sources of Center to provide space for meetings, trainings,and per- _ funds for center development; and build a conference forming arts center. /PE5S 5z • City of Meridian, Idaho Strategy Catalyst 5: Venture Meridian Campus Recommendation #5: Devel- op a Venture Meridian Cam- pus to promote and anchor local entrepreneurship. Action Steps 5A. Have the City's recently hired Small Business Coordinator, Meridian Development Corporation and Chamber of Commerce assist in the relocation of businesses in the Vila Consultants Building at 33 E Idaho Ave into new office spaces throughout the Downtown. 5B. Lease the space to a leading entity, such as Boise State University or The Water Cooler, for the creation of a new Venture and Start-up campus for local residents of all ages. 5C. Partner with the lead entity to find new local Angel investors to have local representation on the Angel Investment Advisory team 5D. Lead efforts to provide an abundance of opportunities for start-ups, the existing business community, and consumers to interact, collaborate and innovate. 5E. Assist in connecting the Venture campus and entrepreneurs to funding sources at the Department of Labor, Idaho Tech Council, and the Idaho Small Business Development Council. Year 1 2 3 4 5 Strategy Strategy 1: Talent and Innovation Ecosystem Cultivation Key Catalyst Projects: oAg Innovation Campus o Venture Meridian Strategic Recommendation #1: Establish a Talent Devel- opment -Industry Partnership initiative Strategy #2: Business Expansion Key Catalyst Projects: o Ag -Focused Talent and Innovation Center o Downtown Conference Center o Venture Meridian Complex Strategic Recommendation #2: Expand and enhance a range of business develop- ment strategies based on Peer -based Retention,At- traction and Mentoring pro- grams,and proactive small business support and import replacement tied to strong local industry targets. Economic Development Audit & Action Plan • 53 Action Steps 111 1A. Implement Catalyst Initiatives to provide infrastructure for talent and entrepreneurs. Promote these institutions as beacons of Meridian's entrepreneurial spirit. 1B. Provide targeted assistance to specialized firms in target industries who might be interested in cultivating entrepreneurs or "intra-preneurs" to service their ancillary or supply -chain needs. 1C. Feature local start-ups in marketing pieces for the City. 1D. Provide opportunities for entrepreneurs and start- ups to pitch concepts in public, interactive settings such as "5 minute pitch" showcases, or "Meet the Start-up" events for youth groups. Invite similar entrepreneurs from around the area to present opportunities for interaction and continued innovation. 1E. Track talent development -industry partnerships with strong data sharing to establish alumni networks to track talent for retention and attraction. 1F. Maintain close connections with all sides of the partnership to plan for necessary expansion or additional infrastructure and funding needs. 1G. Track state and national spending for workforce and entrepreneurship programs and provide evidence of City support in grant applications. 1H. Encourage at -risk youth to join vocational training programs or internships at an early age. Some schools speak to students of these opportunities as early as the 5th grade. 2 3 2A. The City of Meridian Economic Development staff - should lead the development of a Business Retention and Expansion team, with support from the Chamber of Commerce. 2B. The City should add one additional full-time staff person assigned for administrating special projects laid out in this report and to assist in coordination of business expansion efforts. 2C. Some of the largest employers in Meridian are homegrown, with strong commitments to the City.The City should continue to work with them to insure basic infrastructural and workforce needs are met. 21). Meridian should continue to cultivate, define, and empower its "Business Ready -Team" with a coherent message for companies considering locating to Meridian. 54 • City of Meridian, Idaho Strategy Action Steps 2E. The Chamber of Commerce should support small business development through peer-to-peer trainings, mentoring, information exchange, and networking events. 2F: The Chamber of Commerce should offer member - exclusive advertising services on its website and through other media. 2G: The City should encourage the Chamber to lead small business support services, while supporting the business community through developing a "one-stop shop" to assist firms in navigating regulations and codes and identifying potential sources of public funding or procurement opportunities. It should also support infrastructure projects that support entrepreneurship and the small business community, such as the catalyst projects identified in this report. 2H. Implement the Catalyst projects Year 1 2 3 4 5 21. Initiate a "Made in Meridian" campaign — Strategy 3: Tourism 3A. Convene a meeting with the Chamber of Commerce leadership and Meridian to discuss a Tourism Strategy. Key Catalyst Projects: - o Downtown Conference 3B. Develop aTourism Strategy Center o AgTourism Initiative Strategic 3C. Convene a meeting with State and Local tourism is Recommendation - 9 experts to discuss Meridians tourism goals #3: Adopt Tourism as an industry segment to grow in Meridian 3D. Implement the Catalyst Projects. 3E. Determine if a special assessment district or tax is - appropriate for Meridian to create and use for tourism efforts. 3F. Develop marketing collateral that is focused on specific target markets for tourism. 3G. Convene a Scenic Byways meeting with all those involved (state, regional, public, private) to determine how to better coordinate and market the Scenic Byways, and if there is a role for Meridian. 3H. Advocate for H ighway 16 to be the Scenic Byways connector. Economic Development Audit & Action Plan • 55 Strategy 4: Land Use,Trans- 4a. City staff should convene an internal discussion portation and Infrastructure about this Strategy. The goal of the discussion should be to develop specific internal processes that will need to be further developed and approved before 0NCatalystProjects: gHeritage Center implementing. o Ag -focused Real Estate Development o Coordinated Land Use, 4B. Implement the Ag -Heritage and Ag -Focused Real _ Transportation and Estate Catalyst projects Infastructure Policies is Recommendation Strategic 9 4C. The City should perform a Citywide Fiscal Impact Analysis to analyze and determine if the current - 4: Integrate Sustainable development pattern is the best policy for the city Land Use practices with moving forward. Transportation Improve- ments and Infrastructure Investments. 4D.The Capital Improvements Plan should be modified based on the citywide fiscal analysis. A serious consideration should be given to whether or not the ■ City should extend infrastructure to the South of let the southern region of the City continue to maintain its rural character with larger lot subdivisions. 4E. The City Council should maintain to the City's 10 - year and then Annual CIP. This will allow the City and Staff to be proactive with its investment, which will save the City and its taxpayers millions over a 10 -year period. 4F. City should establish and maintain an approval, permit and utility outlay system that maintains to the City's Comprehensive Plan and Capital Improvements Plan 4G. The City should actively market its green and sustainable initiatives including this Fields Initiative, and also the Water Reclamation project with the city's wastewater treatment facility. 4H. Aggressively implement the bicycle program, in collaboration with Meridian's transportation partners. 41. Engage, or re-energize the discussion in the region for Regional Commuter Rail. 4J. Implement the Regional Commuter Rail. 4K. Continue to utilize the City's wastewater by- products as economic development tools. 4L. Develop an incentive policy utilizing the - wastewater by-products as economic development incentives. 4M.Complete the Chinden improvements by widening Highways 20 and Highways 26. 4N. Complete Highway 16. 56 • City of Meridian, Idaho Strateggyy 5: 5A. Work with the Meridian Development Corporation - Strengthen Downtown (MDC) to clarify their role in Economic Development Key Catalyst Projects 56. Make Quality of Place a guiding light for all o Downtown Conference Center aesthetic and structural improvements to the downtown o Venture Meridian 5C. Increase Employment in the Downtown by leveraging City -owned properties 5D. Increase recreation, entertainment, and dining options in the Downtown. 5E. Increase livability of the Downtown 5F. Improve Downtown transportation & connectivity Strategy #6: Strengthen 6A. Provide a greater variety of entertainment venues Quality of Place and events in walkable areas. Keyy Catalyst Projects 66. Host City Develop -wide events (street fairs, music festivals, o Landlocal vendor exhibitions) at a variety of times and Development with vendors, live music, and amenities that cater to a o Agritourism Development diversity of residents and visitors. Strategic Recommendation 6: Promote Quality of Place through arts and entertain- ment programs, wayfinding and signage, and streetscape improvements that draw upon Meridian's agricultural heritage. AI� 'vz 6C. Launch an Art in Public Places program. 6D. Ensure authentic, place -based design of City Wayfinding and signage 6E. Improve the City's Walkability: the most walkable areas are the downtown and the Village, however these are walkable islands in an overall car -dependent city. 6F: Integrate the community's ag heritage into the public realm in creative, interactive ways.This will integrate well into agritourism development. Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: $B PROJECT NUMBER: ITEM TITLE: Public Works: Public Works Week Update MEETING NOTES io Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: July 1, 2014 ITEM NUMBER: 9A PROJECT NUMBER - ITEM TITLE: Ordinance No. /y— Southern Highlands Property Exchange MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE.. E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN ORDINANCE NO. I y— /G 1 BY THE CITY COUNCIL: BIRD, BORTON, CAVENER, MILAM, ROUNTREE, ZAREMBA AN ORDINANCE AUTHORIZING THE CONVEYANCE OF CERTAIN CITY OWNED REAL PROPERTY TO BHH INVESTMENTS 1 LLC, LOCATED IN THE CITY OF MERIDIAN, CONSISTING OF APPROXIMATELY 9207 SQUARE FEET OF REAL PROPERTY ALONG E. TACONIC DRIVE, IDENTIFIED AS A PORTION OF THE SOUTHERLY PORTION OF LOT 16, BLOCK 01, BLACKROCK SUB NO 01, ADA COUNTY PARCEL NO. R0988260167 (THE "SURPLUS PARCEL"); AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AND ATTEST ON BEHALF OF THE CITY OF MERIDIAN THE DEED AND OTHER DOCUMENTS NECESSARY TO COMPLETE THE TRANSACTION; PROVIDING FOR A WAIVER OF THE READING RULES; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, pursuant to Idaho Code 50-1401, the City Council has statutory authority to sell, exchange, or convey any real property owned by the city which is underutilized or which is not used for city public purposes; and, WHEREAS, when it is determined by the City Council to be in the City's best interest, the Council may by Ordinance duly enacted, authorize the exchange of the city - owned real property for property of like value; and, WHEREAS, On January 7, 2014, the City Council of the City of Meridian approved the Decision and Order approving the Annexation and Zoning and Preliminary Plat for the Southern Highlands Subdivision, located at the NW corner of S. Eagle Road and E. Taconic Drive, Case Numbers AZ -13-016 and PP -13-033; and, WHEREAS, as part of that Decision and Order, the City Council declared its intent to grant the Applicant's request to trade real property owned by the developer adjacent to the City's existing well lot with an equal amount of real property owned by the City nearby where a sewer lift station has been located; and, WHEREAS, the City's holdings before and after the exchange are depicted on the attached Exhibit A. WHEREAS, the Applicant has submitted a lot line adjustment application with the City to achieve the proposed property exchange and the City Council must hold a public hearing for the purpose of determining whether the terms and conditions of the proposed real property exchange are in the City's best interest; and, WHEREAS, a public hearing was held at the regular meeting of the Meridian City Council on July 1, 2014 and at the conclusion of said hearing, the City Council ORDINANCE AUTHORIZING CONVEYANCE OF PROPERTY - Page 1 of 3 moved to approve the proposed real property exchange, subject to certain terms and conditions, and directed staff to bring forth this Ordinance authorizing the conveyance. NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF MERIDIAN, IDAHO: Section 1. That a public hearing on the proposed real property exchange was held at the July 1, 2014 meeting of the Meridian City Council. Section 2. That the City Council determined after the public hearing that the Surplus Parcel is underutilized and will not be used for public purposes after the sanitary sewer lift station is abandoned. Section 3. That the proposed exchange is in the City's best interest and the disposition of the Surplus Parcel in the proposed exchange is hereby approved, subject to the condition that the City be granted a land lease to operate the sanitary sewer lift station until it is no longer needed as determined by the City's Public Works Department. Section 4. That the Mayor and City Clerk shall be authorized to execute and attest a standard form warranty deed, the Record of Survey, and any other documents necessary to complete the conveyance authorized by this Ordinance. Section 5. That pursuant to the affirmative vote of one-half (1/2) plus one (1) of the Members of the full Council, the rule requiring two (2) separate readings by title and one (1) reading in full be, and the same is hereby, dispensed with, and accordingly, this Ordinance shall be in full force and effect upon its passage, approval and publication. PASSED by the City Council of the City of Meridian, Idaho, this 1st day of July, 2014. APPROVED by the Mayor of the City of Meridian, Idaho, this 1st day of July, 2014. ORDINANCE AUTHORIZING CONVEYANCE OF PROPERTY - Page 2 of 3 EXHIBIT A 0 76 Ib ra2aB•' / uR 6 BASIS OF BEANNC UNE EW ME OF ]NE NEI/' OF SE(MON 32 ll . KOWIXIM BE M MMO AWNWENIS 'J WON WON tl OBSEINA)KK!5 FP ACMD w IW -D µE5, -NE 01IM) NMB) OOGFlDRIA]E sY51F.N. A DENGNGS ME GAN). N DISTNICES ME GMUND. CITY PARCELS BEFORE EXCHANGE , D ]d 150 ]M W P'q�gP BASISOFBEARING 0 CITY PARCELS AFTER EXCHANGE ORDINANCE AUTHORIZING CONVEYANCE OF PROPERTY - Page 3 of 3