Agency Comments CCCENTRAL
i • DISTRICT
'HE� L-Iff-
DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500
"To iu:prove Plte health of our communities kv iderrtifjlirxg sustainable solutions to corruuutrity healilt issues,
developing parttrerships for inrpletrterrtatior: ofstrategies, and de»roustratiug our success through measurenteut ofoutcotues. "
14-0691
August 28, 2014
Christopher D. Rich
Ada County Recorder
200 West Front Street
Boise, ID 83702
RE: Southern Highlands Subdivision No. 1
Dear Mr. Rich:
Central District Health Department has reviewed and does approve the final plat for this
subdivision for central water and central sewer facilities. Final approval was given
August 28, 2014.
Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional Engineer (QLPE) representing City of
Meridian and the QLPE approval of the design plans and specifications and the conditions
imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those facilities. If the developer fails to construct facilities then
sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval, and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
Ada I Boise Country Office
707 N. Armstrong Pl.
Boise, ID 83704
Enviro'. Health: 327-7499
Reproductive Health: 327-7400
Immunizations: '327-7450
Senior Nutrition: 327-7460
WIC: 327-7488
FAX: 327-8500
Serving Valley, Elmore, Boise, and Ada Counties
Elmore County Office
520 E. 8th St. North
Mountain Home, ID 83647
Enviro. Health: 587-9225
Family Health: 587-4407
WIC: '587-4409
FAX: 587-3521
Valley. County Office
703 N. 1st St.
McCall, ID 83638
Ph. 634-7194
FAX: 634-2174
If you have any questions, please call 327-8517.
Sin erely,
Lori Badigian, R.E.H.
Senior Environmental Health Specialist
cc: BHH Investments 1, LLC
T -O Engineers
City of Meridian
LB:bk
CENTRAL
•• DISTRICT
�THEALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTRAL DISTRICT HEALTH DEPARTMENT
Environmental Health Division
Preliminary / Final / Short Plat
Return to:
❑ ACZ
❑ Boise
❑ Eagle
❑ Garden City
❑ Kuna
9PMeridian
❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
8. After written approval from appropriate entities are submitted, we can approve this proposal for:
central sewage ❑community sewage system LJcommunity water well
Llinterim sewage central water
Ll. individual sewage individual water
,9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
�C central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
❑ 14.
Reviewed By
Review Sheet
15726-001EH1111
Machelle Hill
From: Mack Myers <mack@settlersirrigation.org>
Sent: Monday, June 09, 2014 11:26 AM
To: clerk
Subject: RE: City of Meridian Dev App - FP 14-026
The proposed project will not impact any Settlers Irrigation District facilities.
Please contact the Nampa and Meridian Irrigation District for comment and review.
Thanks,
Mack Myers
District Manager
Settlers Irrigation District
P.O. Box 7571
Boise, ID 83707
Office 208-343 5271 Fax 208 343-1642
From: Machelle Hill [mailto:mhill@meridiancity.org]
Sent: Wednesday, June 04, 2014 3:12 PM
Subject: City of Meridian Dev App - FP 14-026
IDI4�w
E AN
City of Meridian
City Clerk's Office
33 E. Broadway Avenue
IDAHOCity
Meridian, ID 83642
Council
Development Application Transmittal
To: Outer Agencies
j Comments due by: June 17, 2014
Transmittal Date: June 4, 2014
File No.: I FP 14-026
HearingDate: June 24, 2014
Request:
Final Plat approval consisting of 47 building lots and 6 common lots on 27.66 acres of
land in an R-4 zoning district for Southern Highlands
By:
BHH Investments 1, LLC
Location of Property or Project:
South of E. Amity Road and north of E. Taconic Drive
and west of S. Eagle Road
City Council Action:
The City of Meridian is requesting comments and recommendations on the application referenced above. To review
detailed information about the request, please click on the file number above to take you directly to the application.
We request that you submit your comments or recommendations by date specified above. When responding, please
reference the file number of the project. If responding by email, please send comments to clerk cCD.meridiancity.org.
June 11, 2014
City of Meridian
City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: FP 14-026/Southern Highlands
Dear Jaycee:
M
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
If all storm drainage is retained on-site there will be no impact on Nampa & Meridian
Irrigation District (NMID) and no further review will be required.
However, if any surface drainage leaves the site, the Nampa & Meridian Irrigation District
(NMID) requires that a Land Use Change Application is filed for review prior to final platting.
Please contact Suzy Hewlett at 466-7861 for further information.
All laterals and waste ways must be protected. Water delivery is provided by Boise Project.
Please contact Bob Carter, Boise Project - Board of Control, at 344-1141 or 2465 Overland
Rd., Room 202, Boise, Idaho 83705-3173.
Sincerely,
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
PC: Boise Project Board of Control
A. Madsen, Asst. Water Superintendent
Office/File
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
06/17/2014 11:16
RICHARD DUPIRANT
CHAIRMAN OF THE BOARD
GRAHAM PATERSON
VICE CHAIRMAN OF THE HOARD
TIMOTHY M. PAGE
PROJECIT MANAGER
ROBERT D. CARTER
ASSISTANT PROJECT MANAGGR
APRYL GARDNER
SECRETARY. rRI=ASURER
JERRIFLOYD
ASSISTANT SECRETARY-
TREASURF_R
2083441437
BOISE PROJECT
BOISE PROJECT BOARD OF CONTROL
City of Meridian
City Cleric's Office
33 E. Broadway Avenue,
Meridian, Idaho 83642
(FORMERLY BOIrG U.S. RECLAMATION PROJECT)
2463 OVERLAND ROAD
BOISE. IDAHO 8170.5.3155
1.6 June 2014
RE: BHH Investments, 1,LLC File No. FP 14.026
S. of E. Amity and N. of Taconic Dr..
Nampa -Meridian Irrigation District NM -11371-1.6
Grimmett Lateral. 36+70
Sec. 32, T3N, RIE, B.M.
Jaycee Holman.:
PAGE 01/02
OPERATING AGENCY FOR 167,00A
ACRES FOR THF FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
601SE•KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
fSiG SEND DISTRICT
TEL. (200) 344-1141
FAX; (200)3d4 -1n37
0 J,-er
'I, k 1S
The United States' Pierce Lateral lies within the boundary of the above-mentioned
location. The easement for this laterals is held in the name of the United States through
the Burcau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat.
391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We
assert a federal easement 12' west and 18' east feet east of the Pierce Lateral centerline.
Whereas this area is for the operation and maintenance of our facility, no activity should
hinder our ability to do so.
Fencing (as may be required) must be constructed just off. of Boise Project facilities, to
insure public safety and prevent encroachments.
Wording on the preliminary and final recorded plat needs to be noted that this
development must adhere to Idaho Statutes, Title 42-1.209.
Whereas, these easements are for the operation and maintenance of our facility, no
activity should hinder our ability to do so. The Boise Project does not approve
landscaping (other than grass) within its easements, as this will certainly increase our cost
of maintenance.
Project facilities and/or casements that parallel, and are within and/or intended to be
within road right-of-ways due to any development of this property must be relocated
06/17/2014 11:16 2083441437 BOISE PROJECT PAGE 02/02
outside of road right-of-ways. The easements of Boise Project facilities will remain the
same unless agreed upon, and/or approved with written permission from Boise Project
Board of Control..
Crossing agreements must be secured and signed by all parties prior to March I" of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 15th of each year. However, on a case by case basis,
overhead utilities and utilities boring underneath a Project facility may be allowed after
March. 15`h if reviewed and approved by the Boise Project.
Storm Drainage and/or street Runoff must be retained on site.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
Boise Project Board of Control requests an irrigation and drainage plan for .review.
Whereas this property lies within the Nampa -Meridian Irrigation District i.t is important
that representatives of this development contact tb.e NMID office as soon as possible to
discuss the pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the Nampa -
Meridian Irrigation District as to who will own and operate the pressure irrigation system
prior to review and approval of an irrigation plan by Boise Project Board of Control..
Whereas this development is in its preliminary stages, Boise Project Board of Control
.reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Sincerely,
Bob Carter
Assistant Project Manager BPBC
bdc/bc
cc: Phil Comegys Watermaster, Div; 2 BPBC
Greg Curtis Water Superintendent, NMID
File