Loading...
Sagewood Subdivision FP-14-023BEFORE THE MERIDIAN CITY COUNCIL IN THE MATTER OF THE REQUEST FOR FINAL PLAT CONSISTING OF 2 OFFICE LOTS, 45 SINGLE-FAMILY RESIDENTIAL LOTS AND 8 COMMON LOTS ON 15.62 ACRES OF LAND IN THE L -O AND R-8 ZONING DISTRICTS FOR SAGEWOOD SUBDIVISION BY: SAGEWOOD OVERLAND, LLC APPLICANT HEARING DATE: JUNE 3, 2014 CASE NO. FP -14-023 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council on June 3, 2014 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Services Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: The Final Plat of "PLAT SHOWING SAGEWOOD SUBDIVISION, LOCATED IN THE NW '/4 OF SECTION 24, T.3N., R.1 W., B.M., MERIDIAN, ADA COUNTY, IDAHO, 2014, HANDWRITTEN DATE: 05/08/14, CLINTON W. HANSEN, PLS, SHEET 1 OF 3," is approved subject to those conditions in the ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SAGEWOOD SUBDIVISION (FP -14-023) Page 1 of 3 staff report to the Mayor and City Council from the Planning Division and the Development Services Division of the Community Development Department dated June 3, 2014, a true and correct copy of which is attached hereto marked "Exhibit A" and by this reference incorporated herein, and the response letter from Becky McKay, a true and correct copy of which is attached hereto marked "Exhibit B" and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SAGEWOOD SUBDIVISION (FP -14-023) Page 2 of 3 Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty- eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the I d � day of Lk -v`� , 2014. Attest: o� 0 City of E.IDTAN*- aycee lman 5ENL City Clerk By: Tammy d eerd Mayor, ' y of Meridian Copy served upon the Applicant, Planning Division, Public Works Department, and City Attorney. By: Dated: J V n 2. 19. Q o 1 y ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SAGEWOOD SUBDIVISION (FP -14-023) Page 3 of 3 EXHIBIT A STAFF REPORT MEETING DATE: June 3, 2014 M�E PIDIAN TO: Mayor and City Council FROM: Bill Parsons, Associate City Planner 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: FP -14-023 — Sagewood Subdivision I. APPLICATION SUMMARY The applicant has applied for final plat (FP) approval for two (2) office lots, forty-five (45) single- family residential building lots and eight (8) common lots on approximately 15.62 acres of land in the L -O and R-8 zoning districts. II. STAFF RECOMMENDATION/DECISION Staff recommends approval of the Sagewood Subdivision final plat subject to the conditions noted in Sections VI and VII below. These conditions shall be considered in full, unless expressly modified or deleted by motion of the City Council. M. PROPOSED MOTION Approval I move to approve File Number FP -14-023 as presented in the staff report for the hearing date of June 3, 2014, with the following modifications: (Add any proposed modifications.) Denial I move to deny File Number FP -14-023, as presented during the hearing on June 3, 2014, for the following reasons: (You should state specific reasons for denial.) Continuance I move to continue File Number FP -14-023 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: (Parcel #'s: S1224212601, S1224212720 and 51224212805) The site is located on the south side of W. Overland Road; approximately 650 feet west of S. Stoddard Road in the northwest 1/4 of Section 24, Township 3 North, Range 1 West. B. Applicant: Sagewood Overland, LLC 1735 S. Millennium Way Meridian, ID 83642 C. Owners: Sagewood Overland, LLC 1735 S. Millennium Way Sagewood Subdivision FP -14-023 PAGE 1 EXHIBIT A Meridian, ID 83642 Dexter King 1195 W. Overland Road Meridian, ID 83642 D. Representative: Becky McKay, Engineering Solutions, LLP 1029 N. Rosario Street, Ste. 100 Meridian, Idaho 83642 V. STAFF ANALYSIS The proposed final plat depicts two (2) office lots, forty-five (45) single-family residential building lots and eight (8) common lots on 15.62 acres of land in the L -O and R-8 zoning districts. The average lot size for the residential portion of the development is 7,289 square feet. The gross density of the development is 3.98 dwelling units per acre with a net density of 5.98 dwelling units per acre. The proposed open space for the residential portion of the development consists of a 1.12 acre pocket park, 8 -foot wide parkways, and a micropath. Qualifying open space proposed for the development is 1.61 acres which totals approximately 14.2%. The open space complies with the overall project open space approved with the Sagewood development. Staff has reviewed the proposed final plat for consistency with the approved preliminary plat and found it to be in substantial conformance per UDC 11 -6B -3C as the number of buildable lots and the amount of open space are the same. VI. SITE SPECIFIC 1. Applicant shall comply with all terms of the approved Sagewood annexation (AZ -13-012), preliminary plat (PP -13-026) and recorded development agreement (DA #114034783). 2. The applicant has until December 3, 2015 to obtain City Engineer's signature on the final plat or apply for a time extension in accord with UDC 11-613-7. 3. Prior to submittal for the City Engineer's signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. Per the recorded development agreement, a cross-access/ingress-egress easement shall be granted to the properties to the west and the east (parcels S1224223106 and 82928160100) as shown on the submitted concept plan. A recorded copy of the easement shall be submitted with the first Certificate of Zoning Compliance application for the site OR a note added to the face of the plat that references the recorded cross access agreement. 5. Prior to the City Engineer's signature on the final plat, the existing structures on Lot 1, Block 2 shall be removed and all existing wells and septic systems abandoned. 6. The final plat prepared by Engineering Solutions, LLP, stamped on May 8, 2014, 2014 by Clinton W. Hansen, shall be revised as follows: a. Notes #10 and 14: Insert the recorded instrument numbers. b. Note #15: Insert recorded instrument number 114034783. c. Graphically depict a 10 -foot wide landscape buffer easement on the east boundary of Lotl, Block 1 and the west boundary of Lot 1, Block 2. Sagewood Subdivision FP -14-023 PAGE 2 EXHIBIT A 7. The landscape plan prepared by South Landscape Architecture, dated 05/07/14, is approved as submitted. 8. Details of the covered picnic area proposed for Lot 9, Block 3 shall be submitted and approved by the Planning Division prior to signature on the final plat. 9. All fencing installed on the site shall comply with UDC 11-3A-6 and 11-3A-7. If permanent fencing does not exist at the subdivision boundary, temporary constriction fencing to contain debris shall be installed around this phase prior to release of building permits for this subdivision. 10. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat does not relieve the Applicant of responsibility for compliance. 11. Prior to the issuance of any new building permit, the property shall be subdivided in accordance with the UDC. 12. The applicant shall comply with the submitted home elevations approved with the preliminary plat. 13. The applicant shall submit a final approval letter from the Street Naming Committee approving the street names for the proposed subdivision. 14. Prior to developing the office lots (Lot 1, Block 1 and Lot 1, Block 2), a certificate of zoning compliance and design review application shall be submitted to the Planning Division for review and approval prior to issuance of building permits. 15. Prior to signature of the final plat by the City Engineer, the applicant shall provide a letter from the United States Postal Service stating that the applicant has received approval for the location of mailboxes. Contact the Meridian Postmaster, Kimberly Cutler, at 887-1620 for more information. 16. A condition was placed on the approved Preliminary Plat, which restricted the development of lots to no more than 25 until such time as another water main connection can be made or a second connection is made to the Overland Road main. This restriction has since been modified by the Meridian City Council to eliminate the restriction. 17. Due to the elevation differentials in this development, the applicant shall be required to submit an engineered master grading and drainage plan for approval by the Community Development Department. This plan shall establish, at a minimum, the finish grade elevations of the rear lot corners. The engineer will evaluate if rear yard drains are necessary and provide the drainage features necessary to control and maintain storm water drainage. Applicant's engineer shall consult the 2009 International Residential Code when establishing the finish floor elevations and drainage patterns away from the building pads. 18. With the application for a building permit, the home builder shall submit plans consistent with the approved master grading and drainage plan for the subdivision. If deviations from the approved master grading and drainage plan are proposed, they must be submitted and approved by the Community Development Department prior to the issuance of a building permit. Any such revision proposal shall be accompanied by a written authorization from the Developer to allow a revision to the master lot grading plan. VII. GENERAL REQUIREMENTS 1. Sanitary sewer service for this development shall be from an extension of the existing main stub in W. Overland Road adjacent to the Hardin Drain. The master planned routing traverses along the Harden Drain, across a neighboring property. The applicant will be responsible for the acquisition of the necessary temporary construction easement and permanent easements, as well Sagewood Subdivision FP -14-023 PAGE 3 EXHIBIT A as the construction of this off-site main. Failure to obtain the necessary easements for the construction of the sanitary sewer essentially renders this development unviable. 2. This development shall connect to the existing domestic water main in W. Overland Road at the intersection of S. Sagewood Avenue. The preliminary plat also shows a future connection to the south into the future Meridian School District Middle School parcel, and two other future connections to the parcel adjacent to the west. 3. Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub -grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 4. Per Meridian City Code, the applicant shall be responsible to install sewer and water mains to and through this development. 5. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant shall be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. 6. Any existing structures that are required to be removed shall be removed prior to signature on the final plat by the City Engineer. 7. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non -approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to final plat signature. 8. Any existing domestic wells within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8. Contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 9. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9-4-8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 10. Street signs are to be in place, water and sewer system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 11. A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, etc., prior to signature on the final plat. 12. All development improvements, including but not limited to sewer, water, fencing, micro -paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. Sagewood Subdivision FP -14-023 PAGE 4 EXHIBIT A 13. Applicant shall be required to pay Public Works development plan review, and constriction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 14. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 15. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 16. Developer shall coordinate mailbox locations with the Meridian Post Office. 17. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 18. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3 -feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above. 19. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACRD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 20. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 21. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. 22. The City of Meridian requires that the owner post to the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 23. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 24. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20 -feet wide for a single utility, or 30 -feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked Sagewood Subdivision FP -14-023 PAGE 5 EXHIBIT A EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. 25. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. V. EXHIIBITS A. Vicinity Map B. Approved Preliminary Plat C. Proposed Final Plat (stamped/dated: 05/08/14) D. Proposed Landscape Plan (dated: 05/07/14) Sagewood Subdivision FP -14-023 PAGE 6 Exhibit A — Vicinity Map Vicinity Map Legend z Area of Impact Print Date: 612212014 EXHIBIT A 0 0.173 0.35 Miles The Infolmbbon shown on Ihls mat, Is compiled ream various sources eM L subject b wuslonlh Wat n_ The City w Menton moxas no warranty or Bunranro¢ as to Inc content,n¢p.,, emel..' ermmpleleassa.f"of No Colo P.20. wool ..Q.e no legal respanslbllily for the Inroanulloo contained on Ibis map_ NfE IDIZ IANC \liDAuo Sagewood Subdivision FP -14-023 PAGE 7 EXHIBIT A Exhibit B — Approved Preliminary Plat PRE Sagewood Subdivision FP -14-023 PAGE 8 EXHIBIT A Exhibit C — Proposed Final Plat (dated: 05/08/14) FLAT SHOWNO BAOMW®®D RuzzmMiIIow LOCATED IN THE NW Y OF SECTON 24. T.JN.. R.M. B.N. NENOIAN. ADA C NW. IDAHO 2014 �n�L�==i.�.xN 1111eek' av aw-u ro.i y�_ w.�rwoa �uo u.e. iurr _ r x rr o ® •mfa v� +wr I 1-7 ---- wre' x O.fflllAro POID�i.$. _ �{I f s _ 11'e jg _ i u. p F � 'N rYusw®°O•s �vv m�r�vvi°Ao'°a EMKM—Ei— BE k ernix YA. a xY0I Y ^' Me9! b uxxunm 111 8 uryeUUp ply LLO nel.n✓9` uxmrx x ENRIMffRIN6 ntl�ofeedloNc Sxltt 1 oT a SRLNlIRMR ��-yLnu�^ Sagewood Subdivision FP -14-023 PAGE 9 EXHIBIT A Exhibit D —Proposed Landscape Plan (dated: 05/07/14) gg i --W OVfiNLANDNOAD }��1 nun eamiu .•-�•—�.--.• ��8 i 11 1 _ - 1 II 1 ... I OVERALL SITE PLAN pI�G^I ENARur PIAT DATA :zc'Tm i— ® EQSl EAD Rea EOS STOs "MUNIN IMM PLAN AND � MO BOB IOMM!=AI 1 t"�w�Y-r • . —SHEET L2.0 w� ^dYuyY�Yc.,�e �u LANSCME NOTES LANDSCAPE CALCIMTIONB� SYr �^TJ: T` �SI R• � pA ��- SHEET L2.1' _ 4 _ 4 �e GENERAL LAROSOME NOTES w� ^dYuyY�Yc.,�e �u LANSCME NOTES LANDSCAPE CALCIMTIONB� SYr �^TJ: T` �SI R• Sagewood Subdivision FP -14-023 PAGE 10 EXHIBIT A s E b• ' i •• ams- wm \ �— _ - 4f-� Win• I � H i:��� ya1 uL WDA NPOR H^:. ay ?qI 1YYI �:• 1 j nz Ow i --s=-5 �'� _- ,—.- —_ 1 - ' . _�` z �-1' D r•�"fie%.v+ c.r ��� 5 •�.�. Cera—,� �" LANDS—1 CAPE PLAN em eavt• uH Hoa ovimecc errH PLAN. PLANP eHH11111L$ was }� .....•,.. soma. es assts 1.eH .m tw roa rraHaoAPH enANa eHa �L2.1 see rao voH H>.reHH sj 1 ...m 11 � �_PLIMM1M1MfILlA .� P daa4P 1AH OPHBALL eRH PWN. PLANS OOl®HLA AaD [QOTID. eHe eHHH{g LHO W Laf HOR LANDeeAP➢ PLANe S.� � �i3o Sagewood Subdivision FP -14-023 PAGE 11 E IGINEERING planning and engiieedng commundies for the lucre CLP May 29, 2014 Mayor Tammy DeWeerd and Meridian City Council 33 East Broadway Avenue Meridian, ID 83642 Re: Sagewood Subdivision Final Plat File No. FP -14-023 Dear Mayor and Council Members: 1029 N. Rosario Street, Suite 100 Meridian, ID 83642 Phone: (208) 938-0980 Fax: (208) 938-0941 E-mail: es-beckym@gwestoffice.net We have reviewed staff comments for the Meridian City Council meeting of June 3, 2014, and have the following responses: VI. SITE SPECIFIC CONDITIONS 1. The applicant will comply. 2. Understood 3. The applicant will comply. 4. The applicant will comply. 5. The applicant will comply. 6. Recorded instrument numbers will be added to Notes Nos. 10, 14 and 15 and the landscape buffer easements will be graphically depicted on the plat. 7. It is understood that the landscape plan prepared by South Landscape Architecture, dated 05/07/14, is approved as submitted. 8. The Applicant will submit details of the covered picnic area proposed for Lot 9, Block 3, for approval by the Planning Division prior to signature on the final plat. 9. All fencing installed on the site will comply with UDC I I -3A-6 and I 1-3A-7. 10. Understood. I 1. Understood. 12. The Applicant will comply with the submitted home elevations approved with the preliminary plat. 13. The Applicant will submit a final approval letter from the Sheet Naming Committee approving the street names for the proposed subdivision. C:Wacuments\2012\120726 Sagewood Subdivision\RecsResponseCC.doe Mayor and City Council May 9, 2014 Page 2 14. Certificates of zoning compliance and design review applications shall be submitted to the Planning Division for review and approval prior to issuance of building permits. 15. The Applicant shal I provide a letter from the United States Postal Service stating that the applicant has received approval for the location of mailboxes. 16. It is understood the restriction on development until another water main connection is made was eliminated by the Meridian City Council. 17. The Findings of Fact and Conclusions of Law were modified to read as follows: Engineered master grading and drainage plans will be submitted for approval by the Community Development Department that establishes, at a minimum; the finish floor elevation of each building W, the finish grade elevations of the rear lot corners, die drainage patterns away r E)m subsuFfaee The engineer will evaluate if rear yard drains are necessary and provide the drainage features necessary to control and maintain storm water drainage. Applicant's engineer shall consult the 2009 International Residential Code when establishing the finish floor elevations and drainage patterns away from the building pads. 18. With the application for a building permit, homebuilders will submit plans consistent with the approved master grading and drainage plan for the subdivision. If deviations from the approved master grading and drainage plan are proposed, they will be submitted and approved by the Community Development Department prior to the issuance of a building permit. Any such revision proposal shall be accompanied by a written authorization from the Developer to allow a revision to the master lot grading plan. GENERAL REQUIREMENTS I. The applicant will obtain all necessary easements for sanitary sewer service for this development. 2. The development will connect to the existing domestic water main in W. Overland Road at the intersection of S. Sagewood Avenue and provide connections to the south and west. 3, Applicant will coordinate water and sewer main size and routing with the Public Works Department and execute standard forms of easements for any mains that are required to provide service outside of public right-of-way. 4. Per the recorded development agreement, a cross-access/ingress-egress easement shall be granted to the properties to the west and the east (parcels S 1224223106 and R2928160100) as shown on the submitted concept plan. A recorded copy of the easement shall be submitted with the first Certificate of Zoning Compliance application for the site OR a note added to the face of the plat Chat references the recorded cross access agreement. 5. Prior to the City Engineer's signature on the final plat, the existing structures on Lot 1, Block 2 shall be removed and all existing wells and septic systems abandoned. 6. The applicant will comply. 7. The applicant will comply. 8. The applicant will comply. 9. The applicant will comply. 10. The applicant will comply. 11. Understood. 12. Understood. CVDocuments\20121120726 Sagewood Subdivision%=ResponseCC.doc Mayor and City Council May 9, 2014 Page 3 13. The applicant will comply. 14. Understood. 15. Understood. 16. The applicant will comply. 17. The applicant will provide compaction test results to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 18. The engineer's street centerline elevation letter was submitted with the final plat application. 19. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 20. The applicant will comply. 21. The applicant will comply. 22. The applicant will comply. 23. The applicant will comply. 24. The applicant will comply. We appreciate staff's review of this project. Sincerely, Engi eering Solution„_LL Becky McKa /[/]/�L Planner BM: ss cc: Sagewood Overland LLC C:\Documents\2012\120726 Sageaood Subdivision\RecsResponseCC.doc