Final Acceptance Letter COM�jQirE I DIAN�--
IDAHO
May 13, 2014
Mayor Tammy de Weerd
City Council Members:
Keith Bird Joe Borton
Luke Cavener Genesis Milam
Charlie Rountree David Zaremba
Mr. Lorne Duthie Superior Construction & Excavation, Inc.
Mission Coast Properties ID, Inc. PO Box 455
134020-13A Avenue Meridian, Idaho 83680
Surrey BC V4A 1 C3
RE Reflection Ridge Subdivisions #1 and #2 — Final Acceptance
Dear Mr. Duthie:
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of
Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, 2013 Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two -years from the date
of this letter.
City -Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
File
DEQ
Public Works Department - 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500 - Fax 208-898-9551 . www.meridiancity.org