Loading...
Change Order No. 2 with Contractors Northwest for WWTP Fermentation and Odor Control} § It ƒ. LUI0R|| ��£§!■# LL M. O■; F� Q \ � as z 0 y !;®. jj !2)) § d( } § It City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith - Unposted Transactions Included In Report 3590 - WWTP Construction Projects 60 - Enterprise Fund From 10/1/2013 Through 9/30/2014 Date: 4/17/14 12:35:07 em Page: 1 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 96130 Fermentation Projects 10045 Primary 1/2 Fermentation 2,073,997.84 0.00 2,073,997.84 100.00% 10045.a WWTP Fermentation & Odor 0.00 1,603,999.35 (1,603,999.35) 0.00% Control Ph 1 Construction 10045.c WWTP Fermentation & Odor 0.00 176,776.81 (176,776.81) 0.003 Control SDC 10045.e WWTP Fermentation & Odor 0.00 130,975.00 (130,975.00) 0.00% Control - Programming & Integration 10045d WWTP Fermentation & Odor 0.00 7,776.00 (7,776.00) 0.00% Control Special Inspections Total Capital Outlay 2,073,997.84 1,919,527.16 154,470.68 7.453 TOTAL EXPENDITURES 2,073,997.84 1,919,527.16 154,470.68 7.45% Date: 4/17/14 12:35:07 em Page: 1 City Of Meridian Detailed Statement of Revenues and Expenditures - Rev and Exp Report - Keith - Unposted Transactions Included In Report 3590 - WWTP Construction Projects 60 - Enterprise Fund From 10/1/2013 Through 9/30/2014 Date: 4/17/14 12:35:46 PM Page: 1 Percent of Budget with Current Year Budget Budget Amendments Actual Remaining Remaining Capital Outlay 92100 WWTP - Bldg improvements 10002 Odor Control Study Task 0.00 4,003.58 (4,003.58) 0.00& Order 10002 10002.e WWTP Odor Control Project 0.00 298,305.35 (298,305.35) 0.00% - Construction 10002d WWTP Odor Control Project 0.00 12,006.95 (12,006.95) 0.00% - design 10045 Primary 1/2 Fermentation 611,596.69 0.00 611,596.69 100.00& 10045.e WWTP Fermentation & Odor 0.00 20,000.00 (20,000.00) 0.00& Control - Programming & Integration 10158 Chemical Feed Building - 0.00 7,838.59 (7,838.59) 0.005 Design 10158g WWTP Chem Feed Bldg 0.00 3,078.76 (3,078.76) 0.00& Control System Software Services 10163 Wastewater Facility 0.00 215,815.00 (215,815.00) 0.00% Maintenance Shop 10381 WWTP Sampling Station 110,000.00 0.00 110,000.00 100.00W Improvements 10381.a WWTP Sampling Stn 0.00 18,807.50 (18,807.50) 0.005 Imprvmnts - Final Design & Permitting 10381.b WWTP Sampling Station 0.00 54,000.00 (54,000.00) 0.00& Improvements -Construction 10381.c WWTP Sampling Stn - 0.00 3,577.75 (3,577.75) 0.008 Special Inspections 10382 Fiber Optics 0.00 1.20 (1.20) 0.00$ 10430 WWTP Frontage Improvements 295,000.04 19,336.24 275,663.80 93.451; 10430.a WWTP Frontage Improvements 0.00 51,766.90 (51,766.90) 0.005 Headgate Construction 10430.b WWTP Frontage Improvements 0.00 24,981.00 (24,981.00) 0.005 - Entrance Design 1043... Cresson Lateral 0.00 19,982.00 (19,982.00) 0.005 Improvements 10454 WWTP Road Repair and 500,000.04 16,856.17 483,143.87 96.635 Asphalt & Stormwater Retention 1045... WWTP Storm Drainage 0.00 24,950.00 (24,950.00) 0.00& Improvements - Design 1045... WWTP Paving & Grading 0.00 24,500.00 (24,500.00) 0.001; Improvements Design Total Capital Outlay 1,516,596.77 819,806.99 696,789.78 45.945 TOTAL EXPENDITURES 1,516,596.77 819,806.99 696,789.78 45.945 Date: 4/17/14 12:35:46 PM Page: 1 CITY OF. MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 3 PROJECT NO. 10045a DATE: 3/12/2014' EFFECTIVE DATE: 3/12/2014 CONTRACTOR: Contractors Northwest,. Inc. PROJECT: W WTP Fermentation and Odor Control Project The Contractor Is hereby directed to make the following changes from the Contract Documents and Plans. Description: For the addition of odor control to the secondary pump station, a shed for storage of the odor control system, the replacement of the existing worn out fermenter tubes with stainless steel tubes, a new foam roof on the fermentor tank and other related work. Reason for Change Order:. To replace worn out fermentor draft tubes and a worn out roof on the fermentor tank as well as add odor control to the secondary pump station and construct a shed to protect the odor control system. Attachments: Pricing for COR 19, COR 20, COR 23A, COR 25, COR 26, COR 27 and COR 26 CHANGE IN CONTRACT PRICE: 'CHANGE IN CONTRACT TIMES: Original Contract Price $ $2,221,500.00 Original Contract Times: 400 Net changes form previous Change Orders Net changes form pravlous Change Orders No.-1—to-2— No _1_ to 2_ (calendar days) $ 196,763.00 0 Contract Price Prior to this Change Order. Contract Times prior to this Change Order. (calandardeys) $ 2,416,263.00 400 Net Increase (decrease) of this Change Order. Not Increase (decrease) of this Change Order, (calendar days) $ 109,993.00 35 Contract Price with all Approved Change Orders; Contract Times with all Approved Change Orders; (celendardays) $ 2,526,256.00 435 APPROVED: '(Clly Purchaeing Manager) ACCEPTED: (Contractor) Cau�,l,V By: Keith Walls Date; Date: RECOM ENDED: (Public, orita) I rlu By Clint Dolsby / Date: 3 11 S f q Contractor, CONTRACTORS NORTHWEST, INC. Project: Meridian W WTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Change Order Request No: 19 Provide new stainless steel fermenter tubes at interior & exterior of tank 1/20/2014 Note: lube is a 1/4" thick, 27" OD diameter by 14' 10 1/2" length single wall construction. ( 3) Flanges to match existing are included. 9:39 AM 1/20/2014 Page 1 Sheet3Change Order Request 19 - SS tubes Item # Description Quantity Price Unit Cost 1 Western Waterworks 1.00 25161.00 Is 25161.00 2 labor - remove & replace roof system to allow for installation 48.00 45.00 hr 2160.00 3 allowance - replace roof membrane 1.00 1000.00 Is 1000.00 4 liabor - remove existing -install new pipe 96.00 45.00 hr 4320.00 5 Boll kits & gaskets 1.00 1 225.00 IS 1 225.00 6 Scaffolding 1.00 124.00 Is 124.00 7 crane -including in & out 8.00 135.00 hr 1080.00 8 forklift 9.00 105.00 day 945.00 9 misc. materials 1.00 250.00 Is 250.00 10 Dumpster & removal offsite 1.00 375.00 Is 375.00 11 0.00 12 0.00 0.00 0.00 0.00 Sales tax @ 6% 0.06 25760.00 Is 1545.60 Project Manager 4.00 85.00 HR 340.00 Superintendent 12.00 80.00 HR 960.00 Clerical - office 1.00 40.00 HR 40.00 Labor - clean-up 0.00 32.00 HR 0.00 0.00 Sub -total 38525.60 Overhead & Profit: CNI provided @ 10% 0.10 3852.56 Bond rate U42378.16 0.01500 635.67 Liability insurance 0.00550 236.58 Builders risk insurance 0.00350 151.38 Total 843,401.78 9:39 AM 1/20/2014 Page 1 Sheet3Change Order Request 19 - SS tubes 77 11 U m m m E E w a m c D 6 m 0 Nm R m CL �i c 9 7 V N m m to CL >I u E 46cc O 9 7 O T W W 2 o a m N F W U � 0 co IL F N z AR m W F w W m `m 0 H � � H O Q cel J O 200 0.,L.g 3!i Z0 V- o X w > en cO i C O N N ch c_ O F .o ,SN, O Z. C? o E 9 cu U F o `� m y ` O t. v m OLU L c O _k w�c�mc m Q N N m>, 0 m 7 N C m m Nc E0. 2 = z O J U m m m E E w a m c D 6 m 0 Nm R m CL �i c 9 7 V N m m to CL >I u E 46cc O 9 7 O T W I Contractor. CONTRACTORS NORTHWEST, INC. Project: Meridian W WTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Additional odorous air ductwork, per COD #2, Note: includes aluminum ductwork Change Order Request No: 20 1/20/2014 2:30 PM1/20/2014 Page 1 Sheet3Change Order Request 2D Item # Description quantity Price Unit Cost 1 YMC Mechanical 1.00 24300.00 Is 24300.00 2 Titanium Excavation -excavate & backfill pads 1.00 2307.00 Is 2307.00 3 (6) Tx 5'6"x 1' deep concrete pads - conc material ( short load) 6.00 125.00 ry 750.00 4 (6) Tx 5'6"x 1' deep concrete pads - rebar material 768.00 0.62 lbs 476.16 5 ( 8) Tx 5'6'x 1' deep concrete pads - form material 2x12 144.00 1 1.20 If 172.80 6 ( 8) 3' x 6'6"x 1' deep concrete pads - e, bolts & grout material 8.00 12.00 hr 96.00 7 6) 3' x 5'6" x 1' deep concrete pads - form & pour labor 24.00 35.00 hr 840.00. 8 A -Core - core drill 10" diameter holes In wall 1.00 505.00 Is 505.00 9 Automated Dairy Systems- rubber mat material 1.00 3991.40 Is 3991.40 10 KB Welding -aluminum checkered plate & gat bar- materials 1.00 1850.00 Is 1850.00 11 Install rubber mat ( 780 sf ) 16.00 45.00 hr 720.00 12 Install checkered & aluminum plate 64.00 45.00 hr 2880.00 fasteners, tools, equipment & consumables 1.00 280.00 Is 280.00 0.00 0.00 Sales tax @ 60/a 0.06 7520.36 451.22 Project Manager 3.00 85.00 HR 255.00 Superintendent 12.00 80.00 HR 960.00 Clerical -office 3-00 1 40.00 HR 120.00 Labor - clean-up 0.00 32.00 HR 0.00 0.00 Sub -total 40954.58 Overhead & Profit: CNI provided @ 10% 1.00 40954.58 0.10 4095.46 Bond rate 1.00 45050.04 0.01500 675.75 Liability insurance 1.00 45725.79 0.00550 251.49 Builders risk insurance 1.00 45977.28 0.00350 160.92 Total $48,138 2:30 PM1/20/2014 Page 1 Sheet3Change Order Request 2D WORK CHANGE DIRECTIVE No. 002 — Rev. 001 PROJECT: WWTP FERMENTATION AND ODOR CONTROL DATE OF ISSUANCE: October 31, 2013 EFFECTIVE DATE: TBD DATE OF REVISION: January 3, 2014 OWNER: City of Meridian Project No, CONTRACTOR: Contractors Northwest, Inc. ENGINEER: CI -12M HILL You are directed to provide a price quotation for the following change(s); Extend the odorous air ductwork from the 12 -inch wye to the Secondary Pump Station as shown on the attached exhibits Purpose of Work Change Directive: Allows for the capture and filtration of the odorous air associated with the Secondary Pump Station. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Prices ❑ Contractor's records ® Lump Sum ❑ Engineer's records ❑ Other ❑ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded withdut further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: AUTHORIZED by OWNER: By! Perrin Robinson, CH2M HILL By: (Authorized Signature) (Authorized Signature) XN0 ONTRACTORS , INC. 2-12-14 City of Meridian Wastewater Division 3401 N. Ten Mile Road Meridian, ID. 83646 Project: Meridian Fermentation & Odor #424845 RE: Request for Change Orders ATT: Tracy Crane; Clint'Dolsby Contractors Northwest, [nc is pleased to provide a quotation for additional work for the following: COR # 23 -A -REVISED Supply and install 6'x 6'x 6' Stor-Mor insulated shed for storage of Bio Tower 55 drum liquids. Note: electrical excludes division 1, class 2 non- combustible code compliance and consists of conductors, light & switch, and receptacle outlet for use connecting heater or heat blanket by others. Includes heat trace of ( 2 ) I %x" diameter pipes from shed to bio -tower. Add: $ 7,876.00 Please see attached scope of change for details on pricing for each of the above Change Order Requests. We appreciate the opportunity to provide proposals for this work. submitted, Duncan Goundry Project Manager Coeur d'Alene P.O. Box 6300, Coeur d'Alene, ID 83816-1938 // Phone: (208) 667-2456 // Fax: (208) 667.6388 Boise P.O. Box 190689, Boise, ID 83719-0689 // Phone: (208) 362.9656 // Fax: (208) 362-9701 contractorenorthwent.cam Idaho Contractors Regstration 4 RCE -1919 Contractor, CONTRACTORS NORTHWEST, INC. Project Meridian W WTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Supply & install G x 6 x 6' insulated Stor-Mor shed for storage of Bio Tower 55 gallon drum No heat or class r Div 2 compliance Change Order Request No; 23-A Revised 2.12-14 10 12 AM2I12J2014 Page 1 Sheet3Change Order Request 23A Item # Description Quantity Price Unit Cost 1 Sior-MorOwd 1.00 1452.20 Is 1452,20 2 CNI-install shed - labor 6.00 45.00 hr -270.00 3 CNI - concrete pad - labor 12.00 45.00 ht 540.00 4 CNI - sawculting & removal of exislin concrete I asphalt paving 1.00 125.00 Is 125.00 5 CNI - concrete pad materials - concrete & rebar 1.00 t 150.60 Is 1 150.00 6 CNI - excavate & compact pad base 6.00 45.00 hr 270.00 7 Equipment - forldift 3.00 105.00 hr 315.0(1 8 Misc. materials & fasteners 1.00 '.100,00 IS 100.00 9 AME Electric- light, switch, recepl&conductors 1.00 .2980.00. Is 2980.00 10 AME Electric- heat trace (2) 1 1W x 20' pipes 1.0D Ind. IS included 11 Gale Industries - Insulate (2) 1 112"x 20' pipes 1.00 504.00 Is 504.OD 12 ..000 0.00 0.00 0.00 Sales tax @ 6% 250.00 0.00. Project Manager 1.00 85.00 HR 85.00 Superintendent 2.00 80.00 HR 160.00 Clerical - office 100 40,00 HR 40.00 Labor -dean -up 0.00 32.00 HR 0.00 0.0D Sub -total 6891.20 Overhead & Profit: CNI provided 10% 1.00 6991.20 0.10 699.12 Bond rate 1.00 769032 0.01500 115.35 Liability insurance 1 1.00 1 7805.67 0.00550 42.93 Builders risk insurance 1.00 7848.61 0.00350 27.47 Total $7,876 10 12 AM2I12J2014 Page 1 Sheet3Change Order Request 23A JAMIEI WINTERS � lJ4eCtx1L', .l..rAC. MIKES. TENI11)IZEN iomi�j(antelecv¢enm INDUSTRIAL •MUNICIPAL miLciGam.elnlricaam COMMEflCIAL •RESIDENTIAL MOTOR CONTROL 3621 ARTHUR STREET CALDWELL, IDAHO PHONE: (208) 459-8959 FAX: (208) 459-2243 February 6, 2014 PUBLIC WORKS LICENSER 11544 -AA -4 (16000) IDAHO CONTRACTOR LICENSER C 2854 UL 508A INDUSTRIAL CONTROL PANEL LICENSE H E 312625 Web Site; www.ameelectric.com To: CONTRACTORS NORTHWEST Reference: MERIDIAN W WTP FERMENTATION DRUM SHED WIRING AND HEAT TRACE Proposal: A.M E. PROPOSAL #2014-132 A.M.E. Electric, Inc. is pleased to present this proposal for your review and consideration. Our proposal is to provide and install electrical and heat trace for the new 55 gallon drum shed,and piping to be located in an unclassified area INCLUDED IN THIS PROPOSAL: 1. Provide and install one (1) 4' 24amp T-8 fluorescent strip light 2. Provide and install one (I) toggle switch to operate the light 3. Provide and install one (1) 20A, 120V, GFCI convenience receptacle 4. Provide and install heat trace for two (2) 1 %;' pipes from the shed to the bio tower (approximately 20' runs) 5. Provide and install conduit, circuit, and wiring to feed the light, convenience receptacle, and heat trace COST AS DETAILED....................................................................... $2,980.00 LABOR.................................................................................................... $1,950A0 MATERIALS............................................................................................ $1,030.00 A.M.E. Electric, Inc. appreciates this opportunity and we strive to earn your future business. Should you have any questions, or require any additional information please feel free to contact us. Sincerely, Jamie J. Winters Urner; Eitlmaror N� CONTRACTORS NORTHWEST, INC. fin, 1-23-14 City of IVIeridian Wastewater Division 3401 N. Ten Mile Road tMeridian, ID. 83646 Project: Meridian Fermentation & Odor 0424845 RE: Request for Change Orders ATT: Tracy Crane; Clint Dolsby Contractors Northwest, Inc is pleased to provide a quotation for additional work for the following: COR # 25 Install ( l ) owner supplied 8" valve, and supply & install drain valve assembly & additional flange adapters for valve at mechanical room. Add: $ 1,576.00 Please see attached scope of change for details on pricing for each of the above Change ' Order Requests. We appreciate the opportunity to provide proposals for this work. submitted, Duncan Goundry Project Manager Coeur d'Alene P.O. Bax 6300, Coeur d'Alene, to 83816.1938 // Phone: (208) 667-2456 // Fax. (208) 667-6388 Boise P.O. Box 190689, Boise, to 63719.0689 // Phone: (208) 362-9656 // Fax: (208) 362-9701 contractorsnorthwest.com 1 ` Idaho Contractors Regstrabon i RCE 1919 •• : I Contractor. CONTRACTORS NORTHWEST, INC. Project Meridien W WTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Change Order Request No. 25 Install (1 ) owner supplied valve and new drain valve on W diameter pipe 1/23/2014 9'40AM112312014 Page 1 Sheet3Change Order Request 25 Item # Description Quantity Price Unit Coat 1 Fowler-(2)vldsullcedeptemll,draln-maledal 1.00 524.12 to 524.12 2 CNI-inatell valve, couplers 8 drain assembly -labor 8.00 45.00 HR 360.00 3 CNI- ilmovedInstall piping -labor 3.00 45.00 HR 135.00 4 lEolulpmerril,smalltools, gaakels.olherconeumablea 1.00 60.00 Is 60.00 5 0.00 6 0.00 7 0.00 8 0.00 9 0.00 10 0.00 11 0.00 12 0.00 0,00 0.00 0.00 Sales tax 6% 0.06 584.12 35.05 Project Manager 1.00 135.00 HR 86.00 Superintendent 2.00 80.00 HR 160.00 Clerical - office 1.00 40.00 HR 40.00 Labor -dean -up 0.00 32.00 HR 0.00 0.00 Sulkotal 1399.17 Overhead &Profit: CNI provlded ®10% 1.00 1399.17 0.10 139.92 Bond rate 1.00 1539.08 0.01500 23.09 UabAitylnsurance 1.00 1582.17 0.00550 8.59 Builders dsk insurance 1.00 1570.76 0.00350 5.50 Total $1,676 9'40AM112312014 Page 1 Sheet3Change Order Request 25 Bid No: Q239208 Page 1 of 1 H.D. FOWLER COMPANY Customer: BIDDING CONTRACTORS Quote #: Q239208 Estimator: EMILEE DUNCAN Bid Date: 1/23/2014 Job Name: MERIDIAN WWTP DRAIN ASSY Location: MERIDIAN ID Line Qty UoM Description Unit Price Extended Price 1 2 EA B" FUG CI SIZE VIC x341, M GASK, GROOVED 149.67 299.34 2 1 EA 9.05 X 1-1/2"113 SADDLE ROMAC 202 BODY ONLY 30.59 30.59 3 2 EA 9.80 5 S STRAP WITH NUTS FOR ROMAC SADDLE 29.35 58.70 4 1 EA 11/2" X 6" GALV NIPPLE,STO WT,A53 ERW 3.60 3.60 5 1 EA 1.1/2" BRASS BALLVALVE THREADED NO LEAD 30.88 30.88 6 1 EA 1-1/2" MALE CAMLOCK X MIPT ALUMINUM 15F 11.73 11.73 7 1 EA 1-1/2' CAMLOCK DUST CAP 20V ALUMINUM 19.28 19.28 Approximate Total 454.12 eS h irW 10.6a 4 524..tz WORK CHANGE DIRECTIVE No. 007 PROJECT: W WTP FERMENTATION AND ODOR CONTROL DATE OF ISSUANCE: January6, 2014 EFFECTIVE DATE: January 6, 2014 OWNER: City of Meridian Project No. 472317 CONTRACTOR: Contractors Northwest, Inc. ENGINEER: CH2M HILL You are directed to provide a price quotation for the following change(,): Relocate 8" valve SMCB I-VAL-4001 and flow meter arrangement, including 8" x4" eccentric reducers, 4" spool pieces, and flow meter PMT -003 on the VFA-Enriched pump discharge line. Install line drain valve and install 8" V405 (provided by the W WTP) on the VFA-Enriched pump discharge line as shown on the attached plan redlines. Purpose of Work Change Directive: Provide for isolation of flowmeter for future maintenance. ' If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change - order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Unit Prices Lump Sum Other Estimated increase (decrease) in Contract Price: If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMEND by ENGNEER: Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. By: By: (Authorized Signature) AUTHORIZED by OWNER: (Authorized Signature) cni� g9XAC GRTNWEHT ING. 1-23-14 City of Meridian Wastewater Division 3401 N. Ten Mile Road Meridian, ID. 83646 Project: Meridian Fermentation & Odor #424845 PL: Request for Change Orders ATT: Tracy Crane; Clint Dolsby Contractors Northwest, Inc is pleased to provide a quotation for additional work for the following: COR# 26 Insulate ( t ) exterior fermentation draft tube. Add: $ 1,679.00 Please see attached scope of change for details on pricing for each of the above Change Order Requests, We appreciate the opportunity to provide proposals for this work. Duncan Goundry Project Manager tied, Coeur d'Alene P.O. Box 6300, Coeur d'Alene, ID 83816-1938 // Phone: (208) 667-2456 // Fax: (208) 667.6388 Boise P.O. Box 190689, Boise, ID 83719.0689 // Phone: (208) 362-9656 // Fax: (208) 362-9701 cantractoranorthwest.com 1aae � Idaho Contractors Regstragon 9 R& 1919 _ I Contractor CONTRACTORS NORTHWEST, INC. Project Meridian WWTP Fermentation & Odor control - project #424845 Reference. Scope of change: Insulate (1) exterior fermentation draft tube Change Order Request No. 26 1123/2014 9'57 A141112312014 Page 1 Sheet3Chengs Order Request 25 Item # Description Quantity Price Unit Cost 1 Sub - Gala ContractorServloes 1,00 1205,00 Is 1205.00 2 0,00 3 0.00 4 0.00 5 0.00 6 0.00 7 0.00 8 0.00 9 0.00 10 0.00 11 0.00 12 0.00 0.00 0.00 0.00 Sales tax ® 6% 0.08 0.00 Project Manager 1.00 85.00 HR 85.00 Superintendent 2.00 80.00 HR ISOM Clerical - office 1.00 40.00 HR 40.00 Labor - clear-up 0.00 32.00 HR 0.00 0.00 Sub -total 1490.00 Overhead & Profit CNI provided @ 10% 1.00 1490.00 0.10 149.00 Bond rate 1.00 1639.00 0.01500 24.59 ,Usbility Insurance 1.00 1663.59 0,00550 9.15 Builders nsk Insurance 1.00 1672.73 0.00350 5.85 Total $1,679 9'57 A141112312014 Page 1 Sheet3Chengs Order Request 25 a ibis agnamany Company is willing to famish to Customer all medal and labor required for art not within Company's Work unless specifically listed below, OSE NOTICE. If cellulose is to be applied with a wat spray application, you must allow adequate done for it to cure and dry italling drywall or other materials. The adequate lime required varies depending upon climate, aldlude and weather. Do not pat barriers, vapor words, dry wall, or other interior finish until dw material has dried W less than 20% m0lstale content Time Ill very based on climate and weather. Be pure to schedule your trade accordingly. codes may require a thermal barrier or ignition bonier be applied to the spray applied foam insulation. A thermal barrier or ender is not incl Wed within the stupe of this pgteemenr of work unlet sperl really listed below. Work Arm Product Nato DRAFTTUBE 2'PIPE&TANK WRAP W/AS749'X 29 .016 ALUMINIUM JACKETING 36'X 100' SMOOTH ____;>___---_____.._... .. Use Price: S1105.00 _ - - Additional Information: options TANKSEAL R-11. 3.5 NOMINAL INCHES CLOSED CELL FOAM NOW: SPRAY FOAM INSTALLEDAROUND TOP PERIMETER CHANNEL OF TANK t]J . TO SEAL THE ATTACHED LID -------- 7 ------ ----------- NOTE: This agreemenr consists of multiple pages. If you do not receive the number of pages noted below, please contact Company directly at the telephone number sated above. PRICING! The CLSTDMER: 9y SIGNATURE 'TITLE eninwm¢sadlwofmyprym la Voorna you hart mmdot aw IhSavrtemenl 11 CampmY deer nd I[Ria raianmN ieueume I who mM- Quuon4,har,q mon, huh„ Pores U, Mn. neat undo. A., ryrzimwl COMPANY 8v SIGNATURE TITLE Can,, %arae Dare THE INFORMATION CONTAINED IN THIS AGREEMENT IS CONFIDENTIAL. NEITHER THIS ,ACREEMENTNOR ITS TERMS NAY BE DISCLOSED TO THIRD PARTIES. 230 1. Gale Contractor Services - P Lle 8: RCE -906 (Ideho)l CCB -113363 (Oregon) 5 2908 Brandt Ave Nampa, ID 83687-6856 i� II �p Tel: (708) 465-5201, Fu: (208) 465-0773 •g.�9 WORK AGREEMENT TO: CONTRACTORTN0RTUWnST Rg:MERIDL4YwWIFTANUIINS11LATION Addreu: I0940,v EXEMIVE DRIVE Job Addrea: 3401 N 10 MILE ROAD nerwEEN OsncK A MnCREL 110ISE,m0A13 MERIDIAN. ID Ana: oam 0ly^J30W Espinhlas Dale ON+J++-0W 70,11011363-9036 Fu: Eaivaar. vmlcata LuryD Ouaa1_095101 Vaalea lOT1 ibis agnamany Company is willing to famish to Customer all medal and labor required for art not within Company's Work unless specifically listed below, OSE NOTICE. If cellulose is to be applied with a wat spray application, you must allow adequate done for it to cure and dry italling drywall or other materials. The adequate lime required varies depending upon climate, aldlude and weather. Do not pat barriers, vapor words, dry wall, or other interior finish until dw material has dried W less than 20% m0lstale content Time Ill very based on climate and weather. Be pure to schedule your trade accordingly. codes may require a thermal barrier or ignition bonier be applied to the spray applied foam insulation. A thermal barrier or ender is not incl Wed within the stupe of this pgteemenr of work unlet sperl really listed below. Work Arm Product Nato DRAFTTUBE 2'PIPE&TANK WRAP W/AS749'X 29 .016 ALUMINIUM JACKETING 36'X 100' SMOOTH ____;>___---_____.._... .. Use Price: S1105.00 _ - - Additional Information: options TANKSEAL R-11. 3.5 NOMINAL INCHES CLOSED CELL FOAM NOW: SPRAY FOAM INSTALLEDAROUND TOP PERIMETER CHANNEL OF TANK t]J . TO SEAL THE ATTACHED LID -------- 7 ------ ----------- NOTE: This agreemenr consists of multiple pages. If you do not receive the number of pages noted below, please contact Company directly at the telephone number sated above. PRICING! The CLSTDMER: 9y SIGNATURE 'TITLE eninwm¢sadlwofmyprym la Voorna you hart mmdot aw IhSavrtemenl 11 CampmY deer nd I[Ria raianmN ieueume I who mM- Quuon4,har,q mon, huh„ Pores U, Mn. neat undo. A., ryrzimwl COMPANY 8v SIGNATURE TITLE Can,, %arae Dare THE INFORMATION CONTAINED IN THIS AGREEMENT IS CONFIDENTIAL. NEITHER THIS ,ACREEMENTNOR ITS TERMS NAY BE DISCLOSED TO THIRD PARTIES. 230 1. Bid Summary Quote d Plan Trade Total 2095101 Version I Of I INSULATION $1,205.00 Pricer Good For Work Perfarmed Tbmagh: April 22, 2014 Taut Bid: 51,205.00 Bid ealc Jammy 22, 2014 Gale Conlcoclor Servicer t� LIc P: RCE•90d (Idaho); CCB -113362 (Oregon) 56 8346740/13 Tel: 209)46 Ave01.I=: Se) 2 Tel: (208) 465-520 1. Fax: (2119) 9fi5A773 WORK AGREEMENT M. Coirm%cm"3011THWFSF Rg WRIDIAN WW(P*ANKS I D(5ULA21ON Ja4 Addmn 3401 N ID SULE ROAD BEIWEEH USf1OLG 64ITCM Mdmn 10140 • EXECUTIVE DRIVg 11FJUDIAN.no 0015141D0371) Aum D.W 01/»11014 BapINUo)DHn ON12/]019 Td: (NO)362-905b gpimamn Vwhkk WyO Fu: Bid Summary Quote d Plan Trade Total 2095101 Version I Of I INSULATION $1,205.00 Pricer Good For Work Perfarmed Tbmagh: April 22, 2014 Taut Bid: 51,205.00 Bid ealc Jammy 22, 2014 ACCEPTANCE. 2. NI a 1 nes OF anal. wail to yen uee.pr fir one year firm the dam United wrramy does Rt over statuettes o oft m (O uCidM% inqume .1 R`SIM or nmmn wear and Iter. (b) /whim m um or mmwn em ptv¢u r In awotdaneewith nrenof eves imduetlolii aM (a)dmadun repilrw tt4sisped repair by myaR ober dim Caepmy err ire amhorimlrePreseamdye, Youshalbe solely responsible for the canermem M the plum and m aeutmeamm and sw Blase and hold hamlet Campmy Rom any dehugn Inultfg'Rmn Improper, Imdapae m ague Inrmtnaift aupDllhd by you. Cwnpmy dent eke on my dllgul-n m impn orevd •^••Ian wash afousee peones In my mama m open ThisNSUR rsaml. Conrad, 1. INSURANCE. eimP�nr shat murrain aorlms' eompwaefion (anpfym Iiab1110'I, u tequimed by Iso. dad 51.000.000 m ge^a^I.IIeGEay Imutma while pcRotmiog the umY. CatW^Y raervn dee fight m be uifinmued m Ian amu alowcd by vPPltnble law. CaopanY ureses Pw age m onnm mY odta peteannor 4. LIMITATION arid OF R a. LIMITATION OF REMEDIES. Yaa wlh and aelbyC remedy t co Company for my ye rt eluw'fir nod, she boat Dfm case w such adwt w[ be Wank wilt 6e IMited m die tepiirmlepkumem by Cafpat6'. a Capponyl opfivA eranYRmdfoimfg wak or m du lsvuceors creat far such nonwnfomiing woh f uwNence with dwu amdt and ewdldom powded CompenY k giro a toulmble wPmadiry m ftpect the wok and onRmu rich n-ncwfoemlty. Thk nanwnfarmi¢ work add�I. my Co nRteMr bs emadmam m OebHvllery IWfnkdtearrdamme nsdilpl be olimited W.I. coCWmnpteonwy i[s aid.B Cooper, fmm rths,Worris tendo the under shat agramenL This Lindell or Retalles shun "I apply to Em psrein an We agteanea u well as m One ounal ulnad sumewa sod anigne, If you sues...Wm for dumge, by my owrar srising m -for dleged an mvestfapt out ofde I Ca mom of the eWm and provide Company an Opportunity impem rho dlagdd damsga within 10 do ager Cmpmys n MOM sad. aWm fall an alba Com uay m uppameiry x impns de. iii., damsga with. 10 days, yes lardy wail Rc codwofwadtq"Cmpmy.This LimiiagweorR edianmybep1aW useomrylsbhammy xdo to viakdonl S. LIMITATIONS ON ACTIONS AND LIABILITY. All chime andur kawlm alluding but we lmdledat BE LIABLE FOR GNYLOS,DAodes thisu INJURY Ruebemade FROM II monde Rom Endue DELIVERY THE ofsh BE LLARM FOR ANY LOSS, DAMAGE OR IN CES BEYOND IT FROM RELAY IN COMPANY DI OF THE PRO PERFORM THAT IS IGH TO CIRCUMSTANCES BEYOND ITS CONTROL COMPANY IC TO DISCLAIMS AL1 DAMAGE WHICH MIGHT RE SRSTABiED BY ANY PERSON WHO MAY BE ALLERGIC i0 OR AFF! LT' FOR ANY AND ALL BY THE EMANATION OF PIIIIPOSL 6, PRICES, TERMS AND SHIPMENT. No ash&sevam,psd clwgeu ha offs irsvlmmmkims ate dlawed wlasspsified by Campmy. in addivw m to prim spelfisd. you W.I. Fetzer fid", trae or kcd aurae. ume, aWpdonal, msnda m mw In forte or mbe cueud io Ian 0mve, aseud agaWa ConNmY myau byrman a[thm aenmalon No reTnfiwhpe+mhad wlmsCRlpanY+gtenoAawim in wrifing. AnYyeedn RYmmEuillhe.uCmnpenYs opdom subject aiarmilat5%pn mom(11%pmsmuml mtbeumapeamimudby law, You at= mte¢!ve(mpmnll Company kaceivhl mm dm wa lm You E. CONFIDENTIALITY. Ifyou visitcwrpmya pmnkeocyou odoawiu tredve my peopinay ermnftdmdd infomudw bars Campnr.yawWll natio wash (allowed can u co attended and tet uses or drachm, It an my did Perry aithsd CampmYm art= assume. 9. CREDIT APPROVAL. SNpmw[ and ddivay of Bawds aM p:doRena of wary mol u W ebrms be mbdm m the rpptvvd err Compmys sredim d:pu-umhind CampsnY mY u anYEan deelMe m maim mY tF•ptmmardellw0• m � tet my avhanptupoa taeipt afpeYmmlor upon vans mdmditlom 10. CANCELLATION. TION. Thi B eraloo t. my plus you m y u,d CompmY mebad clurpony, mwsama IB. CANCEL(ATeraC This agtwnmh m my pre of M1 may wait' I. esmdmd waters [ompuyt when approval. to 0e mot of <undiadao of suis agmanmLmmY PuldnmLyvu shill pY:U)dm onimtpNceofml mmplercd lmlde:@I Uwl pomanafEo olwatpda lhetkquJmdu hgrm nfeom euro. or tet R wmB In protta. ... w tU dem CompOr- taatm mda.gudies-",re (d the on of W. m es; ad and my. la which EmtIPNy I hove IWa:WdWmd m d loam and ahtdt atm o 1, oftY mild ha un o far a0a m Orr0re RRaer, (d) a h. h pat a fa: and (el my apnwt Iaurmd by Campmy 1lmludlttg legdf mdJWgmmtlaaradaardm Mnllado ofsubLonmuamRtsOaa rela�mthk aDeanem IL DEFAULT, Ywmryav Wmmhisgrwnotfor Compmy'sdefult.whORymmya byglvingcm"ywdnenmda.rlm Mena6n.w. Yau may give a mina =on or temtimdw only If eaRmY bee radved a areas mon hors you spoelf ing surh ddadc do dehde Is at nmuble unEer my doomed a tleRdt fir purposes of tertttwnan. In the event of Immmdao fm defads fa than bes rtllewd of da obligarmn to pat, for weds at pedomted by Compay pries m Em eRecfiva darn of fmh termtmdw. A ddbdt a Company's pan slWl not mbJm Company to liability. duou th pymmsby Company. sn oRar athwAmrarmyothadstmgeuwhMerdlrcgcomqumualarmcldeoW,Wwhedeisoughtwdadoarinofaa immm 12, ASSIGNMENT. Yo may nor anlp lhk agteanm or my dam apse Company rckhng r -this agrtmtmn Il. GOVERNMGLAW. Two yrtmRrit shill be summed. ammdand im nights of the penia dmamud In noNaue with the kw of the Savor Campmymedthasnmiii dmdmhmiarthlsaBreanent Id. DISPUTES AND MANDATORY MEDIATION. f ole amt dm a dhpue arises ova the teamnablenm of a enddwma m fm charged by cempnY. Ito CMIng pang mll he mmlN m roaombla mnmeys fas and mus [nil olhesdbplRs ofmY tenors, exh prey Ibdl pay to aw rm and cam Ealeptm(glt mpmmn onRamrW mfatmAdw andmdmf puhtuauy tnjunceve rtbefm Prevmtlmpa+bla Aum, you andthe Campmy agtm lha pnnm Im Initiation of my begil actiondw penia all casesin fcAnatsve owdfatmafmy ad At disputer loony way related to lhuafirealm, Ifthepudamnotsgra upon a fullltuive mvdim er with. 10 days of ohm the dispute one, as will be alatd pram, m the Camtemkl Mutilation Rules of dm Amednn ArfRuan Alsodatlan. FYh parry tell IM1w gmlly tlm fm afthe fxlloanve mdiamrmd test ofdmmediadw. 13. INSULATION DOES NOT PREVENT FROZEN PIPES. Imukang mated ester Iola in m annul dmwd Or semi conditioned are. will me Items pulpa from Rearing or neon mlmttg modavaium To demmm dm pumbthry of M1mm pipes, loam any won pipet whhln s omgdomd ares Web u mtemd walls miter thenewnnal walls tryout do not tome the pip" mlhm m Internet wall. you how Claps" mrmlems ad Neve Canpmy gam my dorsa 16. SEVERABILITY. SEVERABILITY. Ifmy pmcutnwdus sgteemmtsOut mfartmple. thus pmwmn shill be ettadve,nlY'a tan m:ea pwkedNlew wJ dl other prunwas or.ho,. dullraven, 17, ENTIREAGREEMENT Thur l Ily by. eamm.a rte omus, pang mt o the paten ommo m the abject mem mmir+al my aniv be calved. I:utasd.ismotevL enendN errnd zoreTNnt ortbyawrung ugnell Syrhe putt'eYamtwhom 4-'a moms or my musM1 waiver. aharya mudidmtion. ntenaona I S. I'N Esmghe The term{and;mua fa"gragreementapndemysdtemmui whlrhdiswaded 13.INDEMNITY, F sh o(qe penin ta:fugrmam+gras:o defend and tmlemntfyane nloAardom mV and dl:!eims xfims mdrr Wwluiu;msed by the pdlgemxturumtvuum.Thu,ndemntrychuu d$euhtgmua:m redicrcmthdlcunmlmJrdrcpdad uvermYaroma idmni ogknem manmed cdomm pour tmiupamenu F•snhewltre. Nlvindmwlry.Ivum mJ ole obllgenum mrN neteln shall wood eM the ydaria avermymnmryindemmty hyrtummt enured anti muhsgtwm m:hw aytevn<m unlal Ihe;ubsryums eyeement Ipemgeally refnc .o Ihuindemnlry:Suu roil Jce';ern i1 null wJ vmd 11= I Contractor: CONTRACTORS NORTHWEST, INC. Project: Meridian W WTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Foam spray new roof on fermentation lank. Change Order Request No: 27 21612014 11:29 AM21612014 Page 1 Sheet3Change Order Request 27 Item # Desorption quantity Price Unit Cost 1 Sub- Gale Contractor Services - foam new roof 1.00 6878.00 Is 6878.00 2 Sub- Gale Contractor Services- foam in trough at perimeter 1.00 406.00 Is 406.00 3 scaffolding 1.00 124.00 Is 124.00 4 equipment - forklift 2.00 105.00 day 210.00 5 CNI - clean trough prior to spray 4.00 1 45.00 HR 180.00 6 0.00 7 0.00 8 0.00 9 0.00 10 0.00 11 1 0.00 12 0.00 O.00 0.00 O.oO Sales tax Q 6% 0.06 530.00 31.80 Project Manager 1.00 1 85.00 HR 1 85.00 Superintendent 4.00 80.00 HR 320.00 Clerical - office 1.00 40.00 HR 40.00 Labor - clean-up 0.00 32.00 HR 0.00 0.00 Sub -total 8274.80 Overhead & Profit: CNI provided Q 10% 1.00 8274.60 0.10 827.48 Bond rate 1.00 9102.28 0.01500 136.53 Liability Insurance 1.00 9238.81 0.00550 50.81 Builders risk insurance 1.00 9289.63 0.00350 32.51 Total $9,322 11:29 AM21612014 Page 1 Sheet3Change Order Request 27 Subject to the leans and conditions stated in this agreement, Company is willing to furnish to Customer all material and labor required for the Seem of Work described below: or (LOSE NOTICE. If cellulase Ism be applied With A wet spray application, you must allow adequate time for life cure and dry installing drywall or other materials. The adequate time required varies depending upon climate, altitude and weather. Do not ,spar barriers, vapor retards, dry wall, or other interior finish until the material has dried to less than 201/6 moisture content. Time will vary based on climate and weather. He sure to schedule your trades accordingly. ig codes may require a thermal harrier or ignition barrier be applied to the spray applied ream insulation. A Ihennal barrier or t bamicr I$ not included within the scope of this agreement of work unless specifically listed below. Trade: INSULATION Work Area Praduel Note$ ORAFTTUBE 2"PIPE& TANK WRAP Wl ASJ 43-x26' .016 ALUMNUMJACKETINO Jfi'X 100'.SMOOTH __ - Base Price: $1,205.00 ' — � � � � - _ _ Addltlonel lnformalion: . . ANK SEAL R-172.5 NOMINAL INCHES CLOSED CELL FOAM Notes: SPRAY FOAM INSTALLED AROUND TOP PERIMETER CHANNEL OF TANK TO SEAL THE ATTACHED LID BAYBLOCK 700 ACRYLIC COATING +5406,00 'IPING . - . , ... ` t,5 %P FIBERGLASS PIPE INSULATION' _ .016 ALUMINUM IACKETING CUT & ROLLED 1.5 K 2 NOTE: This agreement consists ofmultiple pages. If you donor receive rhe number ofpages noted below, please contact Company directly az the telephone number stated above. TERMS OF PAYMENT P,Ym.mm ACCEPTANCE1 Company may oho PRICING: mePst.�Y Jamlln:hn A; sans m Par C,ntwnya nen.vn a ask IDmmw�ninJ �m1aJe mY+ndA dl n C_5TO31EA. CUMIANY 3, ...�_ SIGNATURE TILE-� SIGNATURE TITLE ^.xnpvy X u:x bens. THE INFORMATION CONTAINED IN THIS AGREEMENT iS CONFIDENTIAL. NEITHER THIS AGREEMENTNOK ITS TERNIS MAY BE DISCLOSED TO THIRD PARTIES ?YJ Gale Contractor Services Llc N: RCE -906 (Idaho); CC" 13362 (Oregon) 2908 Brandt Ave Nampa, ID 87687.6856 {N11,0 Cunlaxwr (V=)�" Tel: (208)465-5201, Fax: (208) 465-0777 Services WORKAGREEMENT TO: CONTR\CTORSYORTHWEST RE: MERIDIAN WWTP TANKS M. SUlAT10N Job Addreut 34DI N 10 MILE ROAD BETWEEN CSTICK & MITCIIEL Addle: 10340 w. EXECUTIVE DRIVE MEMDIAN.ID 9mSE, ID317D Alm, Dme:01r'rr201J Espinton Oel¢Oaa?9201J Td, 12031362.9056 Estimator. Vamiekle. Larry D Quote 0 209510 Vaaaton IOf 1 Pae Subject to the leans and conditions stated in this agreement, Company is willing to furnish to Customer all material and labor required for the Seem of Work described below: or (LOSE NOTICE. If cellulase Ism be applied With A wet spray application, you must allow adequate time for life cure and dry installing drywall or other materials. The adequate time required varies depending upon climate, altitude and weather. Do not ,spar barriers, vapor retards, dry wall, or other interior finish until the material has dried to less than 201/6 moisture content. Time will vary based on climate and weather. He sure to schedule your trades accordingly. ig codes may require a thermal harrier or ignition barrier be applied to the spray applied ream insulation. A Ihennal barrier or t bamicr I$ not included within the scope of this agreement of work unless specifically listed below. Trade: INSULATION Work Area Praduel Note$ ORAFTTUBE 2"PIPE& TANK WRAP Wl ASJ 43-x26' .016 ALUMNUMJACKETINO Jfi'X 100'.SMOOTH __ - Base Price: $1,205.00 ' — � � � � - _ _ Addltlonel lnformalion: . . ANK SEAL R-172.5 NOMINAL INCHES CLOSED CELL FOAM Notes: SPRAY FOAM INSTALLED AROUND TOP PERIMETER CHANNEL OF TANK TO SEAL THE ATTACHED LID BAYBLOCK 700 ACRYLIC COATING +5406,00 'IPING . - . , ... ` t,5 %P FIBERGLASS PIPE INSULATION' _ .016 ALUMINUM IACKETING CUT & ROLLED 1.5 K 2 NOTE: This agreement consists ofmultiple pages. If you donor receive rhe number ofpages noted below, please contact Company directly az the telephone number stated above. TERMS OF PAYMENT P,Ym.mm ACCEPTANCE1 Company may oho PRICING: mePst.�Y Jamlln:hn A; sans m Par C,ntwnya nen.vn a ask IDmmw�ninJ �m1aJe mY+ndA dl n C_5TO31EA. CUMIANY 3, ...�_ SIGNATURE TILE-� SIGNATURE TITLE ^.xnpvy X u:x bens. THE INFORMATION CONTAINED IN THIS AGREEMENT iS CONFIDENTIAL. NEITHER THIS AGREEMENTNOK ITS TERNIS MAY BE DISCLOSED TO THIRD PARTIES ?YJ Subject to the terms and conditions stated in this agreement, Company is willing to furnish to Customer all material and labor required for the Scope of Work described below: Until: scop, ilia block, tiro stop (unC 7116.2.1 01 seq., lonnerly 2516(q, of locally- 'g0yl equivalent), and fire rated caulking are not included within Company's Work unless specifically listed below, - 'S CELLULOSE NOTICE. Ifccllulose is 10 be applied with a wet spray appli o _ must allow adequmc time for it to cure and dry before installing drywall or other materials. The adequate time required 'd N limate, attitude and weather. Do not install veporhorricrs, vapor retards, dry wall, ar other interior finish anti t atcrlolcss Ihon 20°/. moistarc content Timc la cure will vary based on climate and wemher. Besureloschcdulc d d ccordBuilding codes may require a thermal baffler or ignition barri applied to the sp11 [[qqem insulalian. A Ihcrmal bonier ar ignition barrier is not Included within abc scope of this agree fwork unless speciJI- W. NG-,_--._._-_ Price: 56.878.1 NOTE: This ngmementeonsists of multiple pages. If you do not receive the number of pages noted below, please contact Company directly at die telephone number stated above. TERMS OF PAYMENT: P,, In full due us smlN nn Intake wraNlus ofenyymnMamnymwnuyuu M1aw rvi,h IhiN panics. ACCEPTANCE: Company mey uhangc roxYx i,hdmw ad,asn:nmw RCnwpany Joe, net make yvurdp,W=Mana on or sroe do Eapfmdwr Dow saalN AMre. PRICING+TM1.p,nv nand ln,hk Aan•nwnr o'lllrcmsin 0nn for9a Jan aarr,AA Oat awwl abort. Ifwrf � re of,hi3hamememmrcnd.MwnJ dti, Jn.l�. ue6W r rills ryn m •Anna stand.• any Awt All Adewdwna. amahmmu, UbdUks ar aMbiu atlad,N lees, "Bw Pfk vnrduJr any And Oil wmw+nd mnJillan, nmdptuly sknd eosin imluJlna,vult., IlmOalen. any Abli'd.. bYCAnwAnY In mmu you umA,dkA ,.A.Adiaond io,umd un in, tnfuranac sulky: wpmviduperpmjm aygrryuw mripr fm ae• lYork:,opankllwk to any Arvvu:anwllN. crap, orfbnibrimumucpmamnAra inJomnify w deYrnJ ymnr any IM1iNpmY awnany daMn. wlnm an,h�u laoxulunfmry tlnJ ur nuwewhaso waren...... rhe Ilmind a,dnnmle in AAOrMn axn06k iy mnrnl. AnY remsur eunPubuna nyuhN br5nu by snuxl ur .nhamlm In 1k iann w ry Iwvnsluenr .hit rh,t2 uTrlsely slaved Imhb Ay.n., alit nauh In adaidmnl ah'aryes a„ "r hasher Pring. Any sddiltual it pno.s l Is sublee, m C"l.Ys @.'Arrant Viking lunhv, Cnmpmy mEmoim agn+•s in rditl Ou m Ihls rylremenl. CUSTOMER: COMPAM By: ....... ..... _---"-. B,r.-- "—" SIGNATURE TITLE. SIGNATURE TITLE CJA1p., yNorm Bali: THE INFORMATION CONTAINED IN THIS AGREEMENT IS CONFIDENTIAL. NEITHER THIS AGREEMENT NOR ITS TERMS MAY BE DISCLOSED TO THIRD PARTIES. 2af3 Gale Contractor Services Lle#: RCE -906 (Idaho); CCB -113362 (Oregon) Awa 2908 Brandt Ave Nampa, ID 83687-6856 Conlydr1ar Tel: (208)465-5201, Fax: (2081465-0773 Services WORK AGREEMENT TO: CONTRACTORSNORTUIVEST RE:NER101ANW `r TANK ROOF? INSULATION Addrnu 10940w. EKECU7IVE DRIVE Job Address: 3401 N TENMILE RD MERIDIAN, ID BOISE. ID 83713 Alto: Dere:mi3113014 Rfpinllan Dle:05A)In9I4 Tel-In")361-9056 Quote 9:2107072 version l of Fal Esmrul.r: Wnskklk Lowy D Subject to the terms and conditions stated in this agreement, Company is willing to furnish to Customer all material and labor required for the Scope of Work described below: Until: scop, ilia block, tiro stop (unC 7116.2.1 01 seq., lonnerly 2516(q, of locally- 'g0yl equivalent), and fire rated caulking are not included within Company's Work unless specifically listed below, - 'S CELLULOSE NOTICE. Ifccllulose is 10 be applied with a wet spray appli o _ must allow adequmc time for it to cure and dry before installing drywall or other materials. The adequate time required 'd N limate, attitude and weather. Do not install veporhorricrs, vapor retards, dry wall, ar other interior finish anti t atcrlolcss Ihon 20°/. moistarc content Timc la cure will vary based on climate and wemher. Besureloschcdulc d d ccordBuilding codes may require a thermal baffler or ignition barri applied to the sp11 [[qqem insulalian. A Ihcrmal bonier ar ignition barrier is not Included within abc scope of this agree fwork unless speciJI- W. NG-,_--._._-_ Price: 56.878.1 NOTE: This ngmementeonsists of multiple pages. If you do not receive the number of pages noted below, please contact Company directly at die telephone number stated above. TERMS OF PAYMENT: P,, In full due us smlN nn Intake wraNlus ofenyymnMamnymwnuyuu M1aw rvi,h IhiN panics. ACCEPTANCE: Company mey uhangc roxYx i,hdmw ad,asn:nmw RCnwpany Joe, net make yvurdp,W=Mana on or sroe do Eapfmdwr Dow saalN AMre. PRICING+TM1.p,nv nand ln,hk Aan•nwnr o'lllrcmsin 0nn for9a Jan aarr,AA Oat awwl abort. Ifwrf � re of,hi3hamememmrcnd.MwnJ dti, Jn.l�. ue6W r rills ryn m •Anna stand.• any Awt All Adewdwna. amahmmu, UbdUks ar aMbiu atlad,N lees, "Bw Pfk vnrduJr any And Oil wmw+nd mnJillan, nmdptuly sknd eosin imluJlna,vult., IlmOalen. any Abli'd.. bYCAnwAnY In mmu you umA,dkA ,.A.Adiaond io,umd un in, tnfuranac sulky: wpmviduperpmjm aygrryuw mripr fm ae• lYork:,opankllwk to any Arvvu:anwllN. crap, orfbnibrimumucpmamnAra inJomnify w deYrnJ ymnr any IM1iNpmY awnany daMn. wlnm an,h�u laoxulunfmry tlnJ ur nuwewhaso waren...... rhe Ilmind a,dnnmle in AAOrMn axn06k iy mnrnl. AnY remsur eunPubuna nyuhN br5nu by snuxl ur .nhamlm In 1k iann w ry Iwvnsluenr .hit rh,t2 uTrlsely slaved Imhb Ay.n., alit nauh In adaidmnl ah'aryes a„ "r hasher Pring. Any sddiltual it pno.s l Is sublee, m C"l.Ys @.'Arrant Viking lunhv, Cnmpmy mEmoim agn+•s in rditl Ou m Ihls rylremenl. CUSTOMER: COMPAM By: ....... ..... _---"-. B,r.-- "—" SIGNATURE TITLE. SIGNATURE TITLE CJA1p., yNorm Bali: THE INFORMATION CONTAINED IN THIS AGREEMENT IS CONFIDENTIAL. NEITHER THIS AGREEMENT NOR ITS TERMS MAY BE DISCLOSED TO THIRD PARTIES. 2af3 Bid Summary Plan 2107072 Version I Of I INSULATION 56,878.00 Prices Goad For Work Performed Through: May 01, 2014 Total Bid: $6,878.00 Bid Dale: January 31,2014 AK 700 Gale Contractor Servicer Lie N: RCE -906 (Idaho); CCB -111362 (Oregon) 34ECU 2908 Brandt Ave Nampo, ID 81687-6856 �� ia, Tel:(208)465-5201, Fax: (208) 465-0771 WORK AGREEMENT TO: CONTRACTORS NORTHWEST RE: MERIDIAN WWTP TANK ROOFI INSULATION Add,.,: 10840w. EXECUTIVE DRIVE Jab Addna: 7401 N TEN MILE RD MERIDIAN. ID OOISE, ID 81713 Allo: 0a1r. O1,31014 E,Irulaa Daly. OSMIPA14 Ld;l (101)362.9056 Far. EIIImwoD VansIckh%Lwry D Bid Summary Plan 2107072 Version I Of I INSULATION 56,878.00 Prices Goad For Work Performed Through: May 01, 2014 Total Bid: $6,878.00 Bid Dale: January 31,2014 AK 700 2-6-14 City of Meridian Wastewater Division 3401 N. Ten Mile Road Meridian, ID. 83646 Project: Meridian Fermentation & Odor #424845 RE: Request for Change Orders ATT: Clint Dolsby CNS CONTRACTORS NORTHWEST INC. Contractors Northwest, Inc is pleased to provide a quotation for additional work for the following: COR # 28 Extension of project schedule from original date of 5-5-14 to new completion date of 6-9-14. No Charge : $ 0.00 Please see attached scope of change for details on pricing for each of the above Change Order Requests. We appreciate the opportunity to provide proposals for this work. Respectfully submitted, Duncan Goundry Project Manager Coeur d'Alene P.O. Box 6300, Coeur d'Alene, ID 83816-1936 // Phone: (208) 667-2456 // Fax: (208) 667-6388 Bolsa P.O. Box 190689, Boise, ID 83719-0689 // Phone: (208) 362-9656 // Fax: (208) 362-9701 ��� �`� contractorenorthwest. cam Idaho Contractors Registratlan M RCE 1919 Contractor; CONTRACTORS NORTHWEST, INC. Project: Meridian W WTP Fermentation & Odor control - project # 424845 Reference: Scope of change: Change Order Request No: 28 Project time extension from original completion date of 5-5-14 to 216/2014 new completion date of 6-9-14. 11 23 AM2/612014 Page 1 Sheet3Change Order Request 28 Item # Description Quantity Price Unit Cast 1 Time extension of completion date 1.00 0.00 Is 0.00 2 0.00 3 0.00 4 0.00 5 0.00 6 0.00 7 0.00 8 0.00 9 0.00 10 0.00 1 11 0.00 12 0.00 0.00 0.00 0.00 Sales tax @ 6% 0.06 0.00 0.00 Project Manager 0.00 1 85.00 HR 0.00 Superintendent 0.00 80.00 HR 0.00 Clerical - office _ 0.00 40.00 HR 0.00 Labor - clean-up 0.00 32.00 HR 0.00 0.00 Sub -total 0.00 Overhead & Profit CNI provided @ 10% 1.00 0.00 0.10 0.00 Bond rate 1.00 0.00 0.01500 0.00 Liability Insurance 1.00 0.00 0.00550 0.00 Builders risk insurance 1.00 0.00 0.00350 0.00 Total $0 11 23 AM2/612014 Page 1 Sheet3Change Order Request 28 Bid Summary Quote 8 Plan Trade Total 2095101 Version I Of I INSULATION $1,205.00 Priced Good For Work Performed Through: April 22, 2014 Did Date: January 22, 2014 I If Total Bid. 51,205,00 Gate Contractor Services Lie 0: RCE -906 (Idaho); CCR -1!3362 (Oregon) 2908 Brandt Ave Nampa, ID 83687-6856 NMI) Conlraclor Tel: (208) 4655201, Fax: (208) 465-0773 �I� WORK AGREEMENT TO: CONTR%CfORS NORTBWEST BE: MERIDIAN WIMP TANKS I INSULATION Address 10840 w. EXECUTIVE DRIVE Jab Address: 3401 N 10 MILE ROAD BETWEEN USTICK & MITCNBL BOISE, ID 83713 MERIDIAN, m Ana: Date: OIPM014 ExpInIka Date: 04PJ-014 Te6 (208)361-9056 Estisoxbr: Vanskkla, Levy D Rax: Bid Summary Quote 8 Plan Trade Total 2095101 Version I Of I INSULATION $1,205.00 Priced Good For Work Performed Through: April 22, 2014 Did Date: January 22, 2014 I If Total Bid. 51,205,00 aThis in., diffam. fressdie.cdmanu made addition ro or diRertm from thou mnmincd herein uunnd to all terms and conditions contained M1emin irony pan ofthe product arwone described noon are pmwdm or h: Limited Wmmry. Limimtian ofRcmediu end Limitatlom on Actions and Uabiliry provisions setfoNr below. You c based on the enfa¢mbiliry oftheu terms and canditions. and on On Limited Wamrnry. Limitation of Remedies and Limimnm claw. goodie price would be Wmar ully higher ilCompury could not limit its liability as herein provided, and that you accept 2, LIMITED WARRANTY. All work performed by Company is w nWd to be ace from dance¢ in mated.] and workmanship far one year ft. the dem of completion of the installation subject to die terms below. Company makes no warranties regarding mandate; sold bur assigns to you any mmufaztur¢ wamndes relating on the product, THIS EXPRESS WARRANTY IS IN LIEU OF AND EXCLUDES ALL OTHER WARRANTIES, WHETHER EXPRESSED, IMPLIED OR STATUTORY, INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FORA PARTICULAR PURPOSE. This limited waremry does not cover dmanges minting . (al azeidmt. mise. ehme, region. or ramal wear and tar. Hd failure a. uta m maintain die produW in azcmdmce witheto, thnr. inswuwu: ands and it repairby myope WarrthenCompany or its my damages rendndve,Youshell be mlely responsible for the coememess of the plans and spenlm na[s .nth shall mi lig and hold ct oro Company ham any damage resulting bora improper, in i, mato or vague In tirmabon supplied by you. Company does not wkc on any abliguion oo impea ormalmu rhe work ¢father pmies in any manner or aspect. This wamnry is tat mnumble. 3. INSURANCE. Company shall maintain workers compensation (emplimer liability], W required by Was. and S1.000,000 in general Ianiny Imuran¢ while performing the work Company reserves the right m be self insured m the .mm allowed by applicable law. Company dues Rod agree to mare my other persons or mid, ostddili...I insureds. A. LIMITATION OF REMEDIES, Your sole and .elusive remedy attains, Company for my and .11 claims for damages arising on, of ey alleged to have arisen our the Work will W limited .,he repair or mphcemcm by Company, at Company's optimn, of my nommnkmming work or to the Issuance of. credit for such nanconfoming work in simulative with these turns and conditions provided Company is given a reammble oppommiry to impar the .,it and mnfims such mnconfomiry. nil .clusi a rcmdy shall not be deemed to have haled mf m csamami pmpow, an long as Company is willing and able to repair or m,1.. the nonconforming work and. in any evens Company's randru m liability far my damages shall be limited an the Tend amount paid to Company for the Work miler this agreement. This Limitation or Remedies clause shall apply to the parties to this agreement as well as to the mrzeno owmQsl of the project and i W their respective succnw¢ and assiSm. If you receive a claim for damages by my owner arising out of in alleged to have arisen out or the Work, you agree in give write notice to Company ofthe claim and psevO, Company An oppmardY m Inspect the alleged damages within 30 days Wile, Company's notip, of the retire. Ifyou fail to give rhe requital ..He. No, fail to allow Company m eup... try to inspect rhe allege damages within 30 days, you hereby waive my and all rights for damages anNm correction of work against Company. This Limindons of Remedies maybe plead ss s mmpkm bars. any aztim in vhhtion erthiz deme 5. LIMITATIONS ON ACTIONS AND LIABILITY. All deims md/ar lawsuit including bra not limited m.hims or lawsuit fm Indemnity mdfor contrbution against Company arising under this agreement must ba made within 13 months Fmm the Jett ohompledon of roc iumllmion. COMPANY WILL NOT BE LIABLE FOR ANY LOSS, DAM,%GE OR INJURY RESULTING FROM DELAY IN DELIVERY OF THE PRODUCTS OR FOR ANY FAILURE TO PERFORM THAT IS DUE TO CIRCUMSTANCES BEYOND ITS CONTROL COMPANY DISCLAIMS ALL LIABILITY FOR ANY AND ALL DAMAGE WHICH MIGHT BE SUSTAINED BY ANY PERSON WHO MAY BE ALLERGIC TO OR AFFECTED BY TILE EMNATION OF PARTICLES FROM CERTAIN TYPES OF INSULATION. THE MAXIMUM LIABILITY, IF ANY, OF COMPANY FOR ALL DAMAGES, INCLUDING WITHOUT LIMITATION CONTRACT DAMAGES AND DAMAGES FOR INJURIES TO PERSONS OR PROPERTY, WHETHER ARISING FROM COMPANY'S BREACH OF THIS AGREEMENT', BREACH OF WARRANTY, NEGLIGENCE, 9MLT LIABILITY OR OTHER TORT WITH RESPECT TO THE PRODUCTS, OR ANY SERVICES IN CONNECTION WITH THE PRODUCTS, IS LIMITED TO AN AMOUNT NOT TO EXCEED THE CONTRACT PRICE. IN NO EVENT SHALL COMPANY BE LEABLE FOR ANY INCIDENTAL, CONSEQUENTIAL, LIQUIDATED, OR SPECIAL DAMAGES, INCLUDING WITHOUT LIMITATION, LOST REVENUES AND PROFITS, ATTORNEYS FEES ANDIOR COSTS EVEN IF IT HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE RIGHT TO RECOVER DAMAGES WITHIN THE LIMITATIONS SPECIFIED 15 YOUR EXCLUSIVE REMEDY IN THE EVENT TIAT ANY OTHER CONTRACTUAL REMEDY FATS OF ITS ESSENTIAL PURPOSE. 6. PRICES, TERMS AND SHIPMENT. Norah Ottoman. lauskehouges, set aft mmmmmdums areallowdtalesspaVOedby Company. in addition lathe prices spacifled. you agree to pay any fubml, sore .,?.,a] .nim, me, occupmi mad. or similar was new in fore or to be enanred in dm fume, us and against Coenpmy or you by rm n althu ==coon. No mrcndon is pernlned talus Company alma other ;,e it writing. Any put due payment will be, u Company's option,subjectmded to oIJVteamonm (MS You agre 10 r rhe extortpsmim-0by law. Youaloesrod,rorl(arpema Campmyareceive) near theworksite, my mmerials needed m sampler. the and You agree m promet sura meoeuils arta damage le loss and provide Company. Ree of charge, with ..able o use of Cmispaeaeecives wer,nnrage1. Comfort, .h., hl...eean and hors¢ ssmmani h.pb ailmeteriadyfares Water hisagrdo"mhallnatify. myov mall Campmy receives payroem in full Company may ehmge yauafce mdit uncal.p.ns<s ifthejob rim is norrmdy hrwork on rhe due you specify. 7. FORCEMAJEURE. C¢mpenyshul not be liable for myd.ry, failurte, ordebutln Mureaanccolthie agrtmmtmmismone. In wade ormpaircaund by it. tworr ma of my contingency beyead the mmol eirher.fCompany or of suppliers to the Company. Such contingencies include but am not limited to hi]ure an delay in transportation. ants of my govemmrnt or my agency or subdivision mWorj.dicial actin, labor dispmu, Ire, accident. tats of moue, sevens wanner. producr ulacedm m shomgu. labor shormga, hal sh.mga. nw memnal shoneg., machinery or saaucal lallurt, or work that mmol be eomplbmd bemuse of morhec Campmyreveringtheeminentpardon it thebuilding.IfsWmmingmdy coeurs, Campmymayng,o. produedon, deliveries, and petfommtt of work mrmg i¢ customers orsubadmm suhstmoally similar mmcriala In i¢ soln uurttion, without liability for doing so. 8. CONFIDENTIALITY. Ifyou visit Company's prtmiuz or you otherwise receive my propdehry orconftlmtiu infomatian ham Campmy. ymu soul ¢min taco infoermden as confidmdu and mouse ordisclou it to my thW perry wilhom Campmy's writer mnsena 9. CREDIT APPROVAL. Shipment and delivery of goods and performance of work shall at all drums be subject to the appmvu of Compmy's credit department and Company ..yet my time dedicate make my shipment ordclivey, or parfom my work except upon reaipt¢f payment or upon wars and conditions ecuriry. sadsfazery m Campmy. By signing this agreement, you mthoeiae Company to check your credit and mfimerm s. 10. CANCELLATION. This agrtmenL or my Two of is, may only be ..celled with Company's W. a,,..L Ira the event of condition of this agreemena nr my pm hereof. you shall pay: (al the comraet priev fall completed name: (b) twepotoroldw contromprieethat is equal mLhadegreeofmmpletlen of products ar work in proms, irf.rive m the dem Company receives nate of cmeellm..: Codes cou of my materials and supplies which Company shell hove purchased to perform and which cannot be readily mold or used for other or shNlar purposes: (d) a rest.,king fm: and (el my expense Incumd by Company [including legal fees mdjudgmema) a a result ¢robe mncellnian ofsubcmoac¢ or pumhues related in this agrement 11. DEFAULT. You may tnminate this agaermen[ for Company's defauia wholly or in pan. by giving Campmy writer nmice eReminanon ss follows. You may give . wdue. mitt of teminmi in only if Company has received a anion. mine. ft. you specifying such default, the default Is net ..able ender my provision hereof, and doe default has not been mmedied within thins 1301 days (.,such ]anger Most as may be ...able order the cimumsunm) alter Company's receipt eCtbe nodes of defaila Delivery of nonconfoming pedmt or work by Campmy soul give you oho right set fano in pmgaph i hereof but shall tar be deemed is defauh Bir p..... of oamianon. In the event of u m mama, far dehulc you shall be rtdievcd of rhe obligation to pay for work nor perfumed by Company prior m the off rive dem of such semination. A default on Company's pan shall not subjeco Company to liabdiry, through payment by Company. set off or mherwiss. farany otherJarmge, whedandirect. consequential orincidmal, and whether sought under dead. ufmmmrt or tort. 12. ASSIGNMENT. You maynm usign chis agrtmem ao any claim aloins. Company relating res rM1is agrtemenc 13, GOVERNING LAW. This agrtemmo shall be mummies. interpreted and the rights arrhe Mies dclinumedin azcutdame with the laws ofthe Sum of Compmy's addres rim Itso.dm rhe front of this agmcmenc 13. DISPUTES AND MANDATORY MEDIATION. In the even Wo a dupum vises ova rhe ressanableness of or mdtlemem m fs eM1arged by Company, pe topg party will be emitled m tion die ie anomepr fees and cast. in all other dtpumn ofmy name. mea nary shall pay it own fes and asst. Erceposs unpavedm pmenconhdennallnfomanen and mobtain preliminary injunctive relief us prevent irtepamble hum,yen and the Company magree nrhesprior to rhe Initiation ofany legal anon she penia svitl engage in faelim,ive mmhedun ofmy and all disputes in my way related oo tht alrtmenr. I(the panics cannot agmc upon. ic..Each medhm, withiny't J.yscfees the dlepme.unse,00e,anduretarde magnuo oh.0mmmmialMdimlan Rules of rhe Americm Abimtian Mseci.dan. Each pony will short equally the fees Fun, fazilimrv<mediam, and costs of oho medieoion. 15. INSULATION DOES NOT PREVENT FROZEN PIPES. Insulating around water lines in an unconditioned or s.mi-condinomd vea will not prevent pipes Ram Seem, a, accumulating condemadun. To Jecrmm the possibility of banes pipes. lame my water pipes within a conditioned arca such u imervl wills mohcnhan ramal walls IlYau da nm lumen the pipes within m mmmol walk you hold Company hamlets and rete.. Company Erma any nhMs relating to ft.. or burst pipes. 16. SEVERABILITY. If my pownum an this'ralraem to not enfoneW,le. ohms pmvbmn ;hull be effective only m die event pemind by law and all other point ... s ordas "neon, diAl mount 17, ENTIRE AGREEMENT. Tom msttummt cenmim;he inure agrecmmo of the pant. rchamg to the mbleer matter hemur snit may ..to be waivcd. ehurgd, modified axmndcd m discharged urmly by a wtiting .,,cd Sy rhe parry ag.uml whom mfotmen, ofmy such waver, change. muduimnon. estenamn or Jmnhmge is sough.. The tams sod:omlthurt of rhmagteemenrupende any ageeemrnt in which it is notched. IS. INDEMNITY. Each of rhe pmre m:hu a,tw ent agtm:o defend and indemnity me another fmmmy and Al amens. suns mdse luwsmt mused ay the parry: ale;ligmt act ur oro sWai. Tbt lndarron. clause and 'he obligations crmted hwm n,lull cental and rake pmnry over any contrary indemnity agreement mmrallima rira rotht ageemenc Fmdtemme,Ori indwwrmyclauw and the obligaions-erawarercm shall wmrd and rakc;mmiyovenmmmaey;ndemntry agrccmem emend taro uOwa,em m tht ay¢emmwnlas the remequem ay .anent sotnholly refer, m this mdmiroy clause and Jeclams ¢null and void.