Loading...
Agency Comments CC04/14/2014 09:51 RICHARD DURRANT CHAIRMAN OF THE 6DAR0 GRAHAM PATERSON VICE CHAIRMAN of THG 90AR0 TIMOTHY M. PAGE PROJF_DT MANAGER ROBERT O. CARTER ASSISTANT PROJECT MANAGER APRYL GARDNER 51 CRETARY-TREASURER JERRI FLOYD ASSISTANT SECRETARY. TREASURER 2083441437 BOISE PROJECT ]BOISE PROTECT BOARD OF CONTROL City of Meridian. City Clerk's Office 33 W. Broadway Avenue Meridian, Idaho 83642 (FORMERLY BOISE, U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE. IDAHO 83705.31r,5 08 April 2014 RE: Cindy K. Lewis Trust & T & M Holdings, L.L.C. Whitebark Subdivision 2135 E. Amity Road New York Irrigation District Beasley Lateral 24+40 Sec_ 32, T3N, RIE, BM. Jaycee Holman, City Clerk: PAGE 01/02 OPERATING AGENCY FOR 167,000 ACRES FOR THF FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT 9013E-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BF_ND DISTRICT TEL: (208) 344-1141 FAX: (2(18) 344-1437 File NO: FP 14-015 NY -236-002-00 The United States' Beasley Lateral. lies along the boundary of, the above-mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control, is contracted to operate and maintain this lateral. We assert this federal easement 15 feet westerly and 10 feet easterly of the lateral's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. Fencing (as may be required) must be constructed just off the lateral easement. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Project Board of. Control prior to construction. The construction of any roadway crossings must be conducted only during the non- ir igation season when the canal is dewatered. In any case no work shall take place 04/14/2014 09:51 2083441437 BOISE PROJECT PAGE 02/02 within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation, and the Boise Project Board of Control. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In. any case no work shall take place within the easement before proper crossing agreements have been secured throughboth the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage arad/or Street Runoff must be retained on site. Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Whereas this property lies within the New York Irrigation District it is important that representatives of this development contact the NYID office as soon as possible to discuss the pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the New York Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting any copies of the irrigation and drainage plans. Whereas this development is in its preliminary stages, Boise Project Board of. Control reserves the .right to review plans and require changes when our easements and/or facilities are affected by unknown .factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, 64 rU ` ``ff✓✓ Bob Carter Assistant Project Manager- BPBC bdc/bc cc: Phil Comegys Waterm.aster, Div; 2 BPBC Velta Harwood Secretary -Treasurer, NYID File April 8 2014 City of Meridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83542-2519 r RE: FP 14-015/Whitebark Subdivision No. 1 Dear Jaycee: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Provided all storm drainage remains onsite Nampa & Meridian Irrigation District (NMID) will have no comment as this project lies outside of District boundaries. This lies within New York Irrigation District boundaries. Please contact Bob Carter, Boise Project - Board of Control, at 344-1141 or 2465 Overland Rd., Room 202, Boise, Idaho 83705-3173. Sincerely, Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg PC: Boise Project, New York Irrigation Office/File APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 CENTRAL •• DISTRICT �THEALTH DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Preliminary / Final / Short Plat Return to: ❑ ACZ ❑ Boise ❑ Eagle ❑ Garden City ❑ Kuna IXMeridian ❑ Star ❑ 1. We have No Objections to this Proposal. ❑ 2. We recommend Denial of this Proposal. ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. �i 8. After written approval from appropriate entities are submitted, we can approve this proposal for: OE central sewage ❑ community sewage system ❑ community water well ❑ interim sewage central water ❑ individual sewage Tindividual water ;r9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: `j& central sewage ❑ community sewage system ❑ community water ❑ sewage dry lines ly, central water ❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ❑ 12. We will require plans be submitted for a plan review for any: ❑ food establishment ❑ swimming pools or spas ❑ child care center ❑ beverage establishment ❑ grocery store P13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ❑ 14. Reviewed By: Review Sheet 15726-001EH1111