Agency Comments CC04/14/2014 09:51
RICHARD DURRANT
CHAIRMAN OF THE 6DAR0
GRAHAM PATERSON
VICE CHAIRMAN of THG 90AR0
TIMOTHY M. PAGE
PROJF_DT MANAGER
ROBERT O. CARTER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
51 CRETARY-TREASURER
JERRI FLOYD
ASSISTANT SECRETARY.
TREASURER
2083441437
BOISE PROJECT
]BOISE PROTECT BOARD OF CONTROL
City of Meridian.
City Clerk's Office
33 W. Broadway Avenue
Meridian, Idaho 83642
(FORMERLY BOISE, U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE. IDAHO 83705.31r,5
08 April 2014
RE: Cindy K. Lewis Trust & T & M Holdings, L.L.C.
Whitebark Subdivision
2135 E. Amity Road
New York Irrigation District
Beasley Lateral 24+40
Sec_ 32, T3N, RIE, BM.
Jaycee Holman, City Clerk:
PAGE 01/02
OPERATING AGENCY FOR 167,000
ACRES FOR THF FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
9013E-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BF_ND DISTRICT
TEL: (208) 344-1141
FAX: (2(18) 344-1437
File NO: FP 14-015
NY -236-002-00
The United States' Beasley Lateral. lies along the boundary of, the above-mentioned
location. The easement for this lateral is held in the name of the United States through
the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat.
391; 43 U.S.C. 945)
The Boise Project Board of Control, is contracted to operate and maintain this lateral. We
assert this federal easement 15 feet westerly and 10 feet easterly of the lateral's
centerline. Whereas this area is for the operation and maintenance of our facility, no
activity should hinder our ability to do so.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 42-1209.
Fencing (as may be required) must be constructed just off the lateral easement.
Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement
over Project facility easements must be approved by Boise Project Board of. Control prior
to construction.
The construction of any roadway crossings must be conducted only during the non-
ir igation season when the canal is dewatered. In any case no work shall take place
04/14/2014 09:51 2083441437 BOISE PROJECT PAGE 02/02
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation, and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In. any
case no work shall take place within the easement before proper crossing agreements
have been secured throughboth the Bureau of Reclamation and the Boise Project Board
of Control.
Storm Drainage arad/or Street Runoff must be retained on site.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
Whereas this property lies within the New York Irrigation District it is important that
representatives of this development contact the NYID office as soon as possible to
discuss the pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the New York
Irrigation District as to who will own and operate the pressure irrigation system prior to
review and approval of an irrigation plan by Boise Project Board of Control.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting any copies of the irrigation and drainage plans.
Whereas this development is in its preliminary stages, Boise Project Board of. Control
reserves the .right to review plans and require changes when our easements and/or
facilities are affected by unknown .factors.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Sincerely,
64
rU `
``ff✓✓
Bob Carter
Assistant Project Manager- BPBC
bdc/bc
cc: Phil Comegys Waterm.aster, Div; 2 BPBC
Velta Harwood Secretary -Treasurer, NYID
File
April 8 2014
City of Meridian
City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83542-2519
r
RE: FP 14-015/Whitebark Subdivision No. 1
Dear Jaycee:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Provided all storm drainage remains onsite Nampa & Meridian Irrigation District (NMID) will
have no comment as this project lies outside of District boundaries.
This lies within New York Irrigation District boundaries. Please contact Bob Carter, Boise
Project - Board of Control, at 344-1141 or 2465 Overland Rd., Room 202, Boise, Idaho
83705-3173.
Sincerely,
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
PC: Boise Project, New York Irrigation
Office/File
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CENTRAL
•• DISTRICT
�THEALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTRAL DISTRICT HEALTH DEPARTMENT
Environmental Health Division
Preliminary / Final / Short Plat
Return to:
❑ ACZ
❑ Boise
❑ Eagle
❑ Garden City
❑ Kuna
IXMeridian
❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
�i 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
OE central sewage ❑ community sewage system ❑ community water well
❑ interim sewage central water
❑ individual sewage Tindividual water
;r9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
`j& central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines ly, central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
P13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
❑ 14.
Reviewed By:
Review Sheet
15726-001EH1111