Loading...
Meeting Notes from 12/10/14~~ro~~ NOTES FROM THE HEFTING OF, D_CEMBER 10.2013 WITH The following are matters that were nromi~ed at this meetieg: ,__~~ • The Round a bout will be kept. (It was stated that loping the Roundabout caused them to lose four units) (The scraping of the RAB is due largely to the expenses of removing it, removing and replacing imgation, etc.) * Place one-way signs on RAB. Road to curb cut • Developers are going to control all. • Each building will have its own charterer • Beh~veen the 40 units will be a common area • All units have 2 parking spaces Plus 2-car garages • The units are to be sold between, $199,000 to $220,000 • Sq. ft. of units will be 151600-each. • The units will have many upgrades...marble counters, tiled floors will be put in • 't`here will be any a11ey at the East end ofthe project • Two units together...Color--wise, design-wise will be different on each unit • Units will be offset from each other • no straight Lines • Claimed that they are putting in over 46,000 sq. R of common area instead of the required 37,250 sq. ft. • will have sidewalks • ~~ ~ people can easily back out of garages • will not change open spaces • will not change how many units they will build here • Origina128 don't have access through the open space • will ux stone, rock, stucco. • Colors will be in writing on the presentation. will be mixed up on the units • Back of units face the streets • Trees will be planted in the-middle common area, along the-street every 30 feet, and one tree for each lot. No trees along the alley. • Can get information on the `landscape plan' at City ~atl in Eagle • The landscaping on the approval has to go in the project. Landscaping has to be designed exactly as it was planned • There will be no gravel...very little rocks • The units will be marketed with landscaping around them. •~ will have blueprints for one unit showing landscaping, fencing, etc • Masher plan overrides • They are going to control the landscaping • The landscaping will be done prior to the selling of the units • :Will .Hotpot in-rocks - will have landscaping • Iaigation pipes will be relocated from the RAB • Will get approval from the Irrigation District on December 11, 2013. • The same size pipes will be put in -18 inch size • The pipes will be tied to our irrigation and paths • March 15, 2014, the irrigation will be completed ~ Will have own ass~iation • Landscaping will be maintained by the association The following are matter~g n= w~cons_ • We need mutual discussions alwut changes plans on the iaigation system. • Getting rid of the exh~eme Southwest proposed unit • Can put in three speed bumps ~ Can get rid of copper roofs -Composition on the roofs with color changes • Changing the roof lines. Intermix roof lines. Place peals at common walls • Different options for the potential buyers. Can change interior/exterior around to make custom designed buildings for buyers options. • That the as~ciations coordinate to iron out responsib~ities, issues, etc. • The issue of the rum off/on values of the irrigation pipes are on the wrong side of the ' fence (for a number of feet) be resolved prior to someone building on the vacant lot.