Loading...
Agency CommentsCEP.lTRAL ~-i Ur15TRlC`6 l~EP'ARTIv 14-0080 Christopher D. Rich Ada County Recorder 200 West Front Street Boise, ID 83702 RE: Tustin Subdivision No. 2 Dear Mr. Rich: Central District Health Department has reviewed and does approve the fmal plat for this subdivision for central water and central sewer facilities. Final approval was given February 18, 2014. Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE) representing City of Meridian and the QLPE approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. If you have any questions, please call 32 7-8517. Sincerely, ~~ Lori Badigian, R.E.H.S. Senior Environmental Health Specialist cc: Conger Management /Kent Brown CK Engineering City of Meridian LB:bk Serving lrafiey; Elrrrare, Boise, and Ada Counties Ada /Boise County Otfiee 707 N. Armstrong PI. Boise, ID 83704 Enviro. Health: 327-7499 Reproductive Health: 327-7400 Immunizations: 327-7450 WIC: 327-7488 FAX: 327-8500 Elmore County Office 520 E. 8th St. North Mountain Home, ID 83647 Enviro. Health: 587-9225 Family Health: 587-4407 WIC: 587-4409 FAX: 587-3521 Valley County Office 703 N. 1 st St. McCall, ID 83638 Ph. 634-7194 FAX: 634-2174 ~~'~~ D~~rtir~S, 2013 ~2a~r~rui & ~~i~cid~a~ ~l~rsgatta~c ?~io.~uct 1503 FIRST STREET SOUTH FAX #208-463-0092 City 4f Meridian City Ct~eerk's.Qffice 33 ~ Bri~adw~~? ~1.t~~ue, Suite 102 M~idi~, ID 8~~6.42-x°619 RE: FP' 13-043/Tustin #2 Dear Jaycee: NAMPA, IDAHO 83651-4395 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application as it lies outside of our district boundaries. Please contact Settlers Irrigation at 344- 2471 or at PrJ Box 75?I, Bdise, ID X370?. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, David T. Duvall Crew Foreman. Nampa & Meridian. Irrigation District DTD/dbg PC: Settlers Irrigation Officei file Holly Binkley From: Elias Oropeza <elias@settlersirrigation.org> Sent: Thursday, December 05, 2013 9:27 AM To: clerk; Bruce Freckleton Subject: RE: City of Meridian Dev App -Tustin Sub No. 2 FP Settlers Irrigation District does own and operate facilities located within the project site,file number FP 13- 043. Settlers Irrigation District requires the opportunity to review and comment on this development prior to any construction to insure all the Districts facilities remain protected. Thanks, Please contact me @ Mack Myers District Manager Settlers Irrigation District P.O. Box 7571 Boise, ID 83707 Cell 208-871-4468 Office 208-343-5271 Fax 208-343-1642 From: Mack Myers Sent: Monday, December 02, 2013 10:30 AM To: Elias Oropeza Subject: FW: City of Meridian Dev App -Tustin Sub No. 2 FP From: Machelle Hill [mailto:mhill@meridiancity.org] Sent: Wednesday, November 27, 2013 1:42 PM Subject: City of Meridian Dev App -Tustin Sub No. 2 FP ,,,~, City of Meridian City Clerk's Office 33 E. Broadway Avenue V ~ ~ ~ V Meridian, ID 83642 City Council .Development Application Transmittal To: Outer A encies Comments due b :December 12, 2013 Transmittal Date: November 27, 2013 File No.: FP 13-043 Hearin Date: December 17, 2013 Request: Final Plat approval consisting of 44 single family residential building lots and 10 common area lots on 15.26 acres of land in the R-4 zonin district for Tustin Subdivision No. 2 ~ Location of Property or Project: ~ n/side of E. McMillan Rd, approx. 1/8 mile w/o N. Locust Grove Rd ~ Council Action: The City of Meridian is requesting comments and recommendations on the application referenced above. To review detailed information about the request, please click on the file number above to take you directly to the application. We request that you submit your comments or recommendations by date specified above. When responding, please reference the file number of the project. If responding by email, please send comments to clerk .meridiancitv.orq. For additional information associated with this application please contact City Clerk's Office at number below. Thank you, Machelle Hill Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, ID 83642 (208) 888-4433 mhill(a~meridiancity.orq CENTRAL ~• DISTRICT ~i~THEALTH DEPARTMENT Rezone # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Return to`.°° ^ ACZ ^ Boise ^ Eagle ^ Garden City Conditional Use # ^ Kuna Preliminary /Final /Short Plat ~ 1~~ ~.?~ Meridian ~~~v\ _`~~~~_n . 2 ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ~8. After written approval from appropriate entities are submitted, we can approve this proposal for: `~ central sewage ^ community sewage system ^ community water well ^ interim sewage central water ^ individual sewage ~ individual water ~9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: C~ central sewage ^ community sewage system ^ community water sewage dry lines l~central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store C~;13 ^ 14. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. Reviewed By Dater/~/~. Review Sheet 15726-001EH1111