AIA Agreement with Contractor Quality Concrete for WWTP Plant Improvementsriu =~a~= Dacumen~ A-1 ~2 ~ 2a09 Sfandard F©rm of Agreemet~f Between Owner and Contract©r,Cansr`rucfrort IVlanager as Adviser Edition AGREElV1ENT made as of the 1st day of November in the year 2013 (In woI ds, il7dreate day, n7aI7tI7 and yeah) ADDITtON5 AND DELETtONS• The author of this document has BETINEEIV the Owner: added information needed for its (Marne, legal stators, address and otlrer• ilrforn7atron) completion. The author may also City of Meridian 33 E. Braad~vay Meridian, ID 83642 and the Contractor: (Name, legal status, address alld r)t17e7' I77fo1'177atIDT7) Quality Concrete, Inc. P.O. Box 7245 Boise, ID 83707 for the following Project: (Marne, tocation and detailed descl•r~tion) City of Meridian Waste Water Treatment Plant Improvements 3401 N. Ten Mile Raad Meridian, ID 83642 The Construction Manager: (Nance, Legal status, address and otl7er ittforn7ation) Benitan Construction Co., Inc. P.O. Box 838 Meridian, ID 83680 The Architect: (Name, legal status, address and other il7fol•I77ation) SPF Water Engineering LLC 300 E. Mallard Drive, Suite 350 Boise, ID 53706 For the purposes of this Agreement, the term Engineer and Architect may be used interchangeably. SPF Water Engineering, LLC is the prime consultant upota execution of the Prime Agreement with the City of Meridian. For the purposes of this Agreement oa~Iy, the use of the tetra Architect shall refer to SPF Water Engineering, LLC as the firm will bear all rights and responsibilities to perform the services provided het•ein per the terms and conditions of the Prime Agreement. Johnson Architects, PC is the Aa•chitect of Record for the project upon execution of Consultant Agreement with SPF Water Engineering, LLC. The Owner and Contractor agree as foIIows. have revised the text of the original AIA standard form. An Additions and Deletions Report That notes added information as weEl as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect #o its completion or modification. This document is intended fo be used in conjunction with AIA Documen#s A232TM'-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; 6132T"'-2009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C932n^-2009, Standard Form of Agreement Between Owner and Construction Manager as Adviser. A1A document A232T"'-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AiA Document A132T'" - 2009 formerly A909T"'CMa - 9 B92). Copyright fl 1975, 9980,'1992 and 2009 by The American Institute of Architects. Alt rights Init. reserved. WARNING: This AIA Document is protected by U.s. Copyright Law and Intematianal Treaties. Unauthorized reproduction or distrittution of this AIA® Document, or any portion of it, may result in severe civic and criminal penalties, and will be prosecuted to fhe maximum extent possible t under the Eaw. This document was produced By AIA software at 09:06:57 on 9 9l05/2093 under Order No.9005957857_9 which expires on 01/1A/2014, and is not for resale. User Notes: (9702994502) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS ii DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 9 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Bid Package #4 -Provide all labor, materials, tools and equipment necessary to complete the Concrete in accordance with Project Plans, Specifications, Addendum No. 1, Addendum No. 2, Addendum No. 3 and the Bid Form far BP #4, Note: All required forms, information and insurances must be completed and submitted to Beniton Construction before commencement of any work including but not limited to the Request for Contract Information, MSDS, safety prob •am, a list of suppliers and subcontractors, and any additional forms as requested in the specifications. Provide submittals electronically if available, or one {1) clean copy {able to scan); same exceptions may apply. Samples and color charts must be provided separately. Contractor shall provide (2) full size copies of approved soap drawings to Beniton. Contractor is responsible to pay all applicable taxes, which are included in the contract price. Contractor is required to provide three (3) hard copies and one (l) electt•onic copy of closeout information {O&M Manuals, Warranties, etc.) and one {1) complete set of Record Drawings, as requested prior to substantial completion. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Wark shat[ be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Iiaser•t the date of convrrencemerlt, if it d f~ers.fr-orrr the date of il7is.4greernent or•, rf applicable, state that the date 19~i11 be fixed irr a notice to proceed.) If, prior to the commencement of the Wark, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: AIA Document A132*"' - 2009 formerly A909 TMCMa -1992}, Copyright 0'!975, 1980, 1992 and 20D9 by The American Institute of Architects. All rights Init. reserved. WARNING: This AfA Documen# is protected by U.S. Copyright Law and International Treafies. Unauthorized reproduction or distribution of this A1A° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted #o the maximum extent possible ~ under the law. This document was produced by AIA software at 09:06:57 on 19105/2013 under Order No.10D5957857_1 which expires on 01!14(2094, and is not for resale. User Notes: (1702194502} NIA § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( )days from the date of commencement, or as follows: (Insert raun76er of calendar days. ~Ilter ~7atil~elj; a caleradar• date rr7ay be used wl7er7 coat diraated witTr t/ae date of con7raawacenaer7t. If appropriate, ir7sert requir er7terrts for ear•lier• Szrbstar7tial Corrapletiora of'ce7 tair7 partior7s of the Wark.J Per Exhibit "C" Portion of fhe Work Substantial Gompletion Bate BP #4 -Concrete Lab Building -August I, 2014 Admin Building -- September 19, 20l 4 subject to adjustments of this Contract Time as provided in the Conh•act Documents. (IYlSert pr•OVTS10r7S, 7f arT}; far ligzridated dar77ages relatir7g to failure l0 aChleVG' S7rbstalatial Corr7pletiora Or7 ti177e Or' for bonus paynaerats for early cornpietiora of the Wor k.J Per Supplementary Conditions ARTIGLE 4 CONTRACT SUM § 4.t The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's pcrfonnance of the Contract. The Contract Sum shall be one of the following: (C{TeCk tl7e appz opz'iate 6ox.) [ X ] Stipulated Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below [ ] Cast of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below {Based a7 the selectia:z above, complete Section 4.2, 4.3 or• 4.4 belotiu Based ar7 floe selectior7 above, also complete either Section 5.1.4, 5.1.5 or 5.1.6 belotitj) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Sum shall be Two Hundred Nineteen Thousand Two Hundred Thirty One and Na/100 Dollars ($ 219,231.00 ), subject to additions and deletions as provided in the Contract Doeuntents. Breakdown is as follows: * New Administration Building & Operations Tenant Improvement - $142,475.04 ~` New Laboratory Building - $76,757A0 § 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State floe raumbeas or• other- ideratifrcatiora of accepted alternates. If the bidding or proposal docznnerats permit the Owner to accept other alternates subsequent to the execzrtiora of't17is Agreera7erat, attach a schedule of szrclr other alternates showing the arr7ozrrat, for• each and the date when that an7ozrrat expires.) N/A § 4,2,3 Unit prices, if any: (Iderat~ grad state the unit price, and state the quar7tiry lirr7itatior7s, if ar7y, to ta~laiclr floe unit price it7i11 be applicable.} AiA Document A132T'" - 2009 formerly Al Q1 TMCMa -1992). Copyright ©1975,1980, 1932 and 2009 by The American Institute of Architects. All rights Inst. reserved. WARNING: This AIA~ Document is protested by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent passible t under the law. This document was produced by AIA software at 09:06:57 on 11(0512013 under Order No.1005957857_1 which expires on 01!1412014, and is not for resale. User Notes: {17D2194S02) I#em N/A Units and Limitations Price per Unit ($0.00) § 4.2.4 Allowances included in the Stipulated Sum, if any: (Identify allot+~a>`1ce ared state excltrsio~3s, if as~tj, from the alloti+~ance price.) Item NIA Allowance § 4.3 Cost of the Work Plus Contractor's Fee without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated SUIll" contract {See Paragrapl~ 4.2) (Paragraph deleted} (Table deleted} (Pai`agr aplrs deleted} § 4.4 Cost of the Work Plus Contractor's free with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract {See Paragraph 4.2) (Paragjaphs deleted) (Table deleted} (Paso apps deleted} (Table deleted} (Paragraphs deleted) ARTICLE 5 PAYMENTS § 5.7 Progress Payments § 5.7.7 Based upon Applications for Payment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate far Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending oli the last day of the month. § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the 25th day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the 30th day of the following month. if an Application for Payment is received by the Consh•uction Manager after the application date fixed above, payment shall be made by the Owner not later than sixty { 60) days after the Coiist<•uction Manager receives the Application for Payment. (Federal, state or local tat+~s ~s7ay require pa~m7ef9t ivitlrin a certain period af'tilaae.) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.7.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contiactor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Consh•uction Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.7.4.2 Applications far Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 AIA Document A332T'" - 2009 formerly A309 T'"CMa -- 3992). Copyright m 3975, 3980, 1992 and 20119 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA~ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA~ Document, or any portion of it, may result in severe civil and criminal penaities, and will be prosecuted to the maximum extent possible f under the law. This document was produced by AIA software at 09:06:57 on 11lQ5/2033 under Order No.1005957857_'1 which expires on ©3!14!2094, and is not for resale. User Notes: (1702184502) %). Pending final determination of cost to the Owner of changes in the Wark, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of five percent (5 %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 4.5 of the General Conditions. § 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety-five percent { 95 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines far incomplete Work and unsettled claims; and .2 Add, if final contpletion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10,3 of the General Conditions. § 5.1.4.5 Reduction or !intitation of retainage, if any, shall be as follows: (If it IS lFrt2lydea; pr•i0r• t0 $21~JS1arrtlal CO77rp1et10J? Of the G'r7t1T'L' Work, to reduce or lirrrit the r•etairrage resultnrg fi•orrz the percentages inserted irz Sections 5.1.4.3.1 and 5.1.4.3.2 afrave, and this is trot explained elsetvlrere irz the Contract Documents, izrser 1 lrer•e provisions• for such redlJCtion or linzitatian.) N/A § 5.1.5 Progress Payments Where the Contract Sum is Based on the Cast of the Work without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Par•agrap{rs deleted) § 5.1.6 Progress Payments Where the Contract Sunr is Based an the Cost of the Work with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Par•agr•aphs deleted) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate far Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the par ties rrrutzra!!y agree, insert t/re name, address arrd otlrer• contact information of •tlze Initial Decision Maker; if other than tlze.4r chitect.) AIA Aocument A132;M - 2D09 formerly Ai01 T'"CMa -1992}. Copyright ®1975. 1980, 1992 and 2009 by The American Institute of Architects. All righfs Inst. reserved. WARNING: This AlA~ Donument is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of Phis AIAe Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 09:06:57 on 11105/2013 under Order No.1005957857_1 which expires on 01/14/2014, and is not for resale. User Notes: (17fl2194502) § fi.2 Binding Dispute Resolution For any Claiaaa subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Docwnent A232-2009, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the O>virer- acrd Contractor do Trot select a method of Binding dispute resohrtiorr Beloat; or do Trot suBseguerrtly agree irr >~~ritirrg to a birrdirrg dispute resolzrtiorr rrrethod other tlrarr litigation, Clairns r~~ilt Be r esoh~ed by litigation irr a tour°t of con:peterrt jurisdiction.) [ ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009 [ X ] I,itigatian in a court of competent jurisdiction. [ j Other: (Spec~~) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article l4 of AIA Document A232-2009. § 7.1.2 The Work maybe suspended by the Owner as provided in Article 14 of AIA Document A232-2009. § 7.2 Where the Contract Sum is Based on the Cost of the Wank with or without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 7.1) (Paragraphs deleted) ARTICLE 8 MISCELLANEOUS PROV[SIONS § 8.1 Where reference is made in dais Agreement to a provision ofAIA Document A232-2009 ar another Conti•aet Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the Iegal rate prevailing fa'ona time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) Zero percent (0 %} § 8.3 The Owner's representative: (Nance, address and other irrfarmatiorrJ Beniton Construction Co., Inc. Bryce Parker P.O. Box 838 Meridian, ID 83680 § 8.4 The Contractor's representative: (Name, address arrd other information) Quality Concrete, Inc. Jeff Tiddy P.O. Box 7245 Boise, ID 83707 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: AtA Document A732T'" -- 2009 formerly A10t T"'CMa -19921. Copyright ®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights lrtit. reserved. WARNING: This A1A Document is protected by U.S. Copyright l_aw and ]nternatienal Treaties. Unauthorized reproduction or distribution of this AfA® Document, or any portion of it, may result in severe civil and criminal penalties, and wilt be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 09:06:57 on 11/05/2013 under Order No.1005957857_1 which expires on 01/14x2014, and is not for resale. User Notes: (1702194502) N/A ARTICLE 9 ENUMERATION OF CONTRACT DOCUl1~ENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document AI32-2009, Standard Fortn of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. § 9.1.2 The General Conditions are, AIA Document A232-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, per attached Exhibit "A". (Table deleted) § 9.1.4 The Specifications: (Dither list the Specifications !acre aJ• refer to an exhibit attached to this Agreement.) Per Exhibit "A" (Table deleted} § 9.1.5 The Drawings: (L'ither list the Drawings I7ere or• refe7• to an ~rhibit attached to this Agreerne7lt.) Per Exhibit "B„ (Table deleted) § 9.9.6 The Addenda, if any: Number Date Pages Per Exhibit "A" Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 (Paragraphs deleted) Other documents, if any, listed below: (List here any additional doc:rnzeJ7ts which are iJrtended to•for•m part of •the Contract Doczmae7lts. AIA Doczv7aent A232--2009 provides that biddiJ7g regzrirements szrcl7 as advertisement or• inritatioJ7 to bicl h7str-zrctlons t0 ~ldde7S, SalJ7ple• fOr 17TS aF1d t17e CO!?tF•aClOT S bid are not part of the Contract Doczunerzts zrnless eJrznner•ated in this Agreement. They should be listed here only ij'inteJtded to be part of the Contract Docznrzents.} Exhibit "I" and Sample Certificate -Insurance Requirements * Request for Contract information * WH-5 Fortn ~` Affidavit Concerning Taxes * Application for Payment and Schedule of Values ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 1 l of AIA Document A232-2009. (State bonding regzrirer7zerats, if any, and limits of liabilit;~ far inszrraJace required in Article I1 of AIA Doczvzrent A232-2t?09.) Type of Insurance or Bond Limit of Liability or Bond Amount Insurance per attached Exhibit "i" Payment & Performance Bonds 100% of the Contract Amount (see Supplementary AIA focument A132T"' - 2009 formerly A107 T'^CNEa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AiA~ Dooument is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of Phis A1A® Qocument, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by A1A software at 09:06:57 on 1 1 /05120 1 3 under Order Na.1005957857_i which expires on 01!1412014, and is not for resale, User Notes: (1702194502) Instructions to Bidders for delivery requirement) This Agreement is entered into as of the day and year first written above. .~ ,~ ., OWNER (Sign r M.,. .•--- \ ~o~.rn, oGc. ~ (Printed n e and title) CONTRALTO Si ature) ~e~ ~ . ~~ (Printed name and title) AIA Document A132T"" - 2009 formerly A101 T""CMa -1992). Copyright ©1975,1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 8 this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ~ under the law. This document was produced by AIA software at 09:06:57 on 1110512013 under Order No.1005957857_1 which expires on 01!1412014, and is not for resale. User Notes: (1702194502) of Meridian Exhibi# "C" -Contract Schedule Beniton Construction ~ t ~ 27 MS0003 Substantial Com letion -Lab Buildin Au ust 1, 2014 p g ( g ) . ... _ f _.. _ ~.... _~..___ _.. .. _...__ _ - 0 . . ? I 0% I ; 30-Jul-14 Subst antial Co MSD004 . . . _ I Substantial Completion -Admin Building (September 19 2 . . _... ..... --- - . 0 I 0°J° ( f 08-Sep-14" ~ ubstanti MS0005 ~ Substantial Completion -Existing Admin Building (TBD) 0 ~ 0% ~` i 27-Oct-14* $u - . - ~ , ^ . F ~ g-13 A, Design Phase ~ - - . . ~ ~ ~' ~ - 09-Dec-13, Pre-Constru tion - - • - ~ - ~ ~ - • -Sep-13 A, Material Procureme t " - t• ~ , 27- SIT~WOI~K 201 13-Aug-13 A 30-May 14 30 May X14, EWOR G1000 ~ Temporary Fencing and Gates - CM/Owner 2 L 0 /° 09-Dec-13 l 11-Dec-13 ~ Temporary Fencing and ate$ - G Owner 010 - G1 Construction Entrance / SW PPP 8MP's ..~ ------... _.._....._.....__ _.~._. 2._._.._ . ... 24-Om... ~ .._.__ _-100%~ ct-13 A _. ------.._-... __....__ 125-Oct-13 A -, onslruction Entrance / SW P , P BMP's „ G1030 -~--- Utility Locates and Pot-Holing ~. .M_._ - --- -- --- ... I 5 ( w~.__...__._ SO% 121 Oct-13 A ._...._ ------- - -- 101 Nov 13 - - ................. tilitt~ Locates and Pot-Holing G1040 I Grub Tur# Areas, Strip & Stockpile Topsail ~ 5 ( 4% 101-Nov-13 10&Nov-i3 Gr~{b Turf Areas, Strip & Sto kpil~ Top it G1050 i Layout & Asphalt Sawcutting - ... j 2 ~ --------- - - - ----- __. 20% 21 Oct-13 A _...__ _....._. _ _ _.M..._._._ 05-Nov-13 La but & As hal# Sawcuttin G1055 f Demo & Salvage Fencing as Required _ _ 5 ~ 25 /° ~ 18-Oct-13 A 107 Nov-13 µ ~ Demo & Salvage Fencing as Required G1060 ~ Gate Detection Loops -Coord w/ RV Dump Project , 3 100°I° 117-Oct-13 A , _ ._ ; 18-Oct-13 A ; G to [detection Loops -Coord. / R'~? Du Projec# G1070 ~ Relocate Access Gates ~ 5 0% 23-May-i 4 f 30-May-14 j F Re ocat~ Acc s Gate • ~ ~ ~ ~ - _ ~ ~ _ ~ 16~Nov-13 Other WTP P ojec~s , , W WTP01 I -- ~ - ~_ _ ~ RV DUMP STATION Project {Ewing Co.) ~ 90 100% 13-Aug 13 A _...,__ 25 Oct-13 A V p~JMP STATION roject ( wind Co.) WWTP02 _ I FIBER LOOP Project {By City - PreCom & AME) j 60 + 70% 109-Oct-13 A ~ 16-Nov-13 ~-°= FIBER LOOP Praj ct (By C y-1?reCo & AME . • - _ + _o , ~ 23- ay-i4, L Bldg Si G1400 ; Site Demo Trees, Out Buildings, e#c. -Coord w/Electrical ~ 1 D ( 0% 130-Oct-13' 12-Nov-13 ; >~ Sits Demo Trees, ut-Buildi gs, etc. - oord w! G1410 ~ Grading & Storm Drainage Improvements . ~ 5 I ~ _._ 0% i 06 Nov 13 113-Nov-13 Grading & Storm D ainage I pra~em s G1430 # I µ r TBA Joint Trench Utilities IPGO lnt Gas & Fibe 10 ( ( 4% 13 Nov 13 ) 27 Nov 13 , Joint Trench Utilit es - EPC , Ini Gas Fiber - -- -. G1435 _ ___.. _. _ _ ..............w__..___ ._ _ -- Building Pad 3 _ _ _ __ _ _ _ 0% 27 Nov-13 _ - _ 04 Dec 13 uildin Pad G1440 ~ .. _ Water Service #o Lab 3 ~ I 0% ~ 13 Nov 13 (15-Nov-13 Water Service to L b _._ G1450 ( -._ ....._.__..__ ..._ ..__. ........ New Water Sevcice to Existing Admin / Ops Building ___- _ .._ ....- 3 _ _._ ----.._--- 0°!° 118 Nov 13 ...._...._.._ ._...m-___.. ~ 20 Nov-13 New Water Servic to Exis ng Admin Ops Bu' G1500 ~ Prep and Place Site Concrete 5 0% ~ 24-Apr-14 I I Oi-May-14 ~ Prep a d P[~ce a Conc - -._ __ G1510 ... I _.___ __._ . ~ .. _ . _._ . ~......_.._. __.. _...... _ -- -- - ___ Paving, Signage and Striping --- ----- - ~ 5 ~ ....... .___.,__ --- -. 0°!° ~ 16-May-14 ._..__._.-._.__ -- 23-May-14 ; Pa ng, ~igna and St ~. :.. - ~ s - 23- ay-14, A - in Bldg Gi200 I Grading & Storm Drainage improvements ~ 10 0°l° 141-Nov-i3 ~ 1S-Nav-13 ~ Gradina & Stor rainaae I oro~em is Actual Work Critical Remaining Work ~4 Summary Page 1 of 4 NOVember 5, 2013 Remaining Work ® ~ Milestone of Meridian [ Exhibit "C" -Contract Schedule ~ Beniton Construction G1210 ~ 24" Pressure Sewer -Boise River Outfall (BRO} Line ( 15 ~ 0% 01-Nov-13 ~ 22-Nov-13 ~~ 24" Pressure er -Bois River Ou f II (BRO ._. _.. - ~ I ~ 4- ----- G1215 'Install New Electrical Service - 1PC0 3 ~ 0% 22-Nov-13 27-Nov-13 ~ Ir7stal[ New EI ical Serv ce - PCO ._.__.._ _ .._. .... .......-_._...__ --- .--..._....w._.--_ ._..-._._ .------ ........ G1220 ~ BRO Shutdown and Tie-In (Plant Final Flush Date} ( 1 I 0% 22 Nov 13 25-Now13 --~---------- BRO Sftutd nd Tie-In (Plant Fin Flush ------ G1225 Remove & Dispose BRO Under Building Pad I 2 L. -0% -~~ 08-Nov-13 -I 12-Nov-13 Remove & Di p BRO U er ~uildi Pad - G1235 8" Water Service Relocation I 3 ~ 6D%° (28-Oct 13 A 131 Oct 13 "V~ater Servi location µ ____ --_ - _.._- _ - G1240 2" Non Potable Water 2 I 0% (31-Oct-i3 (04-Nov-13 2" Ikon-Patabl a er G1244 Build Road Section & Early Paving if Possible I 5 0% (25-Nov-13 104Dec-13 . .. _._ . .__.__ __ ---------- __ ~..m... - -. Build Road ---------- - c ion & Ea y Paving i ossibi _... _ _ .---._. _ o ......_ -. .........., . ------ -...__.... G1245 ~ Approaches, Curb, Gutter & ,Pave at S Access Road ~ 10 I 0 /° ~ 10-Apr 14 (24-Apr 14 , ~> Appraa hest Cur ,Gutter G1250 ~ Budding Pad ? 3 j 0% (12-Nov-i3 115-Nav-13 Bujlding Pad G1300 I Prep and Place Remaining Site Concrete 14 0°!° ~ 01-May-14 116-May-14 ~ ~ ~ Prep and lac emaini 61310 ;Paving, Signage and Striping 5 0% 16-May-14 ~ 23-May-14 Pa 'ng, Signa and St B ILDIN ! U G 165 09-Dec-13 04-Aug 14 ;04-A -14, LA • • - • - ~' ~ - 1"P~ 16-Ja - 4 Lab Buil in ~ Fou ation & , g 62015 ~ Excavate, Form & Place Foundations 1 D I 0% 109-Dec-13 23-0ec-13 -.. ~! Excava# . arm & Plac ... Fo~ndat ns 62470 II Backfill Foundations I 2 I 0%° 23- Dec-13 ~ 27 Dec 13 1 Backfill undations _ _ --- -- - m.__.. __._ .......... __- - -_-~__ - ------------ - -------.... 62080 ~ M, P & E Underground Rough-Ins I 10 I 0% 127-Dec-13 ~ 13 Jan 14 .~... ...._._. _-_---- -----~-------------- ... ........-_._ .....--.......___. , ~ M, P Undergrou d Rough- s ------. _.._._o _._..-------- ........ .........._ 62090 Prep & Place Slabs-on-Grade ~ 5 I 0 /° 109-Jan-14 116-Jan-14 _ _ _ _ _ _ rep lace Slabs on-CQrade ~ i . ' 27-Mar-14, Lab i3uildi - Stru -...._u. 63035 (Structural CMU Demo /Tie into 1=xisting I 5 0°t° ~ 16-Jan-14 ; 23-Jan-14 Stru t ral CMU De .... o / die-i ..... .. Existin 63040 _~ Structural Steel-- Framing ~ 10 I w 0% 123-Jan-14 I D6-Feb-14 -- - Str tural Steel - raining -__ ____- ------ -- G3D42 f Structural Steel Complete Upper Decks 5 I 0% 20-Feb-14 27 Feb 14 ~ = t uctural Ste 1- Compl Upper 63144 M, P & E Rough-ins and Penetrations on Upper Decks 5 ~ 0% 127-Feb-14 (06-Mar-14 , P & E Rou h-ink and enetrati 63156 LPrep & Place Upper Deck Slab I 3 ~ 0% I 06 _Mar-14 11_ Mar 14 ~ rep & Plac Upp~r De Sfab . - -- . --- -- .... II 63166 I Light Guage Structural Framing & Shea#hing ~ 15 0% ~ 06-Mar-14 27-Mar-14 ~ __._ ......._ _ I ,. _. .,.,,,. ~ l ~ ~ .. - ~ Li ht Gua g g Str~etur Framin __ .. _ 22-Apr- 4 Lab B i ding - E ; ; , 65040 Aluminum Punched Windows ~ 5 0% 03-Apr-14 ~ 10 Apr 14 ~ Aluminu Punched indow _. . 65054 ~ Standing Seam Roofing i 15 i 0% ~ 27-Mar-t4 i7-Apr-14 _> Sta~din Seafn R fing 65060 BnckVeneer 27_Mar14 ~17_Apr-14 ~ ~ 1 ~ ~ ~ ~ol~ i ~ :: Brit:kVe eerl _ - .... . - _ ...- _-----------. ....._.........__.._ .. ,..___.._. .- ,...__...._ _ --- - --- 65070 Storefront Entrance ( 3 ( 0% 117-Apr-14 j 22-Apr-14 ~ StQrefr nt Er€tran - • :' • : ^ • * - -- - ~- -- _ 64060 ~ Light Guage Intenor Framing I r11-Mar 14 ~ 01 Apr 14 0°I° 1 5 I ~ ~ ; ~ ; 23- Light~u~ ay-14, L a [nt~rior Buildin aming _ - --- - . . .. . ... 64065 M, P & E Rough-Ins 15 ~ 0% 18-Mar-i4 08-Apr-14 j M, F~& it ouch-Ins 64100 Set HM Door Frames m GWB 5 i 0% 01-Apr-14 (08-Apr-14 ~ ~ Set HMS oor Dram in GW . 64110_.....__ . I Batt insulation and. Nang-GWB ...-._.. . _._,..._._._._ _ --10--- ~---0%- -~ 24-Apr 14 - ~ 09 May 14„ „M....~ ; ~ ~iat~~ sula~ion d Hang Actual Work Critical Remaining Work @~®0 Summary Page 2 of 4 November 5, 20'I3 C""~ Remaining Work ~ ®Milestone of ll~eridian Exhibit "C" -Contract Schedule ~ Benitvn Construction G4120 G4134 .~ ~ Tape & Finish Gypsum Wall Board I Set HVAC Equipment - - G6012 ~_ --- ~ Initial Terrazo Grind Slab on Grade ... ... _ - - . G6o15 _._ .... . ------------- - .._.~..... ... . ......... m . ....._.......... (Prime & Paint GWB, HM Frames _ _..__.. _ .._... - G6020 --- . --- ------ ------------ ....~._._ w_w _ ....... ........_ (install Ceiling Grid G6100 I Casework /Lab Equipment Delver & Install G6110 ~ Plumbing -Set Fixtures and Equipment G6118 Floor Coverings & Final Polish Concrete G6120 I Bathroom Partitions & Accessories G6130 ~ Electrical Drop Light Fixtures G6140 ~ ElectricaE Tnm Devices Startup, Drop Registers and Trim C ~ _G6i60 rs and 1..... -----------_..__.......__............_... _Han Doo nstall Hardware g G6168 Drop Ceiling Tile 10 I 0°1° ~ 09-May-14 (23-May-14 5 ~ D°I° ~ 17-Apr-14 124-Apr-14 ~ f s J ~~ -~ 5 0% 1 13-Feb-14 ~ 20-Feb-14 10 ~ 0% ~ 30-May-14 13-Jun-14 5 ~ 0% ~ 13-Jun-14 ~ 20-Jun-14 30 0% ~ 13-Jun-14 28-Juf-14 15 ~ 0% 14 Jul-i4 ~ 04 Aug-14 ~.m._.. . ~ 8 .-...._ ~% -----._. .._.._ 16-Jul_14 _-....~..__._._..__.. 28-Jul-14 _ __... 5 I _...._ _ 0% --- 21-Jul-14 - . .. Mm 28-Jul-14 7 _I __ 0°!° ~ 20 Jun 14...... . ~ 01-Jul-14-M-„ 8 ( _ 0°l° O1.Jul 14 - -~ 14-Ju1 14 10 ( 0% I20-Jun-14 .................. I07-Jul-14 5 I 0% ~ 21-Ju]-i4 ~ 28-Jul-14 2 ~ 4% ~ 28-Jul-14 130-Jul-14 T_d & Sqt H~ C E ~, finish uip ypsum nt ! ~ ' ~ ~" itial T rr~zo~ rind 04-A 3ab -14, La Grade ,~ rime & Pa t GWB, ' ~ ;~ „ nstal Ceil g Grid ase rk / Lat ~~ ~~ ` ; lu ing -Set -1. ~ I loor overing: athr m Parti Trim Mang oors an G200D ~ Excavate, Form & Place Foundations G2020 I Backfill Foundations ---. ._. -.-- [ G2030 M P & E Underground Rough-]ns G2060 ( ~, Prep & Place Slabs-an-Grade - G3025 _..__ .. (structural Steel G3030 Wall and Upper Decks Structure L ---- ---- G3146 ~ _. ....._.._.._.._......,. _ ....__...... __.__ .__.__.._-._ -_. .. .. Light Guage Structural Framing & Sheathing - G5000 ~ Brick Veneer, Stucco, Metal Panels ...._ ................ . _ _ _, G5010 _..... ~..M.. _ _ _ . - --- -------- ----... ------ ...._. - ___ ......... Aluminum Windows G5020 ~ Curtainwall /Storefront Entrances I. _ .._. G5030 f Membrane Roofing ...__.w.. .. ... _. ... G5032 ~ ~. ..... ..._.-._ ____._. __.... ..._....._... ___ .. Standing Seam Roofing .: -. G4000 Light Guage interior Framing G4008 ~ M, P & E Rough-Ins Actual Work Critical Remaining Work ~i Summary Remaining Wark ~ ®Milestone 10 0% 23-Dec-13 09-Jan-14 3 0%° i 09 Jan-14 ~ 14 Jan-14 5 0% ~ 02-Jan 14 09-Jan-14 5 0% ~ 14-Jan-14 # 21-Jan-14 ~, `• ~ '~ 10 0% _ --- --- 06-Feb-14 . i 20-Feb-14 = ---...-- 15 -.._ _. ~ 0% _ ____..ww...w_ ~ 20-Feb-14 .__ .~. _.~....._... ; 13-Mar-14 15 0% f 13-Mar-14 _ ._._.. ~ 03-Apr-14 , i ~ -` ' 40 0% ~ 03-Apr-14 ~ 30-May-14 10 ~ 0% ~ 10-Apr-14 24-Apr-14 10 0'/° ~ 01-May 14 I 116 May-14 5 . __ . 0% W . _ 103-Apr-14 __ ~ 10-Apr-14 15 ~ .~0°J° I~10-Apr-14 iM01- May-14 r~ ~ •~ ~ 20 ' 0% ~ 03-Apr 14 ~ 01 May-14 20 --„- _ ~ 0% - 10-Apr-14 109-May-14 Page 3 of 4 21-J n-14, Admin Buildi g - xcav te,Form & Place un ackfi ]Foundations -, P & E Underground R gh prep & Place Slabs-on- roc 03-Apr-14, Ad in E S ructura) Steel Wal! and Upper ck; Light Guage St uct~ fit/ 30-May 14, Brick V nee Aluminum indi ..-....-r~----- .. Cur{ainw Il 1 ~ M, ~; & ~ l~ou~l~-~ns November 5, 2013 of Meridian ~ Exhibit "C" -Contract Schedule ~ Beniton Construction G4030 Set HVAC Equipment I 2 0% 110-Apr-14 114-Apr-14 _Set HV,ACI Eq~ip~n t _ ......... .. G4040 ...- - ---... _ ... ... ............-...._.._ .. _....-- -- ---- I Set HM Door Frames in GWB .. _ .._.._._ _...._ _ ~. __ ._ ._ ~ -.--...__._ ~ 5 0% 101-May-14 109-May-14 -- Set f;i~ Dgor ~r ---- - __ es in t ` G4050 . . . _ ........- ........... .... ...... I Batt Insulation and Hang GWB .........- - -- -- ~ 15 ._D.... 0l° ._ _--__. _.. _ _. ~ 09 May 14 ...._ .. ._...._ . .._...._...---- ~ 3D May-14 r ~-~ , , Batt ~risr~Eatio and Hai _ G4070 (Ta e & Finish G sum Wall Board P YP - ._ i 20 _.._ 0°l° ~ 30-May-14 27-Jun-14 ~ - ----- - ~ T ~ ` & ~ ~ a'P~ ~ ish G YP~ i ... • • ` - - r E -. is -. ~ ~ -Sep-1~ G60D4 __ I Inrtial Terrazo Grind on Slab ~ .. 5 I ~ 0% 20 Feb i4 ~ 27-Feb-14 Initial Ter az r Gti>i `on'S ~ a b G6DD8 - --------- _ (Pnme & Parnt GWB HM Frames ... _ _ ~ 20 ( ..---- 0% . .__.._ . 24 Jun 14 _... ~ _.. _...~._. 21 Jul 14 , --, -____----- -- ~rim~ Paint C G6010 i install Cerlrng Grrd ~ 10 O% 07 Jul-14 21 Jul-14 , ~'> ;!r}sta~[ eiling G G6430 . Casework Deliver & Install . -- --- _ - i 2p -- 0 /° 14-Jul-14 r 11-Au 14 ~ ~ ~ C' ork De ' ~ G6040 ......__.... _ _ ..._..... Plumbing -Set Fixtures and Equipment I 10 ( 0°t° _...... 27-Jun-14 ..w.. ~ ... ___M ..__~ ~. - ---- 14-Jul-14 ~ lirmbi -Set Fi. G6050 ; Ba#hroam Partitions & Accessories ~ 5 ~ 0% 114-Jul t4 1 21-Jui-14 ~ < I athYo Partit ' G6060 ~ Elecfncal Drop Ligh# Fixtures 8 ~ ~ 0% ~ 21 Jul-14 ~ _._. --31-Jul-14 >; legit i al Drop G6070 _ „. _ ..-- ~ Electncal Trrm Devices --_ _ _ ...-. _ 10 I t ' . 0% 131-Jul-14 1 14-Aug-14 ~ Ele rival Trii _ Gfi080 ......._..V-.... _.. ..______ ._ ._.... . -----._._ _ ~ HVAC Equipment Startup, Drop Registers and Trim ......_ .~.. __~..__...._.._-__ .._.._ ------- 10 ~ .._.._.. 0% _ 121-Jul-14 1 ---__- --......_.. 04-Aug-14 HV,4 Equiprr Gfi090-- _ ......---- --- - - - I Hang,Doors and Enstall Hardware ------------------------- ._.....w..ww~w.. .............w... 10 ~- ..___....._• .__. ...... 0% ._._ _.. ... i 25-Aug-14 ...... ~ --- -- -- -- 08_Sep 14 - - ~ ng Doc G6098 Floor Coverings & Final Polish on Slab , ? 10 ~ ~ 0% - _ ~ 11-Aug-14 _--- ~ W_ „ 25-Aug-14 FI r Cover __ G6108 - ^ m........_.-_...- I Drap Ceiling Tile _ -- € 5 I D% 25 Aug-14 _.~ i .~~.._..~_...__.__. Di-Sep-14 p Ceilit ,EXIS'FIPdG:ACIIf~tiV Buildtng Retrofit , ... ; ,, , _ 40 Di-Sep-14 27-Oct-14 27-~ ~ 5-Sep-1 ._ _- ~~ ~ ~ D5000 ~ Selective Demolition ~ 10 ~ 0% ~ 01-Sep-14 15-Sep-14 elective _. _ r - ~ ~ 27-~ NC1000 ~ Rough Ins, Framing, Drywall & Finishes 3D 0% 115-Sep-14 i 27-Oct-i4 Roi Post-Constructifln ;; 15 OS-Sep-14 29-Sep-14 29-yep ~: -. ~ _, ~ 29-Sep PL20D0 ,Complete & Distribute Final Punchlist f 5 ~ 0% ~ 08-Sep-14 j 15-Sep-14 Compeet PL2DiD ~ Address Punchlist Items I 10 I .. 0% _. ~ 15-Sep-14 ~ 29 Sep 14 _ ~= Addres { PL2020 ... ..... w Final Walkthroughs - - - _ - ...._. ~ 0 0% ~ _ 29-Sep-14 , Fnal W .: r- ..... -. 3 -. ~ W 22-Sep- ' TR20D0 ?Training & Demons#rations F 5 0% ~ 15-Sep-14 i 22-Sep-14 Training ''ice 29-Sep ___ ......._._. - - - O20D0 ------- (Owner Equipment Installation & IT Setup f 5 ~ 0% _ .__.w._ ~ 22-Sep-14 ~ ~ 29-Sep-14 Owner O201D Owner Furnishings i 5 f 0% 22 Sep-14 29-Sep-14 Owner Actual Work Critical Remaining Work P`~ Summary Page 4 of 4 November 5, 2Q13 ["D Remaining Work • ®Milestone ~~~~~ rt6~99 INSURANCE REQUIREMENTS FOR WORKING WITH BENITON CONSTRUCTION COMPANY AND CITY OF MERIDIAN Contractors and Subcontractors shall provide evidence that the following minimum coverage is provided. Commercial General Liabilit 1S0 Form CG0001 10/01 or E uivalent $2,000,000 General Aggregate • $2,000,000 Products/Comp[eted Operations Aggregate • $1,000,000 Each Occurrence • $1,000,000 Personal Injury and Advertising Injury • $ 100,000 Fire Damage Liabili#y • $ 5,000 Medical Expenses -- Each Person o Limits must be on a "Per Project Aggregate". o City of Meridian and Beniton Construction Company must be listed as additional insured (ISO Form CG2010 {11!85), or CG2010 (10101) and CG2037 {10/01), ar Equivalent). A copy of the endorsement adding Beniton Construction Company shall be included with the certificate of insurance. o Completed operations coverage will remain in effect for 2 years after project completion. Business Automobile Liability • $1,000,OOO~Each Occurrence Worker's Compensation and Employers Liability insurance • Statutory Limits • Employers Liability o $100,000 Each Accident o $500,000 Policy Limits o $100,000 Each Employee Excess Liability • $1,000,000 {An Umbrella policy may be used in combination with other policies to provide coverage specified) Far Architects, Engineers, Surveyors, & Testing Firms. Professional Liability (Errors and Omissions) -Continued for Two U Years After Proiect Completion • $1,000,000 per claim and $2,000,000 aggregate for annual claims made coverage OR • $1,000,000 project coverage Certificate of Insurance must be project specific. - Please provide written documentation in regards to your insurance contract(s) cancellation terms. - Insurance is to be Primary &Non-Contributory to any liability insurance carried by Beniton Construction Co., Inc. and Gity of Meridian. - Waiver of Subrogation applies in favor of Beniton Construction Co., Inc. and Ci#y of Meridian. >~f.~oL f'~~~~ ~~ C1 ~~~u---~ ~~42~ ` ~ '~ BATE SFAFAfD3}rYYYY} T HE S C irRTIF[CATE iS iSSUEQ A5 A I~A~ER OF thFOR~iATi01~ ONLY Ai~E1 COtVFERS NO rZiGFiTS UP03~ THE CERTiFiCATc HOLD: R, 's HIS CERTIFICATE ROES NOT AFF1RTt~ATIVELY OR NEGRTIVELY A[49E[dD, EXTEND OR ALTER THE COVERAG'c AFFORDED BY THE POLICIES BELOW. THIS CERTEFICATE OF lilrStlRA1NCE DOES NOT CONSTETUTE A CONTRACT BETWEEN THE ISSUEI~G INSURER(S), ALTHORIZI=R RERRESE1lTATIVE OR PRODUCER, ANR THE CERTIFICATE HOLDER. ti~iPORTAi~3T: I, he certificate holder is an ADAfT10NAL 1RISURED, the paticy(ies) rrlust be endorsed. if SUBROGATlOT@ ]S WAIVEG, s€~bject to the Y®rms and conditions of the policy, certain policies may require an endorsement. A statemenf on ilFis certificate does not confer rights is the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAAiE: ; PHONE -~._ ~ FAX.._.__,... ,... ....~.--- - -- ' - t 'o. Fxtl: :. , _ i tATC;~NnI; _-- Pf4dUC@C'S Warne and address E~dA1L ADDRESS: _ _ __ ' INSURER 51 AF?ORDING COVERAGE NA3C : ._,F.. _ __ .. _...,.......,_.,.„__~~`---- -----.--°--- INSURER A : ISSIlIn~ Company: ANl BEST A-Cr Better ! , INSURED " 1NSURzRB: r~ J` ~ r .''" ' INSURER C . _. .. _ ~ ~ , Subcontractor name and address lNSURERD: ,e``N a -P'~~~.- ;, ~~y " 1 ENSUREFtE: _ _ INSURER F GOVERA{3ES CERTIFICATE NUMBER: R=111SIt~N-NiJVIf3FR~ ~~~:>„:' THIS IS TO CERTIFY THAT THE POLIO=ES OF INSURANCE LISTED BEL04rd HAVE BEEN ISSUED TO THE INSURED N;-u~ ~ 60Vc~ FQ'iE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERIv3 OR CONDITION OF ANY CONTRACT OR OTHER DOCUME .'B~TH,~~PECT TO WHICH THIS CERTIFICATI; 1;AAY t3E ISSUED OR tv1AY PERTAIN, THE INSURANCE AFFORDED BY THE POLtt't _S pESCR18ED HEREIN~~~~tCT TO ALL TH= TEfttu15, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCEO~3~' ~?`t}IO CLAIMS. ,, ,-~ ot15R~ ~ • ~ -~ - ADDL'SUBR~ ?bttCY 6r `~~,ICY E P tTR : TYPE OF INSURANCE ,yy ! POLICY NUbSaER I FAF.•DDM"YYi ~~~YY} ' L1Mt7S GENERAL L€ABILITY ~ ~~^ ~ r r CNGIi P ~Rwf.C£ 5 1 OOD OOO X ~ r3rArf.E,iCiAL GENEr2At L.i,BIL€TY i' n ~ F~"~ ,~~,~ ~' r7: 2~`: FFPPf1r e$ lE1 accurrencej ~_ 1OO,OQO t C:.:.E'~1S-hgADl1 X ~ OCCUR ~ .! ~' ~ i f ~ ~ dE ..~J,a{A yor:¢per.enl_.. ~ ° 1aaQ~O ~~ -.-- Current policy # ~ ~~, ~ 09101!2.0`11 09101!2012 r ~RSCV~.L a Aov1N~i;RY 1 s 1.000,000 i ~,. _ _ . ~N I ~ j GENE+~kL hGGR-cGATE ` 5 i.OOO,OOO j ~; (' G_EN.AGGREGATEY.IFdESA?PLIES P£n' i '; r ., .,..a~ 3 PRO'JUCTS-CO"<4Pfp;=AG^u ' S 2,ODD,©DD_ L. PRO- ..: _.- - --- --_ PU' ICY ~ X I .T LUC "`~ '" >j r,'. l ; S _ - ! I I AUTOFdOa1LE L1AR1LtTY I~ ~ v~ '~ '~~Ti ~~~ `{ ~ l CUt7o:r~:=15'VGLc L!MI ! ~ ~ ~ " ~-' ,, ;.{tea aca~ent} _ ~ ~ ODO 0~0 I X ANY AU"4 cr ~ ~ '.,r ~~ I ' COCiLY INJUR" {per perranl ~~ S ALL Odn~SED I~--....I SCI'.COUL. '°> t~ ~ ~, g .--.-- ~ ------.__ _ . I AUTL`5 I ! AUTUS '~~' . ~ i ~3UD!LY INJURY (?~7aGWdat:[) 5 --- i -' N 'N-aai~vED ~'~Il~}' ~ ~ . ~~~}112011 ~ 08!0112012 a~to;~~rY DA47nGE -- - I HIRcD AU:05 ~ AUTUS ;"~rrr: ~.,~ '. E, y ~ ~;yr I i.{?er acudenlt ~ p I ~-" F~z'.~" "~~4 rte. ~.a •. [ F S i X UAS~RELLA L1A9 ~ X CCCUP ` € ~` ~ r ~ ~ I i cACt~i OCCURR£WC£ i 5 t_DDEJ.D~O _._~ EXCESS L1AB ~ LAIl1S VA ~~'z: .Current pohZ`~ . 09/01?2011 ~ 09101 12 01 2 j qc^R£GATc s 1 A00,000 C£6 R£TErvTEON S x. ~~ ~ ~.~'~.,,."^'_~^.:~», < = ~ ~ 5 I WORKERS COtiPENSRTION ~ ~ •~ `~*~,,,~ '~ ~, ~ ~ .rX.._j_.TGB" 1 ~!TS.,.•.. LGEr~_,~------.~m. AND EFhPLOYERS' L1A61L1TY y ! N ~ ~ ~ ~ ~ ~ , 7 ,,., L l i,ttY ARCPRI=TORiPARTN=R'EXEC€]TIVE f x3'A'-' ~ .!` yy ~' € cr-~ct~atL'F ~pER ExtLLlaEO~ ~ ~ h F A~~ ~t~~~~ent pptlcy'~` ' 09/01!2011 49.'01!2012 ~ I _EAC11 ACS Da \T m S ;,gDD,06D ( tPdandatory in NHl ~~-^ gym„ ~/ ^' c L. DiS..AS • : A 4"~' OY ~ 5 s rD4O,DOO t Ir y¢., de.u:be u^d¢r ~. .` 3 ~ -~-~ .. _'" "' .` ,. ---~--1 I ^~^ T ^~ • ~ P' ' C" 1 ~; .H~, ~ E L tJIS:J~S~ ~ r''~_ICY ~I.v!:T SJ ,DDD,DDD 4 Gsyvv ~ l ~~ y 1 I ~ j €t ~ DESCRIPTION OF OPERATlONS'~~'rATxON51 VEt31CLE5 ``a~iach ACORD 101, Addltlanal Remarks Schndule,lf morn space Is r¢qulr¢dl r Re: City of Meridian Waste Wate~T~eatment Plant Improvements. City of Meridian and Beniton Construction .~, ~ are listed as Additional Insured p~~,rv' erciai General Liability coverage on a primary and non-contributory basis regarding above project provided by town CG201D 10101 and CG203710;01 for eouivalent;.'lJaiver of Subrogation applies in favor of the Beniton Construction Company. ]nC and ovrner (except WC) SHOULD ANY OF THE ASOVE DESCRIBED POLICIES SE CANCELLED i3'eFOrZE THE EXPIRATION DATE T}iEREOF, NOTICE WILL BE D'eLEVERED EPd t3enitnn Construction Company, IttC. ACCORDANCE WITH THE POL{CY PROVESIONS. P.o. SoX s3a Meridian, ID 83680 AUTHORIZED REPRESENTATIVE Original Signature reserved. ACORI} 25;2010!06) The ACORR name and logs are registered marks of ACORI] CITY OF MERIDIAN WASTEWATER TREATMENT PLANT ADMIN., LAB & CONTROL BOILDINGS PACKAGE EXH[BIT "A" SPECII=ICATlONS & ADDENDA Invitation to Bid 1 Notice to Bidders 4 AIA A701 Instructions to Bidders 6 Supplementary Instructions to Bidders 4 Bid Forms Table of Contents 1 Bid Farms 51 Project Schedule 4 AIA A132 Standard Form of Agreement Between Owner and Contractor 8 Supplement to Agreement 2 AIA A232 General Condifions of the Contract 43 Supplementary Conditions 5 Exhibit I -Insurance Requirements & Sample Certificate 2 Contractor's Affidavit Concerning Taxes 1 Public Works Contract Tax Report (WH-5) 2 DIVISION 1 -GENERAL REQUIREMENTS 011000 Summary of Work 1 012900 Price and Payment Procedures 4 013100 Project Management and Coordination 4 013300 Submittal Procedures 2 Submittal Form 1 014200 References 4 014500 Quality Gontrol 4 015000 Temporary Facilities and Controls 9 016000 Product Requirements 2 FORM Substitution Request Form 1 017300 Execution 6 017320 Cutting and Patching 3 017700 Closeout Procedures 4 O&M Instruction Form 1 DIVISION 2 -EXISTING GONDITIONS 024116 Structure Demolition 024119 Selective Demolition DIVISION 3 -CONCRETE 033000 Cast-In-Place Concrete 26 033510 Ground Concrete Finishing 3 DIVISION 4 -MASONRY 042000 Unit Masonry g 042613 Masonry Veneer 14 Page 1 of 4 DIVISION 5 -METALS 051200 Structural Steel Framing 11 053100 Steel Decking 7 054000 Cold-Formed Metal Framing 12 054400 Cold-Formed Metal Trusses 6 055000 Metal Fabrications 13 055113 Metal Pan Stairs 9 055213 Pipe and Tube Railings 10 057313 Glazed Decorative Metal Railings 8 DIVISION 6 - wooDS, PLASTICS, AND COMPOSITES 061053 Miscellaneous Rough Carpentry 8 061600 Sheathing 8 064116 Plastic-Laminate-Faced Architectura! Cabinets 7 DIVISION 7 --THERMAL AND MOISTURE PROTECTION 072100 Thermallnsula#ion 8 072413 Cementitious Finish Over Exterior Insulation System 16 072414 Pre-Coated Faam Architectural Details 6 072500 Weather Barriers 3 072726 Fluid-Applied Membrane Air Barriers 10 074113.16 Standing-Seam Metal Roof Panels 12 074213.13 Formed Metal Wall Panels 10 074213.53 Metal Saffit Panels g 075423 Thermoplastic Palyolefn (TPO) Roofing 14 076200 Sheet Metal Flashing and Trim 14 077200 Raof Accessories g 078413 Penetra#ion Firestopping 7 078446 Fire-Resistive Joint Systems 5 079200 Joint Sealants 11 079219 Acoustical Joint Sealants 4 VOLUME 2 OF 2 DIVISION 8 -OPENINGS 081113 Hollow Metal Doors and Frames 10 081125 Aluminum Frames 4 081416 Flush Waad Doors 8 0$3323 Overhead Coiling Doors 7 083326 Overhead Coiling Grilles 7 083483 )=levator Door Smoke Containment System 5 084113 Aluminum-Framed En#rances and Storefront 15 085113 Aluminum Windows 8 087100 Door Hardware 29 088000 Glazing 12 088300 Mirrors 6 089119 Fixed Louvers ~ Page 2 of 4 DIVISION 9 -FINISHES 092116.23 Gypsum Board Shaft Waii Assemblies 092216 Non-Structural Metal Framing 092900 Gypsum Board 093013 Ceramic Tiling 095113 Acoustical Panel Ceilings 095423 Linear Metal Ceilings 096513 Resilient Base and Accessories 096543 Linoleum Flooring 096723 Resinous Floating 096813 Tile Carpeting 099110 Painting DIVISION 10 -SPECIALTIES 101419 Dimensional Letter Signage 101423 Panel Signage 102113.13 Metal Toilet Compartments 102239 Folding Panel Partitions 102600 Wall and Door Protection 1028flfl Toile#, Bath, and Laundry Accessories 104413 Fire Protection Cabinets 104416 Fire Extinguishers 105113 Metal Lockers 107516 Ground-Set Flagpoles DIVISION 11 -EQUIPMENT 115313 Laboratory Fume Hoods ©IVISION 12 -FURNISHINGS 122413 Roller Window Shades 123623.13 Plastic Laminate -Clad Countertops 123653 Laboratory Countertops 123661 Simulated Stone Countertops 129300 Site Furnishings DIVISION 13 -SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 - CONVEYING EQUIPMENT 142400 Hydraulic Elevators DIVISION 21 -FIRE SUPPRESSION 210000 Fire Suppression 12 11 10 10 6 6 7 6 1a 6 10 7 10 6 6 14 6 6 4 3 14 Page 3 of 4 DIVISION 22 -PLUMBING 220000 Plumbing General Requirements 220100 Plumbing DIVISION 23 -HEATING VENTILATION AND AlR CONDITIONING 230000 HVAC General Requirement 230100 HVAC 230350 Laboratory Ventilation Control 230900 instrumentation and Controls DIVISION 26 -ELECTRICAL 260500 Electrical General Provisions 260501 Field Test and Operational Check 260502 Short-Circuit-Coordination Study-Arc Flash Hazard Analysis 260519 Conductors and Cables 260526 Grounding 260533 Raceways and Boxes 260543 Underslab and Underground Electrical Work 260923 Lighting Control Devices 262416 Panelboards 262726 Wiring Devices 262$15 Disconnect Switches 265100 Interior Lighting 266000 Electrical Demolition and Repair 271101 Telecom Raceway Systems 271500 Telecommunications Cabling 283111 Fire Alarm System DIVISION 31 -EARTHWORK 311000 Site Clearing 312000 Earth Moving 312319 Dewatering DIVISION 82 -EXTERIOR IMPROVEMENTS 12 9 74 16 10 12 13 7 17 321313 Concrete Paving 13 321373 Concrete Paving Joint Sealants 4 321400 Concrete Unit Paving 4 321500 Paver Pedestal System 7 321726 Tactile Warning Surfacing 4 328400 Planting Irrigation 13 329200 Turf and Grasses 4 329300 Plants 7 ADDENDA Addendum No. 1, dated 1014/2013 27 Addendum No. 2, dated 10/9/2013 2g Addendum No. 3, dated 10/14/2013 41 Page4af4 City of Meridian - IdVaste Water Treatment Plant improvements 340'1 N, Ten Mile Road, Meridian, 1D 83642 Exhibit "B" CQNSTRUCTION DRAWINGS SHEET # DESCRIPTION DATED Admin A0.0 A0.0 Cover Sheefi 09/09/2013 Admin A0.1 A0.1 Ener Com Hance 09109/2013 Admin A0.2A A0.2A Code Anal sis pg/Og/2013 Admin A0.2B A0.2B Code Anal sis 09/09/2013 Admin A0.3A A0.3A Accessibilit Access & Si na a Plan 09/09/2013 Admin A0.3B A0.3B Accessibi[i Access & Si na a Plan 09/09/2013 Admin A0.4A A0.4A Assemblies 09/09/2013 Admin A0.4B A0.4B Assemblies Og/Og/2013 Admin A1.1 A1.1 Site Plan 09/09/2013 Admin A1.2 A1.2 Exterior Ram & Ste s 0 910 912 0 1 3 Admin A1.3 A1.3 Site Details 09/09/2013 Admin A10.1 A10.1 Millwork Details 09109!2013 Admin A10.2 A10.2 Millwork Details 09/09(2013 Admin A10.3 A10.3 Millwork Details 09/0912013 Admin A2.1 A2.1 Floor Plan -First Level 0 9/0 912 0 1 3 Admin A2.2 A2.2 F[oar Plan -Second Level 09/09/2013 Admin A2.3 A2.3 Floor Plan -Third Level 09/09/2013 Admin A2.4 A2.4 Roof Plan 09!09/2013 Admin A3.1 A3.1 Door & Frame Schedule 09!0912013 Admin A3.2 A3.2 Window Schedule Og/Og12013 Admin A3.3 A3.3 Fixture Schedule 09/09/2013 Admin A3.6 A3.6 Enlar ed Plans -Restrooms 0 910 912 0 1 3 Admin A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09/2013 Admin A3.8 A3.8 Enlar ed Plans -Stair #2 09109/2013 Admin A4.1 A4.1 Finish Plan - Firsfi Level 10104/2013 Admin A4.2 A4.2 Finish Plan -Second Level 10!04/2013 Admin A4.3 A4.3 Finish Plan -Third Level 09/09/2013 Admin A5.1 A5.1 Reflected Ceilin Plan -First Level 09!09/2013 Admin A5.2 A5.2 Reflected Ceilin Plan -Second Level 10/14/2013 Admin A5.3 A5.3 Reflected Ceilin Plan -Third Level 1 011 4/201 3 Admin A6.1 A6.1 Exterior Elevations 09/09/2013 Admin A6.2 A6.2 Exterior Elevations 0 910 912 0 1 3 Admin A7.1 A7.1 Buildin Sections 09/09/2013 Admin A7.2 A7.2 Buildin Sections 09/09!2013 Admin A7.3 A7.3 Buildin Secfiians Og/pg/2013 Admin A7.6 A7.6 Stair Sections -Stair #1 09(09!2013 Admin A7.7 A7.7 Stair Sections ~ Stair #2 09109!2013 Admin A$.1 A8.1 Interior Elevations -Restrooms 0 9/0 912 0 1 3 Admin A8.2 A8.2 Interior Elevations -Restrooms 09109!2013 Admin A8.3 A8.3 Interior Elevations -Restrooms 0 910 9/2 0 1 3 Admin A8.4 A8.4 Interior Elevations 0 910 9/2 0 1 3 Admin A9.1 A9.1 Details 1µl9 09/09/2013 Page 9 of 7 Admin A9.2 A9.2 Details 20-32 09/09/2013 Admin A9.3 A9.3 De#aiis 33-51 09/09/2013 Admin A9.4 A9.4 Details 52-71 09/09/2013 Admin A9.5 A9.5 Details 72-90 09/09/2013 Admin A9.6 A9.6 Details 91-160 09/09/2013 Admin A9.7 A9.7 Details 107-123 09/09/2013 Admin A9.8 A9.8 Details 124-140 09/09/2013 Admin E0.0 E0.0 Electrical Covershee# 09/09/2013 Admin E0.1 E0.1 Li htin Com Hance Re ort 09/09/2013 Admin E1.0 E1.0 Elec#rical Site Plan 09/09/2013 Admin E2.1.1 E2.1.1 Fire Alarm Plan - Firs# Floor 09/0912013 Admin E2.1.2 E2.1.2 Li htin Plan - Firs# Level 09!0912013 Admin E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Admin E2.1.4 E2.1.4 Power Plan -First Level 09!0912013 Admin E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Admin E2.2.1 E2.2,1 Fire Alarm Plan -Second Level 09/09/2013 Admin E2.2.2 E2.2.2 Li h#in Plan -Second Level 0 910 912 0 1 3 Admin E2.2.3 E2.2.3 Mechanical Power Plan - Second Level 09/09/2013 Admin E2.2.4 E2,2.4 Power Plan -Second Level 09/09/2013 Admin E2.2,5 E2.2.5 S ecial S stems Plan -Second Level 09/49/2013 Admin E2.3.1 E2.3.1 Fire Alarm Plan -~ Third Level 09!09/2013 Admin E2.3.2 E2.3.2 Li h#in Plan -Third Level 09/09/2013 Admin E2.3.3 E2.3.3 Mechanical Power Plan -Third Level 09/09/2013 Admin E2.3.4 E2.3.4 Power Plan -Third Level 09/09/2013 Admin E2.3.5 E2.3.5 S ecial S stems Plan -Third Level 09/09/2013 Admin E3.1 E3.1 Electrical Roof Plan 09!0912013 Admin E4.1 E4.1 One-Line Dia ram 0 910 912 0 1 3 Admin E5.1 E5.1 Electrical Schedules 09!0912013 Admin E5.2 E5.2 Elec#rical Schedules 0 910 912 0 1 3 Admin E6.1 E6.1 Electrical Details 09/09/2013 Admin L1.1 L1.1 Landsca e Plan 09/09/2013 Admin L2.1 L2.1 Irra ation Plan 09/09/2013 Admin L2.2 L2.Z Irra a#ion Nates/Details 09/0912013 Admin L2.3 L2.3 Irra a#ion Details 09/0912013 Admin LG0.01 LG0.01 Structural Cover Shee# 10/02/2013 Admin LG0.02 LG0.02 S#ruc#ural Desi n Notes 10/02!2013 Admin LG0.03 LG0.03 S#ructural Desi n No#es 10/02/2013 Admin LG1.01 LG1.01 Li h# Gau a Floor Plan 10/02/2013 Admin LG2.01 LG2.01 Elevations 10/02/2013 Admin LG2.02 LG2.02 Elevations 10/02/2013 Admin LG3.01 LG3.01 Sec#ions 10/02/2013 Admin LG3.02 LG3.02 Sections 10102/2013 Admin LG3.03 LG3.03 Sections 10/02/2013 Admin LG3.04 LG3.04 Sections 10!02!2013 Admin LG3.05 LG3.05 Sections 10/02/2013 Admin LG5.01 LG5.01 Exterior Li ht Gau e T ical Details 10!02/2013 Admin LG5.02 LG5.02 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.03 LG5.03 Exterior Li ht Gau e T ical Details 10!0212013 Page 2 of 7 Admin LG5.04 LG5.04 Exterior Li ht Gau e T ical Details 10/02/2013 Admin M1.1 M1.1 HVAC Plan -First Level 09/09/2013 Admin M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Admin M1.3 M1.3 HVAC Plan -Third Level 09/09!2013 Admin M1.4 M1.4 HVAC Plan -Roaf 09/09/2013 Admin M2.1 M2.1 H dronic Plan -First Level 09/09/2013 Admin M2.2 M2.2 H dronic Plan ~ Second Level 09/09/2013 Admin M2.3 M2.3 H dronic Plan -Third Level 09/09/2013 Admin M3.1 M3.1 3D HVAC S stem 09/09/2013 Admin M4.1 M4.1 Pi in Schematic 09/09/2013 Admin M5.1 M5.1 Control Schematics 0 9/0 912 0 1 3 Admin M5.2 M~.2 Controls Schematics 09/09/2013 Admin M6.1 M6.1 HVAC Details 09/09/2013 Admin M6.2 M6.2 HVAC Details 09/09/2013 Admin M7.1 M7.1 HVAC Schedules 09/09/2013 Admin M7.2 M7.2 HVAC Schedules 0 910 912 0 1 3 Admin MC1.0 MC1,0 Mechanical Cover Sheet 09/09/2013 Admin MC1.1 MC1.1 Mechanical Comcheck 09/0912013 Admin MC1.2 MC1.2 HVAC Zone Plans 09!09/2013 Admin P1.0 P1 A Plumbin Plan -Foundation 09/09/2013 Admin P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Admin P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Admin P1.3 P1.3 Plumbin Plan -Third Level 09!0912013 Admin P2.1 P2.1 Plumbin Riser Dia rams 09/09/2013 Admin P3.1 P3.1 Plumbin Details 0 910 912 0 1 3 Admin P4.1 P4.1 Plumbin Schedules 0 910 912 0 1 3 Admin S0.01 S0.01 Structural Cover Sheet 10102!2013 Admin S0.02 S0.02 Structural Desi n Notes 10/02/2013 Admin S0.03 S0.03 Structural Desi n Notes 10/02/2013 Admin S0.04 S0.04 Structural Desi n Notes 10!02/2013 Admin S0.05 S0.05 Structural Desi n Notes 10/0212013 Admin S1.01 S1.01 Foundation Plan 1010212013 Admin S1.02 S1.02 Second Level Framin Plan 10!0212013 Admin S1.03 S1.03 Low Roaf Framin Plan 10!02/2013 Admin S1.04 S1.04 Third Level Framin Plan 10/02/2013 Admin S1.04A S1.04A Shearwall And Halddawn Plan 10/02/2013 Admin S1.Oa S1.05 Hi h Raof Framin Plan 10/02/2013 Admin S2.01 S2.01 Enlar ed Plans 10(0212013 Admin S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Admin S3.01 S3.01 Elevations 10/02/2013 Admin S3.51 S3.01 Brace Frame Schedules 10102/2013 Admin S4.01 S4.01 Schedules 10!02/2013 Admin S4.02 S4.02 Schedules 10/02/2013 Admin S5.01 S5.01 Foundation T icaf Details 10!02/2013 Admin S5.02 S5.02 Foundation T icaf Details 10/0212013 Admin S5.03 S5.03 Concrete T ical Details 10/0212013 Admin S5.21 S5.21 Structural Steel T icaf Details 10/02/2013 Admin S5.22 S5.22 Structural Steel T ical Details 10/02/2013 Page 3 of 7 Admin S5.31 S5.31 Steel Stud T ical Details 10!02/2013 Admin S5.32 55.32 Steel Stud T ical Details 10/02/2013 Admin S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Admin S6.01 S6.01 Foundation Details 10!02/2013 Admin S6.02 S6.02 Foundation Details 10/02!2013 Admin S7.01 S7.01 Floor Framin Details 1010212013 Admin S7.02 S7.02 Floor Framin Details 10/02/2013 Admin S8.01 S8A1 Roof Framin Details 10/02/2013 Admin S8.02 S8.02 Roof Framin Details 10/02!2013 Controls A0A A0.0 Cover Sheet 09/09/2013 Controls A0.1 A0.1 Ener Gom !lance 09/09/2013 Controls A0.2 A0.2 Code Anal sis 0 910 912 0 1 3 Controls A0.3 A0.3 Accessibilit Access & Si na a Plan 09/09/2013 Controls A0.4 A0.4 Assemblies 09!0912013 Controls A10.1 A10.1 Millwork Details 09/09/2013 Controls A2.0 A2.0 Demolition Plan 09!09/2013 Controls A2.1 A2.1 Floor Plan 09!09/2013 Controls A3.1 A3.1 Schedules 0 910 912 0 1 3 Controls A3.6 A3.6 Enlar ed Floor Plans 09!0912013 Controls A4.1 A4.1 Finish Plan -First Level 09/09/2013 Controls A5.1 A5.1 Reflected Ceilin Plan 09/09/2013 Controls A8.1 A8.1 Interior Elevations 09/09!2013 Controls A8.2 A8.2 Interior Elevations 09!09/2013 Controls A9.1 A9.1 Details 09!09/2013 Controls E0.0 E0.0 Electrical Cover Sheet 09/09/2013 Controls E1.1 E1.1 Electrical Demolition Plan 10/09/2013 Controls E2.1 E2.1 Fire Alarm Plan 09109/2013 Controls E2.2 E2.2 Li hfin Plan 09/09/2013 Controls E2.3 E2.3 Mechanical Power Plan 09/09/2013 Controls E2.4 E2.4 Power Plan 09!09/2013 Controls E2.5 E2.5 S ecial S stems Plan 10/09/2013 Controls E3.1 E3.1 One-Line Dia ramlElectrical DetailslSchedules 09/09/2013 Controls M1.1 M1.1 HVAC Demolition Plan 09/09/2013 Controls M2.1 M2.1 New HVAC Floor Plan 09109!2013 Controls M3.1 M3.1 HVAC Details 09/09/2013 Controls M4.1 M4.1 HVAC Schedules 09/09/2013 Controls MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Controls P1.1 P1.1 Plumbin Demolition Plan 09/09/2013 Controls P2.1 P2.1 New Plumbin Floor Plan 09/09/2013 Controls P3.1 P3.1 Plumbin Schedules And Details 09/09/2013 Controls P4.1 P4.1 Plumbin Schedules And Details 09/09/2013 Lab A0.0 A0.0 Cover Sheet 09109!2013 Lab A0.1 A0.1 Ener Com !lance 09/09/2013 Lab A0.2 A0.2 Cade Anal sis 09/09/2013 Lab A0.3A A0.3A Accessibili Access & Si na e Plan 09109/2013 Lab A0.3B A0.3B Accessibili Access & Si na a Plan 09!09/2013 Lab A0.4A A0.4A Assemblies 09109/2013 Lab A0.4B A0.4B Assemblies 0 910 912 0 1 3 Page 4 of 7 Lab A1.1 A1.1 Site Plan 09!09/2013 Lab A10.1 A10.9 Millwork Details 09/09/2093 Lab A10.2 A10.2 Millwork Details 09/09!2013 Lab A10.3 A10.3 Millwork Details 09/09/2013 Lab A2.1 A2.1 Floor Plan -First Level 0 9/0 912 0 1 3 Lab A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Lab A2.3 A2.3 Rvaf Plan 09/09/2013 Lab A3.1 A3.1 Daor & Frame Schedule 09/09/2013 Lab A3.2 A3.2 Window Schedule 09/09/2013 Lab A3.3 A3.3 Fixture Schedule 09/09/2013 Lab A3.6 A3.6 Enlar ed Plans - Restrooms 09/09/2013 Lab A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09/2013 Lab A3.8 A3.8 Enlar ed Floor Plans -Stair #2 09/09/2013 Lab A3.9 A3.9 Enlar ed Floor Plan -Lab 09/0912013 Lab A4.1 A4.1 Finish Plan -First Level 10/0412013 Lab A4.2 A4.2 Finish Plan -Second Level 09/09/2013 Lab A5.1 A5.1 Reflected Ceilin Plan -First Level 09!09/2013 Lab A5.2 A5.2 Reflected Ceilin Plan -Second Level 09/09/2013 Lab A6.1 A6.1 Exterior Elevations 09/09/2013 Lab A6.2 A6.2 Exterior Elevations 09/09!2013 Lab A7.1 A7.1 Buildin Sections 09/09/2013 Lab A7.2 A7.2 Buildin Sections 09/09/2013 Lab A7.3 A7.3 Buildin Sections 09/09!2013 Lab A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Lab A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Lab A8.1 A8.1 Interior Elevations 09/09/2013 Lab A8.2 A8.2 Interior Elevations 09/09/2013 Lab A8.3 A8.3 Interior Elevations 0 9/0 912 0 1 3 Lab A8.4 A8.4 Interior Elevations 0 9/0 912 0 1 3 Lab A8.5 A$.5 Interior Elevations -- Restrooms 09/0912013 Lab A9.1 A9.1 Details 1-19 09!0912013 Lab A9.2 A9.2 Details 20-32 09/09/2013 Lab A9.3 A9.3 Details 33-51 09/09/2013 Lab A9.4 A9.4 Details 52-71 09/09/2013 Lab A9.5 A9.5 Details 72-90 09/09/2013 Lab A9.6 A9.6 Details 91-105 09109(2013 Lab A9.7 A9.7 Details 106-123 09/09/2013 Lab A9.8 A9.8 Details 124-140 09/09/2013 Lab E0.0 E0.0 Electrical Cover Sheet 09/09/2013 Lab E0.1 E0.1 Li htin Gom liance Re ork 09109/2013 Lab E1.0 E1.0 Electrical Site Plan 09109(2013 Lab E2.1.1 E2.1.1 Fire Alarm Plan -First Level 09/09!2013 Lab E2.1.2 E2.1.2 Li htin Plan -First Level 09109/2013 Lab E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/0912013 Lab E2.1.4 E2.1.4 Power Plan -First Level 09/09/2013 Lab E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Lab E2.2.1 E2.2.1 Fire Alarm Plan -Second Floor 09/0912013 Lab E2.2.2 E2.2.2 Li htin Plan -Second Floor 0 910 912 0 1 3 Page 5 of 7 Lab E2.2.3 E2.2.3 Mechanical Power Plan -Second Floor 09/09/2013 Lab E2.2.4 E2.2.4 Power Plan -Second Floor 09/09/2013 Lab E2.2.5 E2.2,5 S ecial S stems Plan -Second Floor 09!0912013 Lab E3.1 E3.1 Electrical Roof Plan 09!0912013 Lab E4.1 E4.1 One-Line Dia ram 09!09/2013 Lab E5.1 E5.1 Electrical Schedules 09/09/2013 Lab E6.1 E6.1 Electrical Details 09!09/2013 Lab L1.1 L1.1 Landsca a Plan 09/09!2013 Lab L2.1 L2.1 Landsca a Plan 09/09/2013 Lab L2.2 L2.2 Irri ation Details 09/09/2013 Lab M0.1 M0.1 HVAC Demolition Plan 09/09/2013 Lab M1.1 M1.1 HVAC Plan -First Level 09/09/2013 Lab M1.2 M1.2 HVAC Plan -Second Levef 09/09/2013 Lab M1.3 M1.3 HVAC Roof Plan 0 910 912 0 1 3 Lab M2.1 M2.1 H dronic Plan -First Levef 09109!2013 Lab M2.2 M2.2 H dronic Plan -Second Level 09!09/2013 Lab M3.1 M3.1 3D HVAC S stem 09/09/2013 Lab M4.1 M4.1 Mechanical Pi in Schematic 09/09/2013 Lab M5.1 M5.1 HVAC Controls 0 910 912 0 1 3 Lab M5.2 M5.2 HVAC Controls 09/09/2013 Lab M5.3 M5.3 HVAC Controls 09/0912013 Lab M5.4 M5.4 HVAC Controls 09!0912013 Lab M5.5 Ma,S HVAC Controls 09!0912013 Lab M5.6 Mb.6 HVAC Controls 09!0912013 Lab M5.7 M5.7 HVAC Controls 09/09/2013 Lab M6.1 M6.1 HVAC Details 0 910 912 0 1 3 Lab M6.2 M6.2 HVAC Details 09/09/2013 Lab M6.3 M6.3 HVAC Details 0 9/0 912 0 1 3 Lab M6.4 M6.4 HVAC Details 09/09/2013 Lab M7.1 M7.1 HVAC Schedules 09/09/2013 Lab M7.2 M7.2 HVAC Schedules 09/09/2013 Lab M7.3 M7.3 HVAC Schedules 09/09/2013 Lab M7.4 M7.4 HVAC Schedules 0 910 912 0 1 3 Lab M7.5 M7.5 HVAC Schedules 09/09!2013 Lab MC1.0 MC1.0 Mechanical Cover Sheet 09/09!2013 Lab MC1.1 MC1.1 Mechanical COMCheck 09/09/2013 Lab P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Lab P1.1 P1.1 Plumbin Plan -First Levef 09/09/2013 Lab P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Lab P3.1 P3.1 Plumbin Details 0 910 9/2 0 1 3 Lab P4.1 P4.1 Plumbin Schedules 09/09/2013 Lab 50.01 S0.01 Structural Cover Sheet 10/02/2013 Lab S0.02 S0.02 Structural Desi n Notes 10/02/2013 Lab S0.03 S0.03 Structural Desi n Notes 10/02/2013 Lab S0.04 50.04 Structural Desi n Notes 10/02/2013 Lab S0.05 S0.05 Structural Desi n Notes 10/02/2013 Lab S1.01 S1.01 Foundation Plan 10/02/2013 Lab 51.01A S1.01A First Floor Shearwall And Holdown Plan 10/02/2013 Page 6 of 7 Lab S1.02 S1.02 Second Level & Lowwer Roof Framin 10/02/2013 Lab S1.02A S1.02A Second Level Shearwall & Holdown Plan 10/02!2013 Lab S1.03 S1.03 U er Roof Framin Plan 10/02/2013 Lab S2.01 S2.01 Enlar ed Plans 10/02/2013 Lab S2.02 S2.02 Stair Framin T ieal Details 10102/2013 Lab S4.01 S4.01 Schedules 10102/2013 Lab S4.02 S4.02 Schedules 10/02/2013 Lab S5.01 S5.01 Foundation T icaf Details 10102!2013 Lab S5.02 55.02 Foundation T ica! Details 10!02/2013 Lab S5.03 S5.03 Concrete T ica! Details 10/02/2013 Lab S5.21 S5.21 Structural Steel T icaf Details 10/02/2013 Lab S5.22 S5.22 Structural Steel T ica! Details 10/02/2013 Lab S5.23 S5.23 Structural Steel T ica! Details 10/02/2013 Lab 55.31 55.31 Steel Stud T icaf Details 1 0/0 212 0 1 3 Lab S5.32 S5.32 Steel Stud T ica! Details 10/02/2013 Lab S5.33 S5.33 Steel Stud T ica! Details 10/0212013 Lab S5.34 S5.34 Steel Stud T ica! Details 10/02/2013 Lab S5.01 S6.01 Foundation Details 10/02/2013 Lab S6.02 S6.02 Foundation Details 10/02/2013 Lab S7.01 57.01 Framin Details 10/02/2013 Lab S7.02 S7.02 Framin Details 10/02/2013 Lab S7.03 S7.03 Framin Details 10!02/2013 Site A0.0 A0.0 Cover Sheet 0 811 912 0 1 3 Site C1.1 C1.1 Construction Notes & Abbreviations 07!1912013 Site C1.2 C1.2 tJverall Site Plan And Le end 07/1912013 Site C1.3 C1.3 Existin Conditions & Demo Plan -Lab Build'm 07/19J2013 Site C1.4 C1.4 Existin Conditions & Demo Plan -- Admin. Buildin 07/19/2013 Site C2.1 C2.1 Dimensioned Site Plan -Lab Buildin 07/19/2013 Site C2.2 G2.2 Dimensioned Site Plan -Admin. Buildin 07/19/2013 Site C3.1 C3.1 Gradin Plan -Lab Buildin 07/19/2013 Site C3.2 C3.2 Gradin Plan -Lab Buildin 07/19!2013 Site C3.3 C3.3 Gradin Plan -Admin. Buildin 07119/2013 Si#e C3.4 C3.4 Gradin Plan -Admin. Buildin 07/19/2013 Site C3.5 C3.5 Draina a Pond Details 07/19/2013 Site C4.1 C4.1 Utilit Plan ~- Lab Buildin 07/19/2013 Site C4.2 C4.2 Utilit Plan -Admin. Buildin 07/19/2013 Site C5.1 C5.1 Civil Details 07119/2013 Site C5.2 C5.2 Civil Details 07/19/2013 Site C5.3 C5.3 Civil Details 07/19/2013 Site ESC1 ESC1 SWPPP Site Ma 0$/19/2013 Site S1.01 S1.01 Lab Faundation Plan 08/19/2013 Site S1.02 S1.02 Admin. Faundation Pian 08/19/2013 Site V1.1 V1.1 Existin To a ra h -Lab Buildin 08/19!2013 Site V1.2 V1.2 Existin To o ra h -Admin. Buildin 08/19/2013 Page 7 of 7