Loading...
Agency Comments PZ~~~~~ ~f-t~N~ti1'1 ~ ~O StiLNiGG Date: December 9, 2013 To: Tyler Johnson, via a-mail JTC Inc. 1099 S. Wells St. Meridian, ID 83642 Subject: MRZ-13-017 3150 W. Sheryl Dr. Request to construct Sheryl 4-plex. Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. ]aurena, Commissioner Jim D. Hansen, Commissioner In response to your request for comment, the Ada County Highway District (ACHD) staff has reviewed the submitted application and site plan for the item referenced above. The applicant shall be required to meet the following conditions of approval: • Comply with all ACRD Standard Conditions of Approval (attached) as well as all ACHD Policies. • Prior to the construction, repair, or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc.), a permit must be obtained from ACRD. If you have any questions, please feel free to contact me at (208) 387-6335. Sincerely, ~ ~ti Austin Miller Planning Review Intern Development Services CC: Project file, City of Boise, via a-mail James Gipson, Architect, via a-mail Aaa county Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Traffic Information This development is estimated to generate 27 additional vehicle trips per day; and 2 additional vehicle trips per hour in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual, 9th edition. Condition of Area Roadways: Traffic Count is based on Vehicles oer hour (VPH- Roadway Frontage Functional Classification PM Peak Hour Traffic Count PM Peak Hour Level of Service Cherry Ln. None Principal Arterial 744 Better than "E" Ten Mile Rd. 120-feet Minor Arterial 1,051 Better than "D" Hcceptaa-e -evel of service for afive-lane principal arterial is "E" (1,770 VPH). * Acceptable level of service for afour-lane minor arterial is "D" (1,200 VPH). Average Daily Traffic Count (VDT): Average daily traffic counts are based on ACHD's most current traffic counts The average daily traffic count for Cherry Lane east of Ten Mile Road was 12,969 on May 17, 2011. The average daily traffic count for Ten Mile Road south of Cherry Lane was 15,953 on June 16, 2011 Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Standard Conditions of Approval 1. All irrigation facilities shall be relocated outside of the ACHD right-of-way 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of--way. 3. In accordance with District policy, 7203.6, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACRD right-of--way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of--way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACRD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless awaiver/variance of the requirements or other legal relief is granted by the ACHD Commission. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org ~~~~ ,~' , VOf'~fwt~~1 ~ ~O s~/IMLriG December 9, 2013 Tyler Johnson JTC Inc. 1099 S. Wells St. Meridian, ID 83642 RE: MRZ-13-017 / 3150 W. Sheryl Dr. / Sheryl 4-plex PLAN ACCEPTANCE Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. ]aurena, Commissioner Jim D. Hansen, Commissioner The District has reviewed the building plans for the above referenced project for assessment of impact fees. The District has no comment on the site improvements because all proposed improvements are outside of ACRD right-of-way. If the scope of work changes to include work within the right-of-way, the District will need to .review and approve those changes. Reauirements Prior to Starting Work 1. Comply with all Standard Requirements of approval. 2. The impact fee must be paid prior to issuance of a building permit. When Ready to Reauest ACHD Occupancy Sign-Off 1. Call 387-6380 and provide all information as shown in the header of this letter, i.e. the file number, site address, and the name of the project. Please include your name and return phone number. Total Impact Fee due: $7,480 ACHD inspection is not reauired If you have any questions or concerns please feel free to contact me at (208) 387-6335 Sincerely, Austin Miller Planning Review Intern Development Services cc: Project File James Gipson Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387 6170 • FX 387 6393 • www.achdidaho.org t ~~~_ VOrWritM~~~Q ~iLi^ico~ December 9, 2013 Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim D. Hansen, Commissioner MRZ-13-017 / 3150 W. Sheryl Dr. / Sheryl 4-plex IF Service Area: Ada County IF Ordinance: #222 New Im act Fee ~~, , =~ Impact Fee Units Fee er Unit Total Apartment ITECode:220 4 units $1,870 /1 unit $7,480 **This form must accompany payment of Impact fee** Total $7,480 *Note: If assessed, Plan Review Fees must be paid to ACHD prior to paying Impact Fees. Plan Review Fees can only be paid at ACHD. cc: Gary Inselman / Christy Little Administrative Appeals: to initiate an appeal, the applicant must submit an Impact Fee Appeal application (link attached) within thirty (30) calendar days from this impact fee assessment. Reference I.F. Ordinance, sec. 7321.3 http://www.achdidaho.org/Forms/Dots/impact fee_appeal.pdf Individual Assessment of Impact Fees: to initiate an Individual Assessment, the applicant must submit an Individual Assessment application (link attached) within thirty (30) calendar days from payment of this impact fee assessment. Reference I.F. Ordinance, sec. 7312 http://www.achdidaho.org/Forms/Docs/impact fee_individual_assessment.pdf ITE Code: Impact Fee Classifications are based on definitions provided by the Institute of Transportation Engineers, Trip Generation Manual. 9th Edition in accordance with ACHD Ordinance 222. _ ~~~1~ -_ .. ~. ~. . ~~~.~ ~ 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 ~t+~±~nber 2, 201 ~ FAX #208-463-0092 nmid.org ~.,. ~ ~~ OFFICE: Nampa 208-466-7861 Cit~~f~~ridian SHOP: Nampa 208-466-0663 33 E $ra~y Avenue, Suite 102 Meridian, Ib $3642-2619 --- _ RE: RZ 13-417iSheryl4-Plez Dear Jaycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application for REZONE. However, at the time this parcel of ground is developed if any surface drainage leaves the site, the Nampa ~ Meridian Irrigation District (NMID) requires that a Land Use Change Application is filed for review prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. All laterals and waste ways must be protected. The developer must comply with Idaho Code 31-3.805. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District (NMID). Sincerely,; d ads Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: G. Curtis, Water Superintendent Office/file _. ,, _ •.,. . .,_ e j~ ~~ )..I ~ ,- ~~ ° r .. _ i, ~ .c. _f ~. 'tt ,rlr~i - ~ ~ I 'gib ,`~''} ~ ~ ~ ,^ ..r .,.0 5 ~~ =, ~ s APPROXIMATE IRRIGABLE ACRES , `', ~-`-- RIVER FLOW RIGHTS - 23,000 • BOISE PROJECT RIGHTS -40,000 '' ~ _ I rUANp IDAHO TRAN«gtPORTATi{~FI DEPARTMENT P,O. Box 8028 ,~ ~ {208) 334-8300 Boise, iD 83707-2028 itd.idaha,gov ~ ~ ~ ~ ~~ w s '~~ November 22, 2013 Machelle Hill Meridian City Clerk's Office 33 East Broadway Meridian, ID 83642 VIA EMAIL VIA EMAIL Re: RZ 13-017 at 3150 Sheryl Drive The Idaho Transportation Department has reviewed the proposed multi0family, development at 3150 Sheryl Drive in Meridian. ITD has the following comments: 1) ITD has no objection to this application and requires no mitigation. The trip volume is similar to that anticipated under the Comprehensive Plan and there is no new access to the State Highway System. If you have any questions, you may contact MS Shona Cheever at 334.8341 or me at 334.8377. Sincerely, Dave Szplett Development Services Manager dave.szplett(a7itd.idaho. ov Holly Binkley From: Elias Oropeza <elias@settlersirrigation.org> Sent: Thursday, December 05, 2013 9:12 AM To: clerk; Bruce Freckleton Subject: RE: City of Meridian Dev App -Sheryl 4-Plex RZ This project, file number RZ 13-017 does not impact any of the Settlers Irrigation District facilities. Please contact the Nampa Meridian Irrigation District. From: Mack Myers Sent: Monday, November 25, 2013 10:15 AM To: Elias Oropeza Subject: FW: City of Meridian Dev App -Sheryl 4-Plex RZ From: Machelle Hill [mailto:mhill@meridiancity.org] Sent: Thursday, November 21, 2013 3:31 PM Subject: City of Meridian Dev App -Sheryl 4-Plex RZ City of Meridian ~{ ~~\~ ~ City Clerk's Office Li V ~"` 33 E. Broadway Avenue Meridian, ID 83642 Planning and Zoning Commission Development Applicatian Transmittal To: Outer A encies Comments due b :December 12, 2013 Transmittal Date: November 21, 2013 File No.: RZ 13-017 Hearin Date: December 19, 2013 Request: Public Hearing: Rezone of 0.54 of an acre of land from the L-O to the TN-R zoning district for She 14-Plex B JTC Inc. or Assi ns Location of Pro er or Pro'ect: 3150 W. She 1 Drive The City of Meridian is requesting comments and recommendations on the application referenced above. To review detailed information about the request, please click on the file number above to take you directly to the application. We request that you submit your comments or recommendations by date specified above. When responding, please reference the file number of the project. If responding by email, please send comments to clerk .meridiancity.org. For additional information associated with this application please contact City Clerk's Office at number below. Thank you, Machelle Hill Deputy City Clerk Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, ID 83642 (208) 888-4433 mhill anmeridiancity.org .. ors"TRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to: ~THEALTH Environmental Health Division ^ Acz DEPARTMENT ^ Boise ^ Eagle Rezone # ~ ~ • ~ ~-- C~1 ~- ^ Garden City Conditional Use # ^ Kuna Preliminary /Final /Short Plat Meridian ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. 14. ~'~ \1r."aW Z. ~;'VG 'G~Li~ ~~1'1~~~ ~,~:~ ~`JY~ Reviewed By: \ - Review Sheet 15726-001EH1111