Loading...
Owner Testimony Packet - 11-19-2013Virden Auto Center 2653 E. Fairview Ave Meridian ID 83642 The Virden Auto Center original Site Plan for early start approval was signed and approved on April 30`" 2012 (included). At that time no additional street lights were requested. ACHD and all other requirements were included. Sometime later I was made aware that our engineer (not myself or the contractor) was contacted and we needed to add lights...not sure exactly when but my next conversation was with Bill Parsons on June 9th 2012 (see email) asking to see how we go about taking these off or getting them adjusted. I was not given a final answer on exactly what I was supposed to do until 9/26/2013 (see email conversations) After a long and wide range of discussion the most recent went like this... 1) Had approval from the City to use our existing parking light. 2) Idaho Power said no to installing a street light because the Power lines are running too close to the sidewalk/light pole location. 3) City wanting us to then put up a power pole/wood telephone pole in front to hang a light on it. 4) Now putting up a special light that Idaho Power seemingly making an exception because of its special design. This was not ON my original site plan I sent out to Bid and used to get financing for the loan on the building. I have spent nearly or over $20,000 in fees impact fees to the city &ACHD just to have the privilege of building. Accommodated all request on our original approved plan. Now I have to pay for the entire street light project...) am asked to buy the light, install it to the required engineering specs, run power from the corner 160-180 feet away and have an electrician hook it up. Idaho Power had a suggestion to install a light on the existing power pole located on the property next door when they develop the undeveloped ground. I took a huge risk and poured all I have into the purchase Water Works Car Wash on the corner of Hickory and Fairview Ave from an owner who had to file bankruptcy on the sale. The city in general has been very helpful and understanding of my vision to diversify this property to help me make it successful. I added an office and 3 bay service center on an unused weed covered piece of dirt behind the car wash in hope of making this property cash flow. I honestly can't afford this additional large expense if I am asked to fund this light. I estimate this to cost at minimum $6000-$7500 or more. Currently I am able to employ 7 fulltime employees, 3 part time employees and hope to continue to grow and offer the City of Meridian along with surrounding customers a first class service. I have tried to accommodate all requests and appreciate the opportunity to have a business where my family and I live. I just don't see how this will be of any service to our customers and city stakeholders. Please take the time to walk my property and see what I am being asked to pay for. Mike Virden President Virden Auto Center Inc. RECEISjE~ CITYOFGEfe ID~„w,rf.- CITY CLERKS OFFICE RE: Virden From: Austin Petersen <apetersen@meridiancity.org> To: Mike VIRDEN <mnv13@aol.com> Subject: RE: Virden Date: Thu, Sep 26, 2013 8:37 am Attachments: Davit_Pole_Specs.pdf (439K) Hi Mike, http://mail.aol.com/38079-11 ]/aol-6/en-us/mail/PrintMessage.aspx Thank you for taking the time to meet with me on Tuesday. Scott confirmed with Steve that it will be possible to install a davit pole at that location (between 180 and 180 feet west of the light on the corner). In order to receive your certificate of occupancy, the city requires that you install a 30 ft davit pole with a 250 W HPS luminaire. This is consistent with what was shown in your approved plans and was required by Tim Curns in January. The lights on the car wash and other buildings are too far back to effectively light the roadway itself. Adding a streetlight will improve road visibility increasing driver safety and comfort level. Attached are our specs for davit poles. Please let me know if you have any questions. Regards, Austin Petersen Transportation and Utility Coordinator City of Meridian Public Works Department PW Phone: (208) 898-5500 Direct Line: (208) 489-0352 Email: apetersenCa)meridiancitv.orp From: Mike VIRDEN [mailto:mnvl3Ca)aol.coml Sent: Tuesday, September 24, 2013 11:35 AM To: Austin Petersen Subject: Re: Virden Great look forward to the meeting. Sent from my iPhone l of 5 9/26/2013 1:32 PM 1tE: Virden http://mail.aol.com/38079-111 /aol-6/en-us/mail/PrintMessage.aspx On Sep 24, 2013, at 11:00 AM, Austin Petersen <aoetersen(rDmeridiancitv.org> wrote: Hi Mike, Lets meet at 2:00 today. Scott from Idaho Power will meet us there. He estimates that it will cost $3,500 dollars to install the pole. Regards, Austin Petersen Transportation and Utility Coordinator City of Meridian Public Works Department PW Phone: (208) 898-5500 Direct Line: (208) 489-0352 Email: aoetersen(a~meridiancitv.org From: Mike VIRDEN [mailto:mnvl3Ca~aol.com] Sent: Monday, September 23, 2013 4:47 PM To: Austin Petersen Subject: Re: Virden Tomorrow afternoon or morning will be good let me know....anytime will work MV Sent from my iPhone On Sep 23, 2013, at 4:42 PM, Austin Petersen <apetersenC)a meridiancitv.org> wrote: Hi Mike, I heard back that it is possible for Idaho Power to install a pole at that location . Sorry things have taken so long. I would like to have an on-site meeting with ! of 5 9/26/2013 1:32 PM RE: Virden http://mail.aol.com/38079-111/aol-6/en-us/mail/PrintMessage.aspx you and Scott Pinkston tomorrow afternoon or Wednesday morning. Is there at time that works well for you? Sincerely, Austin Petersen Transportation and Utility Coordinator City of Meridian Public Works Department PW Phone: (208) 898-5500 Direct Line: (208) 489-0352 Email: apetersen(a~meridiancitv.org From: Mike Virden [mailto:mnv13 anaol.com] Sent: Thursday, September 19, 2013 3:54 PM To: Austin Petersen Subject: Re: Virden Thanks Austin... My lender is hounding me on the occupancy permit...not sure what to tell him? Am I still involved in this light thing?? MV -----Original Message----- From: Austin Petersen <aoetersenKDmeridiancitv.org> To: Mike Virden <mnvl3Cilaol.com> Sent: Thu, Sep 19, 2013 3:45 pm Subject: RE: Virden Hi Mike, Given that the power lines are too low for our standard pole or a davit pole, I am investigating the possibility of Idaho Power installing a power pole at that location so that t of 5 9/26/2013 1:32 PM Kb:: Virden http://mail.aol.com/3 8079-111/aol-6/en-us/maiUPrintMessage.aspx a light can be mounted on it. I will let you know as soon as I find out. Thank you for your patients. Regards, Austin Petersen Transportation and Utility Coordinator City of Meridian Public Works Department PW Phone: (208) 898-5500 Direct Line: (208) 489-0352 Email: aoetersenCa~meridiancity.oro From: Mike Virden [mailto:mnv13(c~aol.coml Sent: Thursday, September 19, 2013 1:25 PM To: Austin Petersen Subject: Re: Virden Austin, Checking in to see how we are doing on the Occupancy Permit? Thanks!! Mike Virden -----Original Message----- From: Austin Petersen <aoetersenCc~meridiancity.org> To: Mike Virden <mnv13(a~aol.com> Sent: Tue, Sep 10, 2013 3:52 pm Subject: RE: Virden Mike, Attached are the street lighting supplemental specifications and a copy of the current Improvement Standards for Street Lighting. I have also attached Davit pole specs from the 2013 supplemental specs. Thank you for calling me back. Let me know if you have any more questions. t of 5 9/26/2013 1:32 PM x~: v><•aen Regards, Austin Petersen Transportation and Utility Coordinator City of Meridian Public Works Department PW Phone: (208) 898-5500 Direct Line: (208) 489-0352 Email: aoetersenC~meridiancity.org From: Mike Virden [mailto:mnv13Cg~aol.coml Sent: Tuesday, September 10, 2013 3:07 PM To: Austin Petersen Subject: Virden Good talking with ya. MV http://mail.aol. com/38079-111/aol-6/en-us/maiUPrintMessage.aspx of 5 9/26/2013 1:32 PM Timeline 2/24 February 2012 working with architect on site plan submitted to Planning and Zoning for Review Multiple discussions in regards to use, layout, requirements, side walk, patio etc. 3/15 Resubmitted a new site plan to P8Z 3/16 P&Z All revisions look good" (see email) 4/3 ACHD final report on property Was able to make a compromise on the proposal and only had to modify the one on Fairview-(see email) 4/25 P8Z request approved copies for approval (see email) 4/30 Re-Submitted Plans with all requirements included 5/10 Plans signed off and approved (see Attachment) Had 2 '/: months with plans and an approval and no mention of any street lights??? Mike Virden RECEIVE ,~ . CITY OFC~.I-Ce m~.~xf- CITYCLERKS OFFICE B. Site Plan (dated: 3/16/12) ~ey~~ ~~y ~~rys~«+- L,y~,~f~ FAIRVIEW AVE' HdiCHED gFEA MDICATE9 u /ExIBTING IRJDERGROWVD LIGATION I I~ 1 ~' I ~ I -- ~' „„ , ~ w V^ V E V p a I g~ I I IjT_ (~G 9€ ., 0 ° °w~....w.... ~~w. mom,.. t _________m ___________.. __ _______ _ _ _ _ _~~__Gr~i ,.unp miwum~'r --~_` ngaw~w~~-me...~ / \\ww w N. B9' 95'14"W ]1539' !]TN~Bp Gi. 6LLE3 pIBFL6FtAT PREd J 4 } L) 2 / ~:~\~\ / in~~ `~ f' ~T ~~ f ~ ,a v/ //V1F.~H. HATCHED AREA INDICgiEB ~ EXISTING LNDERGRWDID IRRIGATION C4CULdTIWIB TABLET PAIIX9G BTd_L9~REO.) FPOYIpE EYILDNG GO Fi.. TS] B¢ Ft. Lor BIZE . vpEl m Fr. EEIedCKS•3-'PS FAIfMEW, )o'G ZGNING pIBTRICT. I-L Conditions Document 6 Virden Auto Center CZC-12-018; DES-12-013, ALT-12-003 v E O ~ o d ~ v !A Y d Qj E ~ c~ V ~ C N o ~ a `° ` 'N w ~ ~ LL ~ a ~,~~ - Y [D ~ 2' ll O d O ~ d O LL a N N a 0 E ~ ~ ~ U o Q N 'O O ~ C O. ~ ~ N 3 .~' c ;q o :. ~ .~ ~ ~ a~ "_ m c ~ « m ~ c ~ m n o ~- E .- ~ o fn L U ~ "' OI O N C_ C 7 C - O OI U N C C .~ v o .~~~ a m m ~ c w ~~ w ~~ O N U N fl- N N y '~ "O ~ U C N ~ ~ Vl ~ N - ~~ 3 r N ~' .~~', y o ,~ ~ ~ o n Y N N 3 aw ~ U ~ ~m N N ~ !~ N 3 - . u-- ~ ~~ ~ mEa L 9 N U > C O N O C ~ ; .~ ~ N Q7 ~ N p C O) C E = •- ~ 3a 0 0 9 ~ a~ N O N L ~ 'j O ~ ~ "O N L 7 N ,~ ~ mo O t N ~ U .~- Y N U o r ~ N N N U N c ~- °Q .~ N C (`') ~ ~ U d L N ~ .. ,~„ 'O D E N Q O ~ Y C m L a U Q O (6 a m C c m d U Y f0 ~U 0 N Q C N E r a O C N E a 0 J D> ~" C 7 E E O U N c T 3 'O c0 0 00 ui M v M O t m C (0 "O .~ M M u~ ro 0 N n ii O a u~ LL O U c m v .~ E C O N m U Q N N Y E r o r ~ O ~ lp N d ~ co a v_ t E m ~ U ~ 10 a LPL ~ C N T ~ ~_ Y ~ ~ M (A .`a`_ ~ LL - ~ v E m Elm ILMH V N 0 3 3 N C L N t N N ~ Y_ N ~ = Y C L m F From: Brenl Bjornson <bbjornson@meridiancity.org> To: Mike Fairchild <mikefairchild@frontier.com>; mnv13 <mnv13@aol.com> Cc: Daunt Whitman <dwhitman@meridiancity.org>; Rick Jackson <ryackson@meridiancity.org>; Terry Medley <lmedley@meridiancity.org>; tmedleyrimi <tmedleyrimi@gmail.com>; Martin Langenwalter <mlangewalter@meridiancity.org>; Dennis Holte <dholte@meridiancity.org>; Mindi Smith <msmith@meridiancity.org>; Dinae Edwards <dedwards@meridiancity.org>; Bruce Freckleton <bfreckleton @meridiancity.org> Subject: Virden Auto Center Date: Wed, Apr 25, 2012 4:57 pm Mike, The early start foundation permit and the primary building permit for this project are both on hold effective today and permit delays should be expected. The referenced address is 2651 E. Fairview Ave. Please provide the following -Two complete plan sets and CD-ROM with the following information. The plan sets you provided to us initially are incomplete; Provide comprehensive electrical design including but not limited to; service entrance feeder sizing, load calculations, grounding, etc. per the 2008 National Electrical Code. The Zip Pit drawings (all sheets I-2 through W-2) shall be stamped and signed by a licensed engineer. Provide "listing information" for the Zip Pit from an approved listing agency. Provide manufacturer's shop drawings and engineered stamped design for all vehicle lifts. Provide comprehensive mechanical design, including but not limited to facility ventilation design as well as capture and control design. Specify locations for the code required drinking fountain and mop sink on the plumbing sheets and floor plan. Total occupant load appears to be 29. Additionally, I received a call today from Doug Lasher (contractor). As I understand, Mr. Lasher (the contractor) and the owner have discussed alternate structural design for the roof system, which may be different from what has been submitted for plan review. Please include all new sheets for this design and any related structural calculation changes. Re-review fees will likely be applicable. Sincerely, Brent A. Bjornson, CBO Building Plans & Inspection Coordinator Meridian Building Services 33 Easf Broadway Avenue # 102 Phone: (208) 489-0304