Woodburn West Subdivision No. 1 FP-13-037BEFORE THE MERIDIAN CITY COUNCIL
IN THE MATTER OF THE
REQUEST FOR FINAL PLAT
CONSISTING OF 52 SINGLE-
FAMILY RESIDENTIAL
BUILIDNG LOTS AND 10
COMMON/OTHER LOTS ON 25.75
ACRES OF LAND IN AN R-8
ZONING DISTRICT
BY: NORTHSIDE MANAGEMENT
APPLICANT
HEARING DATE: OCTOBER 22, 2013
CASE NO. FP-13-037
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council on October 22, 2013 for final plat approval
pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the
Administrative Review is complete by the Planning Division and Public Works Department, to
the Mayor and Council, and the Council having considered the requirements of the preliminary
plat, the Council takes the following action:
IT IS HEREBY ORDERED THAT:
1. The Final Plat of "PLAT SHOWING WOODBURN WEST SUBDIVISION NO.
1, LOCATED IN THE SW '/4 OF SECTION 36, T.4N, R.1 W., B.M., ADA
COUNTY, IDAHO, 2013, DATED: 7/29/13, STAMPED BY GREGORY G.
CARTER, PLS, SHEET 1 OF 3," is conditionally approved subject to those
conditions of Staff as set forth in the staff report to the Mayor and City Council
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR WOODBURN WEST SUBDIVISION NO. 1 (FP-13-037)
Page 1 of 3
from the Planning Department and the Development Services division of the
Public Works Department dated October 22, 2013, a true and correct copy of
which is attached hereto marked "Exhibit A" and by this reference incorporated
herein, and the response letter from Scott Noriyuki, a true and correct copy of
which is attached hereto marked "Exhibit B" and by this reference incorporated
herein.
2. The final plat upon which there is contained the certification and signature of the
City Clerk and the City Engineer verifying that the plat meets the City's
requirements shall be signed only at such time as:
2.1 The plat dimensions are approved by the City Engineer; and
2.2 The City Engineer has verified that all off-site improvements are
completed and/or the appropriate letter of credit or cash surety has been
issued guaranteeing the completion of off-site and required on-site
improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULATORY TAHINGS ANALYSIS
The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may
request a regulatory taking analysis. Such request must be in writing, and must be filed with the
City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at
issue. A request for a regulatory takings analysis will toll the time period within which a Petition
for Judicial Review may be filed.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR WOODBURN WEST SUBDNISION NO. I (FP-13-037)
Page 2 of 3
Please take notice that this is a final action of the governing body of the City of
Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an
interest in real property which may be adversely affected by this decision may, within twenty-
eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho
Code§ 67-52.
SP~u 4 r
By action of the City Council at its regttl~r meeting held on the
`'Y l 9N~~„~. ~./L. , 2013.
C~ ~"
day of
Tammy d eerd
Mayor, ~ of Meridian
Attest: ~~
~.
`'~
"' ,
~<',
Cibi o.
Jaycee lman '°~° ~ Ll~ I1 '~~? Psi *;
City Clerk ~n ,~ ~'`1~"~~~
FBI > `-.
FP
'_
~~ ~Gr''.,F ~`'t~`h~
Copy served upon the Applicant, Planning Department, Public Works Department, and City
Attorney.
~ Dated: (~ ~~ /~
T
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR WOODBURN WEST SUBDNISION NO. 1 (FP-13-037)
Page 3 of 3
EXHIBIT A
STAFF REPORT
MEETING DATE: October 22, 2013
TO: Mayor & City Council
FROM: Sonya Wafters, Associate City Planner
208-884-5533
E IDIAN~---
1DAHd
Bruce Freckleton, Development Services Manager
208-887-2211
SUBJECT: FP-13-037 -Woodburn West Subdivision No. 1
I. APPLICATION SUMMARY
The applicant, Northside Management, has applied for a final plat (FP) consisting of 52 single-family
residential building lots and 10 common other lots on 25.75 acres of land in an R-8 zoning district for
the first phase of Woodburn West Subdivision.
II. STAFF RECOMMENDATION
Staff recommends approval of the Woodburn West Subdivision No. 1 final plat based on the analysis
provided below in Section V.
III. PROPOSED MOTION
Approval
I move to approve File Number FP-13-037 as presented in the staff report for the hearing date of
October 22, 2013, with the following modifications: (Add any proposed modifications.)
Denial
I move to deny File Number FP-13-037, as presented during the hearing on October 22, 2013, for the
following reasons: (You should state specific reasons for denial.)
Continuance
I move to continue File Number FP-13-037 to the hearing date of (insert continued hearing date here)
for the following reason(s): (You should state specific reason(s) for continuance.)
IV. APPLICATION AND PROPERTY FACTS
A. Site Address/Location:
The subject property is located on the west side of S. Locust Grove Road, approximately'/4 mile
north of E. Amity Road, in the SE'/< of Section 30, T. 3N., R. lE.
B. Applicant:
Scott Noriyuki, Northside Management
6810 Fairhill Place
Boise, Idaho 83714
C. Owner:
Heartland Homes, LLC
2358 S. Titanium
Meridian, ID 83642
Woodburn West Subl FP-13-037.doc PAGE 1
EXHIBIT A
D. Representative:
Scott Noriyuki, Northside Management
6810 Fairhill Place
Boise, Idaho 83714
V. STAFF ANALYSIS
The proposed final plat depicts 52 single-family residential building lots and 10 common/other lots on
25.75 acres of land in an R-8 zoning district. The gross density of the overall subdivision is 3.92
dwelling units (d.U.) per acre. All of the lots proposed in this phase are for single-family detached
homes and must comply with the dimensional standards of the R-8 zoning district listed in UDC
Table 11-2A-6. Staff has reviewed the proposed plat and found it in compliance with the
aforementioned dimensional standards.
Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary
plat in accord with the requirements listed in UDC 11-6B-3C.2. The number of buildable lots and
common area is the same. Therefore, staff deems the proposed final plat in substantial compliance
with the approved preliminary plat.
VI. SITE SPECIFIC CONDITIONS
1. Applicant shall meet all terms of the approved annexation (A~-13-003, Development Agreement
Instrument #113106153); and preliminary plat (PP-13-007).
2. The applicant shall obtain the City Engineer's signature on the final plat within two (2) years of
Council approval of the preliminary plat which was on July 23, 2013; or, apply for a time
extension in accord with UDC 11-6B-7.
3. Prior to submittal for the City Engineer's signature, have the Certificate of Owners and the
accompanying acknowledgement signed and notarized.
4. The final plat prepared by Bailey Engineering, Inc. on July 29, 2013, stamped by Gregory G.
Carter, shall be revised as follows:
a. Include lot dimensions on Lot 1, Block 6;
b. Widen Lots 1 and 23, Block 4 and Lot 4, Block 5, to allow a minimum 5-foot wide strip
outside of the irrigation easement to allow for trees to be planted in accord with UDC 11-3B-
SJ and 11-3B-12C.
5. The landscape plan prepared by South Landscape Architecture, dated Apri122, 2013, shall be
revised prior to signature on the final plat by the City Engineer as follows:
a. Update the landscape plan consistent with the revised lot configuration of the plat;
b. Widen Lots 1 and 23, Block 4 and Lot 4, Block 5, to allow a minimum 5-foot wide strip
outside of the irrigation easement to allow for trees to be planted in accord with UDC 11-3B-
SJand 11-3B-12C. Depict trees (1 per 1001inear feet) within these lots in accord with the
standards listed in UDC 11-3B-12C.
c. Depict a pathway connection across Lot 7, Block 2 to the school site to the north.
6. All fencing installed on the site must comply with the fencing plan shown in Exhibit D, the
conditions in this report, and with the standards listed in UDC 11-3A-6 and 11-3A-7. If
permanent fencing does not exist at the subdivision boundary, temporary construction fencing to
Woodburn West Subl FP-13-037.doc PAGE 2
EXHIBIT A
contain debris shall be installed around this phase prior to release of building permits for this
subdivision.
7. Future homes constructed in this subdivision shall be generally compatible in appearance and
bulk with the pictures/elevations included in the development agreement recorded as Instrument
No. 113106153.
8. Staffls failure to cite specific ordinance provisions or conditions from the preliminary plat does
not relieve the Applicant of responsibility for compliance.
9. Prior to the issuance of any new building permit, the property shall be subdivided in accordance
with the UDC.
10. Sanitary sewer service to the subject property exists directly adjacent to the north in N. Anfield
Avenue in the Sienna Creek Subdivision. The applicant shall install mains to and through this
subdivision; applicant shall coordinate main size and routing with the Public Works Department,
and execute standard forms of easements for any mains that are required to provide service.
Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than
three feet than alternate materials shall be used in conformance of City of Meridian Public Works
Departments Standard Specifications.
11. Domestic water to serve the subject site exists directly adjacent to the subject property in N.
Anfield Avenue, W. Applepine Street, W. Woodpine Street. The applicant shall be responsible to
install water mains to and through this development, coordinate main size and routing with Public
Works.
VII. GENERAL REQUIREMENTS
1. Street signs are to be in place, sanitary sewer and water system shall be approved and activated,
fencing installed, drainage lots constructed, road base approved by the Ada County Highway
District (ACRD) and the Final Plat for this subdivision shall be recorded, prior to applying for
building permits.
2. Upon installation of the landscaping and prior to inspection by Planning Department staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
3. A letter of credit or cash surety in the amount of 110% will be required for all incomplete
fencing, landscaping, amenities, pressurized irrigation, prior to signature on the final plat.
4. The City of Meridian requires that the owner post to the City a performance surety in the amount
of 125% of the total construction cost for all incomplete sewer, water and reuse infrastructure
prior to final plat signature. This surety will be verified by a line item cost estimate provided by
the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash
deposit or bond. Please contact Land Development Service for more information at 887-2211.
5. The City of Meridian requires that the owner post to the City a warranty surety in the amount of
20% of the total construction cost for all completed sewer, water and reuse infrastructure for
duration of two years. This surety will be verified by a line item cost estimate provided by the
owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash
deposit or bond. Please contact Land Development Service for more information at 887-2211.
6. All development improvements, including but not limited to sewer, water, fencing, pressurized
irrigation and landscaping shall be installed and approved prior to obtaining certificates of
occupancy, or as otherwise allowed by UDC 11-SC-1.
Woodburn West Subl FP-13-037.doc PAGE 3
EXHIBIT A
7. Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as determined during the plan review process, prior to the issuance of a plan
approval letter.
8. It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
9. Applicant shall be responsible for application and compliance with any Section 404 Permitting
that may be required by the Army Corps of Engineers.
10: Developer shall coordinate mailbox locations with the Meridian Post Office.
11. All grading of the site shall be performed in conformance with MCC 11-12-3H.
12. Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
13. The engineer shall be required to certify that the street centerline elevations are set a minimum of
3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom
elevation of the crawl spaces of homes is at least 1-foot above.
14. The applicants design engineer shall be responsible for inspection of all irrigation and/or
drainage facility within this project that do not fall under the jurisdiction of an irrigation district
or ACHD. The design engineer shall provide certification that the facilities have been installed in
accordance with the approved design plans. This certification will be required before a certificate
of occupancy is issued for any structures within the project.
15. At the completion of the project, the applicant shall be responsible to submit record drawings
per the City of Meridian AutoCAD standards. These record drawings must be received and
approved prior to the issuance of a certification of occupancy for any structures within the
project.
16. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public
roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights
shall be installed at developer's expense. Final design shall be submitted as part of the
development plan set for approval, which must include the location of any existing street lights.
Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not
exceed that outlined in the Standards. The contractor's work and materials shall conform to the
ISPWC and the City of Meridian Supplemental Specifications to the ISPWC.
17. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of
way (include all water services and hydrants). The easement widths shall be 20-feet wide for a
single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but
rather dedicated outside the plat process using the City of Meridian's standard forms. The
easement shall be graphically depicted on the plat for reference purposes. Submit an executed
easement (on the form available from Public Works), a legal description, which must include the
area of the easement (marked EXHIBIT A) and an 81/2" x 11"map with bearings and distances
(marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a
Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this
document.
18. Applicant shall be responsible for application and compliance with and NPDES permitting that
may be required by the Environmental Protection Agency.
19. Any existing domestic well system within this project shall be removed from domestic service per
City Ordinance Section 9-1-4 and 9-4-8 contact the City of Meridian Engineering Department at
(208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic
Woodburn West Subl FP-13-037.doc PAGE 4
EXHIBIT A
purposes such as landscape irrigation if approved by Idaho Department of Water Resources
Contact Robert B. Whitney at (208)334-2190.
20. Any existing septic systems within this project shall be removed from service per City Ordinance
Section 9-1-4 and 9-4-8. Contact Central District Health for abandonment procedures and
inspections (208)375-5211.
21. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or
well water for the primary source. If a surface or well source is not available, asingle-point
connection to the culinary water system shall be required. If a single-point connection is utilized,
the developer will be responsible for the payment of assessments for the common areas prior to
development plan approval.
V. EXHIIBITS
A. Vicinity Map
B. Approved Preliminary Plat (dated: 4/19/13)
C. Proposed Final Plat (dated: 7/29/13)
D. Proposed Landscape Plan (dated: 4/22/13)
Woodburn West Subl FP-13-037.doc PAGE 5
EXHIBIT A
Exhibit A -Vicinity Map
Woodburn West Subl FP-13-037.doc PAGE 6
EXHIBIT A
Exhibit B -Approved Preliminary Plat (dated: 4/19/l3)
_.~
1. J :~.
v .~.. ~. ,
,:
:j l :f
r^ T
ai I ~~~ , 13. t.~. ~ ,~:: ::» ~ ....,...
.1 a ~ ,
_ ,~. ~ ~. ~~~"'`~ ! `~' , .. ~.~. r wee i.e'« :~.:'~ {~~.~.~'~ a, ~....
..~ 1 .,~ _
~_ ~ ~~t • _
_ '~ ~IeG LI MINAFev PLAT
.1-fml VV[>b JPN W ST iV I N
WEap LA.h ME LL
Woodburn West Subl FP-13-037.doc PAGE 7
EXHIBIT A
Exhibit C -Proposed Final Plat (dated: 7/29/13)
NO7[S
f lwfre ion of M~fyMrw~fW{w, iNwµ ~~I wws l.M lraa Nfwf
a ~YY 4 "91o ww wF Mliw.fwN^. lr I~ ~fw~lfi~1 ti IM r!
~'ma"""'"war 1°i"e..f.".:r'° a..+" w.w... a irf . ".....f ".
c.w. «w.www.f fww .,.. ~+......w
M ".Y 11wr Mf'fw"Iwww Mw,ww yr Yf"Iw
.w .e~ii M ww w~.www+~"".f w~wwfwi
f w. M~aWaM1wL~M~-.w. w. ,.r eUw~+N
,..we. u.. o,...n. , ~~ 1w.....w ww.. •.
...w~ ~w.+.+, w r
. w~.~ a.~. wrowf+~r...w~ w..w'
.. fr....~r yww..~. ww.w nr. re, .,sy.a".~ ..rww.
f"o w wwf ro>~yf,y~fyy"y~ ww ~ wfw"~-+n~fi~ e.f rr""` ~
~M~rnw i~w6Mr, Mbr Mbt~"Wfy~w~M
f' Mw~"^rW rawni or.~"t "'"'rr. Mrt"MM„tf•rr wawM
n
•
LLtrtl~.waw.n 'T
- ff"w w
-- wUnia~f>t ~R •1
- w.s snow"
- wafw
- w ~a~r+.~raw "
'~w°".~. o aeik'~w
~ !u'f~ic~arw "~ffn
RYe/~YyfK~~ fs wl w~f 1W
~~IfMh Y. N >fw
e~ww~jNwa
PLAT SNOWNG
{~`OOUHURa' {M'E; ~ l' `'(/BDl Vl ~IO.N
LOCATED IN 711E SW 1/t
OF SEC71ON 36, T.N., R.1 W., B.M.
' r ADA COUZ TY3, IDANO
60 0 JO a0 170
SCgF N~
F
~.1a }~~'w,~ M ~ M0.10 l.L~~
tx as jsa ._._._~~._ -i~-~--
~"~°fo
wit M7
Woodburn West Subl FP-13-037.doc PAGE 8
;1' 0. 1
c-w tero
e..f f.w. f~+ ffr wry sfw
f
ff
ru wnr
fmrirw
an"f"t afrfr
wanr
w~afr
w"f rff rr frw
w wort,, ff+r
a>V
frf+n•
n M!r •M f.f+ ~r]P~ irY
m flffw'
m Pff AM "f"fVfV wvYY
ter nfm nw wnra mfv
i n» wfM
Y wD1t9`" frV~Y
onrlfT frnir
w.wm„ mrr
wa "wrfsW sfew•
w w# f!a'o. wnlw'
iY fIGL
rfrfn f>.ffv
u iu ar
u rnnn nm•
« ».w wrwvr .ant
wM afn Ni+feY" ffnfr
wM D frY
W nn M IwnVffl NiYfr
1~I
rp wWW 1INtf
w nf. u a stoat. "r+r
m far nu wr
lf~
~ 7729
A~
Au!!E~~iYpp1 ovl ~f~f~"
~~fiaw"iR{Rw
EXHIBIT A
Exhibit D -Proposed Landscape Plan (dated: 4/22/13)
-_
~`3 ~ ` ~ I ~I', ~ ;I 7 I ~ i II
L/ I
~~ %dl I _ I 7
_ ~ R+8 ZC~1~~~ ' ~•~ I '~~I '~~ I "~
-F'-'. 8747' 1 > I ') 1 e-,
~ ' \
I
r
$ f
+.. _. ~ CKKi4 a ~1~
If I
y1~'~_.i~; ~-~. O~.w~~~yy~~sq"`~~~~.r. , + { J7I I l
k / ~ BiGCA} 4 r..^`9^i'~i:T3Z'3.3.. f ~ ! ~ i '/. 1 ~ '
.
' ~ .
f ~ ~ \.i~"'7' \ .v$'^ ~,~-. ._ I yW. APPI,EP)NE ~. I ~ ~~I
' \ r
tr~ r.w* . .. .-._._ SI
. _
. ---,.
x_~~~
§ . ~.--Wwrw ~ _ _ -- _ ___ _
_~
_ _ 5~ ~ _r ,
. •.
- ~ . , ,. -
< ~~ -; `
I ~ ~ ~ ~ ~ne ocx s ~ ~ F--- - - ~
,--- ,---- '~ .,-_ -, ~s ~--- ~~ j' ~ ' ~ '
-~.. ,1 ~ -- ~ ~ ~_1~ =i`_ i _~~ _/ is ~ I' ~ ~ _
~..- -l Z ir-~- , / ~\ ~ SANDA:WUpO DRIVE ~-\ ~.~.uw. }}fi-#+
~.+ ~ f 1 ~ ~7CC I ~ I ~' ~ ~
i .r-.'-'~~, ` lr' - I ! t•. ' I ..~ iii ~ --~ •°°~~; {
• I --- --
;. _ ~ ~.
v i ~ -• ~~
': '- NiOW OR. 1 ~ -~ i-'".. : !( f ?i ' iiT i' -___... . .. _ W~WY70DPINF ST -
_x i
~' i" T
Pt
II N`. W. Sf.N9 -, ..-. lr--.-, _,__ ~ &.OCK6 ~ ~•is. ~3:.ti 'Y ____- .... I I !~ ~.~. -
' _
_-
Ip (/~/S~~J~~~$~/\~ ~~~yt~.. t 1 ~"" .,;, `~~ i br ` u, t.~ w ; I I ~ I r
"~'~'~ •'` =4.tu"4.NG._~ ~ _______'~, r~ #N ~ ___A~cil4"~._I i________I -______ _ ~_~~T~~yF _ $~
Irk I • ^ _ _ MATCNUNC C _ .•R` k A _ _4AIGt4N4- ~` '. _ MA CMIJNC j T 1~_
1.10!6
,r;~,~ L.~ANDBCAPi PLAN r
x+i ffars uc rcwwrafort I ~ ~±~r,~b ~..•..,, `..~/% !_...I '/\. e.~.on111f..New
swl. fo..s sir rw..r, Plot 1~P Li0 fCOf O~ALi. /1T1 >rL~M. 7~~---
~ae a tfv xn nKt /wnu wa ~.rf r.~wr
femrn a ewx pie-i~°o- z~ ~'k Low ..L7 ~S ''`
111DSi ~11D rL~111910i DOTl~1fJ " I '
Woodburn West Subl FP-13-037.doc PAGE 9
EXHIBIT A
.~..~..
. F ~.~~
~,ssa.;;r ::...:;.::
• K ~~ nM r~M.r ~.,
qr ~~~i .y. rr.
$ .~wc' '~ y :~
~~µ :t
-~c:.~s...~. ... ..._
iiooa
- ..~-...4..a.1.~.~. ~~ .~.
m~~_
#f.~s's"rmit ~~_
j~.~
cc~ ~=~
r~~.x^las
a'~
~-~. .
i'T{i7~'SC ..r.
~
~~~
~ys,~r-- W r.~rs
~. ~ ~..s
te.. ~. A' i . y X...
i .s ..».
® .a....,. ......
.~..~
..__ ~~
~..
t `
Sfax'
wia~r
N ~ ~
•~~ •~•
1416 LLC I WiIYA wYOM
~aaw. 4 uw wee-:.o4-°ms~
ass .a . ~ ia,t ras mss~a~ trta~rs ,.~.f'"* ~~'
lL~M/ ~ Gw'S'C4 .ISC~
Woodburn West Subl FP-13-037.doc PAGE 10