Meridian Final Acceptance Report
~/rE IDR IAN*--
IDAHO /
October 8, 2013
Mr. David Turnbull, President Mr. Richard Brown
Brighton Development, Inc. Brown Construction Co.
12601 W. Explorer Drive, Suite 200 PO Box 495
Boise, Idaho 83713 Nampa, Idaho 83653
RE: Spurwing Grove No. 5 -Final Acceptance
Dear Mr. Turnbull:
MayorTammy de Weerd
City Council Members:
Keith Bird
Brad Hoaglun
Charles Rountree
David Zaremba
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the Public
Works Department' Standard Specifications and Drawings, the installation and materials of the
sewer and domestic water systems are to be warranted against defect by the owner for a period
of two-years from the date of this letter.
Sinre~ly,
Warren Stewart, P.E.
City Engineer
cc. Cit C~ I
PW -Water Division
PW -Wastewater Division
PW -Construction Division
File
DEQ
~„big ~~~`€-,~-ics De,~rtmer~t ~ :3:~ ~ ~r~~d?~°ay f~vc; 5~;;~ Zi`~~. i~er€ds~n_ i?D ~35~2
~'=;~r~s~e 2~~--dig-~~=:~f3 Esc z~..~g~-~~~? ~ s~ v .~.~di~ra~i~§` ~'~a'