Loading...
Agency Comments.. DISTRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to: HEALTH Environmental Health Division ^ ACz DEPARTMENT ^ Boise ^ Eagle Rezone # ~'~G- \~ °~D `~~ ^ Garden City Conditional Use # ^ Kuna Preliminary /Final /Short Plat Meridian ~~t~ ~ ~ C~~v v. ^ Star We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental ~ualiry: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: Dater~/ Review Sheet 15726-001EH1111 RICHARD MURGOITIO CHAIRMAN OF THE BOARD BOISE PROJECT BOARD OF CONTROL KENNETH COLE VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S. RECLAMATION PROJECT) TIMOTHY M. PAGE 2485 OVERLAND ROAD PROJECT MANAGER BOISE, IDAHO 83705-3155 ROBERT D. CARTER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY-TREASURER JERRIFLOYD ASSISTANT SECRETARY- TREASURER O1 October 2013 ~~ OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208)344-1141 FAX: (208)344-1437 City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, Idaho 83642 RE: DMG Eagle & Victory, L.L.C. 3210 S. Eagle Rd. New York Irrigation District McDonald Latera141+00 Sec. 28, T3N, R1E, B.M. File No. TEC 13-006 NY-578-012-00 Jaycee Holman,City Clerk: The Boise Project Board of Control has no objection to a time extension for the above- mentioned property. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, y~ Bob Carter Assistant Project Manager BPBC Bdc/bc Cc: Phil Comegys Watermaster Div; 2 BPBC Velta Harwood Secretary/Treasurer, NYID File September 18, 2013 City of Meridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: TEC 13-006/Shops r� Victory Dear Jaycee: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced application. All laterals and waste ways must be protected. All municipal surface drainage must be retained on -site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, Andy Madsen Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: Office/file El � ,;� !•"" APPROXIMATE IRRIGABLE ACRES L• RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000