Loading...
Agency CommentsHolly Binkley From: Sonya Watters Sent: Monday, September 30, 2013 8:40 AM To: Machelle Hill; Jacy Jones; Jaycee Holman; Holly Binkley Subject: FW: Tustin T.W.O. Sub -Applicant Response to Staff Report From: kent brown [mailto:kentlkb@gmail.com] Sent: Monday, September 30, 2013 8:11 AM To: Sonya Watters Subject: Re: Tustin T.W.O. Sub Sonya on behalf of my we have reviewed the staff report and are in agreement with staff requirements kent CENTRAL •~ DISTRICT ~THEALTH DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Return to: Environmental Health Division ~ ~ ^ ACz ~ ~ ^ Boise Preliminary /Final /Short Plat '~ ~ ~~,-C~2~- 1~a,S~r~ ~u,r~ ~,~. ^ Eagle ^ Garden City ^ Kuna ~ Meridian ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. 1~ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ~$ central sewage ^ community sewage system ^ community water well ^ interim sewage ~ central water ^ individual sewage ^ individual water 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: central sewage ^ community sewage system ^ community water ^ sewage dry lines ~k central water ^ 10. This Department would recommend/deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store X13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. r ^ 14. Reviewed By: Date: ~ / 12- /_~ Review Sheet 15726-001EH1111 i~l ~ dui & ~~i~id~ ~Inu~at~oci 2~~¢~cict 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 September 19, 2013 City of Meridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: PP 13-027/Tustin T.W.O. Subdivision Dear .laycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application as it lies outside of our district boundaries. Please contact Settlers Irrigation at 344-2471 or at PO Box 7571, Boise, ID 83707. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, "--J Andy Madsen Assl. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: Settlers Office/file f". t . '~\ \\ll'\ ~ a~ t~ iv ~- 4__. !. ~ ' 1~.1 -\ ,~ ~ ~~ APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS 23,000 BOISE PROJECT RIGHTS 40,000 DATE: September i9, 2oi3 TO: Ciry of Meridian Attn: Ms. Sonya Waters 33 E. Broadway Ave Meridian, ID 83642 RE: Tustin T.W.O. Subdi~rision Dear Sonya, The Lemp Canal runs along the south boundary of this project. East of this project at the intersection of N. Locust Grove and E. McMillian the Lemp Canal crosses under Locust Grove road with a i4 foot wide, 5 foot deep box culvert. West of this project the Lemp Canal crosses under N. Larkwood Place with an 8 foot wide, ~ foot deep box culvert. My estimate of an equivalent pipe size for this canal would be a 8 foot diameter pipe. Please accept this letter as a formal request to waive any condition to pipe this Canal because of its size. If more is needed, please do not hesitate to call me Respectfully s, ' ted ~ ~ < ~ Chad S. Kinkela, P.E. CK Engineering, P.C CK Engineering 8bo Neadti+~~ters Dr. Eagle. (D 8366 ?ofi.8f>9.o5yr~ mobile chad(~~cl:-enginceis.aim Machelle Hill From: Sonya Watters Sent: Friday, September 20, 2013 10:50 AM To: Machelle Hill; Jacy Jones; Jaycee Holman; Holly Binkley Subject: FW: Tustin TWO Attachments: Lemp Canal 9-19-13.pdf Please add to file...thx From: Chad Kinkela [mailto:chad@ck-engineers.com] Sent: Thursday, September 19, 2013 2:53 PM To: Sonya Watters; 'Chad Kinkela' Cc: 'kent brown' Subject: RE: Tustin TWO Sonya -please see the attached revised letter. Thanks Chad Kinkela, P.E. CKEngineering PC 208-869-o5yo From: Sonya Watters [mailto:swatters@meridiancity.org] Sent: Thursday, September 19, 2013 2:41 PM To: Chad Kinkela Cc: kent brown (kentlkb@gmail.com) Subject: FW: Tustin TWO Can you please include in your letter how large of a pipe it would take to pipe the Lemp Canal? The Council will ask...thx From: kent brown [mailto:kentlkbC~gmail.com] Sent: Thursday, September 19, 2013 2:33 PM To: Sonya Watters Subject: Fwd: Tustin TWO Finally got something for you. Let me know if you need more kent ---------- Forwarded message ---------- From: Chad Kinkela <chad'url:-engineer°s.com> Date: Thu, Sep 19, 2013 at 2:24 PM Subject: Tustin TWO To: Kent Brown <kentlkbr~i~~zmail.com> Kent please see the attached letter. Please let me know if more is needed.