Loading...
Agency Commentsfib Member 5, 20L3 City q~1Vleridian City Clc~k's Office ~3 E Biroadway Avenue, Suite 102 Meridian, Tb X3642-2619 Imo: MI3A ~3-at3Baltic Place Addition Dear Jaycee: GI 1~' . ~ ~. 1503 FIRST STREET SOUTH FAX #208-463-0092 NAMPA, IDAHO83651-4395 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application.. However please be aware that a Land Use Change Application will be required before platting. All laterals and waste ways must be protected. NMID's Hunter Lateral is on the south boundary with a minimum easement of forty feet (40'); twenty feet (20') each side of centerline. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, CJreg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg PC: Office/File APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS -40,000 CENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT •• DISTRICT ~ITHEALTH Environmental Health Division DEPARTMENT Rezone # 'h~~ Pt--- t~ -bl~ ~ ~~,~ P~Q. -P Conditional Use # Preliminary /Final /Short Plat Return to: q I I~' ^ ACZ ^ Boise ^ Eagle ^ Garden City ^ Kuna Meridian ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. 8. After written approval from appropriate entities are submitted, we can approve this proposal for: I~ central sewage ^ community sewage system ^ community water well ^ interim sewage ~ central water ^ individual sewage ^ individual water 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: "central sewage ^ community sewage system ^ communitywater ~j sewage dry lines .central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ~13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: Date: ~ /~/~ Review Sheet 15726.001EH1111