ApplicationTRANSMITTALS TO AGENCIES FOR COMMENTS ON
DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN
Mayor Tammy de Weerd
City Council Members:
Keith Bird
Brad Hoaglun
Charles Rountree
David Zaremba
To ensure that your comments and recommendations will be considered by
the Meridian Planning and Zoning Commission please submit your
comments and recommendations to Meridian City Hall
Attn: Jaycee Holman, City Clerk, by: 29 -Aug -13
Transmittal Date: August 6, 2013 File No.: PP 13-019
Hearing Date: September 5, 2013
Request: Public Hearing - Preliminary Plat approval consisting of 16 single family
residential building lots and 4 common/other lots on 2.86 acres of land in the R-8
zoning district for Copperleaf Subdivision
By: Providence Properties, LLC
Location of Property or Project: 4505 E. Ustick Road
_Joe Marshall (No FP)
—Scott Freeman (No FP)
—Steven Yearsley (No FP)
_ Michael Rohm (No FP)
—Macy Miller (No FP)
_Tammy de Weerd, Mayor
_Charlie Rountree, C/C
—Brad Hoaglun, C/C
—Keith Bird, C/C
David Zaremba C/C
—Sanitary Services
—Building Department/ Rick Jackson
_ Fire Department
_ Police Department
City Attorney
_Community Development
_ City Planner
_ Parks Department
_ Economic Dev.
City Engineer
_ Meridian School District (No FP)
_ Meridian Post Office (FP/PP/SHP only)
_Ada County Highway District
_Ada County Development Services
_Central District Health
_COMPASS (Comp Plan only)
_Nampa Meridian Irrig. District
_Settlers Irrig. District
_ Idaho Power Co. (FP,PP,CUP/SHP only)
_ Qwest (FP/PP/SHP only)
_ Intermountain Gas (FP/PP/SHP only)
_ Idaho Transportation Dept. (No FP)
_Ada County Ass. Land Records
Downtown Projects:
—Meridian Development Corp.
Historical Preservation Comm.
South of RR / SW Meridian:
NW Pipeline
—New York Irrigation District
_ Boise-Kuna Irrigation District
Boise Project Board of Control / Tim Page
Your Concise Remarks:
City Clerk's Office • 33 E. Idaho Avenue, Meridian, ID 83642
Phone 208-888-4433 *Fax 208-888-4218 a www.meridiancity.org
OVEN N'=-
Planning Division
COMMISSION & COUNCIL REVIEW APPLICATION
Type of Review Requested (check all that apply)
D Alternative Compliance
D Annexation and Zoning
D Comprehensive Plan Map Amendment
D Comprehensive Plan Text Amendment
D Conditional Use Permit
D Conditional Use Permit Modification ;STAFF USE ONLY: > q
® Development Agreement Modification
D Final Plat File numbers):Q J
D Final Plat Modification WIDA- 13•
D Planned Unit Development r
® Preliminary Plat Project name: 42 nn
D Private Street Date filed: Date complete:
D Rezone
D Short plat Assigned Planner,
D Time Extension (Commission or Council) Related files: . - " rJ 1 mow 1
D UDC Text Amendment
D Vacation (Council) -
D Variance It ring date ',< 51 Commission D Council
D Other
Applicant Information
Applicamname: Providence Properties LLC Phone: 570.7575 Fax:
Applicant address: PO Box 2648 Eagle Zip: 83616 E-mail:
Applicant's interest in property: D Own D Rent ®Optioned D Other
Ownername: Minzio Sgroi Phone: Fax:
Owneraddress: 4405 East Ustick Meridian Zip: 83646 E-mail:_
Agent name (e.g., architect, engineer, developer, representative): Kevin McCarthy. P . E ,
Firmname: KM Engineering LLP Phone: 639 .6939 Fax: 639.6930
Address: 9233 West a e Street Boise Zip: 83714 E-mail: kevin@kmenallp.com
Primary contact is: D Applicant D Owner O Agent D Other
Contact name:
Contact address:
Subject Property Information
Phone: Fax:
Zip: E-mail:
Location/street address: 4405 East Ustick Road
Assessor's parcel number(s): 51104121051
Township, range, section: T3N, RIE, Sec. 4 Total acreage: 2.86
Current land use: 1 existing residence. Current zoning district: R-8
remainder vacant
33 E. Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.melidiancity.org
1 (Reit 02/08/2013)
Project Description
Project/subdivisionname: Copperleaf Subdivision
General description of proposed project/request: Subdivide 2.86 acres into 16 buildable
and 4 common lots for single-family residential nse
Proposed zoningdistrict(s): R-8 (no change)
Acres of each zone proposed: 2.86 (no change)
Type of use proposed (check all that apply):
0 Residential 0 Commercial 0 Office 0 Industrial 0 Other
Who will own & maintain the pressurized irrigation system in this development? Nampa & Meridian Trrigation
Which irrigation district does this property lie within? Name a & MPri di an Trri gat i on
Primary irrigation source: Surface water Secondary:
Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is city water):
Residential Project Summary (if applicable)
Number of residential units: 16 Number of building lots: 16
Number of common lots: 4 Number of other lots: 0
Proposed number of dwelling units (for multi -family developments only):
2- 3 bedrooms: n/ a 4 or more bedrooms: n/ a
Minimum square footage of structure(s) (excl. garage):
Minimum property size (s.f): _
Gross density (DlJ/acmtotauend):
Proposed building height:
Average property size (s.£): 5 . 235
Net density (DU/acre-excluding roads & alleys): 6.89
Percentage of open space provided: 17.4 Acreage of open space: 0.4
Percentage of qualified open space acreage: 13 (See Chapter 3, Article G, for qualified open space)
Type of open space provided in acres (i.e., landscaping, public, common, etc): landscaping/ common - 0 . 3
Amenities provided with this development (if applicable): pedestrian connectivity to Ustick
Type of dwelling(s) proposed: M Single-family Detached 0 Single-family Attached 0 Townhomes
0 Duplexes 0 Multi -family 0 Other
Number of
Gross floor area proposed: _
Hours of operation (days and hours):
Percentage of site/project devoted to the following:
Landscaping:
Total number of employees:
Total number of parking spaces provided:
Authorization
Print applicant name
Applicant signature:
Building:
Other lots:
Existing (if applicable):
Building height:
Paving:
Number and ages of students/children
Number of compact spaces provided:
33 E. Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
2 (Rev. 02/082013)
km
9233 WEST STATE STREET I BOISE, ID 83714 1 208.639.6939 1 FAX 208.639.6930
July 31, 2013
Project No.: 13-052
Sonya Watters
City of Meridian
33 East Broadway Avenue, Ste. 102
Meridian, ID 83642
RE: CopperleafSubdivision —4405 East Ustick— Meridian, ID
Preliminary Plat & Development Agreement Modification Narrative
Dear Sonya:
On behalf of Providence Properties, LLC, we are pleased to submit the attached application and
required supplements for the preliminary plat and development agreement modification of
Copperleaf Subdivision. Please accept this letter as the required written narrative regarding the
project.
This single-family residential project encompasses approximately 2.86 acres located at 4405 East
Ustick in Meridian, Idaho. The site currently houses an existing residence and outbuildings, all of which
will be removed as part of this project.
On October 7, 2008, the City Council approved a proposal for annexation and zoning of the property
(Case No. AZ -08-011). In May 2012, the owner entered into a development agreement with the City
(Instrument No. 112043739) that allowed for an assisted living facility on the site. In November 2012,
the development agreement was amended (Instrument No. 112117349) to allow the site to develop
as a residential subdivision to include 14 single-family lots and 2 townhome lots.
The attached preliminary plat application reflects utilization of the amended development agreement,
but with modifications. The current developers do not wish to construct townhome units, and are
hereby requesting a modification to the existing development agreement to replace the 2 previously -
approved townhome lots with 2 single-family residential lots, resulting in a project total of 16 single-
family residential lots and 4 common lots. In addition, the layout has been modified slightly to
accommodate the current zoning requirements of 10% open space and a site amenity.
The site carries a Comprehensive Plan designation of Medium Density Residential and a current zoning
designation of R-8 (Medium Density Residential), which allows for up to 8 units per acre. Our
proposed preliminary plat reflects a gross density of 5.59 units per acre, and a net density of 6.89 units
per acre, both of which comply with the current zoning regulations. In addition, the 0.3 acres of open
space proposed with this project total 13%, which meets City requirements. The developer is also
proposing to provide a pedestrian pathway connecting to the sidewalk along Locust Grove, which
ENGINEERS I SURVEYORS I PLANNERS
www.kmengllp.com
complies with the City's requirement to provide a site amenity. We are not requesting any variances
to the ordinance as a part of this project.
As required by ACHD, the existing driveway approaches to Ustick Road will be removed during the
course of construction and the site will be served via the extension of Arch Drive in Red Feather
Subdivision, which is south of this project.
The public utilities providing services to this area have been contacted and none have expressed
concerns with serving this project. These include the City of Meridian, Idaho Power, Intermountain
Gas, CenturyLink, Cable One, and the Nampa & Meridian Irrigation District.
This property has shares within the Nampa & Meridian Irrigation District, which will be utilized to
provide pressure irrigation to the project. The Nampa & Meridian Irrigation has indicated that a minor
pump upgrade may be necessary, but that the irrigation system serving Red Feather Subdivision,
which is owned and maintained by the District, can be utilized to serve this project.
There are no concerns in regards to other public services in the area, as the addition of 16 new homes
within an existing residential area will not greatly impact available public services. Further, Copperleaf
Subdivision will not create excessive additional requirements at public expense for public facilities and
services because services will be supported by property taxes and/or fees paid directly to the service
providers.
At this time, there are no known health, safety, or environmental problems that currently exist or that
will exist as a result of this development.
Should you have questions or require further information in order to process this application, please
let me know as soon as possible.
Sincerely,
KM Engineering, LLP
Kevin McCarthy, P.E.
Principal Engineer
cc: Providence Properties, LLC
PAGE 12
'RCt.,r
1 9233 WEST STATE STREET I BOISE, ID 83714 1 208.639.6939 1 FAX 208.639.6930
July 31, 2013
Project No. 13-052
Copperleaf Subdivision
BOUNDARY LEGAL DESCRIPTION
A parcel of land being a portion of Government Lot 2 and situated in the NEI/4 of Section 4,
Township 3 North, Range 1 East, Boise Meridian, City of Meridian, Ada County, Idaho, and being
more particularly described as follows:
Commencing at an aluminum cap monument marking the north 1/4 corner of said Section 4, which
bears N89044'17"W a distance of 2,649.76 feet from a brass cap monument marking northeast
corner of said Section 4, thence following the northerly line of said Section 4, S89°44'17"E a
distance of 1062.63 feet to a point;
Thence leaving said northerly line, S00°48'17"E a distance of 48.01 feet to a 5/8 inch rebar on the
southerly right-of-way line of E. Ustick Rd. and the POINT OF BEGINNING;
Thence following said southerly right-of-way line, S89"44'17"E a distance of 81.07 feet to a 5/8 inch
rebar;
Thence following said southerly right-of-way line, 588°18'21"E a distance of 120.04 feet to a point;
Thence following said southerly right-of-way line, S89°44'17"E a distance of 60.04 feet to a paint;
Thence leaving said southerly right-of-way line, S00°32'25"W a distance of 542.02 feet to a 5/8 inch
rebar on the northerly boundary of Redfeather Estates Subdivision No. 2, as recorded in plat book
92 at pages 10895 through 10897, official records of Ada County, Idaho;
Thence following said northerly subdivision boundary, N65°53'17"W a distance of 273.76 feet to a
5/8 inch rebar;
Thence leaving said northerly boundary, NOO°48'17"W a distance of 434.39 feet to the POINT OF
BEGINNING.
Said parcel contains 2.86 acres, more or less, and is subject to all existing easements and/or rights-of-way
of record or implied.
-7•-66°700
ENGINEERS I SURVEYORS I PLANNERS
The Orantess harem have read, and approved the following: _ V)
Title File No.: T96-40612"1(/ WARRAIV
FOR VALUE RECEIVED
AOL LIMITED PARTNERSHIP, an Idaho Limited Partnership
GRANTOR(s), does(do) hereby GRANT, BARGAIN, SELL and CONVEY Unto: NUN210 SGROI, an
unmarried man
GRANTEES(s), whose current address is: 4406 Ustick Road , Meridian, Idaho 83642
the following described real property In Ada County, State of Idaho,
more particularly described as follows, to wit:
Fart of Lot 2 of Section 4, Township 3 North, Range 1 East of the Boise
Meridian, Ada County, Idaho, described as follows:
Commencing at the section corner common to Sections 33 and 34, Township 4
North, Range 1 East and Sections 3 and 4, Township 3 North, Range 1 East, Boise
Meridian; thence
South 89052• West 1,325.98 feet; thence
South 0^14120" West 33 feat to the [ZEAL POINT OF BEGINNING= thence
South 89"521 West 261.47 feet; thence
South 10121 East 449.40 feet, thence
South 66^171 East 272.41 feet; thence
North 0^14120" Bast 559.48 feet to the REAL POINT OF BEGINNING.
EXCEPT ditch and road rights of Way. 9 6 1 0 1 7 4 2
TpANSNATION TITLE 8,
ADA CO. RECORDER
.i. DAVID HAVAP,RO
BOISE 10
' 96 DEC 1� P�4&Granteels)
TO HAVE AND TO HOLD the said premises, with their appurtanencas o tYsald t{rNr
heirs and assigns forever. And the sold Grantors) does(do) hereby c df?u3novAmiHb Q rantee(a), that
Grantor(s) Is/are the ownerls) in fee simple of said premises; that said prem sea are free from all encumbrances,
EXCEPT those to which this conveyance Is expressly made subject and those made, suffered or done by the
Granteetsl; and subject to reservations, restrictions, dedications, easements, rights of way and agreements,ltf and
of record, and general taxes and assessments, (including irrigation and utility assessments, if any) for the current
year, which are not Vat due and payable, and that Grantor(s) will warrant and defend the some from all lawful
claims whatsoever.
Dated: December 10, 1996
State of Idaho , County of Ada 1.
On this 11th day of December ,1996
before me, the undersigned, a Notary Public
for said State personally appeared
Larry Compton
know or identified to me to be the person°
whose same—is subscribed to the within
instrument asthe General Partner of
ADL Limited Partnership, en Idaho Limited
_Partnership
and acknowledged to me that he
executed the same as such General Partner
Notary Public for the State Iaaho
Residing at: Meridian. Idaho
Commission Expires 6-10-95
• P' n,. a•47
ea'�4P e°aveeveee.
a �OT-44
° l'fIBLLC
OF 11)?;
title & Escrow, Inc.
AFFIDAVIT OF LEGAL INTEREST
STATE OF IDAHO)
COUNTY OF ADA)
I, Nunzio Siroi---L. 4405 E. Ustick Rd.
(name) (address)
(city)
being first duly sworn upon, oath, depose and say:
_ID 83646-5667
(state)
1. That I ani the record owner of the property described on the attached, and I grant my permission to:
_Providence Properties _701 S. Allen St., Ste. 104 Meridian, ID 83642
(name) (address)
to submit the accompanying application(s) pertaining to that property.
2. I agree to inderanify, defend and hold the City of Meridian and its employees harmless from any
claim or liability resulting fiom any dispute as to the statements contained herein or as to the
ownership of the property which is the subject of the application.
3. I hereby grant permission to City of Meridian staff to enter the subject property for the purpose of
site inspections related to processing said application(s).
Dated this � O � m ,day of t
1,, i ')-
SUBSCRIBED
SUBSCRIBED AND SWORN to before me the day and year first above written.
-F—) I � v U L
` Notary Public for Idaho)
C40TA,7 „7 (n
Residing a '�-' .p -J
J)
"UBLIG My Commission Expires: wnp 30 —A
-
33 E. Broadway Avenue. Suite 102 • Meridian. Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: wnw.meridiaucity.org
USTICK
9233 WEST STATE STREET Plan Scale
BOISE, IDAHO 83714
PHONE FAX (208) 639-6930 9
6396930COPPERLEAF SUBDIVISION
DATE: 7/31/13
PROJECT: 13-052
SHEET:
1 OF 1
MERIDIAN, ID
VICINITY MAP
3 05"? -
CITY OF MERIDIAN
PRE -APPLICATION MEETING NOTES
ProjecUSubdivisionName`. Jgrni PF -par Date:
City Staff: SLmU )U5}Jn . gruc _d'� Pe 1f3
Location; 4 40. e - lst c Rd.
Comprehensive Plan Future Land Use Map Designation: Size of Property: 2 4,5
Design Guidelines Development Context:
Proposed Use:5 (I� �ch) Proposed Zoning: —
Existing Use: S(,t en'4�Existing Zoning: R,-8
Surrounding Uses, dckoot
Street Buffer(s) and/or Land Use Buffer(s): 35 wf3e b ee r a lavw US h'cfC
Open Space/AmenitiestPathways:rPN 5' Wida Ae a -di
Access/Stub Streets/Street System: ipbit 5 ree+ 41vb +o wrsfi
Sewer & Water Service:
Canals/Ditches/Irrigation/Hazards: r4f,
History:. A2-oK-o t 'I MAPF, 117-0+57361 j 112-II"134°i
Additional Meetino Notes:
Note: A Traffic Impact Study (TIS) will be required by ACHD for large commercial projects and any residential development with over '�
100 units. It is the applicant's responsibility to contact & transmit the TIS to ACHD. To avoid unnecessary delays & expedite the hearing
process, applicants are encouraged to submit the TIS to ACHD prior to submitting their application to the City. Not having ACHD
comments and/or conditions on large projects may delay hearing(s) at the City. Please contact Mindy Wallace at 387-6178 or
Christy Little at 387-6144 at ACHD to determine if a TIS is required or for any questions in regard to ACHD conditions,
impact fees and process.
Other Agencies/Departments to Contact:
❑ Ada County Highway District ❑ Nampa Meridian Irrigation District ❑ Public Works Department
F1Idaho Transportation Department ❑ Settler's Irrigation District ❑ Building Department
❑ Sanitary Services Company ❑ Police Department ❑ Parks Department
❑ Central District Health Department ❑ Fire Department ❑ Other:
Application(s) Required:
❑ Administrative Design Review ❑ Conditional Use Permit Modification/Transfer ❑ Rezone
❑ Alternative Compliance ❑ Development Agreement Modification ❑ Short Plat
❑ Annexation ❑ Final Plat ❑ Time Extension - Council
❑ City Council Review ❑ Final Plat Modification ❑ UDC Text Amendment
❑ Comprehensive Plan Amendment - Map ❑ Planned Unit Development ❑ Vacation
❑ Comprehensive Plan Amendment- Text Preliminary Plat ❑ Variance
❑ Conditional Use Permit Private Street ❑ Other
Notes: 1) Applicants are required to hold a neighborhood meeting in accord with UDC 11 -5A -5C prior to submittal of an application
requiring a public hearing (except for a vacation or short plat); and 2) All applicants for permits requiring a public hearing shall post the
site with a public hearing notice in accord with UDC 11-5A-50 (except for UDC text amendments, Comp Plan text amendments, and
vacations). The information provided during this meeting is based on current UDC requirements and the Comprehensive Plan. Any
subsequent changes to the UDC and/or Comp Plan may affect your submittal and/or application. This pre -application meeting shall be
valid for four (4) months.
Subdivision - 4405 East Ustick
Neighborhood Meeting Sign -in Sheet
July 2, 2013, 6:30 p.m. - Meridian City Hall
COMMITMENT OF PROPERTY POSTING
Per Unified Development Code (UDC) 11 -5A -5D, the applicant for all applications requiring a
public hearing (except for a UDC text amendment, a Comprehensive Plan text amendment
and/or vacations) shall post the subject property not less than ten (10) days prior to the hearing.
The applicant shall post a copy of the public hearing notice of the application(s) on the property
under consideration.
The applicant shall submit proof of property posting in the form of a notarized statement and a
photograph of the posting to the City no later than seven (7) days prior to the public hearing
attesting to where and when the sign(s) were posted. Unless such Certificate is received by the
required date, the hearing will be continued.
The sign(s) shall be removed no later than three (3) days after the end of the public hearing for
which the sign(s) had been posted.
I am aware of the above requirements and will comply with the posting requirements as stated in
UDC 11-5A-5.
A.
t
Applica t/agent s gnature Date
33 E. Broadway Avenue, Suite 102 • Meridian, Idaho 83642
Phone: (208) 884-5533 > Facsimile: (208) 888-6854 • Website: www.meridiancity.org
Meridian City Hall, Suite 102
33 E. Broadway Avenue
Meridian, Idaho 83642
Community Development 208.887.2211
Department
Address Verification
Date: 7/2/13
The address information below has been researched and verified as correct by the City of Meridian
Community Development Department.
Project Name: Sgroi Property (Subdivision Name TBD)
Address: 4405 E. Ustick Rd.
Zip Code: 83646
Parcel Number: 51104121051
Acres: 2.855
T/R/S: 3N 1E 4
Owner: Nunzio Sgroi
4405 E. Ustick Rd.
Meridian, ID 83646
Address Verification Rev: 04/23/12
Christen Haisty
From: Jerry Hastings phastings@adaweb.net]
Sent: Wednesday, July 03, 2013 11:03 AM
To: Kirsti Allphin; Aaron Ballard (aballard@kmengllp.com)
Subject: Copperleaf Subdivision Name Reservation
July 3, 2013
Kirsti Allphin
KM Engineering, LLP
RE: Subdivision Name Reservation: " Copperleaf Subdivision"
Dear Kirsti,
At your request I have reserved the name of " Copperleaf Subdivision" for your project. I can honor this reservation only
as long as your project is in the approval process. Final approval can only take place when the final plat is recorded
This reservation is available for the next ten (10) years unless the project is terminated by the client or the jurisdiction or
the conditions of approval have not been met. In which case the name can be re -used by someone else.
Sincerely,
Jerry Hastings, P.L.S.
County Surveyor
Ada County, Idaho
208-287-7912
208-287-7909 Fax
jhastingsna.adaweb. net
From: Kirsti Allphin [mailto:kallphin@kmengllp.com]
Sent: Tuesday, July 02, 2013 1:14 PM
To: Jerry Hastings
Cc: 'Aaron Ballard'
Subject: Sub Name Reservation Request
Hi Jerry -
We are working on a new residential subdivision project located at 4405 East Ustick in Meridian. The parcel number is
51104121051.
The development group, Providence Properties, LLC, has asked that we request the name "Copperleaf Subdivision" for this
project.
Please let me know if this name is acceptable.
Thanks,
Kirsti Allphin
Development Assistant
Office Manager
16nKM Engineering, LLP
9233 West State Street
RE _t Boise, ID 83714
HM
URI
a
7-1
pi
5 ON
I
/ � xonTMsxgxaxavixU�_
s
®§I II
I
I L --
�n
_ I
5 C I
_ A �� r
x. e 1x 0 ery °8 �gg
I --,00h—
qaeCk
5NC M � a
sg£kx x° IC -
mIQ I,
Nva
� la
p39�
E, €5 I�
I ri
y § g� g x
Ji In Imp ea ilvn; � �_ � v
g s 5 § & q�5 fin 0 @ eat .Z7 fTl
5 8sasi® ��$a� q� s N x t§ �➢ s �� m
R
§ � R pcp � r a3 3 5 = 3"'UN.,
v m— r—
as P� / p -� 31 b €3 5 a —
-r° U�R D Co_>
z ,pL'�
xPaszae €s� a p 5 p 6 ��.�� v, o Dr^
°n`5 _'< [A
9
b G
I I
1 1 1
I
—
/ I
as �_ 1 '_ . 1— "9 31 1
7 1 r g l 6w Ei w b° Ij
SAT11 �� L �' �w�.'_I \
�s
Ir _
ks €" a gYl I' 111 G II /SII I B:g
L_J L --J L_<AZ_-�=yl LJ L,__1
M, r
I I
I
e 1
py 1
1
s a ¢@I ly no as m
m �SS n S
z ZO 4 rn
€ � dw C f7
y �-00` II ®Oe 1 111 k 111 k �° O
a Rio I I I I a Z m
z�m
�ELL
m
5 0 k �iyg a"k� @k k$@ 6 o Z G) Ln
6 W
gel: f NP,s'o o�amoma
Ell
4
�^ L
m
r
3�
z0
nm
7o m
amm
Boz
<ac)�
ti Z z N
VOC
n m ou
a A v_
zc
C)Ln
05
o
T
r
m
I;T
°Tr9 i
j P ,
4 i K x K s F e p
� I
o �@ R€
�g
a
s
alp
9`f!!3 'Fa 3s f i�apB� 2Aa4 s�Eq o �
gg €n P x�a a'Y
y 9 g:ai i o 0
8g a{{ a e axg
' atl n °j�§, Kdie
®�
l
2 &€4m POK { 1 �c 39 go
3 � exs
a$
13 v
a$ 77
a m m
t,o �ii➢ixa3xT�ea r� Z
aT
N o
a3 Q
ONS
zo 1 afi� @A ,.� D
5 a>�=• g 9
Ad ��
Raa,
eG�� gam€ rz a t �� ; , h ����€
a �p� a 4e# y5p ��k£ a �^&d 4 Cog qg P a € F UA
F €7§'xq R
g g .} n €gig�p W
e �i � _
G x 4 R F � a F z
si�� x s x j €# _ �� i § Rol �F o
g S@ €
� � a s.��k -p � qFq � �a' E-egf aA A
a�
-
9tl
aeA�
4 xg IgA �
[��75���
9S^ go p e q
Jc d .F g @ij Sta s 3 € 6;g0 RK E A P F SgX 4€
S 8 tt 5
4it€ a al
PH
a 3
g €€i
1
gs��gxa�og; s
ifj lo
sad; s
a m
dMi
g 4 0
�s a Alegi o
A My
Z m
/ m
�D
m
z aLn
Z9A W➢ W
o Z�
MC
r aft €f m N
i e;g° v O
eao� g Z z
A 0E5 0
Dz f q o g r m
i
Roo, '
o;.
July 9, 2013
File: B013323A
Providence Properties, LLC
Attn: Randy Clarno
PO Box 2648
Eagle, ID 83616
RE: Geotechnical Engineering Evaluation
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
Dear Mr. Clarno:
Strata, A Professional Services Corporation (STRATA) is pleased to present our
authorized Geotechnical Engineering Evaluation for the proposed residential development
located at 4405 East Ustick Road in Meridian, Idaho. Our Geotechnical Engineering
Evaluation's purpose was to explore the subsurface conditions in the proposed development
area and provide geotechnical recommendations to assist project planning, design and
construction. The attached report summarizes our field and laboratory test results and presents
our geotechnical engineering opinions and recommendations.
The following report provides specific geotechnical recommendations for preparing the
site, including earthwork activities, pavement design and stormwater design recommendations.
It is our opinion that geotechnical continuity with the project team throughout construction will
lessen the potential for errors and omissions related to our geotechnical recommendations.
The project design, owner, and construction team must read, understand and implement
this report in its entirety. Portions of the report cannot be relied upon individually without the
supporting text of remaining sections, appendices and plates. Our opinion is the success of the
proposed construction will depend on following the report recommendations, good construction
practices, and providing the necessary construction monitoring, testing and consultation to
verify that work has been constructed as recommended. We recommend STRATA be retained
to provide these services to verify our report recommendations are being followed.
We appreciate the opportunity to work with you and we look forward to our continued
involvement on this project throughout construction. Please do not hesitate to contact us if you
have any questions or comments.
Sincerely, M -E6 --, ;
STRATA, Inc. �r�1e J ��
( �) 130
teve Worsley, P.G. (W shington) r: �3 i
Geologist �a 0�
Cc: Mr. Kevin McCarthy/KM Engineering
SW/AM/nm
www.stratageotech.com
Manager
REPORT
Geotechnical Engineering Evaluation
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
Prepared For:
Providence Properties, LLC
Randy Clarno
PO Box 2648
Eagle, ID 83616
Prepared By:
STRATA, Inc.
8653 W. Hackamore Dr.
Boise, Idaho 83709
P. 208.376.8200
F. 208.376.8201
July 9, 2013
TABLE OF CONTENTS
Page
INTRODUCTION............................................................................................................1
PROJECT UNDERSTANDING.......................................................................................2
Existing Site Conditions..................................................................................................2
Proposed Construction...................................................................................................2
SUBSURFACE EVALUATION PROCEDURES..............................................................2
SUBSURFACE CONDITIONS........................................................................................3
LABORATORY TESTING...............................................................................................
3
GEOTECHNICAL OPINIONS AND RECOMMENDATIONS...........................................4
Earthwork....................................................................................................................4
Site and Subgrade Preparation................................................................................4
Wet Weather/Soil Construction................................................................................5
Excavation Characteristics.......................................................................................
6
Utility Trench Construction........................................................................................
6
Structural Fill and Compaction. ......................... ........................ ..............................
7
Table 1. Structural Fill Specifications and Allowable Use .............................................
7
Geosynthetics...........................................................................................................
8
Pavement Section Design............................................................................................8
General....................................................................................................................
8
Trafficand Subgrade................................................................................................9
Table 2. Pavement Design Parameters.......................................................................9
Asphalt, Aggregate Base Course and Subbase Materials ........................................
9
Pavement Section Thickness.................................................................................10
Table 3. Asphalt Pavement Design Section...............................................................10
Pavement Maintenance..........................................................................................10
SiteDrainage.............................................................................................................10
ExteriorGrading.................................................................................................
10
InfiltrationRates.....................................................................................................11
Groundwater.. ...... ..................................................................................................
11
GEOTECHNICAL DESIGN CONTINUITY....................................................................12
EVALUATION LIMITATIONS........................................................................................12
Geotechnical Engineering Evaluation
Sgroi Property
4505 East Ustick Road
Meridian, Idaho
INTRODUCTION
Strata, A Professional Services Corporation (STRATA) has performed our geotechnical
engineering evaluation for the proposed development planned at 4405 East Ustick Road in
Meridian, Idaho. Our evaluation's purpose was to explore the subsurface soil conditions at the
project site and to prepare geotechnical recommendations to assist project planning, design
and construction. We accomplished our services referencing our authorized geotechnical
proposal dated June 26, 2013. To accomplish our evaluation, STRATA performed the following
services:
1. Coordinated exploration with the Idaho Digline Utility Notification Center to help reduce the
potential for damage to existing utilities.
2. Observed the excavation of 2 exploratory test pits within the planned development area.
Test pit exploration extended 13 feet below existing grades. A standpipe piezometer was
installed in one of the test pits. Our field geologist visually described, classified and logged
soil encountered referencing the Unified Soil Classification System (USCS).
3. Performed laboratory tests with reference to ASTM International (ASTM) procedures
including R -value, in-situ moisture content, and grain size evaluation. We utilized these
laboratory results to help characterize engineering parameters and to correlate soil
engineering characteristics used in our design.
4. Performed engineering analyses in order to provide geotechnical design and earthwork
construction recommendations. Our engineering analyses provides geotechnical
recommendations and opinions for:
10 Earthwork
• Site and subgrade preparation
• Wet weatherlsoil construction
• Excavation characteristics
• Utility trench construction
• Structural fill and compaction
• Geosynthetics
Pavement Section Design
• Traffic and subgrade
• Asphalt, aggregate base course and subbase materials
• Pavement section thickness
• Pavement maintenance
`;tW lffc t Hl"Nimove
www.stratageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 2
4 Site Drainage
• Exterior grading
• Infiltration rates
• Groundwater
1§ Geotechnical Design Continuity
• Groundwater Monitoring
• Plan and specification review
• Construction observation and testing
5. Prepared and provided an electronic copy of our final report of geotechnical findings,
opinions and recommendations, including exploration logs and an exploration location plan.
Hard copies are available upon request.
PROJECT UNDERSTANDING
Existing Site Conditions
The proposed construction development is located on the south side of East Ustick
Road approximately 1,300 feet west of the intersection of East Ustick Road and North
Cloverdale Road. The proposed subdivision will be accessed from the south via East Arch
Drive. The site is currently developed with a single family residence and 2 associated detached
garage outbuildings in addition to a mobile home unit. These structures are located in the
northwest corner of the site. Further, in the central portion of the site, there is a concrete slab
that appears to be a remnant of a demolished structure. The site is bounded by West Ustick
Road on the north and by residential properties to the east, a school to the west, and East Arch
Drive to the south.
Proposed Construction
We understand the approximate 2.8 -acre development will consist of 16 buildable lots
with proposed asphalt paved roadways providing access to the development. Although
structures are not currently defined, we anticipate buildings will be supported by shallow
foundations and joist floor systems. We also anticipate stormwater will be disposed of via
seepage beds or swales.
SUBSURFACE EVALUATION PROCEDURES
STRATA accomplished subsurface exploration on July 1, 2013 via 2 exploratory test pits
extending 14 feet below existing ground surface. The approximate exploration locations are
illustrated on Plate 1, Exploration Location Plan, which also delineates the proposed
development. Test pit locations were established in the field by taping from existing site
features.
www.stratagootech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 3
A professional geologist visually evaluated the soil encountered in each test pit and
logged the soil profile referencing the USCS. We provide a brief USCS explanation in Appendix
A to help interpret the terms on individual test pit logs. Individual test pit logs are also provided
in Appendix A. The test pits were backfilled with the excavated material to the ground surface
following the completion of excavations.
SUBSURFACE CONDITIONS
Topsoil and vegetation was observed to a depth of approximately 8 inches below grade
within the test pits excavated. Soil conditions encountered within test pits generally consist of
sandy silt overlying poorly graded gravel with sand and silt. The poorly -graded gravel with sand
was encountered to the bottom of the test pits. We provide more specific discussion of each
soil unit encountered below:
Native silt — Surficial silt and silt with sand was observed at the ground surface,
extending to a depth of 4 to 6 feet below existing grade. Surficial soil was described as
brown to tan, stiff to hard, and dry to moist. Moderate calcium carbonate cementation is
present in the silt between approximately 3 and 6 feet.
0 Poorly -graded gravel with sand — Below silt soil, we observed poorly -graded gravel
with sand and silt to the test pit termination depths of 14 feet. The gravel with sand and
silt was described as tan, dense to very dense, and moist.
Specific soil contacts and descriptions are further described on individual test pit logs
provided as Appendix A to this report, along with a USCS explanation to assist with test pit log
information. Groundwater was not encountered within test pits at the time of exploration;
however, we installed a temporary standpipe piezometer in the excavation for TP -1 for future
groundwater monitoring. Groundwater has the potential to vary with seasonal changes in
irrigation, precipitation, infiltration and development to the project site.
Subsurface variations may exist between exploration locations and may not be apparent
until construction. Test pits only allow us to observe a portion of the site subsurface conditions.
Where such variations exist, they may impact opinions and recommendations presented in this
report, as well as construction timing and costs.
LABORATORY TESTING
We returned soil samples collected in the field to our laboratory for further classification
and testing and accomplished laboratory testing referencing ASTM International (ASTM)
procedures. We developed our laboratory testing program for this project primarily to evaluate
www.stratageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 4
subsurface soil characteristics and engineering properties. Specifically, we accomplished
moisture content, minus No. 200 wash and R -value testing. We present laboratory test results
on individual test pit logs in Appendix A. R -value graphical results are presented in Appendix B.
We will retain soil samples for 90 days and discard after this time period unless we are notified
to store the samples for an extended period of time.
GEOTECHNICAL OPINIONS AND RECOMMENDATIONS
We present the following geotechnical recommendations to assist planning, design and
construction of the proposed development planned at the Sgroi Property, located at 4405 East
Ustick Road in Meridian, Idaho as illustrated on Plate 1 attached to this report. This report
provides geotechnical design criteria for the development which the design and construction
teams must review to verify the applicability to the planned construction. We base our
recommendations on the results of our field evaluation, laboratory testing, our experience with
similar soil conditions and our understanding of the proposed construction. If design plans
change or if the subsurface conditions encountered during construction vary from those
observed during our field evaluation, we must be notified to review the report recommendations
and make necessary revisions.
Earthwork
Site and Subgrade Preparation
STRATA has not reviewed a grading plan for the proposed development, but we
anticipate cut and fill will be less than approximately 1 -foot for project site grading. At the time
of exploration, surficial vegetation and organic material was observed to a depth of
approximately 8 inches. We recommend a minimum of 8 inches of topsoil with organic matter
be stripped beneath all planned improvements, including structural fill areas. This topsoil is not
suitable for use as structural fill and should be wasted or stockpiled on-site for landscape areas.
In the area of the current house, garages, mobile home, and concrete slab area, existing
structures must be completely demolished and removed from the site.
Test pits have been marked in the field with labeled standpipe piezometers or stakes.
Test pit locations should be surveyed prior to any earthwork site grading activities. Test pits
which are located beneath paving, structural fill or building lot areas should be re -excavated and
replaced with structural fill in accordance with the recommendations in this report.
ww w. s t r ata g e o to c h. c o in
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: BO13253A
Page 5
The stripped subgrade in proposed structural fill, pavement and sidewalk areas should
be proof -rolled with a minimum of 5 passes from a heavy 5 -ton roller or equivalent. If weaving
or pumping is observed, those areas should be removed and replaced with structural fill.
Wet Weather/Soil Construction
We strongly recommend earthwork construction take place during dry weather
conditions. Silty soils are susceptible to pumping or rutting from heavy loads such as rubber -
tired equipment or vehicles when the soil is above optimum moisture content. Earthwork should
not be performed immediately after rainfall or until soil can dry sufficiently to allow construction
traffic without disturbing the subgrade. During and after achieving subgrade elevation, the
contractor must take precautions to protect the subgrade from becoming disturbed or saturated.
We recommend the contractor limit construction traffic to any prepared subgrade and reduce
exposure to precipitation and water. Specifically, the contractor should:
6 Grade subgrades to aggressively direct surface water away from construction areas
that could be adversely affected by infiltration.
9, After adequate moisture conditioning efforts have failed, remove exposed subgrade
soil that becomes soft or begins to pump to firm soil and replace it with structural fill
as described above for over -excavations.
Never attempt structural fill placement during or immediately following a significant
precipitation event.
9 Never allow subgrades to freeze or become saturated prior to fill placement.
The final subgrade conditions and careful construction procedures are critical to the
long-term project performance. We recommend earthwork specifications specifically identify the
contractor's responsibility to protect and maintain prepared subgrades. It may improve project
economy to retain STRATA to observe the subgrade preparation activities to identify techniques
or construction activities that may be attributing to unstable subgrades and contributing to the
need for over -excavations. If significant soft/wet soil conditions are encountered, the use of a
woven geotextile fabric may be necessary. These material requirements are presented in the
Geosynthetics report section.
Allowing time for proper moisture -conditioning during dry weather is critical to reducing
excessive over -excavations and importing granular structural fill. However, depending on the
weather and moisture conditions during construction, drying fine-grained soil may not be
practical, and over -excavation in conjunction with the use of geosynthetics may be necessary to
QO
www.stratageoteGh.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 6
help maintain project schedule. In short, using site soil may be impractical during certain
weather or soil conditions and we recommend contingencies to remove and replace wet soil.
Excavation Characteristics
Based on exploration results, it appears the near -surface soil encountered in exploratory
test pits may be excavated with conventional equipment. Excavations can cave and slough and
must be sloped back in accordance with Occupational Health and Safety Act (OSHA)
guidelines. Fine to coarse-grained soil is expected to be exposed in excavations throughout the
development area and should be temporarily sloped at 1.51-1: IV (horizontal to vertical). Due to
the potential for varying soil conditions at the time of construction, we recommend earthwork
contractors evaluate each excavation configuration specific to OSHA guidelines and to seek
appropriate professional guidance to ensure excavation safety and stability.
Utility Trench Construction
Structural fill for backfilling utility trenches and all bedding should conform to Idaho
Standards for Public Works Construction (ISPWC) specifications, except that all trench backfill
must be placed and compacted to the structural fill requirements presented herein. Loose soil
must be removed from the base of utility trenches prior to placing pipe bedding. In addition, if
water is encountered, it must be removed from the base of the utility trench before placing pipe
bedding. We recommend utility pipes be placed on at least 4 inches of bedding placed over
undisturbed native soil, structural fill or otherwise supported according to the pipe manufacturer's
specifications and ISPWC requirements.
After bedding the pipe, place structural fill and compact it from the pipe invert to 1 -foot
above the top of the pipe with tamping bars and/or plate compactors to render the backfill in a firm
and unyielding condition. Thoroughly place and compact bedding below pipe haunches or the
zone between the pipe invert and the spring line. To accomplish backfilling, the distance between
the side of the pipe at the spring line and the trench wall should be at least 12 inches. The
remainder of the utility trench should be backfilled in accordance with the Structural Fill section of
this report.
www.st ratageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 7
Structural Fill and Compaction
All fill placed for the development must be placed as structural fill. The structural fill
requirements described in Table 1 below, in general, correlate to ISPWC material
specifications. Project structural fill products are described in Table 1 below.
Table 1. Structural Fill Specifications and Allowable Use
Structural Fill Product
Allowable Use
Material Specifications'
Sieve
Size
%
Passing
• Soil classified as GP, GW, GM, SP, SW, SM or
General Structural FillML
® General site grading
according to the USCS.
• Maximum particle size must be less than 6 inches.
• Soil consisting of inert earth materials with < 3
percent organics or other deleterious substances
wood, metal, plastic, waste, etc).
Granular Structural Fill
General site grading
• Over -excavation
Pavement section
® granular subbase
• Soil classified as GP, GP -GM, GW, according to
the USCS, and meeting the gradation provided.
• Soil meeting requirements stated in the latest
edition of the Idaho Standard for Public Works
Construction (ISPWC), Section 801— Aggregate
Subbase.
6 Inch 100
3 Inch 90-100
No. 4 30-60
No. 200 <10
• Soil meeting requirements stated in the latest
1 Inch 100
% Inch 80-100
edition of the Idaho Standard for Public Works
Utility Trench Bedding
Construction (ISPWC), Section 305 — Pipe
Bedding.
3/8 Inch 20-70
No.4 5-20
• Soil may not contain particles larger than 1 inch in
No. 8 0-5
median diameter and must meet the required
No. 200 0-3
radation.
• Soil meeting requirements stated in the latest
1 Inch 100
Aggregate Base Course
edition of the Idaho Standard for Public Warks
114 Inch 90-100
Over -excavations
Construction (ISPWC), Section 802—Aggregate
• Granular structural fill
Base.
No.4 40-65
• Pavement section
• Soil may not contain particles larger than 1 inch in
No. 8 30-50
base course
median diameter and must meet the required
gradation.
No. 200 3-9
All structural fill from on-site or imported sources should be placed in maximum 10 -inch -
thick lifts, and each lift shall be moisture -conditioned to within 3 percent of optimum moisture
content and compacted to a minimum of 95 percent of ASTM D 1557 Modified Proctor. The
maximum, loose -lift thickness is based on using large, 5- to 10 -ton, smooth -drum vibratory
rollers. The maximum loose lift thickness should be reduced where smaller and/or lighter
compaction equipment is used. STRATA should be retained to perform field density testing of
structural fill to verify contractor compliance with the above minimum compaction criteria.
Structural fill with greater than 30 percent retained above the'/ -inch sieve is too coarse
for proctor density testing, but may be used as granular structural fill provided it meets the
www.stratageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 8
above specification. Coarse fill must be compacted using a "method specification" developed
during construction, based on the material characteristics and the contractor's means and
methods. It is common that "method specifications" are developed during construction, specific
to the materials and conditions encountered. At a minimum, STRATA recommends coarse,
granular fill be placed in maximum 10 -inch lifts and compacted with 6 complete passes of a 10 -
ton vibratory or grid roller. Vibratory rollers must have a dynamic force of at least 30,000
pounds per impact per vibration and at least 1,000 vibrations per minute. Coarse fill must be
compacted to a dense, interlocking and unyielding surface. We recommend STRATA review
the soil and aggregate material planned for fill use and monitor compaction effort during
construction.
Geosvnthetics
If earthwork contractors are unable to achieve subgrade compaction requirements
outlined in this report's Site Preparation section, geosynthetic fabrics may be used to improve
subgrade support when constructing on soft or wet soil. We recommend woven geosynthetics
at pavement subgrade elevation where moisture -conditioning and re -compaction as
recommended in the Site Preparation section of this report is not possible due to wet soil
conditions. Where required, apply geosynthetics directly on approved subgrade, taut, free of
wrinkles and over -lapped at least 12 inches. Woven geosynthetic fabrics for subgrade
stabilization and soil improvements shall have the following minimum properties of 700 pounds
(CBR Puncture, ASTM D6241) and 200 pounds (Grab Tensile Strength ASTM D4632).
STRATA must be consulted prior to using geosynthetics for subgrade stabilization. Further, we
recommend contractors carefully review subsurface conditions prior to bidding and recommend
the design team include a unit price for woven geosynthetics for the earthwork portion of the
project.
We recommend non -woven geosynthetic fabrics for filtration and for stormwater
facilities. Non -woven fabrics and should have a maximum apparent opening size equivalent to
the U.S. No. 70 sieve (ASTM D4751), a minimum weight of 3.5 ounces per square yard and
minimum CBR puncture resistance of 200 pounds (ASTM D6241).
Pavement Section Design
General
The following flexible asphalt pavement section design is provided referencing the Idaho
Transportation Department (ITD) Gravel Equivalent Design Method using Ada County Highway
Ob
www.stratag eotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 9
District substitution ratios. STRATA estimated traffic loading and design parameters based on
our proposed construction understanding and our understanding of the subsurface conditions.
Traffic and Subgrade
The following tables present our traffic loading, geotechnical design parameters and
references, as well as the resulting flexible pavement section design recommendations.
Table 2. Pavement Design Parameters
Design Parameter
Value Used
References
Traffic Loading
33,000 ESALS
(Local Road, TI=6)
Ada County Highway District Standard
Design Life
20 years
Assumed
Subgrade R -value
20
Laboratory Testing
Asphalt Layer Substitution Ratio
1.95
Ada County Highway District Standard
Base Course Substitution Ratio
1.1
Ada County Highway District Standard
Subbase Course Substitution Ratio
1.0
Ada County Highway District Standard
Equivalent Single Axle Loads (ESALS).
From laboratory test results, and utilizing silt for roadway subgrade, we obtained an R -
value of 41. However, for the purpose of design, we utilized an R -value of 20. To help improve
subgrade characteristics, the pavement Subgrade should be prepared as recommended in this
report's Site Preparation section. Subgrades must be shaped (crowned) and graded to facilitate
positive drainage and inverted crowns must be avoided.
Asphalt, Aggregate Base Course and Subbase Materials
Crushed aggregate base course and granular subbase shall conform to the Structural
Fill requirements and be placed directly over a properly prepared subgrade. A woven geotextile
should be used for constructability, during wet and inclement weather and to increase
performance at the subgrade. The woven geotextile should have material properties and be
placed as outlined in this report's Geosynthetics section. We recommend STRATA observe
final subgrade preparations, geotextile placement and all aggregate placements.
Asphalt concrete must be compacted to 92 percent of the maximum density for a
Hveem or Superpave mix design. The final traveling surface of asphalt concrete shall meet
ISPWC '/-inch asphalt mix design requirements. Asphalt mix designs and all appropriate
aggregate source certificates should be accepted by STRATA at least 5 days prior to initiating
asphalt paving. Asphalt construction and final surface smoothness, joints and density should
meet ISPWC specifications. If subgrade conditions appear significantly different during
www.stratageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 10
construction, traffic loading conditions change or traffic volumes increase, STRATA should be
notified to amend our design accordingly.
Pavement Section Thickness
STRATA evaluated the pavement sections utilizing the ITD pavement design
methodology, soil -engineering parameters from laboratory testing and the estimated traffic -
loading conditions. Based on subgrades prepared as recommended and the traffic criteria
provided, Table 3 provides the recommended asphalt section for the anticipated pavement
application. If subgrade conditions change as design is finalized or during construction, or traffic
loading is different than we have assumed, STRATA must review our pavement analyses and
resulting sections.
Table 3. Asphalt Pavement Design Section
Pavement Maintenance
We recommend crack maintenance be accomplished on all pavement surfaces every 3
to 5 years to reduce the potential for surface water infiltration into the underlying pavement
subgrade. Surface and subgrade drainage are extremely important to the performance of the
pavement section. Therefore, we recommend the subgrade, base and asphalt surfaces slope at
no less than 2 percent to an appropriate stormwater disposal system or other appropriate
location that does not impact adjacent buildings or properties. The pavement's lifespan is
dependent on achieving adequate drainage throughout the section, especially at the subgrade
elevation. Ponding water at the pavement subgrade surface can induce heaving during the
freeze -thaw process.
Site Drainage
Exterior Grading
We recommend the ground surface adjacent to structures slope a minimum of 5 percent
away within 10 feet of the structure. The ground surface beyond 10 feet of structures should be
sloped at least 2 percent away. Improper management of near -surface water, by not providing
an effective grading and drainage design, can result in moisture or water entering foundation
areas. Possible sources of near -surface water include pressurized irrigation water, rainwater,
www.stratageotech.com
Asphalt
Aggregate Base
Granular
Asphalt Pavement Application
Concrete
Course (inches)
Subbase
(inches)
(inches)'
Local Roads (TI = 6)
2.5 4.0
10.0
Pavement Maintenance
We recommend crack maintenance be accomplished on all pavement surfaces every 3
to 5 years to reduce the potential for surface water infiltration into the underlying pavement
subgrade. Surface and subgrade drainage are extremely important to the performance of the
pavement section. Therefore, we recommend the subgrade, base and asphalt surfaces slope at
no less than 2 percent to an appropriate stormwater disposal system or other appropriate
location that does not impact adjacent buildings or properties. The pavement's lifespan is
dependent on achieving adequate drainage throughout the section, especially at the subgrade
elevation. Ponding water at the pavement subgrade surface can induce heaving during the
freeze -thaw process.
Site Drainage
Exterior Grading
We recommend the ground surface adjacent to structures slope a minimum of 5 percent
away within 10 feet of the structure. The ground surface beyond 10 feet of structures should be
sloped at least 2 percent away. Improper management of near -surface water, by not providing
an effective grading and drainage design, can result in moisture or water entering foundation
areas. Possible sources of near -surface water include pressurized irrigation water, rainwater,
www.stratageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B01 3253A
Page 11
snowmelt, or leaking water lines. These water sources can be transmitted to the foundation
stem wall and pond beneath the structure via precipitation, roof downspout discharge, and
snowmelt. Possible conduits for water to enter into crawlspaces can include loose or porous
backfill placed adjacent to foundation walls and loose or porous backfill in utility trenches that
extend through or beneath foundations.
Providing good drainage as discussed above can be supplemented by using
impermeable aprons adjacent to at -grade structures. Impermeable aprons may consist of
asphalt or Portland cement pavement that is placed directly adjacent to the foundation stem -
walls. An elastomeric sealant should also be considered between aprons and foundation stem -
walls to further reduce the potential for moisture to infiltrate the area directly adjacent to
foundations.
Infiltration Rates
We understand on-site stormwater will be retained using subsurface seepage beds or
swales. All seepage swales or subsurface disposal beds should be located a minimum 25 feet
from building foundations to reduce the potential for stormwater seepage into the foundation
wall backfill zone.
All infiltration facilities should be constructed a minimum of 12 inches into native, non-
cemented, poorly -graded sand or poorly -graded gravel with sand. Based on test pit exploration,
we anticipate excavation depths of 4 to 6 feet may be required to expose gravel soil. We
recommend an allowable design infiltration rate of 8 inches per hour be utilized for infiltration
facilities constructed into poorly -graded sand or gravel with sand soils.
Groundwater
The appropriate separation between seasonal high groundwater and the base of the
stormwater disposal facilities must be maintained. Groundwater was not observed at the time of
exploration. Based on our experience, groundwater in the site vicinity is typically related to
seasonal irrigation and is likely near the peak elevation in July to August. Therefore, we
recommend a seasonal high groundwater level of 14 feet below existing grade be assumed for
stormwater facility design. However, this depth is an estimate provided based on conditions
encountered during construction and groundwater levels may vary. Therefore, we recommend
groundwater monitoring be accomplished throughout the remainder of the irrigation season
(July to October) to confirm seasonal high groundwater elevation estimates.
04
www.st rata g eotech. com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B01 3253A
Page 12
STRATA installed a standpipe piezometer within test pit TP -1 to monitor groundwater
levels. We recommend STRATA be retained to perform groundwater monitoring to verify the
seasonal high groundwater level for subsurface stormwater disposal design.
GEOTECHNICAL DESIGN CONTINUITY
Geotechnical design continuity will be an important aspect of this project's successful
completion. In our opinion, geotechnical continuity can occur in 4 stages in the planning, design
and construction project aspects. Specifically, we recommend STRATA maintain the
geotechnical design continuity in the following aspects:
Groundwater Monitoring: The groundwater level should be monitored during the
current irrigation season to verify the seasonal high groundwater level beneath the
site. A piezometer was installed to monitor groundwater levels. Monitoring typically
should be accomplished on a monthly basis between July and October. STRATA
remains available to perform groundwater monitoring at your request.
140 Plan and Specification Review: We recommend STRATA be retained to review
final design and construction plans and specifications to verify our geotechnical
recommendations are incorporated into project bidding and construction documents
as well as to provide additional recommendations based on the final design
concepts. These efforts can help provide document continuity across the
engineering disciplines and reduce the potential for errors as the project concepts
evolve.
6 Construction Observation and Testing: We recommend STRATA be retained to
observe site grading and fill compaction testing. Having STRATA provide testing and
oversight during this process will reduce the potential for an unforeseen construction
error which may ultimately impact the project. STRATA can also provide
construction material testing of pavement sections and asphalt surfaces. If we are
not retained to perform the recommended services, we cannot be responsible for
related construction errors or omissions.
EVALUATION LIMITATIONS
This report has been prepared to assist project planning design and construction of the
proposed Sgroi Property to be located at 4405 East Ustick Road in Meridian, Idaho. Our
geotechnical findings and opinions have been developed based on the authorized subsurface
exploration and laboratory testing, as well as our understanding of the project at this time. Our
geotechnical design recommendations are specific to the planned design and infrastructure
construction and should not be extrapolated to other future site developments without allowing
adequate geotechnical consultation by STRATA.
Our services consist of professional opinions and findings made in accordance with
generally accepted geotechnical engineering principles and practices in southwest Idaho at the
QO
www.sti'atageotech.com
Sgroi Property
4405 East Ustick Road
Meridian, Idaho
File: B013253A
Page 13
time of this report. The geotechnical recommendations provided herein are based on the
premise that appropriate geotechnical consultation during subsequent design phases is
implemented and an adequate program of tests and observations will be conducted by
STRATA during construction to verify compliance with our recommendations and to confirm
conditions between exploration locations. This acknowledgment is in lieu of all warranties either
express or implied.
The following plate and appendix accompany and complete this report:
Plate 1: Exploration Location Plan
Appendix A: Unified Soil Classification System (USCS) &
Exploratory Test Pit Logs
Appendix B: R -value graph
www.stratageotech.com
mmmillik NAME cKilk
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS
GRAPH
SYMBOL
LETTER
SYMBOL
TYPICAL NAMES
(7_3_07) Indicates Date of
BK Bulk Sample
Q'..,Well—Graded
GW
Gravel,
0 Groundwater
RG Ring Sample
CLEAN
at Time of Drilling
Gravel—Sand Mixtures.
GRAVELS(
®
GP
Poorly—Graded Gravel,
GRAVELS
"''
Gravel—Sand Mixtures.
G
GM
Silty Gravel, Gravel—
WITH
WITH
Sand—Silt Mixtures.
GC
Clayey Gravel, Gravel—
COARSE
FINES
GRAINED
Sand—Clay Mixtures.
SOILS
„ , „
SW
Well—Graded Sand,
CLEAN
Gravelly Sand.
SANDSSP
Poorly—Graded Sand,
Gravelly Sand.
SANDS
Silty Sand,
SANDS
-0
'
-
SM
Sand—Silt Mixtures.
FINES
�EITH.
SC
Clayey Sand,
\a
Sand—Clay Mixtures.
ML
Inorganic Silt, Sandy
or Clayey Silt.
SILTS AND CLAYS
Inorganic Clay of Low
LIQUID LIMIT
CL
to Medium Plasticity,
LESS THAN 50%
Sandy or Silty Clay.
OL
Organic Silt and Clay
of Low Plasticity.
FINE
GRAINED
Inorganic Silt, Mica—
SOILS
MH
ceous Silt, Plastic
Silt.
SILTS AND CLAYS
Inorganic Clay of High
LIQUID LIMIT
CH
Plasticity, Fat Clay.
OH
Organic Clay of Medium
GREATER THAN 50%
to High Plasticity.
PT
Peat, Muck and Other
_
Highly. Highly Organic Soils.
BORING LOG SYMBOLS GROUNDWATER SYMBOLS TEST PIT LOG SYMBOLS
IStandard 2—Inch ODGroundwater
Split—Spoon Sample
_ After 24 Hours
BG Baggie Sample
California Modified 3—Inch
OD Split—Spoon Sample
(7_3_07) Indicates Date of
BK Bulk Sample
Reading
IIRock Core
0 Groundwater
RG Ring Sample
at Time of Drilling
Shelby Tube 3—Inch OD
Undisturbed Sample
Shorthand Notation:
BGS = Below Existing Ground Surface
N.E. = None Encountered
a:
NN
O
ae
0L°�Q
�ow
cc
REMARKS
USCS Description w'K
g
g
Qo �'E
a
oS
FT
a o
g
o
Y
Note: BGS = Below Ground
=0
rq
N
�i—m
Z
o
:�iU
a
Surface
v
SANDY SILT, (ML) brown, stiff, '
moist
Grass and roots to 8 inch BGS
ML
BG
2,5
B K
3.5
SILT, (ML) tan, hard, moist to dry
R value = 41
2.5
>4.5
Moderate cementration from
ML
3.5 to 4.5 feet BGS
>4.5
5.0
Caliche from 5.0 to 6.0 feet
BGS
Difficult excavation from 5.0 to
6.0 feet BGS
Very difficult excavation from
6.0 to bottom of excavation
POORLY GRADED GRAVEL, With
Sand And Silt, (GP-GM) tan, very
° °
dense, moist
oO
Slight caving from 7.0 to bottom
°
of excavation
7.5
O
5.5
6.8
i
, S
�
°
Infiltration test performed at 9.5
feet BGS. Infiltration rate = 20
i
C)
inches per hour measured.
10.0
GP
i
GM
°
i
a
O
O
a
0
O
12.5
0
O
Plezometer Installed to 13.0
feet BGS.
Test Pit Terminated at 14.0 Feet.
Client: KM ENGINEERS Test Pit Number: TP-1
EXPLORATORY
Project: B013323A Date Excavated: 07-01-2013
—rFRaY& TEST PIT LOG
Backhoe: CASE 580K Bucket Width: 2'
Depth to Groundwater: N.E. Logged By: SW "''' " ` ''' "" Sheet 1 Of 1
U1 W
0
J G
`O �'
,coo
zl
d o
a
REMARKS
F=-..
USCS Description o
S.
E >a
¢
m
m a
a
y d
r
LU
ur
m i-.
o m °+
a o i7i
�'o
o
m --
Note: BGS = Below Ground
v
vt
N
Z
o
v
Surface
U
a
SANDY SILT, (ML) brown, stiff,
moist
3.5
Grass and roots to 8 Inch BGS
ML
BG
>4.5
SILT, (ML) tan, hard, moist to dry
>4.5
2.5
ML
>4.5
Moderate cementration from
3.0 to 4.0 feet BGS
>4.5
POORLY GRADED GRAVEL, With
Sand And Silt, (GP -GM) tan, dense,
°
moist
oQ
O
O
°
O
7.5
0
O
Infiltration test performed at 8.0
feet BGS. Infiltration rate = 20
FBG
inches per hour measured.
I
o
Q
GP-
°
GM
o0
i
i
10.0
0
Q
0 °
O
Q
O
Q
O
12.5
0
Q
0
O
Test Pit Terminated at 14.0 Feet.
Client: KM ENGINEERS Test Pit Number: TP -2
EXPLORATORY�+
Project: B013323A Date Excavated: 07-01-2013
TEST PIT LOG
Backhoe: CASE 580K Bucket Width: 2'
' ' ' ' "'
Sheet 1 Of 1
Depth to Groundwater: N.E. Logged By: SW
�
RNALUE
AS RECEIVED
AS TESTED
Idaho T
%PASSING
Project: Sgroi Property
4"
Project Number: B013323A
Client: KM Engineering
Density, PCF
Lab Number: B13LO715A
Sample Identification: TP -1 @ 1 - 1.5 ft
Date Received: 7/1/13
Sample Classification: Silt
21.8
Date Tested: 712-3/13 By: IR/CK
20.8
Exp. Pressure, PSI
SOIL CONSTANTS
R VALUE DATA
0.09
1f2"
Percolation: None Paints Polnt2
Polnt3
R VALUE: 41
Exudation, PSI 109 207
265
No.4
y
DrLq
100
No. e
No. 16
No. 30
0
0
No. 50
v
m
No. 100
No. 200
N
c
o
m
O
o
M
�
❑
d
d V
o a
(p J
N
d
N
2�
N
o
a N
c
a
c
0
c
p N
m
8
o K
0
0
u
o
o
N
O
�
0
0
0
R value
Note: This report covers only material as represented by this sample and does not necessarily cover all
soil from this layer or source.
A PROFESSIONAL .SERVICES CORPORATION
Reviewed by: f '�f
��
fq_Y�- gr/=Fy Trow J'/, <'ai'oceNd IJP
GRADATION: AASHTO T -i 1, T27
SCREEN
AS RECEIVED
AS TESTED
SIZE
%PASSING
%PASSING
4"
Density, PCF
99.0
99.6
99.7
Moisture Content, %
21.8
21.2
20.8
Exp. Pressure, PSI
0.00
0.03
0.09
GRADATION: AASHTO T -i 1, T27
SCREEN
AS RECEIVED
AS TESTED
SIZE
%PASSING
%PASSING
4"
3"
2"
1"
314"
1f2"
3!S"
No.4
100
100
No. e
No. 16
No. 30
No. 50
No. 100
No. 200
Kirsti Allphin
From: Mindy Wallace [Mwallace@achdidaho.org]
Sent: Wednesday, June 26, 2013 1:42 PM
To: Kirsti Allphin
Subject: RE: Sgroi Property
Kirsti,
A traffic impact study is not require for this application.
Thank You,
Mindy
From: Kirsti Allphin [mailto:kallphin@kmengllp.com]
Sent: Wednesday, June 26, 2013 10:35 AM
To: Mindy Wallace
Subject: Sgroi Property
Hi Mindy—
We are working on a new single-family residential subdivision project located at 4405 East Ustick in Meridian. The project will
consist of +/- 16 buildable lots on 2.86 acres. The property owner entered into a Development Agreement with the City last
year, and we are now preparing a preliminary plat application for the project, which will take access via Red Feather
Subdivision to the south. Any existing vehicular access to Ustick will be eliminated as a part of this project.
As a part of our submittal to Meridian, we need to provide documentation from ACHD that a TIS will not be required for the
project. If this is the case, please reply to my e-mail and state as much so I have the documentation for my submittal package.
If you have questions or need any further information, please feel free to call.
Thanks,
Kirsti Allphin
Development Assistant
Office Manager
IonKM Engineering, LLP
9233 West State Street
Boise, ID 83714
208.639.6939 Fax 208.639.6930
kallphin@kmengllp.com
No virus found in this message.
Checked by AVG - www,avg.com
Version: 2012.0.2242 / Virus Database: 3204/5942 - Release Date: 06/26/13
1
m
Hearing Date: September 5, 2013
File No.: PP -13-019
Project Name: Copperleaf Subdivision
Request: Request for preliminary plat consisting of 16 single-family residential building lots and 4
common/other lots on 2.86 acres of land in the R-8 zoning district, by Providence
Properties, LLC.
Location: The site is located at 4405 E. Ustick Road, in the NE V4 of Section 4, Township 3N,
Range IE.
File No.: MDA -13-016
Request: Request for a modification to the development agreement to remove the requirement for
townhomes to be constructed on two of the building lots; and inclusion of a revised
conceptual development plan and building elevations.
***rPlease notice the 9WQA to run with the 1P at Councif~2TLX1***