Agency CommentsCENTRAL
`~ DISTRICT
HE/~LTH
DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5271 ~ FAX 327-8500
"To lurprove 1/ee /eeu!!G of orm conurirurilies by rdeulifyiag sersluirrnb/e sole[ions to tronmrxniry Hea/Ih issrres,
rleve%pirrgparluersGips for iutplenteululiar ofclrnlegies, purl dentaus0•nling orrr success llrrougG uaeesuremeu! of o« 7corues. "
13-1037
September 4,.2013
Christopher D. Rich
Ada County Recorder
200 West Front Street
Boise, ID 83702
RE: Reflection Ridge Subdivision No. 2
Dear Mr. Rich:
Central District Health Department has. reviewed and does approve the final plat for this
subdivision for central water and central sewer facilities. Final approval was given
September 4, 2013.
Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of
Meridian and the QLPE approval ofthe-design plans and specifications and the conditions
imposed on the developer for continued satisfaction of the sanitarysestrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those facilities. If the developer fails to construct facilities then
sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval, and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
Servi{vy_Velley, Elnra•e, Boise,undAda Couhfies
Ada /Boise County Otfice Elmore County Office Valley Counly Office
~70T N. Armstrong PL
- 520 EBIh SL North 703 N. 1st SL
Boise, ID 83704 : Mountain Home; ID 83647 McCall, ID 83638
Enviro. Healthi 327-7499 - Enviro. HeAllh: 567-9225 Ph. 634-7194
Reproductive Health: 327-7400 - Family Nezllh: 587-4407 - - FAX: 634-2174
Immuniiationst 327-7450. - WIC: 587-4409 ~ -
Senior Nutrition: 327-7460 FAX: 587 3521
WIC: 327-7488 - ~ ..
FAX: 327-8500
If you have any questions, please cal] 327-8517
Sincerely,
~~-
Lori Badigian, R.E.H.S.
Senior Environmental Health Specialist
cc: Mission Coast Properties ID, Inc.
T - O Engineers
City of P/Ieridian
LB:bm
gig
. ~ ~.
1~~3~.'~8, 2013
City ~t~'-Iexidian
City Gl+~rk's Office
33 E $roadw~y Avenue, Suite 102
M~ritli~rz, ID 8642-2619
RE: FP13-8~O~Reflection Ridge No. 1
Dear Jaycee:
1503 FIRST STREET SOUTH
FAX #208-463-0092
NAMPA, IDAHO 83651-4395
nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) has and Land Use Change Application on file
and is currently reviewing this project.
All comments will be withheld until our review is completed.
Sincerelny,
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC!dbg
PC: File/Office
-- .
,y ,.
~ ;~
APPROXIMATE IRRIGABLE ACRES
- - RIVER FLOW RIGHTS - 23,000
`°_, '_ ~ BOISE PROJECT RIGHTS-40,000
CENTRAL
•! DISTRICT
PRHEALTH
DEPARTMENT
Rezone #
CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
Environmental Health Division 2 ^ ACZ
aJ ^ Boise
^ Eagle
Conditional Use #
Preliminary /Final /Short Plat ~' l3°-
^ Garden City
^ Kuna
I~Meridian
~ ~- ^ Star
^ 1. We have No Objections to this Proposal.
^ 2. We recommend Denial of this Proposal.
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
8. After writte approval from appropriate entities are submitted, we can approve this proposal for:
central sewage ^ community sewage system ^ community water well
interim sewage ~ central water
^ individual sewage ^ individual water
9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
central sewage ^ community sewage system ^ community water
sewage dry lines ~ central water
^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 12. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
~13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
^ 14.
Reviewed By:
9
Date: ~ /~/ ~
Review Sheet
16726.001EH1111
I
1
1
duly 9, 2013
~I~~
~~~~~~~
City bf meridian
City C~etl~'s Office
33 E BrtsaCiWay Avenue, Suite 102
Meridian, ID $3£42-2619
Rl: FP 13-030/Reflection Ridge #2
Dear Jaycee:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application
be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for
further information.
All laterals and waste ways must be protected. The District's Ridenbaugh Canal courses along
the north boundary of this proposed project. The easement for the Ridenbaugh Canal at this
location is a minimum of one hundred feet (100'); fifty feet (50') each side of the centerline.
However please contact the District directly to verify the width of easement necessary to
operate, maintain, and repair the Ridenbaugh Canal. Please send revised plans showing
exactly what. proposed encroachments, if any, will be within the District's easement and
exactly how far. This easement must be protected. Any encroachment without a signed
License Agreement and approved plan before any construction is started is
unacceptable.
Ail municipal surface drainage must be retained on site. If any municipal surface drainage
leaves the site, the Nampa & Meridian Irrigation District (NMID) must review drainage plans.
Sincerely,
~ n ~~
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
PC: File/Office'
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
~~ ~~Z~i ~ ~ ~ ~ ~ r ~ .
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Chris Todd
T-O Engineers
332 N. Broadmore Way
Nampa, ID 83687
RE: Land Use Change Application -Reflection Ridae #2
Please note the District now requires three (3) sets of plans
Dear Chris Todd:
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above-referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order or
cash as payment of the fees in order to speed the process up. If you submit a company or
personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G.
Curtis, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or Greg G. Curtis, at the District's shop.
Sincerely,
Suzette G. Hewlett, Asst. Secretary/Treasurer
NAMPA & MERIDIAN IRRIGATION DISTRICT
SGH/smk
cc: File
Water Superintendent
City Clerk's Office, City of Meridian
Mission Coast Properties ID, Inc., 13402 13A Avenue, Surrey, B.C. V4
enc. ~ O~ l
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
11 July 2013
~~1~
~,r~a &
~.
r
1503 FIRST STREET SOUTH NAMPA, IDAHO83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
City of Meridian
City C~er1c's Office
3~/~E Bro~~adwayy ,~4~.v~e'~nue, Suite 102
RE: MFP 13-002/Reflection Ridge Sub #2
Dear Jaycee:
Nampa & Meridian Irrigation District (N1V11D j has no crnr~meT>t on the above-referenced
application for M~d~ificatio~n to Final Plat.
All laterals anal waste ways must be protected. All municipal surface drainage must be
retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District
(NMID) must review drainage plans.
Sincerely,
Y~c
Andy adsen
Asst. Water Superintendent
Nampa & Meridian Irrigation District
AM/dbg
PC: Office/file
.. „ ~r. ~ ~ 1' , r.. .
-~. ~ .,,~c,s r, ..~_,_
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS -40,000
~alse~;~~, 2013