Loading...
Agency CommentsCENTRAL `~ DISTRICT HE/~LTH DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5271 ~ FAX 327-8500 "To lurprove 1/ee /eeu!!G of orm conurirurilies by rdeulifyiag sersluirrnb/e sole[ions to tronmrxniry Hea/Ih issrres, rleve%pirrgparluersGips for iutplenteululiar ofclrnlegies, purl dentaus0•nling orrr success llrrougG uaeesuremeu! of o« 7corues. " 13-1037 September 4,.2013 Christopher D. Rich Ada County Recorder 200 West Front Street Boise, ID 83702 RE: Reflection Ridge Subdivision No. 2 Dear Mr. Rich: Central District Health Department has. reviewed and does approve the final plat for this subdivision for central water and central sewer facilities. Final approval was given September 4, 2013. Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of Meridian and the QLPE approval ofthe-design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitarysestrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. Servi{vy_Velley, Elnra•e, Boise,undAda Couhfies Ada /Boise County Otfice Elmore County Office Valley Counly Office ~70T N. Armstrong PL - 520 EBIh SL North 703 N. 1st SL Boise, ID 83704 : Mountain Home; ID 83647 McCall, ID 83638 Enviro. Healthi 327-7499 - Enviro. HeAllh: 567-9225 Ph. 634-7194 Reproductive Health: 327-7400 - Family Nezllh: 587-4407 - - FAX: 634-2174 Immuniiationst 327-7450. - WIC: 587-4409 ~ - Senior Nutrition: 327-7460 FAX: 587 3521 WIC: 327-7488 - ~ .. FAX: 327-8500 If you have any questions, please cal] 327-8517 Sincerely, ~~- Lori Badigian, R.E.H.S. Senior Environmental Health Specialist cc: Mission Coast Properties ID, Inc. T - O Engineers City of P/Ieridian LB:bm gig . ~ ~. 1~~3~.'~8, 2013 City ~t~'-Iexidian City Gl+~rk's Office 33 E $roadw~y Avenue, Suite 102 M~ritli~rz, ID 8642-2619 RE: FP13-8~O~Reflection Ridge No. 1 Dear Jaycee: 1503 FIRST STREET SOUTH FAX #208-463-0092 NAMPA, IDAHO 83651-4395 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) has and Land Use Change Application on file and is currently reviewing this project. All comments will be withheld until our review is completed. Sincerelny, Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC!dbg PC: File/Office -- . ,y ,. ~ ;~ APPROXIMATE IRRIGABLE ACRES - - RIVER FLOW RIGHTS - 23,000 `°_, '_ ~ BOISE PROJECT RIGHTS-40,000 CENTRAL •! DISTRICT PRHEALTH DEPARTMENT Rezone # CENTRAL DISTRICT HEALTH DEPARTMENT Return to: Environmental Health Division 2 ^ ACZ aJ ^ Boise ^ Eagle Conditional Use # Preliminary /Final /Short Plat ~' l3°- ^ Garden City ^ Kuna I~Meridian ~ ~- ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. 8. After writte approval from appropriate entities are submitted, we can approve this proposal for: central sewage ^ community sewage system ^ community water well interim sewage ~ central water ^ individual sewage ^ individual water 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: central sewage ^ community sewage system ^ community water sewage dry lines ~ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ~13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: 9 Date: ~ /~/ ~ Review Sheet 16726.001EH1111 I 1 1 duly 9, 2013 ~I~~ ~~~~~~~ City bf meridian City C~etl~'s Office 33 E BrtsaCiWay Avenue, Suite 102 Meridian, ID $3£42-2619 Rl: FP 13-030/Reflection Ridge #2 Dear Jaycee: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. All laterals and waste ways must be protected. The District's Ridenbaugh Canal courses along the north boundary of this proposed project. The easement for the Ridenbaugh Canal at this location is a minimum of one hundred feet (100'); fifty feet (50') each side of the centerline. However please contact the District directly to verify the width of easement necessary to operate, maintain, and repair the Ridenbaugh Canal. Please send revised plans showing exactly what. proposed encroachments, if any, will be within the District's easement and exactly how far. This easement must be protected. Any encroachment without a signed License Agreement and approved plan before any construction is started is unacceptable. Ail municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, ~ n ~~ Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg PC: File/Office' APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 ~~ ~~Z~i ~ ~ ~ ~ ~ r ~ . 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Chris Todd T-O Engineers 332 N. Broadmore Way Nampa, ID 83687 RE: Land Use Change Application -Reflection Ridae #2 Please note the District now requires three (3) sets of plans Dear Chris Todd: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G. Curtis, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or Greg G. Curtis, at the District's shop. Sincerely, Suzette G. Hewlett, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT SGH/smk cc: File Water Superintendent City Clerk's Office, City of Meridian Mission Coast Properties ID, Inc., 13402 13A Avenue, Surrey, B.C. V4 enc. ~ O~ l APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 11 July 2013 ~~1~ ~,r~a & ~. r 1503 FIRST STREET SOUTH NAMPA, IDAHO83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 City of Meridian City C~er1c's Office 3~/~E Bro~~adwayy ,~4~.v~e'~nue, Suite 102 RE: MFP 13-002/Reflection Ridge Sub #2 Dear Jaycee: Nampa & Meridian Irrigation District (N1V11D j has no crnr~meT>t on the above-referenced application for M~d~ificatio~n to Final Plat. All laterals anal waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, Y~c Andy adsen Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: Office/file .. „ ~r. ~ ~ 1' , r.. . -~. ~ .,,~c,s r, ..~_,_ APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS -40,000 ~alse~;~~, 2013