Loading...
Applicant Response to Staff ReportMachelle Hill From: Sonya Watters Sent: Wednesday, July 17, 2013 2:41 PM To: Machelle Hill; Jacy Jones; Jaycee Holman Subject: FW: Bainbridge -Applicant Response Attachments: Bainbridge Pre-plat Applicant Response July 2013.docx From: Mike Wardle [mailto:MWardle@brightoncorp.com] Sent: Wednesday, July 17, 2013 10:13 AM To: Sonya Watters Cc: David Turnbull; Caleb Hood Subject: Bainbridge -Applicant Response Sonya, We will propose the attached modifications to staff's recommended conditions of approval at the P&Z Commission hearing Thursday evening (1 will bring color copies if you don't have that in-house capability). I expect to have a PowerPoint but not likely in advance. Trust that you will agree with the proposed changes (which focus on the fact that Bainbridge is still "valid" and being modified only to bring Keego into the project and to accommodate the relocation of the church site) so that the hearing will be "smooth." Would appreciate your thoughts in response. Mike Wardle Direct 208.287.0512 Cell 208.863.6150 July 17, 2013 Bcrinbriclge Sub~fwision Rezone & Preliminary Plat (RZ-13-005/PP-13-011) Applicant Response to Staff Recommendation (proposed condition changes nre highlighted in red) 1.2 Preliminary Plat -Site Specific Conditions of Approval l .2.1 The preliminary plat shall be revised as follows: a. All lots shall comply with the minimum street frontage requirements listed in UDC Table 11- 2A-6 for the R-8 zoning district or UDC l 1-2A-3B for properties with street frontage on cul- de-sacs, approximately 90° angles, flag properties or properties sharing a common driveway. Applicant Response: Concur b. Common driveways are required to be in an easement rather than a common lot, per UDC 11- 6C-3D.8. If an amendment to the UDC occurs prior to sz~bnaittal of the final plat application(s) that allows common driveways to he placed in common lots, this may not be required. The applicant shall comply with the UDC requirements in effect at the time offinal plat submittal. Applicant Response: Concur C. TJ 7~1 1, (] ,7 Z 1 r ..1~.. ,;rt, rl,a ... .Y, L,1.,..1.- lo,,nr4. ~o ..;.-o.,,~..r~ l;~ro.7_;,, y ................ ......... . I i Ili. (~~~ ~ , Applicant Response: This condition should be deleted, for the following reasons: • The proposed Block 9 street connections between Keego and Bainbridge rrre exactly as approved in the original Keego Springs project AND the approved, unchanged, and still- valid larger-lot area of the original Bainbridge preliminary plat. This point was specifically discussed rrt tliepie-application meeting on Apri117, 2013. Staff indicated at that time that the previously-approved alignments would be respected ~ Block 30 remains unchanged, it is exactly as originally approved in the preliminary plat, and as reapproved by the Meridian City Council on April 16, 2013 (TEC-13-002). d. Revise note #5 as follows: ""°"~~~~'~~ ~~~°°° r~'^r~ ~'~~~~ In accord with UDC 11-3A-3 direct lot access to W. Chinden Blvd/U.S. Hwy 20-26 N. Ten Mile Road, N. Black Cat Road, and E. Broadbent Drive is prohibited unless specif]cally allowed by Ada County Highway District and the City of Meridian." Applicant Response: Concur e oow.n..o oll i.-~-,nil.- Ln o+rnn+ L.,~.~Llo~ Applicant Response: We request that this condition be deleted Staff analysis states that the knuckle islands are not "required "However, they remain unchanged, as original/y approved, and reapproved on April 16°i. Thus, noting that they «re "allowed" by ACHD, we will construct the islands, as proposed and approved, incorporating Fire Department clearance requirements into dte design. £ Include the 4.9 acre parcel (Parcel #50427234000) owned by the Meridian Joint School District No. 2 at the southwest boundary of the site in the proposed plat. Applicant Response: Concur. The affidavit and deed Izave been requested from Dr. Brccce Gestrin. They will be. forwarded to staff immediately upon receipt. 1 g. Include the 70-foot wide +/- strip of land that lies at the east boundary of the site between the church property and the Johnson property (Parcel #SO427142323) in the proposed plat or complete a property boundary adjustment in conjunction with the final plat for that area. Applicant Response: Modify the condition as proposed. T/te referenced parcel will become a part of the Johnson property tltrocrgh a property boundary adjerstntent in exchange for a small portion of the adjacent street right-of--way. That will occur at final plat design when precise boundaries can be accurately established h. Revise note #4 as follows: "Lots 1 & 19, Block I; Lots 1 & I5, Block 2; Lots 1 & 6, Block 5; Lots ~7 x-312, -1-17, & X328, X829, 4342 &4443, Block 6; Lot 1, Block 7; Lots 11, 12, and 25, Block 9; Lots 1, 16, and 22, Block 10; Lot 1, Block 12; Lots l and 17, Block l4; Lots 1, 3, and 7, Block 15; Lots 1, 3, and 7, Block 16; Lots 1, 4, and 7, Block 17; Lot 1, Block l8; Lots 1, 3, and 7, Block 19; Lots 1, 2, and 15, Block 20; Lot l0, Block 21; Lot I, Block 22; Lots 1 and I I, Block 23; Lots 1, 2, and 26, Block 24; Lot 6, Block 25; Lot 18, Block 27; Lot 16, Block 28; Lots l and 20, Block 31; Lot 1, Block 32; Lot 7, Block 33; and Lots 1 & 2, Bloch 34 are designated as common/landscape area lots and will be owned by the homeowners association and/or assigns." Applicant Response: Concur, noting that !ot/block numbers are subject to change at platting. i. Depict the approved preliminary plat layout for Volterra Subdivision where it abuts the subject property in a light line type to ensure stub streets line up with approved stub street locations in Volterra. Applicant Response: The preliminary plats will be paired to verify street alignments IF CAD drawings are provided by Volterra. However, inasmaclt as Bainbridge was approved prior to Volterra, and is still "valid,"regarired modifications will hrrve to be made by Volterra. j. Include amicro-paths in Block 6 to the school property from the ~~ north. ~}se; ~",~~~. Applicant Response: Modify as noted • The originally-approved and tune-extended Baiizbride plat depicts a IS foot wide corridor along the southern boundary of the project. from Ten Mile Road all t/ze way to tlae school site. That corridor was matched by a corresponding corridor along the north boundary oJ' Volterra. Apparently, the City approved the revised Volterra preliminary plat without consideration of this approved, joint project facility. • A micro path connection to "James Park" it not necessary since direct access to that site is provided by Ironbridge Avenue. k. Depict irrigation easements as applicable on the face of the final plat. Applicant Response: Easements will be provided for realigned facilities on final plots. I. Remove the stub street, N. Eynsford Way, which stubs at the south boundary to Volterra Subdivision. An additional residential lot may be provided in its place. Applicant Response: Concur, with approval of an additional lot in its place. However, Dr. Bruee Gestrin of the School District hrrs expressed support for the street connection which apparently was deleted by City approval of the revised Volterra preliminary plat. The City should contact the Schoo! District, and reassess t/te Volterra change prior to the City Council hearing. 2 Prior to the City Council meeting, the part applicant sl:al! submit a revised preliminary plat Nzat includes the revisions noted above in #f, #g, ~md #i, or as morli~ed by the Conrmissioir. 1.2.2 The landscape plan shall be revised as follows: a. Revise the landscape plan in accord with the applicable revisions to the plat referenced above in condition #1.1.2. Applicant Response: Conccrr b. Depict minimum 5-foot wide detached sidewalks along N. Black Cat and N. Ten Mile Roads in accord with UDC 11-3A-17. Applicant Response: Concur c. Depict a minimum 10-foot wide multi-use pathway along W. Chinden Boulevard in accord with UDC 11-3 H-4C.4. ~plicant Response: Conccrr d. Include a minimum 5-foot wide pedestrian pathway through Lot 6, Block 25 with landscaping in accord with the standards listed in UDC I 1-3B-12C. Applicant Response: Concur e. Include a berm or a bean and wall combination in accord with the standards listed in UDC H -3H-4D for traffic noise abatement from Chinden Boulevard (SH 20/26). If a wall is proposed, include a detail of the wall. Applicant Response: Concur f. Depict the edge of pavement on the plan. If the unimproved street right-of--way along Ten Mile, Black Cat, and Chinden is l0 feet or greater from the edge of pavement to edge of sidewalk or property line, and street widening project is not in the transportation authority's five year funded plan, the developer is required to maintain a 10-foot wide compacted gravel shoulder meeting the construction standards of the transportation authority and landscape the remainder with lawn or other vegetative ground cover in accord with UDC 11-3B-7C.5. Applicant Response: Concur 1.23 Submit a copy of the Warranty Deed and an Affidavit of Legal Interest signed by the Joint School District No. 2 for inclusion of Parcel #50427234000 in the Bainbridge Subdivision preliminary plat. Applicant Response: Concur; see prior Condition 1.2.1.f. 1.2.4 Submit a public use easement to the Planning Division for the multi-use pathway adjacent to W. Chinden Boulevard ~ in conjunction with the submittal of the #`+rst final plat application for that area_ Applicant Response: Modify as proposed; action prior to design and platting is crnnecessary. 1.2.5 The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. Applicant Response: Concur 1.2.6 The applicant shall provide a minimum of nine (9) site amenities in accord with the standards listed in UDC 11-3G-3C and a minimum of 31.66 acres (16.55%) of common open space that meets or exceed the standards set forth in UDC 1 1-3G-3. Prior to the Commission meeting, the applicant shall provide details as the site amenities being provided Applicant Response: Two of the nine required amenities have been provided as noted on Page 7 of the staff report. Consideration should be given to the Multi-use Pathway along Chinden 3 (Condition 1.2.4) and the pedestrian pathway in Lot 6, Block 25 (Condition 1.2.2.4). The remaining amenities will include 2-3 play structures, fitness stations, sport courts, an4picnic areas. Speeifrc. facilities and equipment to be provided, an4 their locations, will be i4entifred on the lan4scape plan with each phase and submitted with the final plat. ] .2.7 The applicant shall pipe or otherwise cover all irrigation ditches, laterals or canals, intersecting, crossing or lying within the area being developed in accord with UDC 11-3A-6A, unless left open as a water amenity or linear open space in accord with UDC 11-3A-6A.2. ~plicant Response: Concur 4