ACHD CommentsSara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim D. Hansen, Commissioner Date: July 8, 2013 To: Robert Powell, via a-mail Dave Evans Construction 7761 W. Riverside Dr. #100 Garden City, ID 83714 Subject: MCZC-13-086 68 S. Baltic Ave. Request to construct a therapy center. In response to your request fior comment, the Ada County Highway District (ACRD) staff has reviewed the submitted application and site plan for the item referenced above. The applicant shall be required to meet the following conditions of approval: Comply with all ACRD Standard Conditions of Approval (attached} as well as all ACRD Policies. A traffic impact fee may be assessed by ACRD and will be due prior to the issuance of a building permit. This is a separate review process that requires direct plans submit#al to the Development Review staff at the Highway Distric#. For questions regarding the submittal for impact fee assessment please contact the Development Review staff' at 208-387-6170. Prior to the construction, repair, or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc.}, a permit must be obtained from ACRD. !f you have any questions, please feel free to contact me at (208) 387-6335. Sincerely, Austin Miller Planning Review Intern Development Services CC: Project file, City of Meridian, via a-mail Lee Centers, via a-mail Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-b100 • FX 345-7650 • www.achdidaho.org 'Traffic Inf®rri~ati®n This development is estimated to generate 56 additional vehicle trips per day {none existing); and 8 additional vehicle trips per hour in the PM peak hour {none existing), based on the Institute of Transportation Engineers Trip Generation Manual, 9th edition. Condition of Area Roadways: Traffic Count is based on Vehicles per hour (VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Franklin Rd. None Principal Arterial 888 Better than "E" ~` Acceptable level of service for afive-lane principal arterial is "E" (1,770 VPH). Average Daily Traffic Count {VDT): Average daily traffic counts are based on ACHD's most current traffic counts The average daily traffic count for Franklin Road west of Locust Grove Road was 17,847 on August 13, 2009. Ada County Highway District • 3775 Adartts Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Standard Conditions of ~Qpproval Any existing irrigation facilities shall be relocated outside of the ACRD right-of-way. 2. Private sewer or water systems are prohibited from being located within the ACRD right-of- way, 3. In accordance with District policy, 7203.6, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA} requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACRD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits {spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9, Ail design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACRD Policy and Standard Conditions of Approval in place at that time unless awaiver/variance of the requirements or other legal relief is granted by the ACRD Commission. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7656 • www.achdidaho.org 1Request f®r Appe~A ®~ Sfiaff ®e~isi®n Appea! of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not property apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACRD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10} working days from the date of the decision that is the subject of the appeal. The notice of appeal shalt refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10} working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at feast one {1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend ar supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PN 208-387-6100 • FX 345-7650 • www.achdidaho.org Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim ~. Hansen, Commissioner July 8, 2015 Rob Powell Dave Evans Construction 7761 W. Riverside Dr. #100 Garden City, ID 83714 RE: MCZC-1 3-086 1 68 S. Baltic Ave, /Advanced Therapy Pl_AhJ ACCEPTANCE The District has reviewed the building plans for the above referenced project for assessment of impact fees. The District has no comment on the site improvements because all proposed improvements are outside of ACRD right-of-way. (f the scope of work changes to include work within the right-of-way, the District will need to review and approve those changes. Requirements Prior to Starting Work 1. Comply with all Standard Requirements of approval. 2. The impact fee must be paid prior to issuance of a building permit. When Ready to Request ACHD_©ccupancy Sign-Off Call 387-6380 and provide all information as shown in the header of this letter, i.e. the file number, site address, and the name of the project. Please include your name and return phone number. T®tal Irnp~ct Fce dui: $22,700 ~4CH® irasp~c~i®rt i~ n®t ~eguir~d. If you have any questions or concerns please feel free to contact me at (208j 387-6335. Sincerely, Austin Miller Planning Review Intern Development Services cc: Project File L.ee Centers Ada County Highway District • 3775 Adams Street • Garden City, TD • $3714 • PH 208 387 6170 • FX 387 G393 • www.achdidaho.org Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim D. Hansen, Commissioner July 8, 2013 MCC-13-086 / 68 S. Baltic Ave. /Advanced Therapy IF Service Area: Ada County IF Ordinance: #222 IVew Impact Fee Impact Fee Area (SF) Fee per Unit Tota] General Office ITE Code: 710 5,050 SF $4,495 /1,000 SF $22,700 **7'his form must accompany payment of Impact fee** Total $22,700 *Note: If assessed, Plan Review Fees must be paid to ACHD prior to paying Impact Fees. cc: Gary Inselman / Christy Little Administrative Appeals: to initiate an appeal, the applicant must submit an Impact Fee Appeal application (link attached) within thirty {30) calendar days from this impact fee assessment. Reference l.F. Ordinance, sec. 7321.3 http://www.achdidaho.org/Forms/Docslimpact fee_appeaf.pdf lndividuai Assessment of Impac# Fees: to initiate an Individual Assessment, the applicant must submit an Individual Assessment application (link attached) within thirty (30) calendar days from payment of this impact fee assessment. Reference I.F. Ordinance, sec. 7312 http:l/www.achdidaho.org/Forms/Does/impact_fee_individual_assessment. pdf ITE Code: Impact Fee Classifications are based on definitions provided by the Institute of Transportation Engineers, Trip Generation Manual 9th Edition in accordance with ACRD Ordinance 222.