CommentsMayor Tammy de Weerd
City Council Members:
Keith Bird
Brad Hoaglun
Charles Rountree
David Zaremba
March 10, 2014
Mr. David Turnbull Brown Construction, Inc.
Brighton Corporation PO Box 495
12601 W. Explorer Drive Nampa, Idaho 83653-0495
Boise, Idaho 83713
RE: Paramount Subdivision #23 -Final Acceptance
Dear Mr. Turnbull:
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of
Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, 2013 Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two-years from the date
of this letter.
Sincer~;ly,
.~.a,..~.._..a.__,...,_ _......._., ....._.
~~
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW -Water Division
PW -Wastewater Division
PW -Construction Division
File
DEQ
Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org
CENTRAL
i• DISTRICT
'i~HE~LTH
DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500
"To improve the health ojour communities by identifVitrg sustainable solutions to corranttniq~ health issues,
developing partnerships for inrpteerrentatia: of strategies, arrd denrorrstratirrgnur success t/trough merrsurenreut of outcaeres. "
13-0880
July 11, 2013
Christopher D. Rich
Ada County Recorder
200 West Front Street
Boise, ID .83702
RE: Paramount Subdivision No. 23
Dear Mr. Rich:
Central District Health Department has reviewed and does approve the final plat for this
subdivision for central water and central sewer facilities. Final approval was given
July 11, 2013.
Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of
Meridian and the QLPE approval of the design plans and specifications and the conditions
imposed on the developer for continued. satisfaction of the sanitary restrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those facilities. If the developer fails to construct facilities then
sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval, and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
Serving. Valley, Elmore, Boise, and Ada Cottnties
Ada /Boise County Office Elmore County Office Valley County. Office
707 N. Armstrong PL 520 E. 8th St. North 703 N. ist St.
Boise, ID 83704 Mountain Home, ID 83647 McCaII, ID 83638
Enviro. Health: 327-7499 Enviro. Health: 587-9225 Ph. 634-7194
Reproductive Health: 327-7400 Family Health: 587-4407 FAX: 634-2174
lmmunizationsi 327-7450- WIC: 587-4409
Senior Nutrition: 327:7460 fAX: 587-3521
WIC: 327-7488
FAX: 327-8500
If you have any questions, please ca11327-8517.
Sincerely,
`'G~~~X~' ~~
Lori Badigian, R.E.H.S.
Senior Environmental Health Specialist
cc: Department of Housing and Urban Development
Brighton Development, Inc.
The Land Group, Inc.
City of Meridian
LB:bm
.. p CENTRAL DISTRICT HEALTH DEPARTMENT
C HEALTH Environmental Health Division
Rezone #
Conditional Use #
Preliminary / Final I Short Plat '~ ~-C~ -~
~3
Return to: ~ I t~
^ ACZ ~ ~
^ Boise
^ Eagle
^ Garden City
^ Kuna
'Meridian
^ Star
^ 1. We have No Objections to this Proposal.
^ 2. We recommend Denial of this Proposal.
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of;
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
8. After writt n approval from appropriate entities are submitted, we can approve this proposal for:
central sewage ^ community sewage system ^ community water well
^ interim sewage `central water
^ individual sewage ^ individual water
9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
central sewage ^ community sewage system ^ community water
sewage dry lines entral water
^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 12. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
^ 14.
~' .
Reviewed By:
Date:~l~l
Review Sheet
15726.001 EH1111
'ha.~fr~ria & 712e~udiaoc ~~eigatta~ ?>i~~zict
1503 FIRST STREET SOUTH
FAX #208-463-0092
City of Meridian
City Clerk's Offce
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
l~.N:: AZ 1,~-Ol)5, ~'~' 13-008, ~'P I3-026 ~ MDA 13-01.0
Dear Jaycee:
FP 13-026/Pramount Subdivision #23
MDA1.3-O10/Paramount Subdivision
& AZ 13-005 & PP 130-008. Paramount Northeast Subdivision
NAMPA, IDAHO 83651-4395
nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) has ~~o cumrnent ors the above-refere~~ced
applications as it lies outside of our district boundaries. Please contact Settlers Irri anon at
344-~ 7 ~ ~ g
X4.1 or at PO Box 7571, Bolse, ID 83 ~ 07.
All municipal. surface drainage must be retained on-site. If any surface drainage leaves the
site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. The
Developer must comply with Idaho Code 31-3805.
Sincerely,
Andy Madsen
Asst. Water Superintendent
Nampa & Meridian Irrigation District
AM/dbg
PC': Settlers Irrigation ~ ~ ~ ~ ~.~ ,;, ~, ,
k
FilelOffice ~ »-
1.
~ w. ~' v :;
t ,- . i ' l ~. K. '~: w . ~. ~.:• s .~ : .. x ~ a z'u. ~ § S `} ..~ * v r..,. ~ • •.^, .~ j '. - •' Ar A f x • ~. .~ .:
..~ t. ~ f., 1 ,, ~ . °,.J it1~, a . ! ti. -b4a.~ . +. ~ ` '~+~a~ ~ ~„ t' i 4 #'"" '~'~,i '~"* +" t ~ a ~' ~ ,
" ~~., '0~: '~~ ~ ~ ~ ~ *.. '~~, ...-L.a? + 1 t. 1 Jrj .r ,.t€~w ~.. ,~ ~ ...,~, ~ ,~$~' -~ a'~,1~ ~t'd.~'~~~.,~ s ...?' ~ ~ M» :" ~si~~~
..'.
~ f ( 1 '
~~::a~ ~ d`rF \~ '~~ ~ w4if, o-P
~w\, \~ ,~ `L;
~ ~ ,J
~s,_ y~r.;;.
~~`` ~' APPROXIMATE IRRIGABLE ACRES
v t 'r w
~ ~ ~ ~~ ,~ ~ RIVER FLOW RIGHTS - 23,000
. ~? ..._
_a ~"
~,{~'~`'~ BOISE PROJECT RIGHTS -40,000
~.
Jacy Jones
~'"`~rom: Mack Myers <mack@settlersirrigation.or >
gent: Freda Ma 24 2013 ~ g
To: y' y ~ 9.59 AM
Bruce Freckleton; clerk
Subject: RE: City of Meridian Dev App - FP 13-026 Paramount Sub No.
23
Settlers Irrigation District operates facilities within, and claw praximit to the ra'ecfi sit
Y p J e and requires all construct~an
plans be reviewed by the District prior to ANY development fia ensure all irri anon facile i
g t es rerna~n protected.
Yau will also want to contact Rad vVagner the North Slav h irri anon As ~ .
g g sac~at~on forcommenfi to ensure all North
Slough facilities remain prafiected.
I~ad 208-751-0041
thanks,
Mack Myers
District Manager
Settlers Irrigation District
P.O.Box 7571
raise, ID $3707
Cell 208-871-4468 Office 208W343 5271 Fax 208 343-x.642
From; Machelle Hill [mailto:mhill(almeridiancity.org]
Sent: Thursday, May 16, 201312:42 PM
Subject; City of Meridian Dev App - FP 13-026 Paramount Sub No. 23
... •..•••:n:.•.•.: ••••••:...•• +••••:.••...........:..........vi:•:fv.Nf{R:.Y:I:^'F..:.:Oiiil.ntii,Y,:Nb:i:::ii:~iiiiii:::•\i'1.:4ilri:?iii•:v'i: •. v~~ •:•
.:\..:.:.iY.•iY.9P:IXF:in:.is~iiiiiti:•i:•:•:ii::H .:..........:::::::::..::i:•::.ix.::::.J:iii:•life:i:.ii::ifi:i::.:~ii:.................
n•.i•,•::: ::.............. .... ....... „v::.;vv::w: :•: N.i:IX+rir.:v:Jii:O:/.•iii:N.:.i4ii:i:\!iLiiiii:4:0iiiy: iii:•:vii:?iiiiii:U.iiiii:.••. •.. •. •.
v.:~::v::rlh:•i:^ii:^i:~i:Sii:{{i:•:\^i:::•:ii:LiNi::bile:8iiiiiifi:•'f.5fiiii::::}:Oiiiifiiiiiii\•%•i:Q:i4'F.4:8 ^:Nii::.iiiiiii::.iiiii..•••..••.•:::• ::::::::.:::::::::.~:.,..................
::::::::::...: .....................:..~::::::.,~::::::.: iiii:
~~~~~ City of Meridian
'''~' City Clerk's Office
33 E. Broadway Avenue
Meridian, ID 83642
City Council
Development A~~plicati~n Transmittal
To: Outer A encies Comments due b : FP 13-026
Transmittal Date: Ma 16, 2013 File No.: FP 13-026
Hearin Date: June 4, 2013
Request: Final Plat consisting of 35 single-family residential buildin lots and two
g (2)
common/other lots on 12.5 acres of land in an R-8 zoning district for Paramount
Subdivision No. 23
`B : SCS Bri hton, LLC
vocation of Pro er or Pro'ect: North of W. McMillan Road and east of N. Lin
der Road
City Council Action:
i