Loading...
Agency CommentsCENTRAL •~ DISTRICT ~THEALTH DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Preliminary /Final /Short Plat ~1~~ 1~-eon Return to: ~I ^ ACZ ^ Boise ^ Eagle ^ Garden City ^ Kuna '~ Meridian ^ Star ~j1. We have No Objections to this Proposal. rr^_2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: ~j Date:/ /~ Review Sheet 15726-001EH1111 ~i~ 'ha~yu~ ~i ~le~ridiasi ~Ia~cigauosc 2~ta.~cict City of Meridian City Cferk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: iiv'ti~A:~-t3a~!~~d'ie Creek Dear Jaycee: 1503 FIRST STREET SOUTH NAMPA; IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. All laterals and waste ways must be protected. The District's Milk Lateral courses through this proposed project. The District's easement for the Milk Lateral at this location is a minimum of thirty feet (30'), fifteen feet (15') each side of the centerline (facing downstream). However please contact the District directly to verify the width of easement necessary to operate, maintain, and repair the Milk Lateral. Please send revised plans showing what proposed encroachments, if any, will be within the District's easement and exactly how far. This easement must be protected. Any encroachment without a signed License Agreement and approved plan before any construction is started is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leav:s the Site, ihv lValTipa & i~~2rl~:~an iii-i~atiOr i Dijii'i%t (i'Vi~ii~) i"rili~ review. drainage plans. Sincerely, --~ And Madsen Asst. Water Superintendent Nampa & Meridian Irrigation District AMidbg PC: File/Office .. ~3; : ,~`,:. APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS -40,000 n !J'1. / _! (~ 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Matt Schultz Schultz Development PO Box 1115 Meridian, ID 83680 RE: Land Use Change Application -Sadie Creek Promenade Please note the District now requires three (3) sets of plans Dear Mr. Schultz: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G. Curtis, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or Greg G. Curtis, at the District's shop. Sincerely, Suzette G. Hewlett, Asst. SecretarylTreasurer NAMPA & MERIDIAN IRRIGATION DISTRICT SGH/smk cc: File Water Superintendent City Clerks Office, Meridian, City of Sadie Creek Commons, LLC, 10789 W. Twain Avenue, #200, Las Veg s~,,~~~~~ T enc. ~..~ Y APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS -40,000 22 March 2013 ~~~~e ~DANO IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 (208) 334-8300 * * Boise, ID 83707-2028 itd.idaho.gov s ZJ,A Q,~i o91gT10N O~QP March 13, 2013 Machelle Hill City Clerk's Office City of Meridian 33 East Broadway Avenue Meridian, ID 83642 Re: Modification of the Sadie Creek Development Agreement (MDA 13-005) Dear MS Hill: The Idaho Transportation Department (ITD) reviewed the referenced application for the Sadie Creek development west of SH-55 (Eagle Road) and south of Ustick Road. ITD has the following comments: 1) ITD has no objection to the proposed change in the development agreement. The proposed change does not require a change in access to the State Highway System or generate additional vehicle trips that were not anticipated under the original agreement. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, ~Mr/~ (U~~L~_ Dave Szplett Development Services Manager dave.szplett a,itd.idaho.gov