Agency CommentsCENTRAL
•~ DISTRICT
~THEALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTRAL DISTRICT HEALTH DEPARTMENT
Environmental Health Division
Preliminary /Final /Short Plat ~1~~ 1~-eon
Return to: ~I
^ ACZ
^ Boise
^ Eagle
^ Garden City
^ Kuna
'~ Meridian
^ Star
~j1. We have No Objections to this Proposal.
rr^_2. We recommend Denial of this Proposal.
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
^ central sewage ^ community sewage system ^ community water well
^ interim sewage ^ central water
^ individual sewage ^ individual water
^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
^ central sewage ^ community sewage system ^ community water
^ sewage dry lines ^ central water
^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 12. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
^ 14.
Reviewed By: ~j
Date:/ /~
Review Sheet
15726-001EH1111
~i~
'ha~yu~ ~i ~le~ridiasi ~Ia~cigauosc 2~ta.~cict
City of Meridian
City Cferk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: iiv'ti~A:~-t3a~!~~d'ie Creek
Dear Jaycee:
1503 FIRST STREET SOUTH NAMPA; IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application be
filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for further
information.
All laterals and waste ways must be protected. The District's Milk Lateral courses through this
proposed project. The District's easement for the Milk Lateral at this location is a minimum of
thirty feet (30'), fifteen feet (15') each side of the centerline (facing downstream).
However please contact the District directly to verify the width of easement necessary to
operate, maintain, and repair the Milk Lateral. Please send revised plans showing what
proposed encroachments, if any, will be within the District's easement and exactly how far.
This easement must be protected. Any encroachment without a signed License
Agreement and approved plan before any construction is started is unacceptable.
All municipal surface drainage must be retained on site. If any municipal surface drainage
leav:s the Site, ihv lValTipa & i~~2rl~:~an iii-i~atiOr i Dijii'i%t (i'Vi~ii~) i"rili~ review. drainage plans.
Sincerely,
--~
And Madsen
Asst. Water Superintendent
Nampa & Meridian Irrigation District
AMidbg
PC: File/Office
.. ~3;
: ,~`,:.
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS -40,000
n !J'1.
/ _! (~
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Matt Schultz
Schultz Development
PO Box 1115
Meridian, ID 83680
RE: Land Use Change Application -Sadie Creek Promenade
Please note the District now requires three (3) sets of plans
Dear Mr. Schultz:
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above-referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order or
cash as payment of the fees in order to speed the process up. If you submit a company or
personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G.
Curtis, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or Greg G. Curtis, at the District's shop.
Sincerely,
Suzette G. Hewlett, Asst. SecretarylTreasurer
NAMPA & MERIDIAN IRRIGATION DISTRICT
SGH/smk
cc: File
Water Superintendent
City Clerks Office, Meridian, City of
Sadie Creek Commons, LLC, 10789 W. Twain Avenue, #200, Las Veg s~,,~~~~~ T
enc. ~..~ Y
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS -40,000
22 March 2013
~~~~e
~DANO IDAHO TRANSPORTATION DEPARTMENT
P.O. Box 8028 (208) 334-8300
* * Boise, ID 83707-2028 itd.idaho.gov
s
ZJ,A Q,~i
o91gT10N O~QP
March 13, 2013
Machelle Hill
City Clerk's Office
City of Meridian
33 East Broadway Avenue
Meridian, ID 83642
Re: Modification of the Sadie Creek Development Agreement (MDA 13-005)
Dear MS Hill:
The Idaho Transportation Department (ITD) reviewed the referenced application for the Sadie
Creek development west of SH-55 (Eagle Road) and south of Ustick Road. ITD has the
following comments:
1) ITD has no objection to the proposed change in the development agreement. The
proposed change does not require a change in access to the State Highway System or
generate additional vehicle trips that were not anticipated under the original agreement.
If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377.
Sincerely,
~Mr/~ (U~~L~_
Dave Szplett
Development Services Manager
dave.szplett a,itd.idaho.gov