Loading...
Agency Comments~,~~ IDAkp ~ ~ H 9 y vfA Q~~ o91AT10N D~QP IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 Boise, ID 83707-2028 (208) 334-8300 itd.idaho.gov March 11, 2013 Machelle Hill Meridian City Clerk's Office 33 East Idaho Avenue Meridian, Idaho 83642 VIA EMAIL Re: TEC 13-002 for the Bainbridge Subdivision The Idaho Transportation Department has reviewed the referenced time extension request for the Bainbridge Subdivision on US 20-26 (Chinden Boulevard) west of Ten Mile Road. ITD has the following comments: 1) ITD has no objection to the requested time extension. Any change in the preliminary plat will require a new level of analysis by the Idaho Transportation Department. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, ~~~~~ Dave Szplett Development Services Manager dave.szplett(a~itd.idaho~ CENTRAL ~~ DISTRICT ~iRHEALTH DEPARTMENT Rezone # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division ;1 ~ Conditional Use # Preliminary /Final /Short Plat ~~~°0~2 ~~~br~~~ ~• Return to: ^ ACZ ^ Boise ^ Eagle ^ Garden City ^ Kuna Meridian ^ Star 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: ,. Date:~/~2 /~ Review Sheet 15726-OOtEH1111 ~('a 1503 FIRST STREET SOUTH NAMPA, IDAHO83651-4395 ~J}~rCh 13, 2013 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 City of Meridian SHOP: Nampa 208-466-0663 City Clerle's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: TEC 13-002/Bainbridge Subdivision Dear Jaycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application as it lies outside of our district boundaries. Please contact Settlers Irrigation at 344-2471 or at PO Box 7571, Boise, ID 83707. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. The Developer must comply with Idaho Code 31-3805. Sincerely, ~~ Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg C: Settler's Irrigation File/ z,C2 APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000