Loading...
Agency Comments%OANo Z A � o9lq),ION O�QP March 11, 2013 IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 Boise, ID 83707-2028 Machelle Hill Meridian City Clerk's Office 33 East Idaho Avenue Meridian, Idaho 83642 VIA EMAIL (208) 334-8300 itd.idaho.gov Re: VAR 13-001 Northwest Corner of Linder Road and Chinden Boulevard (US 20-26) The Idaho Transportation Department has received a variance request application for a new private street approach to US 20-26 (Chinden Boulevard) approximately 500 -ft west of Linder Road. ITD has the following comments: 1. ITD has received the application, the site plan, a traffic analysis and the processing fee. The application is still incomplete because we have not received a copy of the deed, showing that the applicant controls the subject property. 2. The ITD Board recently changed the approach separation standards. The proposed location and the submitted traffic analysis appear to meet the newest Idaho Transportation Department policies. ITD has not processed the application because the proposed approach violates City of Meridian policy. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, Dave Szplett Development Services Manager dave.szplett(a itd.idaho.gov CrHEALTH CENTRAL DISTRICT DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Returnto: Environmental Health Division , f ❑ ACz ❑ Boise Preliminary / Final / Short Plat \]AV, Vb— oo\ ❑ Eagle ❑ Garden City ❑ Kuna Meridian ❑ Star i 1. We have No Objections to this Proposal. ❑ 2. We recommend Denial of this Proposal. ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ❑ central sewage ❑ community sewage system ❑ community water well ❑ interim sewage ❑ central water ❑ individual sewage ❑ individual water ❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ❑ central sewage ❑ community sewage system ❑ community water ❑ sewage dry lines ❑ central water ❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ❑ 12. We will require plans be submitted for a plan review for any: ❑ food establishment ❑ swimming pools or spas ❑ child care center ❑ beverage establishment ❑ grocery store ❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ❑ 14. Reviewed By: Dater/ 1 Z / Review Sheet 15726-001EH1111 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 Cch 13, 2013 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 City of Meridian SHOP: Nampa 208-466-0663 City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: VAR 13-001/Knightsky Estates Dear Jaycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced application as it lies outside of our district boundaries. Please contact Settlers Irrigation at 344-2471 or at PO Box 7571, Boise, ID 83707. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. The Developer must comply with Idaho Code 31-3805. Sincerely, A� Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg C: Settler's Irrigation R e/Offte APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000