Loading...
Agency Comments~~~~~1 (~Ofw~w~~ ~O s~il~G~i Date: 2/14/2013 To: Treasure Valley Pediatrics 1620 S. Celebration Ave. Meridian, ID 83642 Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim D. Hansen, Commissioner Subject: MCUP-13-001 1620 S. Celebration Ave. Request to construct an addition to an existing office building. In response to your request for comment, the Ada County Highway District (ACRD) staff has reviewed the submitted application and site plan for the item referenced above. It has been determined that ACRD has no site-specific conditions of approval for this application; however, the applicant shall be required to submit plans for impact fee review and assessment. The applicant shall be required to meet all of the ACRD Standard Conditions of Approval as well as all ACRD Policies and requirements that may apply as noted below. ~-...~ar - -:~.. ,.-3. 1.1 a~ °~ _ 11_ ~> a~. ~. 1i#.'C- X1° !i. J ~li'J ~tfl. _:.1.C ~.l~s" ~, t If you have any questions, please feel free to contact me at (208) 387-6335. Sincerely, Q.~ nrC Austin Miller Planning Review Intern Development Services CC: Project file, City of Meridian, via a-mail Millennium Pediatric Associates, via a-mail ZGA Architects & Planners, via a-mail Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Applicant's Responsibilities Prior to final approval the applicant will be required to submit construction plans to the ACRD Development Review Section for review and approval and to ensure compliance with the conditions identified above and/or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. The Plan Submittal Checklist can be found on the ACHD website at http://www.achdidaho.org/Forms. • A traffic impact fee will be assessed by ACHD after plans have been submitted and approved, and will be due prior to the issuance of a building permit. For questions regarding the submittal of vour construction plans and impact fee assessment please contact Development Review staff at 208-387-6170. • Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit must be obtained from ACHD. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way. 2. Private sewer or water systems are prohibited from being located within the ACHD right-of- way. 3. In accordance with District policy, 7203.6, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless awaiver/variance of the requirements or other legal relief is granted by the ACHD Commission. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ®Send a "No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACRD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment ~ Erosion Submittal • At least one week prior to setting up aPre-Construction Meeting an Erosion & Sediment Control Narrative & Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre- Con being scheduled. ^ Final Approval from Development Services is required prior to scheduling aPre-Con. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org .. DI TRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to: 3I ~' HEALTH Environmental Health Division ^ ACz DEPARTMENT ^ Boise ^ Eagle Rezone # ^ Garden City I, Conditional Use # J( ~ ~ 3 -00 I ^ Kuna Preliminary /Final /Short Plat Meridian . Ld L / ,B~~C / 6`,,x(,~. S~ b ^ Star We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store 3. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be ^ 14. submitted to CDHD. Reviewed By: Date:/ ~~f Review Sheet 15726-001EH1111 IDAHO IDAHO TRANSPORTATION DEPARTMENT * * P.O. Box 8028 (208) 334-8300 Boise, ID 83707-2028 itd.idaho.gov a -, ~ i '~ m ~~ Q 91gT10N O~QP February 11, 2013 Machelle Hill Meridian City Clerk's Office 33 East Idaho Avenue Meridian, Idaho 83642 VIA EMAIL Re: CUP13-001 for Treasure Valley Pediatrics The Idaho Transportation Department has reviewed the referenced conditional use application for the Treasure valley Pediatrics facility at 1620 South Celebration Avenue. ITD has the following comments: 1) ITD has no objection to the conditional use application. The project has little impact on regional transportation volumes and does not require any new access to the State Highway System. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, p(~~~~<~ Dave Szplett Development Services Manager dave.szplett a itd.idaho.gov 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 ~ebrs;lary 26, 201.3. FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 City ofi Meridian SHOP: Nampa 208-466-0663 City Clerk's .Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: CUP13-Qf3.9ITreasure Valley Pediatrics Dear Jaycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application. All laterals and waste ways must be protected. Please be advised there is a pressure irrigation tine in the thirty-five foot (35') utility easement. Alf municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. The Developer must comply with Idaho Code 31-3805. Sinc ely, Andy Ma sen Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: File/Office APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS-23,000 BOISE PROJECT RIGHTS -40,000