Loading...
Agency CommentsCENTRAL •• DISTRICT ~ HEAL DEPARTM "To iu:p developing party 13-0906 N ENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208). 375-5211 • FAX 327-8500 rove the Prea/Itr of our conurrurrities by fderctrjyirrg sustainable solutions to corrrrnuniry headt/r issues, terslrips for iurp(enrentutiorr of strategies, arcd den:onsirating our success tlrrougb rneusurerrtenf ofoutcanes. " July 24, 2013 Christopher D. Rich Ada County Recorder 200 West Front Street Boise, ID 83702 RE: Karmelle Subdivision Dear Mr. Rich: Central District Health Department has reviewed and does approve the final plat for this subdivision for central water and central sewer facilities. Final approval was given July 23, 2013. Sanitary restrictions as required by Idaho Code,. Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE} representing the City of Meridian and .the QLPE approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. Serving Valley, Elmore, Boise, and Ada Counties Ada /Boise County Office Elmore' County .Office Valley .County Office 707 N. Armstrong PL 520 E. SthSt. North 703 N: tst St. Boise, ID 83704 Mountain Home, ID 83647 McCaII,1D 83638 Enviro. Health: 327-7499 t:nviro. Health: 587-9225 Ph. 634-7194. Reproductive Health: 327-7400 Family Healthi 587-4407. FAX: 634-2174- Immunizations: 32Z-7450 WIC: 587-4409 Senior Nutrition: 327-7460 FAX: 587-3521 WIC: 327-7488 FAX: 327-8500 If you have any questions, please ca11 327-85 1 7. Sincerely, Lori Badigian, R.E.H.S. Senior Environmental Health Specialist cc: Department of Housing and Urban Development J-U-B Engineers, Inc. Providence Management, LLC City of Meridian LB:bm CENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT Return to: .3I~ •• DISTRICT ~THEALTH Environmental Health Division ^ ACz DEPARTMENT ^ Boise ^ Eagle Rezone # ^ Garden City Conditional Use # ^ Kuna Preliminary /Final /Short Plat ~p I ~ -~d 8 ,Meridian ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. After writte approval from appropriate entities are submitted, we can approve this proposal for: ~sentral sewage ^ community sewage system ^ community water well ^ interim sewage ,r~entral water ^ individual sewage ^ individual water ~. The follow~iryrygg plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: central sewage ^ community sewage system ^ community water ^ sewage dry lines ~Sentral water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ beverage establishment ^ grocery store Infiltration beds for storm water disposal are considered shallow injection wells. submitted to CDHD. ^ 14. ^ child care center An application and fee ust be Reviewed B : /I'G~!`--~ y Date: ~ / ~~ /~ Review Sheet 15726-001EH7111 02/28/2013 09:44 RICHARb MURGOITIO GfIAIRMAN OF TNF pOnRn KENNETH COLE `/ICE ChIAIRMAN bF 7HE 130nRD 'TIMOTHY M. PAGE FROJECr MANAGER RO@ERT D. CARTER nsslSrnNl' PROJF_cr MnNAnER ApRYLQARDNER SFCRCTARy-TRLl51aRGR JERRI PILOYD ASSISTANT SEQRF_TARY- TRGASURrR 2083441437 BOISE PROJECT ~t~zs~ ~to,TlcC~r Bo.~,~>d ol~ ~s,tv~~>~oL (FGRMERLY BOISE u,S. RC-C.LAMATIt)N PRU.IpOT) 24f!} OVERLAND RnAD BOISE, IDnHt] Ii3705~?955 PAGE. 01/02 ~3 '~ OPERATING AC~ENCV FOR 1B7.OD0 ACRES FOR TIaF FOLLOI+UING IRRIGATION DISTRICTS NAMPq-MERIDIAN DI;7RICT BOISE-KUNA DIS I RIOT WILDER DISTRICT NIF'W YORK bISTRICT BIG 13EN0 DISTRICT TEL, (201;1 5A4.9tat FAX: (SOB) 3M4-14.77 1.1 February 2013 City of Meridian City Clerk's Office 33 B. Broadway Avenue Meridian, Idaho 83642 12E: Karmelle Subdivision South Side of B. Victory Bast of S. F.a.glc R.d 1Vew York Imgation. I)isi><-ict McDonald .Lateral 13+50 Sec. 28, T3N, R1 F, B.M. Jaycee I-Iolman,City Clerk: File Nu.1FP 13-008 NY-S7R-002-00 The Boise Project Board of Control Ends the plans submitted by J-U-B Engineers, Inc., stamped, signed sand dated ]./29/2013 by Micl~acl S. Byrn.s, P.L.S. to be acceptable. A relocation agreement h.as been obtained through th.e Bureau of Reclamation to relocate the McDonald I.,ateral and has been signed by the Boise Project, the Bureau and the Landowner. Whereas this property lies within t.lae New York Irrigation District it is importa>cat that representatives of this developrnen.t contact the NYITJ off ce as soon. as possible to discuss the pressure system prior to any costly design work. if applicable, the irrigation system will have to be built to specific specifications as set by the District /Project, 13oisc Project Board of Control must recEive a written response from the New York Irrigation District as to who will own and operate the pressure irrigation system, prior to review and approval of an irrigation plan by Soise Project Hoard of Co>~trol. Whereas tltis development is in its preliminary stages, Boise Project Board of Control reserves the .right to review plans and require changes when otu easements and/or facilities are affected by unknown .factors. 02/28/2013 09:44 2083441437 BOISE PROJECT PAGE 02/02 If you have any .further questions or comments .regarding this matter, please do not hesitate to contact trae at (208) 344-1141. Sincerely, ~(Y ~ '~.J ~ L Bob Carter Assistant Project Manager. BPBC Bdc/bc Cc: Phil Comegys Watermaster Div; 2 SP$C Velta I~arwood Secretary/T.reasurcr, NYID Tile City cif 11A~ridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 1503 FIRST STREET SOUTH FAX #208-463-0092 RE: FP 13-8Ug/ll~armelle Subdivision Dear Jaycee: NAMPA, IDAHO83651-4395 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 If all storm drainage is retained on-site there will be no impact on Nampa & Meridian Irrigation District (NMID) and no further review will be required. However,. if any surface drainage leaves the site, the Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application is filed for review prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. All laterals and waste ways must be protected. The developer must comply with Idaho Code 31-3805. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District (NMID). Please contact Bob Carter, Boise Project -Board of Control, at 344-1141 or 2465 Overland Rd., Room 202, Boise, Idaho 83705-3173 for information regarding McDonald Lateral. Sin rely, nM~'-J Andy Ma sen Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: File/Office ' .. ' .: a ~.: ,, APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS -40,000 yaa. & 7~1~~~dtaot ~I~cigatiaac Z~iQ.~cict 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Scott Wonders J-U-B Engineers 250 S. Beechwood Ave., Ste 201 Boise, ID 83709 RE: Land Use Change Application - Karmelle Subdivision Please note the District now requires three (31 sets of plans Dear Mr. Wonders: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G. Curtis, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or Greg G. Curtis, at the District's shop. Sincerely, Suze G. Hewlett, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT SGH/smk cc: File Water Superintendent City of Meridian Providence Management, LLC, 7761 W. Riverside Drive, #100, Boise, I enc. (~ O~~ APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 28 February 2013 RICHARD MURGOITIO CHAIRMAN OF THE BOARD BOISE PROJECT BOARD OF CONTROL KENNETH COLE VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S. RECLAMATION PROJECT) TIMOTHY M. PAGE 2465 OVERLAND ROAD PROJECT MANAGER BOISE, IDAHO 83705-3155 ROBERT D. CARTER ASSISTANT PROJECT MANAGER APRYLGARDNER SECRETARY-TREASURER JERRIFLOYD ASSISTANT SECRETARY- TREASURER 17 May 2013 City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, Idaho 83642 RE: Karmelle Subdivision South Side of E. Victory East of S New York Irrigation District McDonald Lateral 13+50 Sec. 28, T3N, R1E, B.M. Jaycee Holman, City Clerk: File No. FP 13-008 Eagle Rd. NY-578-002-00 OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (208)344-1437 This letter is to inform you that the developers of the above-mentioned project have satisfied their obligation to the New York Irrigation District and therefore the Boise Project Board of Control requests that the letter dated 16 May 2013 be disregarded and that work on the subdivision may proceed as planned. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, ~a Bob Carter Assistant Project Manager BPBC bdc/bc Cc: Phil Comegys Velta Harwood Dean Cardwell File Watermaster Div; 2 BPBC Secretary/Treasurer, NYID J-U-B Engineers,Inc. 05/16/2013 15:41 RICHARD MURGOITIO CHAIRM1MN tJl= SHE 134ARD KENNETH COLE vir..E r,HAIRMA>`I OF 7HF BOARD TIMOTHY M. PAGE aRO.IFr,T MnNnGER R08pRT D. CARTER Afl9l;irgnlT cROJ6c7 MANAGER APRYL GARDNER :, ECRETAR Y•TRFA9URER JERRIFLOYO n~~ISraNr SECRETARY. TRCnSURER 2083441437 BOISE PROJECT 1)QI,S1r ~Ri~JEC:'I' ~®~Yl l~ l.~.l' l.. ~l ~'M ~.l'A IJ i~ (FORMERLY DOI;F t/,;,, RECLAMATION PROJECT) 26.5 OVERLAND ROAD OOI SE, IDAHO 83 i p5-1•f !i!i 16 May 2013 City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, Idaho 83642 RF: Karmelle Subdivision File No. lE'P ].3-DOS South Side of. E. Victory East of S. Eagle Rd. New York Irrigation District NY-578-002-00 McDonald Lateral 13+50 Sec. 2$, T3N, R1E, B.M. Jaycee Holman,City Clerk: PAGE 01/01 OpfiRATIM1IG AgENCY FOR 157~pOp ACRES FOR THF_ FOLLOWING IRRIC,ATION DICaTKIf;Tg NAMPA-MERIDIAN pISrRICT DOI~E.KUNA DISTRICT WILDER DISTRICT NF_W YORK DISTRICT BIG PEMD DISTRICT 7EI,; IZ08) 344.1141 rnx:~zDn~ 344-1471 On behalf of the New York Irrigation District, the Boise Project Board of Control is requesting that this development be stopped froTxA any further construction as they need to satisfy delinquent assessments to the New York Irrigation District_ Whereas this property lies within the New York Irrigation District, it is important that representatives o£ this development contact the NYID office as soon as possible to malts arrangements regarding this matter_ Whereas this development is i.n its preliminary stages, Boise Project Board o~'Control reserves the .right to review plans and require changes when our easements andlor facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do riot hesitate to contact m.e at (208) 344-1141. Sincerely, ~~~~ ~~~ Bob Carter Assistant Project Manager BPBC Bdc/bc Cc: Phil Comegys Waterm,aster Div; 2 BP$C Velta T~a.rwood SecretarylTreasurer, NYID Doan CardwEll J-U-B En.gineers,Inc. File