Agency CommentsCENTRAL
•• DISTRICT
HEAL
DEPARTM
"To irnp
developiugpar/r
13-0915
TH
ENT MAIN OFFICE • 707 N. ARMSTRONG PL • BOISE, ID 83704-0825 • (208) 375-5211 • FAR 327-8500
rove dre bea!!h ojaur cmuraunilies by identifying suslniauble salrrtions to caurnruniry lrerdtlr issues,
rers/ripsjor inrp/emedtnlioa afslrategies, and dearanslralingoursuccesslbrorrgb nreusurenrent ojoulcoures."
July 31, 2013
Christopher D. Rich
Aaa County Recorder
200 West Front Street
Boise, ID 83702
RE: Mulberry Subdivision
-Dear Mr. Rich:
Central District Health Department has reviewed and does approve the final plat for this
subdivision for central water-and central sewer facilities. Final approval was given
July 31, 2013.
Sanitary restrictions as required'by Idaho Code; Title 50; Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional-Engineer (QLPE) representing the City of
Meridian and the QLPE approval of the design plans and specifications and the coridtions
imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those facilities. If the developer fails to construct facilities then
sanitary restrictions maybe reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval; and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
Jervreg
'Ada / Boise.County Office
707 N: Armstrong PI
Boise ID 83704
Enviro_Health: 327-7499
Reproductive Health:-327-7400
.' Immunizations:. 327 7450.
Senior Nutrition: 327 7460
.WIC:' 327-7488 -
-. fAX;, 327-8500 -
'alley, Elneol•e, Boise; aHrl:,
'.Elmore.Counfy_Office-
520E S1h.5t. North
Mountain Nome,. ID 83642
EOViro. Heallhi 587-9225.
Family Heallh:587-4407
WIG 587-4409
FAR. 587-3521
da CoitriYies
Valley County"Office
703 N tsl 5[ _
McCall, 7D 83638
Ph: 6347194
FAR;- 634 2174
If you have any questions, please. call 327-8517.
Sincerely,
ichael H. Reno, R:E.H.S.
Supervisor
Land Based Programs
cc: Department of Housing and Urban Development
City of Meridian
Settlers Park, LLC
Engineering Solutions, LLP
MHR:bm
CENTRAL
•• DISTRICT
pITHEALTH
DEPARTMENT
Rezone #
CENTRAL DISTRICT HEALTH DEPARTMENT
Environmental Health Division
Return to:
^ ACZ
^ Boise
^ Eagle
^ Garden City
Conditional Use # ^ Kuna
Prelimina /Final /. Short Plat ~ ~ G ~.c,~ w ~ u_~.~ ~~ ~~~.Ln
rY ~ ~ ~~f ~ h ~ Meridian
^ Star
^ 1. We have No Objections to this Proposal.
^ 2. We recommend Denial of this Proposal.
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
'~8. After written approval from appropriate entities are submitted, we can approve this proposal for:
central sewage ^ community sewage system ^ community water well
interim sewage ~ central water
^ individual sewage ^ individual water
~.9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
central sewage ^ community sewage system ^ community water
sewage dry lines ~-central water
^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 12. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
~13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
^ 14.
Reviewed By:
A
Date:/ Z-S/~
Review Sheet
15726-OOtEH1111
~~ ~ ~ .
February 20, 2013':
City of Meridian
City Glerk's Office
33.E Bresadway Avenue, Suite 102
Meridian, ID 83642-2619
1503 FIRST STREET SOUTH NAMPA, IDAHO83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
RE: FP 43-006/Mulberry Subdivision
Dear Jaycee:
Nampa & Meridian Irrigation District (NMID) has a current Land Use Change Application and
plans on file which are currently under review.
There are no District facilities impacted by this proposed project. NMID will withhold further
comment until it has finished its review.
Sincerely,
r~"""1
Andy dsen
Asst. Water Superintendent
Nampa & Meridian Irrigation District
AM/dbg
PC: File/Office
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS -40,000