Loading...
Applicant Response to Staff Report/ExhibitsWs~s li'1®®Y`Yi C O M P A N Y Real Estate Development EI Dorado Business Campus 1940 S. Bonito Way, Suite 160 Meridian, Idaho 83642 TELEPHONE X2081323-1919 /FAX 323-7523 P.O. Box 8204 Boise,ldaho 83707-2204 Date: February 21, 2013 To: Sonya Wafters, Associate City Planner Meridian Planning & Zoning From: Jonathan R. Seel WH Moore Company Subject: MDA-13-002, RZ-13-002, PP-13-003 Red Wing Subdivision (FKA Cavanaugh Subdivision) Planning & Zoning Hearing February 21, 2013 We would like to provide the following comments to the referenced staff report: VIII. Analysis - Dimensional Standards: Staff states they have "reviewed the proposed plat and found several line and cord segments to be missing and lots (L9 L10, B2 and L24, B1) that don't meet the minimum street frontage requirements." The applicant has submitted a corrected preliminary plat to staff. Common Open Space & Site Amenities; Staff questions whether the applicant meets the standards of the qualified open space requirements as set forth in UDC 11-3G-3B. Please refer to the attached letter from Jason Densmer of The Land Group. Exhibit B A~ency & Department Comments/Conditions - Planning Department 1.1 c. -The applicant has submitted a cross section of the berm in relation to the centerline of SH 69 demonstrating compliance with the standard listed in UDC 11-3H-4D. 1.2.6 -Restricts the development to one access off of Victory Road. We oppose this condition and request two access points off of Victory. The basis for this request is as follows: Comments to Staff Report February 21, 2013 Page 2 • Our submitted site plan shows two access points off of Victory Road. The attached "Project Entrance Exhibit" illustrates that separation between access points meets ACHD's policy requirements. Further, the westerly entrance is 721 feet from the Meridian and Victory Roads intersection and the easterly one has 577 feet of separation to the next intersection for Standing Timber subdivision. • The staff report from ACRD Development Services supports the two access points. We understand a draft report has been sent to Meridian. • We will enter into a cooperative agreement with ACRD to improve Victory Road to 3 lanes with curb and gutter the entire length of our project. This work will be completed this summer and we believe will improve traffic safety. • In prior meetings, Meridian Fire Department has advised that two access points will be required. The plan for the residential development does show an access to a future street referred to as Cavanaugh Way. However, there are no plans or discussions for constructing this road. • Article 4.7 states that the Fire Department requires two access points for a project with more than 50 homes. The residential portion has 48 homes and there are an additiona1220+/- apartment units. All of which would have to rely on one access point for emergency service, based on staff s conditions. This seems to ignore Fire Department safety concerns. • In reading UDC 11-3A-3-A, attached herewith, we do not see where the conditions of restricted access apply to this development. Clearly we have no access to a local street and this project will never change from residential to nonresidential. 2. Public Works Department 2.1 -Requires the applicant to install sewer mains to and through this subdivision. We believe this requirement should be waived as the Ridenbaugh Canal borders the property to the south and the east parcel has sewer. 2.11 -Requires all development improvements, including sewer, fencing, micro paths, and irrigation and landscaping shall be installed and approved prior to obtaining certificate of occupancy. We have no objection to completing all of the above items prior to CofO, with the exception of the landscaping. This is a large project and some of the work could extend into winter. If weather conditions do not allow us to complete the landscape work, we would ask that the City provide a CofO with a letter of credit/bond for uncompleted work. THE LAND LRUUP, INC. February 21, 2013 Mr. Jonathan Seel Redtail Communities, LLC PO Box 1030 Meridian, ID 83680 Re: Red Wing Subdivision Preliminary Plat - Design of Open Spaces Dear Mr. Seel: via email j.seel@att.net This narrative summarizes the design of the proposed Red Wing subdivision, as is now being presented to the City of Meridian for review and approval. I would like to take this opportunity to describe the methods by which the project's design and provided open spaces meet the requirements of Meridian UDC it-3G. The project includes two major land-use types: asingle-family residential area consisting of 48 buildable lots, and amulti-family residential component consisting of 215 to 228 units. Although the entire 31.11- acre property will be platted as one project, our design sought to assure that each area independently achieves the minimum required open space. As I believe you'll see from this narrative, each area not only achieves the minimum, but goes significantly beyond in amount of open spaces and amenities available to the future residents. Single Familv Portion The project will develop 48single-family lots and 7 common area lots on a land area of 15.90-acres. The common areas provide open space as follows: Block 1, Lot 4 and Block 2, Lot 1 ............................................................................ 26,999-sf The entire area of these lots is 36,841-sf but the qualified open space area is reduced by 50% of the required frontage landscape buffer (9,842-sf) because Victory Rd is classified as an arterial, per UDC 11-3G-3. B.4 Block 1, Lot 16 ........................................................................................................21,020-sf This lot also encompasses Nampa-Meridian Irrigation District's (NMID) easement for the Ridenbaugh Canal and their maintenance access road. By virtue of its common area designation, this open space area is withheld from development and serves to reduce the overall density of the property. The developer proposes to fence the perimeter of the easement for safety purposes, consistent with UDC 11-3A-66. The area will remain accessible to residents and maintenance will be provided by the Owner's association. NMID has indicated that their use of the easement area does not prevent use by residents. It's availability as both an active (for walking or running along the Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com February 21, 2013 Page 2 of 3 NMID maintenance road, which would not be restricted) and as a passive amenity (providing agreen-way and separation from future development south of the canal) both qualify the area for inclusion in open space requirements. Block 1, Lot 26 ..........................................................................................................7,575-sf Block 2, Lot 11 .............................................................................................................968-sf Block 3, Lot 1 ............................................................................................................1,129-sf Block 4, Lot 7 ..........................................................................................................11,545-sf Total Open Space in Single-Family Area 69,236-sf or 1.59-acres As described, the single-family portion of the project provides 1.59-acres of open space, which is equal to 10% of the total 15.90-acres encompassing this use, as required by UDC 11-3G. Within this area, we have proposed a seating and picnic area as amenities, as required by UDC 11-3G- 3.A.1. Although we believe that the single-family residential area's design `stands alone' in achieving the required UDC open spaces, the single-family lot owners will also enjoy access to the extensive open spaces and amenities within the multi-family portion of the development as described below. Multi Familv Portion The multi-family portion of the project comprises between 215 and 228 units to be constructed on a single lot of 14.55-acres. Along the required street frontage landscape buffers, common area lots are provided of 22,133-sf (Block 1, Lot 1) and 7000-sf (Block 1, Lot 3). In addition to these two, smaller frontage common area lots for the landscape buffers, the multi-family project will include extensive open spaces. While we continue to work towards finalizing the configuration of the multi-family project, the current design provides the following amenities (which, as mentioned above will also be available to the single-family property owners): • Central amenity core' providing: o Clubhouse o Resort-style swimming pool o Cabanas o Open grass areas o Play structure o Bar-b-que facilities o Hot tubs or spas o Sand volleyball courts o Bocce courts • Pedestrian walkway network, including interconnectivitytyith sidewalks throughout the single- familyarea and perimeter sidewalks including along Victory Rd and the multi-use pathway at Meridian Rd. Site Planning ~ Landscape Architecture • Civil Engineering • Golf Course Irrigation. & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83516 • P 208.939.4041 • F 208.939.4445 • wwwxhelandgroupinc.com February 21, 2013 Page 3 of 3 • Heavily landscaped grounds comprising more than 2.56-acres (or nearly 18% of the multi-family area) We look forward to presenting the final configuration of these areas, including the final amenity selection and landscape design during the pending Conditional Use Permit process. In conclusion, our design of the Red Wing subdivision provides both the single-family and multi-family areas with adequate open spaces that exceed UDC requirements when viewing each project component independently. When the true vision of the project is considered -that the extensive multi-family area's open spaces and amenities are shared so they also enrich the single-family lot owners - we are confident that the project achieves an exciting new way of exceeding both the intent and the letter of the City's ordinance. The Red Wing subdivision will truly provide unrivaled open spaces and amenities to enhance the City and benefit its residents. Please don't hesitate to let me know if we can provide any additional information. I can be reached via email to iason@thelanderoupinc.com or at 208-939-4041. Sincerely, J o ensurer Principal & Project Engineer The Land Group, Inc. Site Rlanning • landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle,ldaho 83616 • P 208.939,4041 • F 208.939A445 • www.thelandgroupinc.com ~ gg, .$ ~ ~ '> ~ ~~ ~ ~ ~4BPI uelpuaW sa~u~a~u ~~afoad ~ x ~ ; ~ ~ a m ° x ~ $ ~ igiy ~ ~~ g x ~sp~ ~~~.~~I.~ ~=~~ ~ ~ 'pal ~(ao~~in as ~~s , ~ - ~~`" ~ § s ~ ~w~~ o uoisin~pgns fiuiM pad §~ ~g ` w ~ H $ ~ ~ ~INL lMt6 r ~ ~ ~ s ~tF h ~ ~ ~. z C C7 0 z ~ ~: soapuy ~~, ~ ~ ~___ - cn ~ I ~ I ~~~~~...., I ~' z ___. O ~~' ---.'°"' ~ ~ ~l ~ O ~ aaquail ~ Buipu~~S File Location: g:\2012\112168\wd\prelim plat\112168 street offset eKhibltdwg Last Plotted 8g Jason densmer Date Plotted: Wednesday, February 20 2013 at 04:40 PM Sterling Codifiers, Inc. Page 2 of 9 Note: 1.Measured from back of sidewalk or property line where there is no adjacent sidewalk. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005; amd. Ord. 07-1325, 7-10-2007) 11-3A-3: ACCESS TO STREETS: The following standards shall apply unless otherwise waived by city council. The intent of these standards is to improve safety by combining and/or limiting access points to collector .and arterial streets and ensuring that motorists can safely enter all- streets. A. The following standards shall apply to any use and/or property that takes direct access to an arterial and/or collector roadway: Prior to any new, expanded, or extended use or development. of the property: 1. Where access to a local street is available, the applicant shall reconfigure the site circulation plan to take access from such local street. 2. Where access to a local street is not available, the property owner shall be required to grant cross-access/ingress-egress easements to adjoining properties. This standard is intended to apply primarily to nonresidential properties, but may extend to residential properties where the use is anticipated to change to a nonresidential use. 3. All subdivisions must provide local street access to any use that currently takes direct access from an arterial or collector street. B. All landscaping or constructed features within the clear vision triangle shall comply with the restrictions as set forth in this section. 1. Measurement of the clear vision triangle: (Ord. 08-1372, 7-8-2008, eff. 7-8-2008) a. For two (2) public streets or a street and railroad crossing, the area is defined by measuring from the intersection of the edge of the travel lane (excluding parking and sidewalk) a distance of forty feet (40') along each road. See figure 1 of this section. b. For a public street and driveway or alley, the area is defined by measuring from the intersection of the edge of travel lane and the corner of the driveway or alley twenty feet (20') along the roadway and ten feet (10') along the driveway or alley. See figure 1 of this section. FIGURE 1 CLEAR VISION TRIANGLE DRAWINGS http://www.sterlingcodifiers.com/codebook/printnow.php 2/19/2013 Red Tail Community Amenities offered to single family home owners and occupants of apartments Club House Business Center Cardio and Weight Lifting Exercise Equipment Swimming Pool Sand Volley Ball Courts Bocce Ball Courts Cabana Gazebos Picnic Tables Outdoor Fireplace Play Equipment Walking Path Water Feature Builder Team for Red Tail Development Hunter Homes Thompson Homes Stacey Construction Tresidio Homes Alturas Homes