Loading...
Agency Comments1 / ~~ `pAHO IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 (208) 334-8300 * * Boise, ID 83707-2028 itd.idaho.gov -i r 9 2 Z W f ~~ A Q, o9TgTI0N D~QP December 20, 2012 Machelle Hill Meridian City Clerk's Office 33 East Idaho Avenue Meridian, Idaho 83642 VIA EMAIL Re: CPAM 12-005 Cavanaugh The Idaho Transportation Department has reviewed the referenced comprehensive plan amendment for the Cavanaugh project site on Victory Road near SH-69 (Meridian Road). ITD has the following comments: l) ITD has no objection to a local jurisdiction's changes to a land use plan. The proposed change to the comprehensive plan requires no ITD-related mitigation. 2) ITD has an access management plan for SH-69 (Meridian Road). The plan does not include any access to SH-69 between Victory Road and Harris Street. The applicant's site plan should consider ITD's access management plans. 3) The proposed change in land use is a net reduction in site-generated trip volume that has an important impact on the regional roadway system. The conversion from employment / commercial center to residential development separates homes from employment opportunities and increases the average journey-to-work and home-to-shopping trip distance. Although this project is relatively small, the cumulative impact of such rezone/comprehensive plan changes will certainly increase regional travel demand and necessitate additional investment in the transportation system. These incremental changes to the development plans incur a regional cost to expand the roadway network. This site's location on the regional highway system could have provided some benefit in improving accessibility and reducing both travel distance and the number of trips. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, ~~~~~~ Dave Szplett Development Services Manager davc.szhlc tu;itd.idaho.<~u~ ~~~~~~a 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 City of Meridian City Clerk's Office 33 E Broadway Avenue Ste 102 Meridian, ID 83642-2619 RE: CPAM 12-005/Cavanaugh Dear Jaycee Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. All laterals and waste ways must be protected. The District's Ridenbaugh Canai (south boundary) and Kennedy Lateral (east side) course through this proposed project. The District's easement for the Ridenbaugh Canal at this location is a minimum of one hundred feet (100'), fifty feet (50') each side of the centerline. The easement for the Kennedy Lateral is fifty-five feet (55'}; twenty feet (20') left and thirty-five feet (35') right of centerline facing downstream. These easements must be protected. Any encroachment without a signed License Agreement and approved plan before any construction is started is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian Irrigation District (NMID) must review drainage plans. The developer must comply with Idaho Code 31-3805. Sincerely, n C~-..~. Gre~. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg C: File/Office ~: '. APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS 40,000 January 3, 2013 '12g.~rr~ia & `n~~:r.'d.~a~c ~In~zi yat~a~ D~t~cict 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Jonathan Seel Red Tail Communities, LLC 1940 Bonito Way, Suite 160 Meridian, ID 83642 RE: Land Use Change Application -Cavanaugh Please note the District now requires three (3) sets of plans Dear Mr. Seel: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G. Curtis, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. if you have any questions concerning this matter, please feel free to call on me at the District's office, or Greg G. Curtis, at the District's shop. Sincerely, Suzette Hewlett, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT SGH/smk cc: File Water Superintendent -~.- ,~ City Clerk, Meridian City !' W H Moore Company, 1940 Bonito Way, Suite 160, Meridian, ID 83642 1 I enc. APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 9 January 2013 CENTRAL • ~ DISTRICT ~i1THEALTH DEPARTMENT Rezone # Conditional Use # C~,~r~ I~- Preliminary /Final /Short Plat Return to: ^ ACZ ^ Boise ^ Eagle ^ Garden City ^ Kuna Meridian ^ Star We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division 'ice Date~~- `~ ~~~- Review Sheet 15726-001EH1111