Applicant Response to Recs/Staff ReportNCINEERING
planning and engineering communities for the future
OLUTIONS~LP
November 2, 2012
Mayor and City Council
City of Meridian
33 East Idaho
Meridian, ID 83642
Re: Zebulon Village Preliminary Plat
File No. PP-12-009
Dear Mayor and Council:
1029 N. Rosario Street, Suite 100
Meridian, ID 83642
Phone: (208) 938-0980
Fax: (208) 938-0941
E-mail: es-beckym@gwestoffice.net
We have reviewed staff comments for the City Council meeting of November 7, 2012, and have
the following responses:
1. PLANNING DEPARTMENT
1.1 Site Specific Conditions of Approval
1.1.1 The applicant will comply.
1.1.2 The applicant will comply
1.1.3 The applicant shall revise the landscape plan, dated 3/23/12, prepared by Jensen Belts
Associates, labeled as Sheets L1 & L2 as follows:
a. It is anticipated that street lighting will be provided from each public street
adjoining the path. Therefore, separate bollard lighting should not be required.
b. The applicant will comply.
To maintain continuity and symmetry with previous phases of Zebulon (Alpine
Pointe), we respectfully request that the Chanticleer Pears remain throughout
all phases of Zebulon Heights/Zebulon Village within an eight-foot-wide planter
strip. Pyrus calleryana is an approved water-conserving tree species and is
widely used as a street tree. Boise City accepts Chanticleer Pears as a street tree
but has not changed their tree planting guide.
d. This condition was deleted.
C:\Users~Shari\Documerits\201 I'~, I 111061RecsResponseCC.docx
Meridian Mayor and City Council
November 2, 2012
Page 2
e. Landscaping on Lot 25, Block 2, will be landscaped with lawn and two trees.
1.1.4 The applicant will comply.
1.1.5 The applicant will comply.
1.2 General Conditions of Approval
1.2.1 The applicant will comply.
1.2.2 The applicant will comply.
1.2.3 The applicant will comply.
1.2.4 The Settlers Canal would require a 72-inch pipe and will remain open; the applicant
respectfully requests that this condition by waived by the Meridian City Council per
UDC 11-3A-6.a.3.b.
1.2.5 The applicant will comply
1.2.6 The applicant will comply.
1.2.7 The applicant will comply.
1.2.8 The applicant will comply.
1.2.9 The applicant will comply.
1.2.10 The applicant will comply.
1.2.11 The applicant will comply.
1.2.12 The applicant will comply.
1.2.13 The applicant will comply.
1.2.14 The applicant will comply.
1.2.16 The applicant will comply.
1.3 On~oins Conditions of Approval
1.3.1 The applicant will comply
1.3.2 The applicant will comply.
C:1Users\ShariADocuments\201 I `,III 106\RecsResponseCCdocx
Meridian Mayor and City Council
November 2, 2012
Page 3
1.3.3 Noted.
1.3.4 Noted.
1.3.5 Noted.
1.3.6 Noted.
1.3.7 Noted
1.4 Process Conditions of Approval
1.4.1 The applicant will comply.
1.4.2 The applicant will comply.
1.4.3 Noted.
1.4.4 The applicant will comply.
1.4.5 Noted.
1.4.6 The applicant will comply.
2. PUBLIC WORKS DEPARTMENT
2.1 The applicant will comply.
2.2 The applicant's engineer had discussions with Kyle Radek at Public Works
concerning the single water connection. After water modeling, we received written
confirmation from Clint Worthington that asingle-point connection would be
sufficient (see attached copy of e-mail).
2.3 The applicant will comply.
2.4 The applicant will comply.
2.5 The applicant will comply.
2.6 The Settlers Canal would require a 72-inch pipe and will remain open; the applicant
respectfully requests that this condition by waived by the Meridian City Council per
UDC 11-3A-6.a.3.b.
2.7 The applicant will comply.
2.8 The applicant will comply.
C\ U sers~S hari\Documen is\20 1 111 1 1 1061RecsResponseCC. docx
Meridian Mayor and City Council
November 2, 2012
Page 4
2.9 The applicant will comply.
2.10 The applicant will comply.
2.11 Noted.
2.12 The applicant will comply.
2.13 The applicant will comply.
2.14 Noted.
2.15 The applicant will comply.
2.16 Noted.
2.17 The applicant will comply.
2.18 The applicant's engineer will comply.
2.19 The applicant's design engineer will comply.
2.20 The applicant will comply.
2.21 The applicant will comply.
2.22 The applicant will comply.
2.2 The applicant will comply.
Thank you for your review of this project. Please feel tree to call me if you have additional
comments or questions.
Sincerely,
Engineering Solutions, L
Becky Mc a
Planner
BM:ss
cc: The Traditions by Amyx II, LLP
C':\l1 sets\Sh ari\Documents\20 1 111 1 1 106U2cesResponseCC.dow
Becky McKay
From: Kathy Stroschein <es-kathys@gwestoffice.net>
Sent: Tuesday, October 02, 2012 11:27 AM
To: Becky
Subject: FW: Zebulon heights
From: Kathy Stroschein (mailto:es-kathysC~gwestoffice.net]
Sent: Monday, August O1, 2011 12:05 PM
To: 'Clint Worthington'
Subject: RE: Zebulon heights
Thank You! O
From: Clint Worthington [mailto:cworthingtonCa~meridiancity.org]
Sent: Monday, August 01, 2011 11:50 AM
To: Kathy Stroschein
Subject: RE: Zebulon heights
Kathy,
We have got the 1500 gpm at 20 psi at the dead end, so a second connection won't be required. Sorry for the delay.
Clint Worthington, P.E.
Staff Engineer II
City of Meridian -Public Works
208.489.0349
From: Kathy Stroschein [mailto:es-kathysCa~gwestoffice.net]
Sent: Monday, August 01, 2011 11:05 AM
To: Clint Worthington
Subject: RE: Zebulon heights
Clint,
Have you been able to work on this yet?
Thanks!
Kathy
From: Clint Worthington [mailto•cworthingtonCa~meridiancity org]
Sent: Tuesday, July 26, 2011 8:40 AM
To: Kathy Stroschein
Subject: RE: Zebulon heights
Kathy,
The water model is currently not working and our IT staff is trying to get it going. If it is up and running within a day or two,
1 will have the water guys go out and do a flow test to be sure of fire flows. I am pretty sure the flows are OK but just want
to double check. Sorry for the delay.
Thanks,
Clint Worthington, P.E.
Staff Engineer II
City of Meridian -Public Works
208.489.0349
From: Kathy Stroschein [mailto:es-kathysCa~gwestoffice.net]
Sent: Monday, July 25, 2011 9:32 AM
To: Clint Worthington
Subject: FW: Zebulon heights
Clint,
Have you had time to look at this? (We are trying to revise some lots and this is important information for us. O)
Thanks!
Kathy
From: Kyle Radek [mailto:kradekCameridiancity.org]
Sent: Friday, July 22, 2011 11:52 AM
To: Kathy Stroschein
Cc: Scott Steckline; Clint Worthington
Subject: Zebulon heights
Kathy,
Since 1 don't remember specifically checking the area north of the N Slough proposed to be served by the dead end, 1
want to model it now to be sure before 1 confirm that a loop is not necessary. My model is currently broken and I'm out all
next week.
I have copied Clint Worthington on this. He will mode! the dead end and confirm that a second connection is not required
provided he gets 1500 gpm at 20 psi at the last hydrant.
1 think it will be fine, but 1 want to be sure. Sorry about the delay.
Kyle Radek, PE, CFM
Assistant City Engineer
Meridian Public Works