Agency Commentst ~~~~~ ~iorrvn,~to~~o ~ibvwco Date: October 5, 2012 To: Kevin Amar, via a-mail Iron Mountain Real Estate 3681 N. Locust Grove Rd., Ste. 100 Meridian, ID 83646 Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner Mitchell A. ]aurena, Commissioner Subject: MCUP-12-010 / MRZ-12-010 1023 & 1025 W. Pine Ave. Request to construct (2) four-plexes within Rockcreek Subdivision In response to your request for comment, the Ada County Highway District (ACHD) staff has reviewed the submitted application and site plan for the item referenced above. It has been determined that ACHD has one site-specific condition of approval (see below) for this application at this time. • Minor Improvements Policy: ACHD District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. • Staff Comments/Recommendations: The applicant should be required to replace any deteriorated or deficient sidewalk, curb, gutter or pedestrian facilities along Pine Avenue abutting the site, consistent with ACHD's Minor Improvement Policy 7203.3. A traffic impact fee may be assessed by ACHD and will be due prior to issuance of a building permit. Please contact ACHD Planning and Development Services at 387-6170 for information regarding impact fees. Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc.) a permit or license agreement must be obtained from ACHD. The applicant shall also be required to meet the applicable ACHD Standard Conditions of Approval as well as ACHD Policies and requirements that may apply as noted below. If you have any questions, please feel free to contact me at (208) 387-6282. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Sincerely, w,~ Chrissy Weiser Planning Review Intern Development Services CC: Project file, City of Meridian, via a-mail, Bruce Farrelly, Kent Brown, Kent Brown Planning Services, via a-mail Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Applicant's Res onsibilities Prior to final approval the applicant will be required to submit construction plans to the ACHD Development Review Section for review and approval and to ensure compliance with the conditions identified above and/or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. The Plan Submittal Checklist can be found on the ACHD website at http://www.achdidaho.org/Forms. • Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit must be obtained from ACHD. Ada County Highway District • 3775 Adams Street • Garden Ciry, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the ACHD right-of--way 2. Private sewer or water systems are prohibited from being located within the ACRD rig ht-of-way. 3. In accordance with District policy, 7203.6, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACRD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of--way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACRD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant. to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ®Send a "No Review" letter to the applicant stating that there is one site specific condition of approval at this time. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Itelins tt~a pe o~e~ b~ A-airnt: ^For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ^ Driveway or Property Approaches) • Submit a "Driveway Approach Request" form to ACRD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal • At least one week prior to setting up aPre-Construction Meeting an Erosion & Sediment Control Narrative & Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services is required prior to scheduling aPre-Con. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org ~~~ ~p114s 10AHp * ~ 9 J~ Qom, ~9TATION O~Q! IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 Boise, ID 83707-2028 (208) 334-8300 itd.idaho.gov October 3, 2012 Machelle Hill Meridian City Clerk's Office 33 East Idaho Avenue Meridian, Idaho 83642 VIA EMAIL Re: RZ 12-003 and CUP 12-010 1023 and 1025 West Pine Street The Idaho Transportation Department has reviewed the referenced zoning and conditional use application for the multi-family project at 1023 an 1025 West Pine.Street. ITD has the following comments: 1) ITD has no objection to the conditional use and zoning request. The project does not require access to the State Highway System. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, ~~.~~~ Dave Szplett Development Services Manager dave.szplett~a~,itd.idaho.~,ov .. ~~ TRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return .to: HEALTH Environmental Health Division ^ ACz DEPARTMENT ^ Boise ^ Eagle Rezone # ~ ~ ~~ "~ 3 ^ Garden City Conditional Use # ~ u~ la -D / D ^ Kuna Preliminary /Final /Short Plat Meridian ~~ ~~~~-~S ^ Star ^ 1. We have No Objections to this Proposal. ~E~ErV ^ 2. We recommend Demal of this Proposal. CCT ' ~L ^ 3. Specific knowledge as to the exact type of use must be provided before we can commen~p~~i~ ®~~012 ^ 4. We will require more data concerning soil conditions on this Proposal before we can commentCLERks OF~ioE ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ~8. After written approval from appropriate entities are submitted, we can approve this proposal for: ~'eentrat sewage ^ community sewage system ^ community water well ^ interim sewage ~ central water ^ individual sewage ^ individual water The followi g plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: tral sewage ^ community sewage system ^ community water ^ sewage dry linescentral water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store 3. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be ^ 14. submitted to CDHD. Reviewed B : ~ ~%~i~~~ Y Dater/lam /~ Review Sheet 15726-001EH1111 RECEIVED oCT t 8 2012 CITY OF G14~ opnN CITY CLERKS OFFICE fJ ~ ~ . 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 Phones: Area Code 208 City of Meridian City Clerk's Office 33 E Broadway Avenue Ste 102 Meridian, ID 83642-2619 RE: RZ 12-003 & CUP 12-010/ Rockcreek Apts. Dear Jaycee: OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for further information. All laterals and waste ways must be protected. The District's Nine Mile Drain courses through this proposed project. The District's easement for the Nine Mile Drain at this location is a minimum of sixty feet (60'), thirty feet (30') each side of the centerline (facing downstream). However please contact the District directly to verify the width of easement necessary to operate, maintain and repair the Nine Mile Drain. Please send revised plans showing exactly what proposed encroachments, if any, will be within the District's easement and exactly how far. This easement must be protected. Any encroachment without a signed License Agreement and approved plan before any construction is started is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, the Nampa & Meridian Irrigation District (NMID) must review drainage plans. The developer must comply with Idaho Code 31-3805. Si cerely, 1 ~~,~--' Andy Madsen Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: File/Office APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS • 23,000 BOISE PROJECT RIGHTS - 40,000 October 11, 2012 yza & ~l~entd~a~ ~In~igat~ D~ztct 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Kent Brown Kent Brown Planning Services 3161 E. Springwood Drive Meridian, ID 83642 RE: Land Use Change Application -Rezone 0.58 acre for ROCKCREEK APARTMENTS Please note the District now rectuires three (3) sets of plans Dear Mr. Brown: Enclosed please find a Land Use Change Application for your use to file with the Irrigation District for its review on the above-referenced development. If this development is under a "rush" to be finalized, I would recommend that you submit a cashier's check, money order or cash as payment of the fees in order to speed the process up. If you submit a company or personal check, it must clear the bank before processing the application. Should this development be planning a pressure urban irrigation system that will be owned, operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G. Curtis, Water Superintendent for the Irrigation District, concerning the installation of the pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate the process of contractual agreements between the owner or developer and the Irrigation District for the ownership, operation and maintenance of the pressure urban irrigation system. If you have any questions concerning this matter, please feel free to call on me at the District's office, or Greg G. Curtis, at the District's shop. Sincerely, Suzette G. Hewlett, Asst. Secretary/Treasurer NAMPA & MERIDIAN IRRIGATION DISTRICT SGH/smk cc: File Water Superintendent Meridian City, City Clerk's Office Iron Mountain Real Estate, 3681 N. Locust Grove Road, Suite 100, Me I Ian, Bruce Farrelly, 127 Delaware Ave., Laurel, DE 19956 (~(~PY enc. lsllJJi 1 APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS -40,000 16 October 2012