Loading...
Applicant Response to Staff ReportNGINEERING planning and engineering communities for the luture o~vTron-s«P October 2, 2012 Planning & Zoning Commission City of Meridian 33 East Idaho Meridian, ID 83642 Re: Zebulon Village Preliminary Plat File No. PP-12-009 Dear Mayor and Council: 1029 N. Rosario Street, Suite 100 Meridian, ID 83642 Phone: (208) 938-0980 Fax: (208) 938-0941 E-mail: es-beckym~gwestoffice.net We have reviewed staff comments for the City Council meeting of October 4, 2012, and have the following responses: PLANNING DEPARTMENT 1.1 Site Specific Conditions of Approval 1.1.1 The applicant will comply. 1.1.2 The applicant will comply 1.1.3 The applicant shall revise the landscape plan, dated 3/23/12, prepared by Jensen Belts Associates, labeled as Sheets L 1 & L2 as follows: a. It is anticipated that street lighting will be provided from each public street adjoining the path. Therefore, separate bollard lighting will not be required. b. The applicant will comply. c. To maintain continuity and symmetry with previous phases of Zebulon (Alpine Pointe), we respectfully request that the Chanticleer Pears remain throughout all phases of Zebulon Heights/Zebulon Village within an eight-foot-wide planter strip. Pyrus calleryana is an approved water-conserving tree species and is widely used as a street tree. d. Lot 9, Block 2, will contain the sewer and water main lines crossing the Settlers Canal; trees are not allowed by the Meridian Public Works Department within the easement. C:U;sers~Shari\Documents~01 I ~ I I 1106\RecsResponse.doc Meridian Planning & Zoning Commission October 2, 2012 Page 2 e. Landscaping on Lot 25, Block 2, will be landscaped with lawn and two trees. 1.1.4 The applicant will comply. 1.1.5 The applicant will comply. 1.2 General Conditions of Approval 1.2.1 The applicant will comply. 1.2.2 The applicant will comply. 1.2.3 The applicant will comply. 1.2.4 The Settlers Canal would require a 72-inch pipe and will remain open; the applicant respectfully requests that this condition by waived by the Meridian City Council per UDC 11-3A-6.a.3.b. 1.2.5 The applicant will comply 1.2.6 The applicant will comply. 1.2.7 The applicant will comply. 1.2.8 The applicant will comply. 1.2.9 The applicant will comply. 1.2.10 The applicant will comply. 1.2.11 The applicant will comply. 1.2.12 The applicant will comply. 1.2.13 The applicant will comply. 1.2.14 The applicant will comply. 1.2.16 The applicant will comply. 1.3 Ongoing Conditions of Approval 1.3.1 The applicant will comply 1.3.2 The applicant will comply. C:~UserslShariADocuments ,201 I \ 1 11106\RecsResponse. doc Meridian Planning & Zoning Commission October 2, 2012 Page 3 1.3.3 Noted. 1.3.4 Noted. 1.3.5 Noted. 1.3.6 Noted. 1.3.7 Noted 1.4 Process Conditions of Aaproval 1.4.1. The applicant will comply. 1.4.2 The applicant will comply. 1.4.3 Noted. 1.4.4 The applicant will comply. 1.4.5 Noted. 1.4.6 The applicant will comply. 2. PUBLIC WORKS DEPARTMENT 2.1 The applicant will comply. 2.2 The applicant's engineer had discussions with Kyle Radek at Public Works concerning the single water connection. After water modeling, we received written confirmation from Clint Worthington that asingle-point connection would be sufficient (see attached copy of e-mail). 2.3 The applicant will comply. 2.4 The applicant will comply. 2.5 The applicant will comply. 2.6 The Settlers Canal would require a 72-inch pipe and will remain open; the applicant respectfully requests that this condition by waived by the Meridian City Council per UDC 11-3A-6.a.3.b. 2.7 The applicant will comply. C" ~•Users`~Shari~Documents\201 I`I I 1106\RecsRespons-e.doc Meridian Planning & Zoning Commission October 2, 2012 Page 4 2.8 The applicant will comply. 2.9 The applicant will comply. 2.10 The applicant will comply. 2.11 Noted. 2.12 The applicant will comply. 2.13 The applicant will comply. 2.14 Noted. 2.15 The applicant will comply. 2.16 Noted. 2.17 The applicant will comply. 2.18 The applicant's engineer will comply. 2.19 The applicant's design engineer will comply. 2.20 The applicant will comply. 2.21 The applicant will comply. 2.22 The applicant will comply. 2.2 The applicant will comply. Thank you for your review of this project. Please feel free to call me if you have additional comments or questions. Sincerely, Engi Bering Soluti ns, L P Becky Mc Planner BM:ss cc: The 'Traditions by Amyx II, LLP C:AUsers\ShariADocuments\201 I \ 111 106\RecsResponse.doc Becky McKay From: Kathy Stroschein <es-kathys@gwestoffice.net> Sent: Tuesday, October 02, 2012 11:27 AM To: Becky Subject: FW: Zebulon heights From: Kathy Stroschein Lmailto:es-kathysCagwestoffice.netl Sent: Monday, August 01, 2011 12:05 PM To: 'Clint Worthington' Subject: RE: Zebulon heights Thank You! O From: Clint Worthington [mailto:cworthingtonCa~meridiancity.or4] Sent: Monday, August O1, 2011 11:50 AM To: Kathy Stroschein Subject: RE: Zebulon heights Kathy, We have got the 1500 gpm at 20 psi at the dead end, so a second connection won't be required. Sorry for the delay. Clint Worthington, P.E. Staff Engineer II City of Meridian -Public Works 208.489.0349 From: Kathy Stroschein [mailto:es-kathxsCalq_westoffice.net] Sent: Monday, August Ol, 2011 11:05 AM To: Clint Worthington Subject: RE: Zebulon heights Clint, Have you been able to work on this yet? Thanks! Kathy From: Clint Worthington [mailto•cworthi~tonCa~meridiancity ory] Sent: Tuesday, July 26, 2011 8:40 AM To: Kathy Stroschein Subject: RE: Zebulon heights Kathy, The water model is currently not working and our IT staff is trying to get it going. If it is up and running within a day or two, I will have the water guys go out and do a flow test to be sure of fire flows. I am pretty sure the flows are OK but just want to double check. Sorry for the delay. Thanks, Clint Worthington, P.E. Staff Engineer II City of Meridian -Public Works 208.489.0349 From: Kathy Stroschein [mailto•es-kathysCa~c~westoffice.net] Sent: Monday, July 25, 2011 9:32 AM To: Clint Worthington Subject: FW: Zebu-on heights Clint, Have you had time to look at this? (We are trying to revise some lots and this is important information for us. O) Thanks! Kathy From: Kyle Radek [mailto•kradekCa~meridiancity.org] Sent: Friday, July 22, 2011 11:52 AM To: Kathy Stroschein Cc: Scott Steckline; Clint Worthington Subject: Zebulon heights Kathy, Since I don't remember specifically checking the area north of the N Slough proposed to be served by the dead end, 1 want to model it now to be sure before 1 confirm that a loop is not necessary. My model is currently broken and I'm out al! next week. 1 have copied Clint Worthington on this. He will model the dead end and confirm that a second connection is not required provided he gets 1500 gpm at 20 psi at the last hydrant. 1 think it will be fine, but ! want to be sure. Sorry about the delay. Kyle Radek, PE, CFM Assistant City Engineer Meridian Public Works