Indemnification and Limitation of Liability Agreement with Idaho Power for Installing 3-phase power to Parks and Recreation Building~ Idaho Power Company P~~.1
. Date: 511511012
~ Service Re nest
~~ ~~~~ c~~~ q
rte.
-- .
Service Request Number: 003268Sb
CITY OF MERIDIAN-1853 ELANARK ST/MERID[AN,1D 83642 COMM SERV
Work Order Number: 27368515 Eng Hours: 40010
Request Type; CS Eng Fee Amaunt(Att98): 640.00
Rate Sch.: 09 Eng Fee Amount{Att 1 b):
Reply By: Eng Fee Service Agreement No:
Eng Fee Service Agreement Date:
Customer No;
Feeder: MRDN14A
Service Location: 1$53 ELANARK 5T MERIDIAN, ID 83642
Required in Service Date : 6J712012
Planning CenterlTeam: MERIDIAN
Contact Detail:
Attribute Information
RESICOM
Service Voltage 1Z41Z08 Na. Of Meters ONE
Number of Phases THREE Meter Location WEST EXTERIOR 1NAt,.L
~ KW Motor Load: Ct Loc WEST EXTERIOR WALL
Largest Motor Primary OHIUG UG
1 Phase KW Demand Service OHIUG UG
3 Phase KW Demand Srv Owner IPCO
Connected KW Load 112ICVY Panel Amp Size ~OOOAMP
Commercial Deposit Amount
THREE PHASE LINE EXTENSION TO SERVE NEW PARKS AND RECREATION BUILDING.
SERVICE VOLTAGE WILL BE 124208 THREE PHASE, TRANSFORMER, SERVICE, AND
CIT METERING PACKAGE WERE SIZED TO SERVE FIELD HOUSE BEING BUILT
IN THE FUTURE. A SIGNED, NOTARIZED EASEMENT WILL BE REQUIRED PRIOR TO THE
LINE BEING ENERGIZED. IFCO CREW TO INSTALL TWO 4" SERVICE STUBS FOR THIS
PROJECT, TWO 4" STUBS FOR FUTURE FIELD HOUSE, AND ONE 2" STUB FOR LIGHTING
PEDESTAL. 95% COMPACTION OF THE TRENCH WAS CALLED FOR IN WORK ORDER
FOR THE LAST 230' OF TRENCH GOING NORTH TO TRANSFORMER. CUSTOMER TO
STAKE TRANSFORMER LOCATION AND FINAL GRADE PRIOR TO CREW BEGINNING
JOB. RUNNING LINE WAS OK'D BY DC ENGINEERING ON 6-$-12. THANKS
I understand that the information provided above is accurate to the best of my knowledge. Changes to load; voltage; location; etc.
maX result in additio 1 engineering charges.
~ .~ / ..~-
/"'~lient Signature Date Fdaho Power Representative Signature Date
~~
''~ ~ ~DJ~tP Comp~n~
,~"''~
Customer or Project Name: Design Number: Work Order #;
CITY 4i=MERIDIAN-1853 E LANARK STlMERIDIAN, ID 836 ,~,_~, Q00009 ~3 , ~_, , ,_,37368515 ,~___~__
CUSTOMER COST QUOTE
IDAHO
Line Installation Cost
1. Line InstallationlUpgrade Costs
2. Company Betterment !Other Credits
3. Salvage Taxable • Credit
4. Customer Provided Trench
5. Net tine Installation Cost
Terminal Facilities
6. Terminal Facili8es
7. Customer Allowance
8. Nat Terminal Faclilites
9. Unusual Conditions
~$n~` ~a~ tTnusua9f~cindii~ans over $10,000
11. Net Construction Cost
12. Net Vested OR Refundable Construction Cost
(limited to 5 years or 4 additional applicants)
13. Construotion Cost Not Available for Vesting or Refund
Other Charges
14. Vested Interest Work Order #
15, Billable Right of Way Permits
1 fi. Prepaid Right of Way Permits
17. Billable Engineering Charges
18. Prepaid Engineering Fees
19. Underground Service Attachment Charge
20, Relocation or removal with new capacity
21. Relocation or removal with NO new capacity
22. Salvage Credit on Relocation or Removal
23. Miscellaneous ChargeslAdjustments
24. Net Other Charges
25. Total 1Nork order Charges
26, Idaho Power Co. Contribution & Other Credits
27. Total Customer Paymenf Due (Line 11 + Line 24)
Notes:
Prepaid Fees Debit
2a,sas Credit Totals
1,110
0
~~
23,235
13,297
3,549
9,748
1,500
~~
34,483
20
088
,
14,395
~~
$ 0 D
~ o D
1,904
0
0
L~..: J
~~
2,864
$ 42,006
$ 4,659
~ 37,347
This written quotation shall be binding on the Company for a period of sixty days (60}from the date blow indicated, subject to changes in
information provided by the Customer or changes in the Company's ability to obtain satisfactory rights-of-way or to comply with governmental
regula~ons, including but not limited to the rules, regulations, and tariffs of the ldaha Pudic Utilities Commission. The Customer must make payment of the
quote amount not less than thirty (30}days prior to the start of ovnstructivn, but the Company does not represent that cvnstruc~ion will commence within
30 days of receipt of payment, The star~bf oanstruction ~) be subject to the Company's ability to obtain the necessary labor, mate~als and equipment
~.
Customer Signature X Date X ~ Z~ ~2
~(~ (Customer lnibals} Ch rges for instalia~on of and r nd deecclriical service are nvt included in this Cost Quote and will be blll~ to
the customer after work has completed
~,~ (Customer Initials} The c~cstomer acknowledges receipt of the reduced charge option brochurelpadcet, also available at idahopower.oam
IPCo Representative ~ ~ __ Quotation Date ~ , ~ - ~~
~ ~/
.~~
Gustorner or Project Name: Design Number: Work Order #:
CITY OF MERID ~ 53 E LANARK T!M D 836
~-
~~~~
Unusual Conditions Acknowledgement
Unusual Conditions are construction conditions not normally encountered.
These conditions may include, but are not limited to: frost, landscape
replacement, road compaction, pavement replacement, chip-sealing, rock
digging, boring, incomplete customer trench, nonstandard facilities or
construction pracrices, and other than available voltage requirements.
I have read and understand the above definition of Unusual
Conditions as set forth in Idaho Power Company's Line Installation
tariff, Rule H. I further understand that Idaho Power Company will
determine the type and extent of the Unusual Conditions encountered.
Unusual Conditions charged for on the Customer Cost Quote sheet, but
not encountered, will be refunded to the Customer by Idaho Power
Company after the completion of construction.
Signed: X ~ ~.~`
a:mm~
Date: ~ ~ 22 L
Are C~~Ct#RP C~r11p~Cty
INDEMNIFICATION AND LIMITATION OF LIABILITY
.~
c ~'~.~'/ cy ~ f , ~ ` L (hereinafter referred to as "Customer") has entered
...M-
into an a reement with Idaho Power Company to , --s.~- ~~° %~~ ~,~~'~,~~
g
~~~~ ~
(hereinafter referred to as "Service"} Customer will identify for Idaho Power Company, prior
to the commencement of Services, the location of all underground pipes, lines, and other
facilities (collectively referred to as "Underground Lines") that may be in the area in which
Idaho Power Company is working. Customer agrees to be responsible for identification and
location of all underground lines and to indemnify and hold Idaho Power Company, its
agents, subcontractors, employees, officers and its directors, harmless from Customer's
failure to properly or adequately identify same except to the extent finally determined by a
court of law to have resulted from the gross negligence or willful misconduct of Idaho Power
Company, its agents, subcontractors, employees, officers, and directors.
This indemnification and limitation of liability agreement shall survive the
termination/completion ofthe Services.
.~- ~ ~
~.
Dated. u S
Customer: