Loading...
Letter of Compliance 8/16 e of work ~o~.~~,croAS o s 9 -+ m ~ a BBB Zebulon Heights Subdivision AKA Alpine Pointe Subdivision Meridian Regards: Pool Landscape Project Zebulon No. 4 Sheet L1 As of 8/16/2012 all required landscaping for community pool is finished and corresponds correctly to L 1 landscape plan Block 12 Lot 1. Required Notes B: Irrigation and lawn retained where possible. All areas disturbed by contruction Adjustments to plan as follows above required: 1. Perimeter of pool modified to accommodate various vegetation for both aesthetics and obscurity 2. All perimeter of pool is surrounded with decorative rock and fabric to add aesthetics and help eliminate over spray of sprinkler system 3. All perimeter vegetation provided irrigation by 40PSI regulator adapted to existing irrigation Best regards, Joe Kowalczyk A2Z Fence and Landscape llc 208-724-4314 Nursery License #6301 Contractor License RCE-10540 1~~ '~a Ths IrN~atlon Innovators