CERTIFICATE OF ZONING COMPLIANCE*
CZC-06-002
Date: January 13, 2005
Project Name/Number: Holy Trinity Charismatic Episcopal Church -AMENDED -CZC-OS-077
Project Address: 237 E. State St, Meridian
Proposed Use: CHURCH - w/ off street Parkin>? approved under VAR-04-008
Owner Applicant: Holy Trinity Charismatic Episcopal Church, Phillip Mark Finley
Comments:
Conditions of Ap royal: Project is subject to all current City of Meridian ordinances and the Development
Agreement on this property. The issuance of this permit does not release the applicant from any previous
requirements of the other permits issued for this site (see VAR-04-008).
Landscaping: The Landscape Plan is approved per Sheet C-2, (dated 4/05, by Design Services, Roger
Graham), stamped "approved" on 6/23/05 per the full sized copies of the plan, with No Changes
issued with CZC-OS-077.
The landscape plan is not to be altered without prior written approval of the Planning and Zoning
Department. No field changes to the landscape plan permitted; prior written approval of all material
changes is required.
Site Plan: The Site Plan prepared by Landmark Engineering, labeled C1.0, is approved (stamped "Approved"
on January 13, 2006 by the Meridian Planning Department) with no changes.
Note: The applicant has significantly changed the site plan due to issues with parking as defined by ACHD
and this approval is being reviewed under the Unified Development Code and in conjunction with the
Meridian Development Corporation for Old Town properties.
Elevations: The Elevations prepared by Glancey -Rockwell & Associates, on August 31, 2005, labeled A-2.1
and A-2.2, are approved with no changes from the Planning Deparhnent. See CZC-OS-077.
Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the
approved specifications and in accordance with UDC 11-3A-15.
Protection of Existin Tg rees: Any existing trees on site must be protected or mitigated for in accordance with
the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the
Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the
existing trees prior to construction. Any severely damaged tree must be replaced incompliance with UDC 11-
3B-10-C.5.
Parkine: The proposed parking areas shall be paved and striped in accordance with UDC 11-3B. Project
engineer/architect shall certify that the number and size of handicap-accessible spaces conforms to the
Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA
and signed "Van Accessible". The approximately 2400 sq church would be required to provide five onsite
parking stalls where they are also proposing to use an ACHD license agreement to install an additional five
offsite parking stalls on North Third Street. These approvals have been granted with VAR-04-008 and with
the ACHD comments received July 21, 2005.
Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed
prior to occupancy.
Drainaee: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fu]ly vegetated, and
shall be designed in compliance with UDC 11-3B-I 1 and UDC 11-3A-18.
Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in
UDC 11-3A-7. NOTE: Specific fencing requirements are required along the west boundary of this site.
Lighting: Lighting shall not cause glare or impact the traveling public or neighboring development and
comply with lighting standards as defined in UDC 11-3A-11.
Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in
compliance with UDC 11-3D.
Trash Enclosure: Any dumpster(s) must be screened in accordance with UDC-11-3A-12. Trash enclosures
must be built in the location and to the size approved by SSC.
Handicap-Accessibility: The structure, site improvements and parking must be in compliance with all federal
handicap-accessibility requirements.
ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any
changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be
submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit.
Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of
Occupancy. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the
form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid
must accompany any request for Temporary Occupancy.
Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan stamped
"Approved" on January 13, 2006, and Elevations, and are not to be altered without prior written approval of
the Planning Department. No significant field changes to the site or landscape plans are permitted; prior
written approval of all changes is required.
ph Guenther
Associate City Planner
*This letter does not indicate compliance with requirements of other departments/agencies, including, but
not limited to, Ada County Highway District, Central District Health Department, affected irrigation
district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co, etc. This letter
shall expire one (1) year from the date of issuance if work has not begun.
104 9~h Ave. South, Suite C
Nampa ID, 83651
Ph: (208) 442-6300 • Fax: (208) 466-0944
LETTER OF TRANSMITTAL
T0: Joe Guenther
Meridian Planning And Zoning Dept.
FROM: Mike Anderson
Date: December 29, 2005
PROJECT NAME: Holy Episcopal Church
PROJECT N0. C05100
NO. OF ITEMS DESCRIPTION
4 4 sets of improvement plans
s
J
~
~
~/ N A
~
~..-
~
~ ~
~
V ~ -
~
~ ~ i
~
0
i? 7~_ ..i. ~~
~ ~
(( ~ ~` ~
't-~
v? 1.1_
a ~
REMARKS: p' m ~ ~-~.~- ~ ,~
m
RECEIVED BY: DATE: