Solitude Subdivision TEC-12-007BEFORE THE MERIDIAN CITY COUNCIL C/C APRIL 24, 2012 IN THE MATTER OF THE REQUEST FOR A TWO (2) YEAR TIME EXTENSION ON THE PRELIMINARY PLAT FOR SOLITUDE SUBDIVISION IN ORDER TO OBTAIN THE CITY ENGINEER'S SIGNATURE ON THE FINAL PLAT, LOCATED IN SECTION 31, T.4N., R.lE, MERIDIAN, IDAHO CASE NO. TEC-12-007 ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION BY: M2 LAND, LLC APPLICANT This matter coming on regularly before the City Council on Apri124, 2012, upon the Applicant's submittal of a preliminary plat time extension application for a two (2) year extension within which to obtain the City Engineer's signature on a final plat for Solitude Subdivision, which preliminary plat was originally approved on April 11, 2006, as provided in Unified Development Code § 11-6B-7C, and good cause shown. An administrative time extension (TE-08-023) for eighteen (18) months was approved for this subdivision by the Planning Director on October 22, 2008 and would have otherwise expired on March 28, 2010. A final plat was signed by the City Engineer on March 25, 2010, within the time period allowed, ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION FOR SOLITUDE SUBDNISION TEC-12-007 Page 1 of 2 which extended the time period to March 25, 2012 to obtain the City Engineer's signature on the final plat for the next phase of development. IT IS HEREBY ORDERED THAT: The above named Applicant is granted an additional two (2) year extended period of time, until March 25, 2014, within which to obtain the City Engineer's signature on a final plat, subject to the conditions of approval as shown in the attached Staff Report for the hearing date of Apri124, 2012, incorporated by reference. Attached: Staff Report for the hearing date of Apri124, 2012 By the action of the City Council at its regular meeting on the $~- day of 2012. DATED this , ~~~ day of , 2012 Mayo •• a my de Weerd Attest: 3GO49oat,Tnonuc~~,'o ow n ~ c+ry of \ IDPMO aycee I~lman, City Clerk Copy served upon the Applicant, Attorney. BY: SEAL ,~n, rac Department, Public Works Department, and City Dated: ~ ~~ ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION FOR SOLITUDE SUBDIVISION TEC-12-007 Page 2 of 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT DATE: April 24, 2012 E IDIAN~-- TO: Mayor & City Council I D A H O FROM: Sonya Watters, Associate City Planner SUBJECT: Solitude Subdivision -Preliminary Plat Time Extension (File #TEC-12-007) I. APPLICATION SUMMARY The applicant, M2 Land, LLC, requests approval of a two (2) year time extension on the preliminary plat for Solitude Subdivision to obtain the City Engineer's signature on the final plat. The subject preliminary plat consists of 225 single-family residential building lots and 9 common area lots on 59.88 acres of land. A total of 6.27 acres or 10.47% of the site is proposed as common open space. The Applicant has been unable to meet the time requirements specified in Unified Development Code (UDC) 11-6B-7 and submitted the request for a time extension within the allowed time period. II. STAFF RECOMMENDATION Staff recommends approval of a two (2) year time extension to obtain the City Engineer's signature on the final plat for Solitude Subdivision as requested by the applicant, to expire March 25, 2014, with the conditions included below in Exhibit B. III. PROPOSED MOTION Approval After considering all Staff, Applicant, and public testimony, I move to approve File Number TEC-12- 007, as presented in the staff report for the hearing date of Apri124, 2012. Denial After considering all Staff, Applicant, and public testimony, I move to deny File Number TEC-12- 007, as presented during the hearing on April 24, 2012 for the following reasons: (You must state specific reasons for denial and what the applicant could to do to obtain your approval in the future.) Continuance After considering all Staff, Applicant, and public testimony, I move to continue File Number TEC- 12-007 to the hearing date of (insert continued hearing date here) for the following reason(s): (you should state specific reason(s) for continuance) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The subject properly is generally located on the southeast corner of N. Meridian Road and E. McMillan Road, in the northwest''/4 of Section 31, Township 4 North, Range 1 East. B. Owner: M2 Land, LLC 2228 W. Piazza Street Meridian, ID 83646 C. Applicant: Same as owner Solitude Sub TEC-12-007.doc Page 1 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT D. Applicant's Statement/Justification: Please see applicant's narrative for this information. V. UNIFIED DEVELOPMENT CODE Per UDC 11-6B-7A, approval of a preliminary plat shall become null and void if the applicant fails to obtain the City Engineer's signature on the final plat within two years of the approval of the preliminary plat. Per UDC 11-6B-7B, In the event that the development of the preliminary plat is made in successive phases in an orderly and reasonable manner, and conforms substantially to the approved preliminary plat, such segments, if signed by the city engineer within successive intervals of two (2) years, may be considered for final approval without resubmission for preliminary plat approval. Per UDC 11-6B-7C, upon written request and filing by the applicant prior to the termination of the allowed time period, the Director may authorize a single extension of time to obtain the City Engineer's signature on the final plat not to exceed two (2) years. Additional time extensions up to two (2) years as determined and approved by City Council may be granted. With all extensions, the Director or City Council may require the plat to comply with current provisions of the UDC. VI. PROCESS FACTS A. The subject application is for a time extension. A public hearing is required before the City Council on this matter, consistent with Meridian City Code Title 11, Chapter 5. B. Newspaper notifications published on: Apri12, and 16, 2012 C. Radius notices mailed to properties within 300 feet on: March 29, 2012 D. Applicant posted notice on site by: April 12, 2012 VII. HISTORY OF PREVIOUS ACTIONS: • The annexation (AZ-06-007) and preliminary plat (PP-06-006) for Solitude Subdivision were approved by the Meridian City Council on April 11, 2006. The development agreement (Instrument # 106133466) was approved by the City Council on August 8, 2006. • A final plat (FP-06-039) for the first phase of development was approved by City Council on September 5, 2006 and signed by the City Engineer on March 28, 2007. The City Engineer's signature was required to be obtained on the final plat for the second phase prior to September 28, 2008, within 18 months of the final plat for the first phase being signed. • The final plat (FP-07-002) for the second phase of development was approved by City Council on March 20, 2007. • An 18-month time extension (TE-08-023) to obtain the City Engineer's signature on the second phase final plat was approved with conditions by the Director on October 22, 2008. This approval extended the period of time until March 28, 2010 in which to obtain the City Engineer's signature on the final plat. The City Engineer signed the plat on March 25, 2010 within the time period allowed. In accord with UDC 11-6B-7B, the applicant had two years from that date, until March 25, 2012, to obtain the City Engineer's signature on the final plat for the third phase or apply for a time extension. • An amendment (MDA-08-007) to the development agreement was approved by City Council on July 28, 2009 and recorded as Instrument No. 109088810 as required by TE-08-023. Solitude Sub TEC-12-007.doc Page 2 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT VIII. STAFF ANALYSIS The applicant requests a two year time extension on the preliminary plat for Solitude Subdivision to obtain the City Engineer's signature on the final plat for the third phase of development. This is the second time extension requested for this subdivision. As conditions of granting the first time extension, the development agreement (DA) was required to be modified to include the building elevations presented at the. April 11, 2006 City Council hearing for the annexation & zoning and preliminary plat applications; and a revised preliminary plat was required to be submitted in compliance with open space requirements in effect at that time. The applicant obtained the DA modification as required and submitted documentation demonstrating the approved preliminary plat meets the 10% open space required in UDC 11-3G-3. Per UDC 11-6B-7C, with all extensions, the City Council may require the preliminary plat to comply with the current provisions of the UDC. Staff has reviewed the approved preliminary plat for compliance with current UDC standards and found the proposed plat meets. current UDC standards including minimum requirements for open space & site amenities; there are no multi-use pathways planned for this property. Since the last extension, the Unified Development Code has been amended to require the property owner to post a performance surety with the City in the amount of 125% of the total construction cost for all incomplete sewer, water and reuse infrastructure prior to final plat signature. Additionally, the property owner is required to post a warranty surety with the City in the amount of 20% of the total construction cost for all completed sewer, water and reuse infrastructure for a duration of two years. Staff recommends these new UDC requirements be included as conditions of approval of the current time extension request. Staff recommends approval of the subject time extension with the conditions noted above. V. EXHIBITS A. Drawings 1. Vicinity/Zoning Map 2. Approved Preliminary Plat (dated: 1/13/06) B. Conditions of Approval Solitude Sub TEC-12-007.doc Page 3 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT Exhibit A.1-Vicinity Map Solitude Sub TEC-12-007.doc Page 4 CITY OF MERIDIAN PLANNING DEPAR"fMEN'I' S"1'AFF REPOR"T Exhibit A.2 -Approved Preliminary Plat (dated: 1/13/06) 1 )E":. ~r~A ~i. it ~rk $ ~d)}~ ssnt~2rt T. ypypkT,~Y p ~FYfw ~_~~ mr ~ ~m - - ~ - Yav Vt wt O -_~f--o- ww•ea cwwr Nn~ -P~-~n~--, mM YaY~ LL'wa h ~ ~ 5 `Y.~ ~ y _. _ uK •~~~~~~~•• Y~~toaOMr -- 1AS0a No n IIi[ ~~ fvro¢c wx! ~.wsry .___.~____ ties'aR wsLtw ut g ~ 1~~r .. a ___ ' ~ M1n R1f.'P Tit avrw rn't.~ts ./W~ WtTT ..yf -~... ... ••• . .~~..... »..~... wypy nA4N ....-.~. •...-- tatM ~wu uK _ a:ltcra SSnu ~ ! Sung urat R1Nixn rx y } :• ~ { ~~i f3ie ._... t PRF11Y4NY EtAT MTA ~ Q + w.~ tw ... < m ..,.. ..., L :a I ; V O i (' p: n. ~, a. ,.,,,.,,»r .., W ~~_. u~,.~.._ aves~.ntaaa~i.aa.. uv.x U ~ .`.705 ~ t ~' ~~ 1 ~ ~ =_ . .. P~ pp~~ F ~t { ~< t v _._ e Dff ~ I e- . __ _..._ ,. . . w $ TYRICA: LOCAL STREET SECTI ' o~,b~ol~~ ON - SO RIGHT-Of-WAY PRE Solitude Sub TEC-12-007.doc Page 5 CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT Exhibit B -Conditions of Approval 1. The applicant is to meet all terms of the approved Annexation (AZ-06-007), Development Agreement (Instrument No. 106133466), amended Development Agreement (MDA-08-007, Instrument #109088810), Preliminary Plat (PP-06-006), Final Plats (FP-06-039 & FP-07-002), and Time Extension (TE-08-023) for this development. 2. The City of Meridian requires that the owner post to the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 3. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 4. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required per the City of Meridian Department of Public Works Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted to the Public Works Department for approved. The street light contractor shall obtain the approved design on file and an electrical permit from the Public Works Department prior to commencing installations. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Solitude Sub TEC-12-007.doc Page 6