Loading...
Agency CommentsCENTRAL •• DISTRICT HEALTH DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500 "To improve the lreu/th of our conrmurrilies by iderrtifjdug srrstu/noble solutions to cnnurruuitp heultlr issues, developing partnerships for iurplenrerrtutinn ofstrategies, and demm~strulirrg our success through n:eusarrertrent of outcomes. " 12-0313 March 7, 2012 Christopher D. Rich Ada County Recorder 200 West Front Street Boise, ID 83702 RE: Spurwing Grove Subdivision No. 3 Dear Mr. Rich: Central District Health Department has reviewed and does approve the final plat for this subdivision for central water and central sewer facilities. Final approval was given March 7, 2012. Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of Meridian and United Water and the QLPE approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. Serving Vul/ey, E/snore, Boise, and Ada Counties Ada /Boise County Office 707 N. Armstrong PI. Boise, ID 83704 Enviro. Health: 327-7499 Reproductive Health: 327-7400 Immunizations: 327-7450 Senior Nutrition: 327-7460 WIC: 327-7488 FAX: 327-8500 Elmore County Office 520 E. 8th St. North Mountain Home, ID 83647 Enviro. Health: 587-9225 Family Health: 587-4407 WIC: 587-4409 FAX: 587-3521 Valley County Office 703 N. 1st St. McCall, ID 83638 Ph. 634-7194 FAX: 634-2174 If you have any questions, please call 327-8517. Sincerely, i ~ ~~ Mic ael H. Reno, R.E.H.S. Supervisor Land Based Programs cc: Department of Housing and Urban Development Brighton Development, Inc. City of Meridian Eugene P. Smith MHR:bm f~ ~ ~ . 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 6 February 2012 City of Meridian City Clerk's Office 33 E Broadway Avenue Ste 102 Meridian, ID 83642-2619 RE: FP 12-001/Spurwing Grove No. 3 Dear Jaycee: Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 Nampa & Meridian Irrigation District has no comment on the above-referenced application as it lies outside of District boundaries. Please contact Nathan Draper with Settlers Irrigation at 344-2471 or at PO Box 7571, Boise, ID 83707. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District must review drainage plans. The Developer must comply with Idaho Code 31-3805. Sincerely, ~ ~~ Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg C: N. Draper, Settlers Irr. File/Office ., ,. _. r ; APPROXIMATE IRRIGABLE ACRES RIVER PLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 ?2ar+r~ia &'~a+<d'a..a 9nra'galiax Dto~iet 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 Phones: Area Code 208 City of Meridian City Clerk's Office 33 E Broadway Avenue Ste 102 Meridian, ID 83642-2619 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 RE: CPAM 11-003/Sable, LLC Dear Jaycee: Nampa & Meridian Irrigation District has no comment on the above-referenced application as it does not impact any District facilities. However there are water user facilities within this area. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District must review drainage plans. The Developer must comply with Idaho Code 31-3805. Sincerely, l~-~~ Gre G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg C: File/Office APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 6 February 2012 IDAHO IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 * * Boise, ID 83707-2028 (208) 334-8300 ~ itd. idaho.gov Y sp i P~ ~9lATlON O~QP January 12, 2012 Machelle Hill City Clerk's Office City of Meridian 33 East Broadway Avenue Meridian, ID 83642 Re: Jayker Subdivision Final Plat (FP 12-001) Dear MS Hill: The Idaho Transportation Department (ITD) has reviewed the referenced development application for the February 7, 2012 City Council meeting. The proposed project has no impact upon the state highway system and corresponds to the original subdivision plan. ITD has no comments on this final plat application. If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377. Sincerely, ~~.~8< Dave Szplett Access Management Manager dave.szplett e,itd.idaho.gov CENTRAL •• DISTRICT ~THEALTH DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division ~ ~I Preliminary /Final /Short Plat ~f /~ -~a / Return to: ^ ACZ ^ Boise ^ Eagle ^ Garden City ^ Kuna ,,~ Meridian S,a,,~--,,.~ r.~c G•-o J~ ~3 ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ~8. After writtert approval from appropriate entities are submitted, we can approve this proposal for: central sewage ^ community sewage system ^ community water well ^ interim sewage central water ^ individual sewage ^ individual water - -. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: central sewage ^ community sewage system ^ community water ^ sewage dry lines ~eentral water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ~13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: ~ i~ Dater/~/~Z Review Sheet 15726-001EH1111