Agency CommentsCENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT
•• DISTRICT
pRHEALTH Environmental Health Division
DEPARTMENT
Rezone # y t~4-~ I l -Cd 3 ~' WL ~~ 1 ~ •D03
Conditional Use #
Preliminary /Final /Short Plat
~.a ~ 1~ asR Su ~, '~
Return to: l; ~ 2.~
^ ACZ
^ Boise
^ Eagle
^ Garden City
^ Kuna
Meridian
^ Star
We have No Objections to this Proposal.
^ 2. We recommend Denial of this Proposal.
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
^ central sewage ^ community sewage system ^ community water well
^ interim sewage ^ central water
^ individual sewage ^ individual water
^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
^ central sewage ^ community sewage system ^ community water
^ sewage dry lines ^ central water
^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 12. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
^ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
^ 14.
Reviewed B : ~ i~G,~~~~t/
Y
Dater/2~ /~
Review Sheet
15726-001EH1111
& .. ~ ~. .
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
City of Meridian
City Clerk's Office
33 E Broadway Avenue Ste 102
N1,eridia~,,;IDr X3642-2.619
RE: VAC 11-003 & MFP 11-003/Jayker Common Drives
Dear Jaycee:
Nampa & Meridian Irrigation District has no comment on the above-referenced application as
it lies outside of our district boundaries. Please contact Nathan Draper with Settlers Irrigation
at 344-2471 or at PO Box 7571, Boise, ID 83707.
All laterals and waste ways must be protected. All municipal surface drainage must be
retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District
must review drainage plans. The Developer must comply with Idaho Code 31-3805.
Sincerely,
Gr. Curtin
g
Water Sapernt~ndcnt
Nampa & Meridian Irrigation District
GGC/dbg
C: File/Office
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
9 January 2012
01/18/2012 13:09 FAg 2084594491 PIONEER IRRIGATION 0 001
Pioneex Irrigation District
J
'~... ` 1
M
JEFF SCOTT
Superintendent
MARK ZIRSCHKY
Asst. Superintendenl
January 18, 2072
Meridian Planning & Zoning Commission
Email: jjones~meridiancity.org
Re: Case No. VAC 11-003 (Spurwing Greens, LLC) Vacation
TO WHOM IT MAY CONCERN:
P.O. BOX d26 • CALDWELL, IDAHO 83606
(208) x59.3617
DAWN FOWLER
Secretary-Treasurer
Please be advised that this project is outside of Pioneer Irrigation District's boundaries. Although it is outside our service
boundary, the Phyllis Canal may be impacted by this development.
There is to be no construction within the easements of the Phyllis Canal, which are 20 foot from top of bank of the canal
along each side. The areas in which the adjacent lands are lower than the canal, the easement well extend to the toe of
bank. The area above the Phyllis canal must not be altered in any way that might weaken the soils and be allowed to fall
into the canal. Any development that may impact the upper bank of the Phyllis Canal must be approved by Pioneer
Irrigation District.
Storm water discharge is not allowed into the Phyllis Canal.
Please be advised that NQ change to or crossing of a District facility can take place unless a License Agreement or
Crossing Agreement between the District and the owner/developer of the property has been signed and recorded. Please
contact the District's Attorney, Scott L. Campbell, in writing if you need to obtain such an agreement. His contact
information is: Scott L. Campbell, Moffatt Thomas Barrett Rock & Fields, Chtd., 101 S. Capitol Blvd., 10`" Floor, Boise,
Idaho 83702, phone: (208) 345-2000, fax; (208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the Developer and/or
owner. All agreements must be reviewed by and approved by Mr. Campbell. The least expensive way to have an
agreement drawn up which meets the need of the District is by having Mr. Campbell himself draw it up. Otherwise there
will be two attorney fees for said developer and/or owner to pay. A deposit of $1000.00 must be paid to Moffatt, Thomas
to cover the attorney fees before the work can begin. Any unexpended portion of the deposit will be refunded. Pioneer
Irrigation District will recommend disapproval of the final plat approval, until the agreement has been executed and
recorded. If construction begins without the required agreement, Pioneer Irrigation District will pursue judicial relief to stop
the construction.
Plans must be received by Pioneer Irrigation District by December 15`", 2012. All construction which may impact
District facilities must be completed prior to the March 15`", 2013 deadline. The construction time frame which
Pioneer Irrigation District allows is November 16` of the current year to March 15`" of the following year.
Ten percent (10°/a) of the PID project costs, as determined by Pioneer Irrigation District's engineer, shall be deposited with
Pioneer, in the form of a cashier's check, payable to Pioneer Irrigation District, at the time of execution of the agreement
by the Developer/Land Owner. Pioneer shall refund this deposit if the construction is completed by March 15'" and in
accordance with the terms of the agreement, otherwise the deposit shall be forfeited to Pioneer Irrigation District.
If construction is not completed by March 15'" in a manner which allows for adequate delivery of water, Pioneer will
intervene and pertorm whatever work is necessary to allow adequate delivery of water to patrons. This work will be
01/18/2012 13:09 FA% 2084594491
PIONEER IRRIGATION
~ 002
performed at the convenience and discretion of Pioneer Irrigation District. The Developer/Land Owner shall pay the costs
of this remedial work.
Any proposed development which will have downstream waterusers using gravity flow irrigation must develop their
irrigation system in a manner which will insure the downstream waterusers the ability to acquire at least as much irrigation
water for gravity flow irrigation as what they received prior to any development or construction taking place, The gravity
flow irrigation system must be totally separate from the proposed pressurized irrigation system within a subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of Pioneer Irrigation
District's facilities, prior to preliminary plat approval. Any said relocations are subject to approval from the
Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from the Corp of Engineers.
Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must receive a copy of a
404 permit that has been properly executed, If it is determined by the Corp of Engineers that a 404 permit is not required,
Pioneer Irrigation District must be notified in writing by the Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary agreements with
Pioneer Irrigation District have been executed and recorded.
If you have any questions or comments, please do not hesitate to call.
Sincerely,
f..~.
~ r" ~ ••
l~( • !r r
~ i~ 1
Mark Zirschky
Superintendent
cc, Jaycee L. Holman, City Clerk via fax 888-4218