ACHD Bid Amount Approval for Pine/Linder IntersectionIVI o: Jaycee Holman, City Clerk From: Keith Watts, Purchasing Manager CC: Jacy Jones, Brent Blake ate: 1 /12/12 Re: January 17 City Council Meeting Agenda Item The. Purchasing Department respectfully requests that the following item be placed on the January 17 City Council Consent Agenda for Council's consideration. Approval of ACHD Bid Amount for the Pine/Cinder Intersection Protect. This is the City's portion of the bid amount for the Pine/Cinder Intersection Project. The Interagency Agreement for this project was approved by Council October 11, 2011. Recommended Council Action: Approval of the bid amount of $137,608.00 and authorize the Purchasing Manager to issue a PO to ACHD for the same amount. Thank you for your consideration. Page 1 Mayor Tammy de Weerd City Council Members: Keith Bird Brad Hoaglun Charles Rountree David Zaremba ~~pp~~ _ / 5A i..,_.~.. ~.... _. -_~- T®: Mayor Tammy de Weerd Members of the City Council FIB®1VI: Brent Blake, Engineering Technician II DATE: January I I, 2012 SUB.IECT: APPId®'VAL ®F' TIIE $137,608.00 BII) AM®U~1T F®12 THE PIIOiE/I~I1~IDER INTEItSECTI®N PR®JECT I~t C®I~3LII~CTI®N WITII T1EIE ASS®CIATEI) ACIID C®®PEI2,ATI~E AGREEIVIEl®1T. I. REC®1VIMEIetDED ACTI®l~t A. Move to: 1. Approve the bid amount of $137,608.00 for construction of the Pine Avenue/Cinder Road Intersection Project in conjunction with the associated ACHD cooperative agreement. II. I)EPAI2TNIETIT C®NTACT PERS®1~iEI,L Brent Blake, Engineering Technician II 489-0342 Kyle Radek, Assistant City Engineer 489-0343 Warren Stewart, PW Engineering Manager 489-0350 III. I)ESCRIPTIOIV A. Back rg ound The Ada County Highway District (ACHD) will begin reconstruction of the Pine Avenue/Linder Road intersection in February 2012. As part of the reconstruction, City of Meridian utilities are being adjusted to meet State required clearances and to avoid conflicts with the ACHD new storm drain and irrigation pipelines. 1 of 2 IV. IMPACT A. Strate ig'c Impact: The agreement with ACRD allows the City's work to be constructed at the same time as ACHD's project, resulting in cost savings and a reduction in the overall duration of construction in the roadway. These benefits further the goals of the Public Works Department to conduct projects in a fiscally responsible manner. B. ServicelDelivery Impact: This project is expected to minimize impacts to the traveling public by completing the work in conjunction with the ACHD project, i.e., an additional road closure would be expected if the City were to separate the two projects. C. FiscalImpact: This project was budgeted during FY2011. The City will realize a reduction in the overall project construction cost due to sharing administrative, traffic control, and mobilization costs. The City will not have to pay certain costs, such as permanent pavement restoration and Storm Water Pollution Prevention Plan administration, associated with constructing the project separately. V. ALTERNATIVES A. Council may choose not to approve this project; however, this would require the City's work to be removed from the ACRD project and bid separately, which would likely result in higher costs. VI. TIME CONSTRAINTS A. Council's approval will allow the City's work to be completed with the ACHD's project. VII. LIST ®F ATTACHMENTS A. Agreement with ACRD B. ACHD bid abstract C. Staff's Recommended Amount ~x, Approved for Council Agenda: ' ~ -- "~ ~, ti t z~ ~arren St art, Engineering Manager Date J 2 of 2 _ ~~. _~~ ~_~_._ w_._ __ r .o, i~ 0 Q .., U ® P. _ N Rl (n L C W O T ~ ~ ~ C ~ q Q O ~ ~ N N _ N t~ u ~ ~ ~ ~ ~ FW- LL_ C Il. ® ~ ® O , ~ ~ ~_yy ~J ~_ C ~ ~ ~ (II e~i ~ ~ ~ r ~, ~, ~ ~ 1 I_ O U W ~ a O B: i ¢ ~' ~ ~ ~ ~ a e°•7~ t ~rFit~~z ~~ ) ~.,~:,..L,. -- _ ~ Contract Number CT292~09 ~~` f__"` contract Name Pine and finder Intersection BidDate 1/512012 Bidders 0? Bidder Nampa Paving 02 Bidder Central Paving 03 Bidder~idaho Sand & Gravel 04 Bidder WF Construction 05 Bidder C & A Paving Co, ; O6 BidderiKnife River 3chadule 1a-Baas t31d PIne,4ve 13< Linder Rd IN270 308007 Plne Ave and Linder Rd Estimate `,0201.4.1.C,1, Removal of Obstructions I 1 i LS ~ $4z,ooo.oo I $42,000.00 0181dder{ $15595.00 ~ 515,b95.00 ~ 02B/dder $8,000.00 $8,000.00 ~ 04 Bidden $23 BDO.OD~ $23,800.00 ~ OS eldder $18 000.00 $18,000.00 03Bldder 06 Bldder~ $12,500.00 $12,500.00 f $12,500.00 512,5 y02024,1;A,1 Excavation Plan Quantity I 10010 ~ CY ~ $s,oo ~ $50,050.00 ~ ~~ ~. ~ ~v 01 Bidder $4.00 $40 040 00 02 8ldder $8 40 $t)4 084 00 03 Bidder $9.OU $90,090 OO 04 Bidder $8.00 $80,080 00 ' d r $5.00 550 050 00 06 eldder $8.85 $88 588.50 I '10202 4 5.A,1 unsuitable Material Excavation ___- 100 CY ~ $20.00 $2,000.00 01 Bidder $12,00 $1,200.00 02Bldder $12,20 $1,220.00 0381dder~~ $30.50 $3,050,00 04 eldder $17,00 $1,700.00 OS Bidder $23.00 $2,300.00 06 8ldder $8.85 $885.00 0307.4.1.G.1 Type "P" Surtace Restoration (Asphalt Roadway) ~ .1260 SY $20.00 $2b,200.00 Ol Bidder $0.00 $0.00 ! 02 Bidder $16:20 $20,412,00 03 8ldder -~ $22,00 $27,720.00 ~~ 04 Bidder $23 50 $29,810.000581dder $9.00 $11 340 00 06 Bidder _.$18,30. $23,05 0 10601.41 A 1 12 L____ ~._...~ _ _ 12",Storm.Drain/CulvertlGramtylrngahon Prpe Class V Reinforced Concrete {RCP 260 ~LF'L $2500 _ L $6 500.00 0601,4.1.A,136 36"Storm Drain/Cuivert/Gravily Irrigation Pipe, Class V Reinforced Concrete (RCP) 1125 LF $95,00 $106 876.00 01 eldder ~ $80.00 _$90,000.00 02 Bidder $87.20 $98,100.00 03 Bidder _ _ $77.27 $86,928.75 04 Bidder n $79.00 $88,875.00 OS eldder $78.00 $87,750.00 06 Bidder $93.35 $106,018.7fi - -- - u _.___.. ..... -_ 060141,A.1112 12" Storm DrafnlCuivert Gravity Imgation Pipe, Class _ Corrugated Galvanized 35 LF $40,00 $1,400A0 Steel (GGSP)14 Gage ~~ -"'~-^"-" 04 Bldderl___$21.50~ $752.50 j O5 eidde _ $22.00` $770.00 106 i3ldder~ ___ $74 95 ' _ _$2,823.25; E08 1 A.11 12.A 12" Storm Drain/Culvert Gravity Irrigation Pipe, Class „~,., Corrugated Galvanized 335 LF $60.00 $20,100.00 !. -`-~'~ Steel (CGSP) 14 Gage -Slotted Drain _ _ __ _ ~'~ 0181dder $115.00 $3t1,52b 00 02 Bidder $59.60 $19,966 00 03 8ldder $66.67 $22 334.45 04Btdder ^ _ $88,00 $22,780.00 ? 058ldder __ $67.00 $22,445.00 f 06Bldder~ $lOrAO ~ $34,170.00 060141,A,610 10" Storm DrainlCuiverUGravily Irrigation Pipe, Class SDR 35 pVC 70 (LF $30.00 $2,100.00 01 Bidder $20.0 $1,40000 ~02Bidder $17.00 $1,190.00 03Bidder ~ $19.19 $1343,30 -- - - 04Bidder $19.50 $1,38500 _0$_Bldder $19,40 $1,358,00 06 eldder $30A5 _$2,103,50 !, 0601.4.1.A,512 12"Storm Drain/Cuivert/Gravity irfigation Pipe, Class SDR 35 PVC 980 LF $21.00 $20,b80.00 .~__ -01 Bidder $22.00 $21,560 00 02 Bidder $20.30 $19,894.00 03 Bidder $19.19 $18,806.20 04 Bidder $19.50 519,110.00 , OS Bidder $19.40 $19,012.00 06 Bidder $31.50 530 870.00 j ~_ ~ _ ~ _ _ - - ---- 060141 A,515 15"Storm Drain/Cuivert/Gravity IrrigatiorrPipe, Class SDR 35 PVC ~ 110 ~ LF ~ $34,00. ~ $3 740.Q0 1 -_ ___._...._ ,c - 01 B/dder _ _ $26.00 $2,880.00 ~ 0 d r $25.80 $2,838.00 03 Bidder ___ $24.75 52,722.50 04 _eldder $25.50 $2,805,00 OSB/dder $25.00 $2,750.00 06©Jdder $38.85 $4,273.60. 0601.4.1.A.518 18" Storm DraiNCulverf/Gravity Irrigation Pipe, Class SDR 35 PVC 930 ~LF $30.00 $27,900.00 ~~ _ ~. _ ___ I°- OS Bldde $33,00 $30,690.00 i 02 Bidder $34,30 $31,899.00 ~ 03Bldde $30.30 $28,179.00 ~ 04 Bldde $31,00 $28,830.00 OS 8ldder $31.00 ~ $28,830.00 ~ 06 Bldder~ $43.65 $40,594.50 0601.4.1,A,5 24 24" Storm Drain(Gulvert/Gravity)mgatlon Pipe, Class SDR 35 PVC 75 LF $60,00 $4,500.00 01 Bidder $54.00 $4,050 00 ; 02 eldder $50.10 $3,757.b0 03 8ldder $48.48 $3,638.00 0481dder $49.50 $3,712 50 ; OSe/dder $49.00 $3,67b.00 06Bldder S68.00 $5,100.00 '; ~. T~. _ .---m .~~ - _ ,~ _ 0602.4,1.A,1 B 60 Storm Drain or Gravity Imgation Manhole - Type YB 60" 2 EA $3,000.00 $6,000.00 ~..._._~ 01 Bidder $3,500.00 $7,000 DO ~ 02 Bidder $3,300.00 $6,800.00. 03 Aldder $_2,500.00 _$5 00_0.00 04 Bidder $2,550.00 $5,100.00 OS Bidder $2,500.00$5,000.00 06 Bidder _ $2,890.00 .$5,780.00 1/9/2012 C7212-09 -Pine and Linderlntersection Page 1 0602,4.1.A.1 B.72 Storm Drain or Gravity Irtigation Manhole - Type- __B 72" ~ ~~ 1 2 j FA T $3,500.00 $7,000.00 r $3 500 OD $7,000 00 02 Bidder $3,300.00 $6 600 00 03 Bidder $3,333 33 $6 666 66 09 Bidder __ $3 400.00 $8,800 00 O5 Bidder $3,400.00 $8 800 00 06 Bidder $3,15000 $8 300 OD 0602.4.1,E.1 A Stann Drain ar Gravity Irrigation Catch Manhole Type A 1D Ffi . $2,000 00 l 520 000.00 ~ Ol Bidder $2 30000 $23,000 00 02 Bidder $2 OD0.00 520 000 00 03 Bidder $Z,OZO 20 $20 202.00 ~ 04 Bldder __ ~_ _ $2 050 00~ $20,500.00 ~ 05 Bidder $2.100.00 ~ $21 000 00 ~O6 Bldder~ $2,460 00~ 824 600.D~ ;0 602 4.1.F.1 Catch Besin - Type I ~ ~ -- ~ ~ ~ 13 5600.00 $7,800.00-~ . 0181dder $512.50 $6,66250 ; 02 Bidder $3 54.00 $4,602.00 038/dder $353.5A $4,696.02 ' __ _ _ 04 Bidder _ $800.00 $10,400 00 T OS Bidder .__ _ $612.00 $7,956.00 06 eldder $379.00 $4,927.00 J'; 0602.4.1.H.1 A $2,000,00 $6,000.00 Precast Sediment Box -Size _ 1000 Gallon 3 t a~ Dl Bidder $2,700,00 $8,100.00 0281dder $2,300.00 $8,900.00 03Bldder $2,222.22 .$6,666,86 04 eldder $2,265.00 $6,795.00 ~ OS eldder ~ $2,300.00. $6 900.00 06 Bidder $3,25000 '$9,750.00 X602 4~ 1.H.18 Precast Sediment Box -Size ®1500 Galion ~ 2 FA $2,800.00 $5,600.00 ~ ` m ~ W 01 Bldderl ~ $2 900.00 $5 ,800.00 02 81dde $3,100.00 $6 200 00 03 Bidder $2,929.29 $5 858.58 _ _ _ 04 Bidder $3000.00 $6,000.00 OS Bldde $3,400.00 $6 800 00 06 Bidder $3,930.00 } $7 860{00 .-. ___ . _ _~._ ~ ~ _ _ _ ~T__ .~ _-__~,. ~ _. ~ ,_,_ _ ~__~_J _ _. 0602 41,M.1 A Conaete irrigation Box 51ze _ 4x4 4 FA $2,000.00 58 OOOAO ii. _ 0181dder $1,600.00 $6,400 00 02 Bidder c $1,30000 $5 200.00 03 Bidder $1.15000 $8,800.00 t __ _ _ _ OQ Bidder $2 010 00 $8,040.00 r05 Bidder $1,500.00 $8 000 00 06 Bidder $2,260.00. $9,040.00 r _ ~ ~ 0602 41 M 1 B m_K_ _ . r , ~. _ _ .._.. _ ...~ . _ Concrete Irrigation Box Size ~ 7'x9' ~ m 1 ~EA ! Si0A00.00 ~ $10 000.00 ~~ Ol Bidder 04 Bidder $12 000 00 $9 80000 _ $12 000 00 ~ 02 Bidder $8 500 00 $8 b00 00 03 Bidder $9 800 00 ~ OS Bidder $8,50000 $8,500 00 06 Bidder $4 200 00 $4 200 00 j $15,230 OD $15,230 00 ;0706.A 31 A 31 A 6" Vertical Curb (No Gutter) _ 510 LF $12.g0_ _$8,120.00 01 Bidder _ $12 30 $8,273 00 (~02 eldder ~ . $12.10 _$6171.00 03 Bidder _ $1316 $6,711.60 04 Bidder xV_ _ $10.30 $5,253.00 ~ 05 Bldde~~ $18.00 $9180.00 06 Bidder ~_ $13 OD ;T$6,830.00~ - - -- 0706.4 t A.5 Standard 6-inch Vertical Curb ~ Outten 2080 LF $8.00 $18,640.00 _ 02 Bidder $7.94 $16,515 20 ; 02 eldder ~ $8.60 $17,888.00 03 eldder $9.10 $18 928.00; 04 Bidder $7.20 $14,976.00 05 eldder $21,00 $43,880.00 068idder $8.65 $17 992 00 !0706 4.1.8.1 - - -~ a Concrete Valley Gutters 280 I LF $zo.DO $5,800.00 Ol Bidder $ZS 21 $7 030 80 0 Bidder $it3 20 ~$5 096 00 03 eldder $22 88 $6 406.40 04 Bidder $18 00 $b 040 00 ' OS Bidder $22 25 $6 230 00 06 Bidder $29 45 ~ $5 446.00 . ~ ~~ - ~ - 7 L706.4vt.E,1 .._ - . __ ._..._ . ~_.. _. ...v _..__.._._ .~..._,._ _ . t . ~.. ____ _.._ ._., -_- -.- - --- - - - - - - -- - Concrete Sidewalks, thickness 4 1480 ' SY $16.00 $23,680.00 OS Bidder $17.99 $26,625.20 ~ 02 Bidder $18.40 $27,232.00 03 eldder $23.30 $34,484.00 04 Bidder $26.50 $24,420.00 ~ OS Bidder $22.50 $33,300.00 06 Bidder $27.85 $26,418.00 , 070641.F.1 Concrete Driveway Approach 185 5Y $25,00 $4,625.00 '. _~~ w~~ ti _ ra eldder $22.42 $4,147 $32.63 ~8 038.55 Ol 70 02 Bld der $2 6.90 54 976.50. 03 Bidder _ _ _ __ _ _ _ 04 Bldder~ $24.00 $4,440.00 . OS Bidder $24.60 $4,551.00 06 Bidder $27.05 $5,004.25 070641.G.1 _ Concrete Repair 40 SY ~ $3200 $1 280.00 01 Bidder $22,42 5896.60 j®02 eldder $25.30 $1 012.00 03 Bidder $67 07 $2 682.80 0481dder $28.00 $1,120.00 ~ 0581dder $21.42 $858.80 068/dder $27,05 $1082,00 0706 41 H 1 A Pedestrian Ramp w/Detectable Waming Domes, Type A 8 FA $700 00 .$5,800.00 -- - $317.75 $2,542.00 0181dder $404.00 $3,232.00 03 Bidder $52100 $4188.0 Ol eldder . - _ _ . ,,... _ _ .. -T~_ _ - _~ _ _~,_ ~~__ __ __ 04 Bidder _ $800.00 $8,400.00 'OS eldder _ $820.00 $4,OBOAO 06 Bldde~ _ $a33 00 $3,464,,00 w ~~ 10106.4.1.H.1 G3 Pedestrian Ramp w/Detectable Waming Domes, Type,_C3 ~2 _ FJ1 $1,400.00 $700.00 01 Bidder $317.75 $835,50 02 eldder $404 00 $808.00 03 Bidder $52100 $1 042 00 04 Bidder $800.00 $1 600 00 OS Bidder $510 00 $1 020.00 06 Bidder $433 00 _._ $866 00 0706.4.1.H.1 C4 Pedestrian Ramp wiDetectable Waming Domes, Type _C4 8 E A $700.00 $5,600.00 _ _ ~~ ~~_._..r..__ 01 6ldder $317.75 $2,542 00 01 Bidder $404.00 $3,232.00. 03 Bidder ~ $521,00 $4,1 68.00 _ _ 04 Bidder $800.00 $6,400 00 P OS Bidder $510.00 $4,080.00 -06 Bidder $433.00 $3,464,00 j 0706.4.1.H.1 G Pedestrian Ramp w/Deteciable Waming Domes, Type uG 1 F~, $100.00 f $700 00 ~ ~_ ~ 01 Bidder $317 75 $317.75 02 Bidder $404 00 $404 00 03 Bidder $521.00 $521.00 -- -- 0481dder_ _$80000 $800.00 0581dder _ $510.00 $510.00 06Bldder $433,00 _ $43 0 _~ __.. _ _ ~~ 0801.4.1.8.1 Minus Uncrushed Aggregate Base 6".(Plan Duantity) 12830 TN $6.00 $76,980.00 0181dder $5 22 $68 972.80 ~ 02 Bidder ~ $5,65 $72,489.50 03 eldder $6,35 $81 470 50 _... 04 Bidder $6.50 $83 395.00 OS Bidder $8,00 $102,640.00 0681dder $7 25 $93 017 50 1/9!2012 C7212-09 -Pine and under Intersection Page 2 0802.4.1,8.1 Crushed Aggregate for Base Type 1 Plan Quantity 2800 ~~ $11.00 $30,800.00 01 Bidder $9.35 $26,180 00 02 eldde $10.10 $28 280.00 03 8ldder $13 50 $37,800.00 04 Bidder $14.50 $40,800 00 OS eldderi S14.25 $39 900.00 0681dder $14.15 $39,820.00 08t0.4.1.A.1 Plant Mix Pavement'Class I ~ 2380 ~7N~ $60.00 I $142,800.00 W OI Bldder $61A0 $145,180.00 02 Btdder~ 04 8ldder $66.00 $157,080.00 ~ OS Bidder .,~ $60,50 $143 990 00 03 Bidder - $62.00 $147 580 00 06 Bidder ^ $69 00 $184 220.00 - $64 50 5153 510.00 ----- 1001418.1, Stabilized Construction Entrance ` ^ 1 EA ~ $ .00 $1,000.00 01 Bidder ._$200.00 $20000 0281dder __ $1,300.00 $1,300.00 _$1,6 00.00 x1,800.04 03B/dder 04 Bldder ~ $1,080.00 $1,08000 058tdder _ $360.00 $360.00 06Bldder f _ _ $1,140.00 $1,140.00 ~1003.4J.C.1 SfltFence ___- _-- -525 LF $2.50 ~ $1,312.50 01 Bldder $1.79 $939 75 02 Bldder ~ $3.30 $1,732 50 03 Bldder $170 $892 50 _ _ $1.60 $840 00 05 Bidder 04 Bldder $1.80 $945 00 06 Bldder $180 $845 00 (1008.4.1.8.1 Riprap 51ope and Outlet Protec0on ______~~T ~ ~~ ~ 5~ S45,00 5270.00 ~ 01 Bldder ~ 5100.00 $600 00 E 02 Bldder 597.30 _ $58_3.80_ 03 8ldder $55,00 $330A0 ~._.~ .__~. 04 8ldder $62.00 $372 00 OS 8ldder $46.00 $278,00 06 8ldder $374.00 $2,244.00 `1006.4,1.C.1~ InleiPratection ~~18 EA~ ~ $60,00 ~ $1,0130 00_ _ 01 Bldder $ _ _ _ __ 04 Bldder ___ $74.00 51,332.00 OS Bldder $25.50 $459.00 06 Bldder $53.60 $964.80 'I 1103.4.1.8.1 (Traffic Control Signs ~ ~ 800 ~ SF $3 00 ~ $2 400 00 ~ 01 Bidder $5 38 04 Bldder $5 50 s $4,304 00 k 02 Bldder $5 30 $4 240 00 03 8ldder $5 30 $4 240 00~ $4,400 00 T OS Bidde $100 $800 00 06 Bldder $5 70 $4 560 00 j 1103 41 C;1 Traffic Control Barricades Type III ~ 9 EA $40.00 $380.00 01 Bldder $43.05 $387 45 X02 Bldder $42.40 $381 80 03 Bldder $42 50 $382 50 ~ ~~ 04 Bldder $43,00 $387 00~ 05 Bldder $51.00 _ $459 00 06 Bidder $45 40 $408 60 - --- 11034.1,0,1 Traffic Control Drums a 200 EA $11,00 $2,200.00 ~~~. 01 Bidder $li 28 $2 256 DO 02 8ldder $11.10 $2 220.00 03 8ldder $1L25 $2,250.00 04 8ldder $1150 $2,300 00 05 Bldder $10,25 $2 050.00 06 Bldder $11,90 $2,380.00 110341,G.1 . Traffic Control Maintenance 960 i MH $25.00 $24,000.00 '01 Bldder $20.50 $19,880 00 ! 02 Bidder $20 20 $19 392,00 03 Bldder .$1.00 $960.0 0 O4 Bldder 520,50 $19,880 00 , OS Bidder $2045 $19,632.00 0681dder $2165 ; $20,784,00 1103.41.H,1 ---- Portable Tubular Markers 100 EA $4.z5 $425.00 0181dder $3,08 $308.00 02 Bldde $3,05 $305.00 03 Bldder $3 03 $303.00 ~ 04 Btdde 53.10 $310.00 OS Bidde $5.25 ~ $525.00 06 Bldder $3 25 ~ $325.00 110341.1_1 Traffic Control Flaggers 1280 M~ $18.00 ~ $23,040.00 0161dder $17.43 $22,310.40 02 Bldder $17.20 522 018,00 03 Bldder $1717 $21 977.60 04 Bldder $17.50 $22,400.00 OS Bldder $17.30 $22,144.00 06 Bldder $18.40 $23,652.00 ~~` 1131.01,01 A Traffic Signal and Illumination System Complete Pine & Linder 1 L~ $65,000.00 $65 000.00 __ r ._..~.. _.~._. - 01 Bldder $56 580.00 $68 580 00 02 Bidder $43,800.00 $43,800.00 03 Bldder $55,750.00 $55,750.00 ' _ _._ _. __ __. 04 Bldder $44 300.00 $44,300 00 OS Bidder $45,000.00 $46,000.00 06 Bldder $46,940.00 546,940.00 1 131.01.02 Install Traffic Signal Interconnect Conduit 371.0 LF $3 50 ~ $12 985.00 . .... __ , 018ldder ~ $2,99 $11 ,092 90 ~ 02 Bldder $2,85 $10,573.b0 03 Bldder _ $2 95 $10,944.50 o4 Bldder $3.00 $11,13000 + 5 dder $2.90 $10,759.00 06 Bldder $305 $11,316.50 1131.01.03 Install Traffic Signal IntereonnecfJunclion Box 5-45T/ADA with Riser 7 ~ EA $700.00 $4,900.00 0181dder $824.10 $5 788 70 0 Bldder $707.00 $4 949 00 03 Bldder $812 00 $5 884,00 04 Bldder ~ __ $721.00 $5 047 00 05 Bldder ~G $715,00 - $5 005 00 ~~.~._.~..~.. 06 Bldder _.~ ,a_ $757 00 $5 2 8 ~~ 1131.01.04. 1 ~EA Install Inlerconnect Splice Vauit $2,500.00 52,600.00 O1 Bidder $1,735,33 $1,73~~~5.33~~ 02B/dder $1,300.00 $1,300,00 03 Bldder $1,700.00 $1,700.00 04 Bldder µ~$1,288.00 $1,288,00 05B/dder $1,275.00 $1,275.00 06 Bldder $1,350.00 $1,350,06 ~1131.Of.07 Instal~SireeiLightingConduit '19t0 LF $5.50 $10505.00 J 01 Bldder $2.30 $4,393.00 ~ 02 8ldder $3,55 $8,780.50 03 Bldder $2.25 $4,297.50 04 8ldder $3.60 $8,878,00 OS 8ldder $3.60 $8,878.00 06 Bldder $3.80 $7,258.00 1131.01.08. Install Street Llghling Junction Box S-40T/ADA 6 EA $450.00 ~ $2,700.00 _ _.-- ~ _ . _ _.__ Ww._..~ - a 01 8ldder $443 83 $2,662 98 02 8ldder $354 00 ~ $2 124 DO __ ___ _ D3 8ldder $440 00 $2,840.00 ~ 04 8ldder $36100 $2,188 00 OS Bidder $360 00 $2,180 00 - ~ 1 ~ --- .___ ----- _- ,____ _ _T ~ _ ____ _ ~_ _~. ~~_ 06 Bldder $379.00 $2,274.00 1/9/2012 CT212-09 -Pine and Underlntersectlon Page 3 1131.01.09 Install Street Lighting Junction Box S-45T/ADA ~ 1 ~ EA $800.00 Di Bidder $62013 $62013 02 8ldder $5611 00 $566.00 03 Bidder $610 00 $610.00 04 Bidder .~-nn. $57700 $577 00 _~ 05 Bidder $575 00 $576.00 06 Bidder $606 00 $606.00 ' ~~- ..~ ~-~. ....._x _ _. _.~r~Y. ~....- _~.. 11 34.03.18 ~ 6720 SF $0,50 $3,360.00 Pavement Markings (Paint) _ _ _ v ..~~_ ~,~n_ 01 Bidder $0.44 $2,966 80 02 Bidder $0.43 $2 889 60 03 Bidder $0.43 $2,889.60 - 04 Bidder _ $0.45 $3,024 00 . OS Bidder $0.45 ~ $3 024 00_~ 06 Bidder $0.45 $3,024.00 113405.18 Pavement Markings (Thermoplastic) T- TY 1660 SF $7.00 $11 820.00 $8.35 $13,888.00 $8.00 $13,280 60 OS Bidder $7.90 $13,114 00 06 8ldder 04 8ldder v :1134.09.01 _ ~ __ _ ~ 4 FA $130.00 $520.OD Delineators (White) `~ _ OfBtdder __ $41,00 $184.00 02 Bidder _ $40.40 $161.80 038tdder $4100 $164.00' »~~ 04 Bidder '~~ $72.00 $288.00 , O5 8ldder $71.00 _ $284,00 06 Bidder ^_$75 70 $302.t)0~ ~~~ X11350101 _ Roadside Traftic Sign Installation (One Metal Pasi) 20 F~4 $35,00 $700.00 01 Bidder $66.63 $1,332.60 02 Bidder $65.70 $1,314.00. 03 Bidder $66.00 $1 320.00 04 Bidder ___ $46.00 $920.00 OS 8ldder $45.00 $900.00 06 Bidder $48.65 ~ $973.00 1135.01.06 Remove and Salvage Roadside Sign _ 12 EA ( $23.00 $276.00 01 Bidder $15 38 $184 66 02 8ldder $15.20 _$182 40 U3 Bidder _ $15.15 _ $181.1)0 $300 00 068fdder $z7.os $324.60 „ $z6 00 $31 0 OS Bidder $25.00 N 04 Bidder {- . 113501.07 t .. a N _ x Relocate Roadside Sign 1 V EA $100.1)0 $100 00 ~~ a ~ _ 02 Bidder ~ ~-..n -~e~...~..~~ .$1.5.15 $15.38 $16.3t3 0281dder $15.20 $15 20 0381dder $1515 ~ 04 Bidder _ $81 00 ~06 Bidder $64.90 __ $84.90 $62.00 . _ $62.00 OS Bidder _ $61T00 2010.4.1.A.1 1 }~LS $45,1100.00 $46 000.00 Mobilization l ~ ~ _ .v F ~~ ~ ---.,._ ___ _. _ __ ,. __ ~.. _ ___~ . 01 Bidder $84,350.00 $84 350 00 x~02 Bidder $63 737.82 $63 737.82 03 Bidder $49,000 00 $49 000,00 04 Bidder $44,800.00 $44 800 00 OS Bidder $52 000.00 $62,000.00 06 Bidder $32,580.00 $32 580.00 x2030 4 tA.1 Manhole Adjust to Grade 6 ~ FJ~ I 5350.00 { $2,100.Ob i OS 8ldder $460 00 $2 760 00 06 Bidder $964 00 $5 904 00 04 Bidder $450:0 $2700 00 ~ 5P•08124 , MiscAsphait (Road Hump) 20 TON $150.00 $3,000.00 OI Bidder $200.00 $4,000.00 02 Bidder $108A0 $2180 00 03 8ldder S69.D0 $1 380 00 . } _~ $2 240 00 $130.00 $2 600 00 $115.00 $2,300.00 05 Bidder 06 Bidde 04 Bidder $112 00 1 ~ ~1 ;SP-11400 ,_ -- _ _ _. _ _ .-_ __ .- - - - - Obliterate Pavement Markings 1000 SF $2.25 $2,250.00 01 Bidder 04 Bidde ~ $0 OD $2.10 .. _.~ $0 00 02 Bidder $2,10000 OS Bidder _____.... i.._ $2.00 _ $2.00 $2,000.00 $2,000.00 03 Bidder $2.02 _.~ ,~H.._ 06 Bidder $2.15 $2,020,00 . $2,180.00 SP 29067 ~ Repair Landscap(ng 100 SY $45,00 $4 500.00 ~.. -n ...~ __._ _ $910.00. 03 Bidder $9.09 $909.0 $9,10 02 Bidder $8.20 $820.00 ~ 02 Bidder ~ 04Btdder ~ $9.50 $960.00 , O5Bldde ____ $5.00 _ 3800.00 06Bldder $10.80 $1,080.00 5SP-02020 Gravel Repair 360 SY $6.00 $2,160.00 ~ OI Bidder $4.00 $1,440.00 02 Bidder $3 65 $1,314.00 03 Bidder $9.00 $3,240.00 ___~~ 04 Bidder $780 $2,700.00 OS Bidder $9,00 $3,240.00 06 Bidder $4,65 $1,874.00 , P~_. _ _._~ ~ ~ _.._ _,. e_._ ., ,~.~__. _ _._: rrSSP-06013 - - -- Storm Water Management Plan Preparation and Approval 1 LS $3 000,00 $3 000 00 $500 00 $500 00 ~ 02 Bidder $1,000 00 $1 000 00 03 Bidder $965 00 $965.00 Ol Bidder _ $5,350.00 , $350 00 ~ OS Bidder $1,200,00 $1 200 00 OS Aldder~5,350 00 04 Bidder ~ $350 00 , a p _ _ SSP-08105 Temporary Pavement 1000 5Y $15,00 $15,000.00 $13.50 $13 600 00 03 Bidder $100 $1 000.00 j Ol 8ldder $OAO $0.00 ~02 Bidder _ _ $ __ _ ____ 4__: __ ~ 04 8ldder $12 50 $12 600A0 OS Bidder 16,00 $i6 000 00 068idder 15,00 $15 000.00 $ ~ f SSP-08125 m _ ___ ~ _ _ ~ _ ~~.__ ~ ~ _ __ _-_- V _ ~.,. .x r,.~e ,. ___ _ Asphalt Repair -Other 660 5Y $20.00 $13,0_00.0 $11 060.00 ,670.0 $17 00 $12.00 $7,800.00 02 Bidde $11.80 0 03 Bidder 01 Bidder $7 _ _ __ _ _ _ _ 04 Bidder ~ $22.00 $14,300.00 os 8ldder _m ~ $11.00 y 57,800.00 06 Dldder $13 30 $8,645.00 _,_~~m --- SSP-1100E _ _ _ Portable Changeable Message Sign 840 HR $6.00 $5,040.00 01 Bidder $3 0~ $2 b87 20 02 Bidder $3.05 32 682.00 03 Bidder $3 03 $2 545 20 ; 04 8ldder $310 $2 604.00 OS Bidder $11.00 $9,240.00 06 Bidder $3 25 $2 730 00 ~~ tiSt'-20003 - - ___ Temporary Construction Fenclhg 800 1F $3.00 $1,b00.00 ~ 01 Bidder $154 $770 00 02 Bidder $1.50 §750.00 03 Bidder $120 $600 00 ._~ _,r ____ ..._ ~__ ._ 04 Bidder $150 $750 00 ~ 05 Bidder $1.20 $600.00 06 8ldder $165 $825 00 E 1/9/2012 CT212-09 a Plne and Under Intersection Page 4 __ 4" Topsolt QI Bldder ~~ $3.74 $1 795 20 02 Bidde 0 __ 04 Bldder ~ $3.1 ~ $1 488 00 t 05 Bidde ~~ Remove a nd Reset Ma(Ibox ------ 01 eldder` -- $158,88 I $1,588 80 i 02 B/dde~ 04 Bldderl) $IBO.UO $1,800 00 ; 05 Bidder 480 i SY $4.25 $2,040.00 $3.05 $1,464.00 03 Bidder $6.01 $2 884 80 . $3.75 TM$1,800A006 Bldder ~_~ $7,20 $3 458 00 $157 00 $1 570 00 03 eldder $160 00 $1 800.00 G . $180 00 $1 800.00 06 eldder $189 00 $1,89U•00 { - __ - ---- - ~ aeo sv ~~ $d oo--__~ $z,t3eo.ao $3.05 $1,464.00 03 Bldder $303 $1,454.4 0 ' $3.35 $1,608A0 06 Bldder _ _ ~~ $7.20 _ _ ____ $3,458,00 lS$P-29093 Remove Tree 8"+ 18 EA $225.00 $3,600.00 OI Bldder $284.95 $4,559 2 0 Bldder $334.00 $5,344.00. 03 Bldder $280.00 $4,4 04 eldder r ~ $290.00 $4,640 00 * OS Bidder $285.00 $4,560A0 06 Bidder _ $286.00 $4,576.00 SSp•29101 Remove and Resel Sprinkler System 1210 ~ LF ~ $6,00 $7,280.00 01 Bldder $4.05 54,000 50 02 Bldder $4.05 $4,900 60 03 Bldder $404 $4 888 40 04 Bidde~ $4.10 $4,981 00 ' OS Bldder $4.OD ~$4 840 00~ 06 Bidder $8 107 00 $6 70~ y Estimate G` $990;653160`- -- - -- 'OJ Brdde $907,438,81 ~ ~02 Bldder t.__ _~,_ _ -- I - $931,706.82 ~ ~03 Bldder+ ~ 1 - - $860,884:12 -- -- - l04 Btdder~ _ $878,771:00 ~ ~5 Bidder? _ $97Q374.80 ~ cos erdd8r~ $..1,062,542,96. Schedule 16-Alternate Bld Pine Ave ~ Linder Rd IN270 306007 Plne Ave and Linder Rd Estimate 0202.4~1.A.1 ( Y) - - - F~ccavalion Plan Quantlt _ i - i 7060 CY - $6.00 542 360 00 _ 01 Bldder 04 Bldder $0 60 $4,236 00 02 Bldder } ~ $800 $56 480 00 ~DS Bldder _~ ~~~ $8 40 $59,304.00 03 Bidder $9 DO $83 540.00 3 $500 $35 300.00 D6 Bidder $7 95 $56 127.00 ~ ~ -__-l ~202.4.5.A.1 Unsuitable Material Excavation ~~ ~ 50 ~CY ! $35.00 X1,750.00 0191dder ~. $12 00 $600 00 ~ 02 Bldde ~ ~ ~ ~ $14.30 $715,00 03 Bldder $30.50 $1 525 00 04 Bidder $17.00 $850 00 ~ 05 Bidder $23.00 $1,150,00 06 Bldder $8.85 $442 50 '; 0601.4.1.A,512 - 12"Storm Dram/Culvert/Gravlty Irrigation Pipe, Class - - .=- ~ PVC SDR 35-7 165 ~ LF ~ S30.OD $4,950A0 ~~ 0181dder $22 00 $3 830 00 02 Bldder $23 50 $3 877,50 ' 03 Bldder $19.19 $3,166.35 ~,.y __ 04 Bidder $19 50 $3,217 60 ~ OS Bldder $19 00 _.._ _ $3135.00 ... __.________. _ ~, 06 Bldder $25.90 $4,273,50 `0602 41 F 1 Catch Basin - Type I 4 EA $775.00 $3,100.00 OSr?Idder $512.50_ - 04 Bldder $800.00 $2,06000 i 02 Bldder ---_-_~.w__ _ $3,200 00 ~ OS Bidder $354.00 $1418.00 03 Bldder $353.54 $1,414.16 ~ - --- -- _~~~ 5615.00 $2 480.00 06 Bidder $379.00 $1,518.00 ~ ~0706.4.1.A.5 -- Standard 6-Inch Vertical Curb & Gutter - - 1100 ~ LF~ $8.75 ~ $9,625.00 4 ~.__ -.._ Ol Btdde-r-{~--- $7,94 $8,734.00 i 02 etdder~ ~ $8.95 $9 845.00 03 Bldder $910 04 Bldderl $7.20 $7,920.00 f OS Bldder $11.00 $12 100.00 06 Bldder $8 65 . $10 010 OD $9 515 00' s. ~ ~ - -- - _-- - - 0706 41 E 1 Concrete Sidewalks, thickness 4" ~ -_ - ~. ~~ ~ _ - - 820 ) SY l $16.50 $13,630.00 O1 Bldder $17.99 $14 751.80 02 Bldder $19.20 $15,744.00 03 Bldder $23 40 $19,188.00 04 Bldder $17.50 $14,360A0 ~ OS Dldder $22.50 518,450.00 06 Bldder $17 85 $14,837,00 0706.4.1,H,1 A Pedestrian Ramp w/Detectable blaming Domes, Type A 6 EA $700,00 $4 200 00 ~ ~~ ~ _ 01 Bidder $317.75 $1,906 50 ~ ~dr~ ~_ 02 eldder ...___~. _. .._.a.~-_~.~..,~-. $404.00 $2,424 00 r ~__- _ ~ _ _ .,...... . ...~ ._ 03 Bldder $521.00 $3126.00 ~ 04QIdde~ $800.00 $A,800.00 OSBIdde~ $3,080.00 $510.00 ~ $433.00 $2 598.00 ~06BIdde _ 108014.1.6.1 6" Mrnus Uncrushed Aggregate Base Plan Quantit - t _ 9180 {SON $7. OD $64260.00..._;. ~ 1' ~ ~ _ _ _L. 01 Bldder $5.22 $47,919.80 02 Bldder _ ~ ~ 04 eldder $6.50 $59,870.00 OS Bldde _ _ ~,, .~,~_ __ -_ y $5 65 $51 867 00 03 Bidder $6.35 ~ $58,293.00 $8 00 $73,440 00 06 Bldder $7.20 .$88,096.00 ~~ ~ ~ ~ _ .... _._,., f000241.~.1 Crushed Aggregate for Base Type I (Plan Quantity) I ~ ._ _..~ ._.v __._ _ ___~. _ _ . _ - ~ _ _ 1880 ~TONj $12.00 $22,560.00 ... _._ .~.,~.e.~- 01 Bldder $9.35 $17,578.00 02 Bidder $10.10 $18,98t3,00 03 Bldder $13 50 $25 380 00 44 Bldder $14.50 $27,280.001 DS Bldder $15.30 $28,784.00 06 Bldder $12 90 ~ ~, ~ -- ---- -- -- - $24 252 00 _...~ _ .. 4 ~._ ~ ~0810.4.1.A,1 PIanl Mix Pavement Class I .... _ ~~, _ ~ .., , .-.. -. T 1670 ON $60A0 $100 200,00 _ ~ 0181dder $61.00 ~ ~~ $101,870.00 ~02Bldder _ $60.50 $101,035.00 _ 03 Bldder $69. 00 $115,230.00 _ 04 eldde __ $66.00 $110,220.00 ! OS Bidder $62.00 $103,540.00 06 Bldder _____ _ $63.80 106,548.00 1/9/2012 CT2J2-09 -Pine and Linder lnlerseclion Page 5 i1003.4.1,C.1 ~5ilt Fence -- ~ __._._ --_T 218 ~ LF ~~-- $3.50 ~ $763.00 0181dder $1.79 $390 22~ 02 Bidder $3.30 $719 40 03 Bidder $1.70 $370.60 ---~_ 04 Bidder $2.00 $438 00 ~ OS Bidder $1.85 $403 30 06 Bidder x$1.80 ~ $39 Q 1003.4.1.C.1 ___ _ w__r..~r~..~__:.~- _ T 5111 Fence 1 LF $5,000.00 $5,000.00 r $4,SOO.QO $4,500 00 03 Bidder .$185000 .$1,850 00 __ 04 Bidder $9 4 000 $9,400.00 05 Bidder $3,400.00 $3 400 00 06 Btdder __ ~.__. ___ - $5,01000 $5 010.00 _..., n. _ ~1006,4.1.C.1 ___ --- --- ---- inlet Protection -~- ---~ --~ - ~~-8 - HA $75.00 ~ $800.00 -~ ~ ~~ 01 Btdder e~_ ~__a ~ $69.70 _____ $557.60 02 Btdder ___. $59.60 _ u._, $478.80 __ 03 Btdder .- . $50.00 _.__._ _ _ _ $400.00 ', ,a ~_ 04 Bidder $74.00 $592.00 p5 8ldder $25.00 .$200.00 ~ ~ _ 06 Bidder . $53.60 $428.80 11034 tG_t Traffic Control Maintenance 160 ~MH ~ $25.00 $4 000.00 ~ ~~ __ OI Bidder $20.50 $3_,280,00102 B/dder __ $20,20 $3,232._00 03 Btdder $1.00 ~_ $160,00 0 04t3 ~ 0 dd 3 280 00 I 21 3360 00 $3 484 00 ~ d er $2 .5 $ der $21.65 i , . 0581dder .00 $ . 068/ , . $ 110341.1.1 Traffic Control Flaggers 280 MH $18.00 $6,040.00 ', 018idder' $17.43 $4,880.40 D2 Bidder $17.20 $4,816A0 03 Btdder $17.17 $4 807 60 ~~ _ ~_ _ _.~ 04 Btdder ___ $17.80 ~ ? $4,900.00 ~OS Bidder $17.50 ^$4,900.00 06 Btdder _ _$18.40 $5 152 00 ;. 1131.01.01 B Traffic Sighal and Illumination System Complete Pine & Linder 1 LS $14,800,00 »$14,800~00~ O181dder $469.4_5 5469 45 ' 02 Brdder~ $q,000 00 $4 000.00 03 8ldder $ $460 00 _ $480.00 04 Btdder $4,100.00 ~ 54,100.00 ' 05 Bidder 4 300.00 $4,100.00 06 Bidder 22180 00 $22,180.0 ~3t O1A1 C Traffic Signal and Illumination System Complete Pedestrian Hybrid Beacon ~ 1 ~LS $29,000,00 $29,000.00 j _ Ol 8ldder $20,708.011 $20,708 08 02 Btdder $18 800.00 $1.13 800 00 03 8ldder $20,500.00 $20,500.00 j _~ _.___e 0461dder $19,150.00 $19,16000 058ldder $19000.00 $19,000.00 06 Bidder $4,320.00 $4,320.00 _ . ~, ~.~ .~:. r -- _ _ -_ --- - r°- -- 11310102 _ - - - ----. ._-. --- InstallTrafFlcSignal Interconnect Conduit 2160 { LF $4.00 $8,840.00 ~ 4 01 Bidder $2.98 56 436 80 02 8ldder $2,85 $6,156 00 U3 8ldder $2.95 $6 372.00 ! r 04 Btdder $3.00 $6,480 00 OS 8ldder $3.00 $6,480.00 06 8ldde $3.05 $6,588.00 x11310103 (( -- Install Traffic Signal Interconnect Junction Box S-457/ADA with Riser 2 h EA $800,00 $1,600.00 ~ 01 Bidder $825.13 $1,650.28 f 02 Bidde $707.00 $1 414 00 03 Btdder $810 QO $1 620 00 ~ ____ __..__ _ f _. ._... 04 Btdder $721.00 $1,442.00 I 05 Bidder $715.00 $1 430 00 06 Bidder $757 00 $1 514.00 1131,01.04 Install Interconnect Splice Vault 1 FA $2,500.00 $2,500.00 OlBidder $1,735.33 $1,735.33 0281dder $1,300.00 $1,300.00 0381dder $1,70000 S1,700.00 04 Bidder $1,290.00 $1,290.00 058/dder $1,275.00 $1275.00 O6Bldder $1,350,00 $1,350.00 1131.01,05 Install Traffic Signal Interconnect Cable 1220 f=A $2.50 $3,050.00 ' 01 al d re $1.08 $1,317.60 028/dder~ $1.30 $1,586.00 0381dder $106 $1,293.20 04 Bidder' $1.35 ~ $1,647.00 __ OSeidder~ $1.30 $1,586.00 0681dder $1.40 $1,708.00,. 111310107 Install Street Lighting Conduit T~ ~ 1250 LF $5.00 $6,250.00 ~' 01B/dder _ $4.78 $6,975.00 0 d8/ der $6.65 $8,312.50 038ldder $470 $5,875.00 04 8ldder $680 $8,b00.00 i 05 Bidder $6,75 $8,437.50 06 Bidder $715 $8,937,50 ; 1131 8~ ~~ Install Street Ughting Junction Box S-40T/ADA 3 1=A I $450.00 $1,350.00 ~ 018ldder $442.80 $1,328,40 , 02 Bidder $354.00 .$1,062,00 p3eldder $435,00 $1,305,00 04Bldder $360,00 $1,080.00 , OSBidder $357.00 $1,071.00 06 Bidder $379.00 $1,137.00 :; X1131.01.10 ~ ~~ 1, Terminate Fiber Optic Cable Strand 12 F~4 $70.00 $840,00 ~~^ ^___ ~ _ OlBldder __ $70,21 _ $842,52 028ldder $75.80 _ $909,60 03Bldder $7000 $840,00 I 04 Btdder $77_.00~~ $924.00 OS Bidder _ $76.50 $918.00 v6 Bidder ._$8110 ^, $97320 t134.03.11f Pavement Markings (Paint) 018ldder $0.44 $1,9_83.20 02 Bldd~ T ~ 04 Btdder $0.45 $2,038.50. 05 81dd~ 1134.05.18 __.. Pavement Markings (Thermoplastic) 135.01.01 01 Biddei $7.91 $7,989 001 2 Btdder $7,80 $_7,878.00 04 Bldder~ $8.00 $8,080.00 DS Btdder $S.OO~~Y$8,080.00~0 Roadside Traffic Sign Installation (One Metal Post) 01 Btdder $66,63_ _$7_32 93 Oz 8ldder $65,70 $722 70 0 04 Btdder $46 00 $506 00 OS Btdder ~$46.OD $506 00 0 Remove and Salvage Ro adside Sign -- 01 Bidder $15.38 ~ . $92.28 02 8ldder $15.20 $91 20 ~ 0 04 eldder , $26.00 ~ $156.00 05 Btdder $26,0D $156.00.- 0 4630 SF ~ $0.50 $: 3Bldder $0.43 $1,947,90 6Bldder 0.45 ,$2,038.50 _ z $ 1010 _ SF $6.75 $f 381dder _ _ $7.f30 $7,878.00 ___ 6Bldder _ $8.35 $8,433.50 11 0 -- --_ - EA ~ $50,00 T $ 3 8ldder $66,00 $726 00 6Bldder $48.55 $535,16 6 FA $40,00 $ „~,x,. ~., _a. ,. ~ 3 Btdder _ $15 15 ., $90.90 6Bldder $27.05 $162.30 1 /9/2012 CT212-09 -Pine and Under Intersection Page 6 -- - 201041.A.1 Mobilization _ 1 ~LS $20,000.00 $20,000.00 0181dder $0.00 $0.00_ 02 Bidder _ $1,100,00 $1 100 00 03 8(dde~ $10,000.00 $10 000A0 04 Bidder $1,000.00 $1,000.00 OS Bidder $17,000.00 $17 00000 0681dder $3 SOD,00 $3 50000 j i2030.4.1.A.1 -- - - - Manhole, Type Adjust to Grade - -- --- 13 EA $325.00 $4 225,00 01 Bidder $281.88 $3,664.44 02 Bldde c t ~~* F - $278.00 $3 614 00 03 B/dder S280 00 $3 640 00 !, ~ $450.00 ~ $5, 04 Bidde ~ 850.00 c OS 8tdder $275.OOr $3 675.00 06 Bidder $984 00 ~ $12 792 00~ ;SP 11400 . _ Obliterate Pavement Markings 1500 SF $2.25 $3,375.00 01 Bidder _ . $0.00 $0.00 02 Bidder $2.00 $3,000,00 v _ ~_ .__---__.__ ___ __._ ~ . _._ 03Bidder $2.02 $3,030.00 04 Bidder _~_ __.__--._,-__ ____ ------- _-- __ _ $2.10 $3,150.00 05 8tdder $2.00 $3 000.00 D6 Bldderl $2.15 $3,225.00 SSP 07005 Extruded Concrete Curb 178 LF $10.00 $1 760.00 - -- -r~ .~ 01 Bidder $20 50 $3,808.00 ~ 02 Bidder ~ _ __ ~ ~-...~_ $17.70 $3,115,20 D3 Bidder $1414 $2 408 84 . r. _x ~c~ - _ - 04Bldder $12.50 $2,200,00 `- OS Bidder _ - - --- _- - - $12.25 $2,156.00 ObBldder $20.60 $3,625.60 ,_--- _ ___ ~_~_ SSP-08105 Temporary Pavement ^?~ ._ T _ __ -= ------ 300 SY $15 00 $4,500,00 i t ~ _~ _ _~ ru DI Bidder $0.00 $0 00 02 Bidder ~ ~ ....~ a.~.__ $300 00 j $13 60 $4 080.00 03 Bidder $100 _ _ _,---~ ~ 04 Bidder $12"SD $3,750 OD i OS 8tdder ~~~~ ~ _ $26.00 $7 800.00 06 Bidder $15 00 $4 500 00~ ~ _~~ LL_. _ ~ . .,___ 5SP•08125 Asphalt Repair-Other -. _._ _.._..,_.w.. _.....V.,_........~...._ _ 20 SY $35.00 $700,00 Oi 8tdder $17..00 II $240 00 02 Bidder $11,80 $238 00 03 Bidder $32 00 $640.00~~ w_.___ 0481dder~ $29.00 ' $500.00 05Bldder $71,00 $1 420.00 068idder $13.35 $287.00 e ~_ ~ _ SSP 11002 Portable Changeable Message Sign - - 420 1 HR $6.75 $2 835 00 0181dder $3.08 $1,29360 02Bldder 04 eldde~~ $3,10 $1,302 00 OS Bidder $305 $1,281.00 ~ 0381dder $3.03 ~ $1 272.80 ; $1100 $4,620"00 ~ 06 Bidder $3.25 ~ $1,365.00 ', SSP 20003 Temporary Construction Fencing ~ I 200 11 LF $3 75 $750 00 1 ~ ~ ~ ___ _T_ r __..__.~ ~~ _ __~..__~ ,. ... , .. m _.,_ $1,54 $308 00 ; 02 8tdder 01 Bidder .,a...,.. e.~ ..~~.~_.~:.~.. _ _r. . ,._ _,....,.,. _ _ ~_~y $1.50 $300.00 03 Bidder $120 $240.00 ' __ 04 Bidder $1.5~ $300 00? 05 Bidder $1.25 ~ ^ $250A0~06 Bidder ~ $165 ~ $330.00 ~ ==- _ SSP-25050 4 Topsoil 01Oldder $3,74 $1,08460 02 Bidder 04B/dder $3.10 $899 0 005 8/dder - --- 290 SY $4.50 $1,305.00 ~ $3.05 $884.50 03 Bidder $6.01 $1,742.90 J .$3.40 $986.00 OSBtdder $7.20 $2,088.00 SSP 29065 Sod Repair 290 SY $ti 75 $1 957.50 ~ ~ ~ ~ .__~._- Y,_ _ 33 ~ $965.70 D2 eldder 01 Bidder $3. ~ ' ~~ ~ ..,• t -. $3.05 $884,5 0 03 eldder $3 03 $878,70 04 eldder $3 ~ SO $899.00 OS Bidder _ _ _ $3.40 $988.00 06 Bidder , $7 20~~ $2,088.00 _~~ SSP•29093 Remove Tree 6"+ ----- 1 EA $350,00 $350.00 .. OlBidder $284,95 $284.85. 02 eldder $334.00 $334.00 038tdder $280.00 $280.00 04 Bidder $290.00 $290.00 OS Bidder $255.00 $255.00 068tdder $286.00 $286A0 SSP 29101 Remove and Reset Sprinkler System C --,, 1700 LF $600 y $10 200.00 I ~ ~ ~ . __ ~ _ 0181dder $4.05 ~ $8,885 00 ~ 02 8/dder R _ ~. ~ ~ ~ m ~~_ $4.05 36 885 00 03 Bidder $4.04 $8,868.00 04 erdder $410 $6,970 00 OS Bidder $4.00 $B 800.00 06 Bidder $6.70 $11 390.00 i Estimate I $411,798,00 --. '01 Bidder $282 489,36 + 02 gldde ` i~_. _ -_ -___, $388,863.80 ~ ~03 Bidder! $390,449,66 04 Bidder, $389,969.00. ~ ~05 Bidder $397,&88.30 ~ O6 Bidder $406,783.96 Schedule 2-tdine Rgile Croek Pipe Replacernont Protect IN270-01 306007 Nino h711e Creak Pipe Replacement PraJect Estimate 0201.1 4.1,C•1 _ Removal of Obstructions 0181dder $1,730.00 $1,730.00 02 Bidder 1 LS $5,000,00 $5,000.00 $10000 $100.00 038/dder $5000.00 $6000,00 ' -- -- 04 Bidder T $5,900 00 ~ $6,900.00 i OS 81dde~ - $2 625.Q0~ ~ $2,625.00 06 Bidder $4,350,00 $4 350,00 = ',020141 F 1 Removal of 12" Tree -- --- 1 EA $750.00 $750.00 01 Bidder $284,95 $284.95 02 8tdder $334.00 ~334.OD 03 Bidder $510 00 $510,00 , 04 8tdder $290,00 $290,00 OS Bidder $260.00 $260.00 06 Bidder $573 00 $b73.00 '0205 41 ®.1 oewatering 1 LS $5,000.00 $5 000 00 ~" _.w.......~_.~..~~..._r. _ -.._. 01 Bidder $3,500.00 $3,50 0 2 eldder $11,600.00 $11 800 00 03 Bidder $11,010.10 $11 01010 ___~ 04 Bidder $11,225.00 $11225.00 OS eldder $ _~^ 1150000 $11,500,00 Obeldder $6,190,00 $8180,00 ~ 1/9/2012 CT212-09 - Plne and Under intersection Page 7 ;0206 41,13 Hand Placed Riprap- 6' /12 mix 15 CY $50A0 $750 00 01 Bidder $75:00 $1 125 00 j 02 Bidder ; $75.00 $1 125 00 03 Bidder _ w.. $55 00 $825 DO 04 Bidder $62.0 $930 00 I OS Bidder $38.00 _ . __ $570 00 Ob Bidder w__ $43 20 $848 00 . '~0307~4,1.F.1 Malp Line Type P" Surface Restoration (Asphalt Roa dway)- 655 $19~650~00 LF $3D,Op ''I __r__ 018ldder _ $28 30 _ ._ $18,536.50 02 Bidder ~, $19.10 _ _ ~.- $12 510.50 03 Bidder ~ W _~_y _ $2300 $15 065 00 04 Bidder $2500 $18,375.00 ~ OS Bldder ~ $1300 ~ 58,515.00 06 8ldder $29 80 $19 519,00 r03074.1.F.3 Main Line Type "P"Surface Restoration {Asphait Roa dway wish Fabric)- 190 _ 1F $40.00 $7,600.00 Ol Bidder $30.00 $5,700T00 02 8ldder $20.50 $3,895.00 03 Bidder $35.00 $8,850.00 04 Bidder _ _ $27.00 $5,130A0 05 Bidder __ __.. $16.00 $3,420.00 06 Bidder _ ~ $47.55 $9,034.50 (06014 f A 0148 48" Storm Drain/Culvert/Gravity Imgation Pipe Reinforced Concrete (RCP) 1015 LF~ $120.00 I $121,800.00 l' Gravity Irriga ti on, Class V _ _ _ _ ,_ O1 Bidder $144 00 $148,180,00 ~ 02 8ldder ~ $144 00 $146180.00 03 8ldder $158.59 $180 988.85 ; 040idde ~ $162.00 $164,430.00 1 0581dder $16500 $18747600 06Bldder $159.00 $161,385.00 ~'; T 106024 Et .1 _ Storm Drain orGravity In•igailon Catch Manhole- 96' ~... ~ T ` 5 w __ ~ EA } $5,800.00 $29,000:00 018(dder _~ ,.r~ $7,800.00 $39,000 00 02 8ldder _ $8,900.00 - $44,500.00 _ 03 Bidder $10,166 67 .$50,833.35. j ~4Bldder~ $10,100.00 $50,b0000 OSBldder $10,300.00 $61500.00 ObBldder $9,69000~$48,460.00~ 0706.4.1.A.6 _ _ ~ _ .__ Standard 6-inch Vertical Curb & Gutter- Remove and replace ~ 50 __ _ , _~ ~ e. ~ LF$32.00 $1,800.00 , 01 Bidder $12.81 $640.50 02 Bidder _ ~..~ - $12.00 $800 00 03 Bidder $56,30 $2,815.00 € 04 8ldder $36.00 $1,800.00 OS Bidder $9.00 $450.00 Ob Bidder _ $17.35 $867.50 _ (0706.4.1:8.3 ~ _ T Concrete Valley Gutters- Remove and replace _ __ 45 _~: _ _--. SF 1 $15.00 $675,00 ~ ~ ---- ~~ffiu, 01 Bidder ~,..~_ ~,~ ~:.-,~ a _.u, $10.25 $461.25. OZ Bidder .,~,- _ .-v, _ $20.40 $918.00. 03 Bidder ~-_ - ~~ R -A $47 42 $2 133.90 R48ldder ~ $14.00 $630.00 OSBldder 55,25 ~ $236.25 068ldder $2465 $1109.25!. 0706.4.1.E.1 --°°- -- Concrete Sidewalks, - Remove and replace, 4" ------ ~- 30 SY $30.00 ~ $900.00 -' , 01 BI d ~$22 55 $B 6 02 Bldde - $22.90 - ~~ $887.00 - _ 03 8ldder ~ $95.34 _ $2 860 20 04Bidder $4000 l $1,20000 ; 0581dder $27A0 $810.00 6BIdder $30A5 $91x.50 `1001A.1.A.1 _ _ . ~~. ~ ~, -~_ ~ _ ~.a_ ~ u - d Cont r ---- - --. _. ~... 2,500.00 2,500,00 $ LS e ad~ O $ i1025.00 $1,025 00,022 8ldder $1,000.00 ~~ $1,000.00 03 BJdde $1$ 0 $1. 04 Bidder $585.00 I $585.00 , OS B/dde $1,100.00. $1,100.0006 8ldder $686.00 $688 00 1103 41 A 1 _ _ _ .. _,. Construction Traffic Control i 1 _ ._.._.__. LS ~ $5,000.00 $5 000.00 I .~ 01 8idder~ $1A3 $1.03 02 Bldde --_ -- - $1.00 j $1.00 ', 03 ©Idderi $1.01 $1.01 04 Bidder; $1.00 $1.00 ' 05 Bldde I j $2,100.00 ~ $2,100.00 06 Bidder - - $1.05 ~ $1,06 1103.4.1.8.1 Traffic Contra{ Signs ~ 64 ~ SF ~ $6.00 ~ $384.00 J -_ . e 01 Bidder - $5.38 ~~. -. $344.32 ~ 02 Bidder ~ -- ~ $5.30 _ _ ~ _ $33920 03 Bidder $530 $339.20 _ ~-- - - 04 Bidder $5.50 $352.00 05 f?idde $5.25. $338.00 06 Bidder $5.70 $384.80 1201041 A 1 G Mobilization 1 __,_~ LS $10,000 00 $10 000,00 __ __~_~._.,_~.~u_ - ~ - 018fdder _ $0.00 $0.00 ~ 018fdder $1600.00 -- _ _ $1,600.00 03 Bldder _,. s $4,90000 _,~ ,~.. $4,900 00 ~ ___ $1,000.00 $1,000.00 105 Bidder 04Bldder $8,000,00 $8,000,00. _ 0681dder _ $2,34000 _ ~ $2,340.00 ~ ~SP06017 _ _ Confitct Manhole- 72" Irrigation drain/sanitary sewer _ _ - -- 1 - ~ FJ1~ $6,000:$6,000.00 - Ol Bidder 04 8ldder $13 80000 !.$9,500 00 - $13,800 00 ~ 02 Bidder _ $9,600 00 OS 8ldder $10 300.00 $10,300 OD 03 8ldder $9,700,00 $9,700 00 06 8ldder _ _ $9 292.93 $9,292,93 $8 880.00 $8,880.00 ) ~,SP-0 8 Ircigallon Drain /Sanitary Sewer Conflict Box- 1 , EA $35,000,00 $36,000.00 01 Bidder 04 8ldder $15,600 00 $15 800 00 ~ $16 840.00 $18840 00 02 8ldder ~05 Bidder $16 900,00 $18,900.00 $17 200.00 $17,200.00. -03 Bidder 06 8ldder $16,515.15 ~ $16 515 15~u $17,970.00 , $17 870.00 SP 08120 Asphalt Repair 130 SY $25.00 $3,250,00 { ~ -- --- OZ Bidder $12.00 ~ $1,560.00 02 Bidder $11.80 $1,534.00 03 Bidder ~ $20.00 $2,800.00 L04_Bidder ~ $24.50 $3,185.00~058fd1 SP 0 ~ Repair Landscaping 01 Bidder $4,100.00 $4,100.00 02 Bldr _ - - 04Bidder $1,310.00 ~$1,310A0 ~ 0581dc 01 Bidder w264,246.06, ~ ~02 Bidden -- '04 Bidder $291,183.00 05 Bidder 1 LS $3,000.00 $ $1300.00 $1,300.00 03Bldder $1,287.86 $1,287,8E $2,100.00 $2,100,00 06Bldder $4,640.00 $4,840.0( _. _ ._.._, _.___._________ _ _._. m_. ~ -. __ _-- Estimate $266;403.7Q i 038idder $293,608.67 t $289, 687.26 ~ OB 8idder~ $291,923;80 1/9/2012 CT212-09 - Plne and Linder Intersection Page 8 Scht~dula 3-r+ino A,ve R, Ltnd©r Rd SaYrer f~ Water ProJecY 1N270A2 308007 Pine r.~rt~ ~ ~.ir~i3cr Rr~ ~3~:~ar i~ ~~#rnierProjoct 0307 41.G,1 TYPE P Sl1RFAi/E RESTORATION-t'Et2MAi~lEt31" ~-- 0181dder $25.50 $688.5001 Bidden 1.A.1 Estimate 27 SY $35.00 ~ $845.00......_ $33.50 .$904,60 03Bldder $22.00 $594.00 $50.00 $1 350.00 O6Bldder '$30.30 ^ $818.10 _ __= .. v_..~.v ,~ _--- ~ ~ 95 ~ LF $20.00 $1,900.00 01 Btdder ~ $25.00 $2,375 00 OZ Bidder ~ $21.30 $2,023.50 03 Btdder $1616 $1,535.20 04Bldder __ $17.D0 $1,61500 OS Bidder _$17.00 ~$1,6i5.00 06Bldder ^a $3130 ~$2,973.fi0 04024 tA.1-' 6".GATE VALVE __.__ ..T 4 EA S~oo.oo X2,800.00 j 01 Bidder $1,000.QO ___ $4,000.00. 02 Bidder $661.00 $2,644.0 0 03 8(dder $765 66 $3,062: 04 Btdder $780.00 ~ $3,120.00 05 Btdder _ _ $795.00 _ 1$3,180.00 0681dder -- ~w $403 00 $3 812.00~ r04i" 03•Q.1.A.1 NEW FIRE HYDRANT ASSEMBLY 4 ~ FJ~ $1,60D.00 T $6 400.00 01 Btdder $4,400.00 $19,600A0 02Bldder $2,1W.00 $8,400,00 0381dder $2,873.74 $11,494.96 04 Bidder $2,930.00 "_ $11,720.00 xi OS Bidder $2,900.00 $11,600.00 OS BJdder $2,520.00 $10,080.00 ; E ---- D404.4.1,A.1 - 1"f71 STANDARD WATER SERVICE CONNECTION 17 EA $1,200.00 ..$20,400.00 01 Bldd_er _ $800.00 $13,600.00 -0Z Btdder $1,300.00 $22,100,00 03 Bidder $1,111.11 $18,888.87 0481dder ~ $277.00 ~ $4,709.00 OS Bidder $1,200.00 $20,400.00. 06Bldder $755.00 $12,835.00 : - _ ~07064.1.G.1 v .._. _ ___ ; - - ~ _.T ~~: v CONCRETE REPAIR _ u _ ~ 46 ~SY $40.00 $1,840.00 oiBJdder $3q.75 $1,414.50 02 Btdder $25.30 $1,163.80 03Bldder $69.54 $3188.84 1 04Bidder~_T $28.00 $1,288.00 L0581dder _ $30.00 $1 380.00^, 06 BJdder $27.05 _$1 244.30 12030 4~1.C.9 ADJUST VALVE 80X TO GRADE a ~ ~ 17 EA~ $300.00 $6100.00 ~ v4 _ _ ___~ 04 Bidder $277.00 $4,709 00 ~ JOZ 8ldder - $152.00 $2 684.00 ~ 03 Bidder $177,00 $3,009,00 OS eldde $190.00 $3,230.00 O6 8ldder $276.00 $4,892.00 ~~~ ~SP 08105 - - - - - Temporary Paving 238 SY $20,00 $4 760.0 0 ~ _ _ 01 Btdder $9.90 $2,356.20 02 Bidder $12.80 $3,046.40 ' 03Bfdder $1.00 $2~8. 0 ._ _ 04 Bidder $13.00 $3,094.00 OS 8ldder $11.00 $2 818.00 068idder $15.00 $3,670.00 - . __ _ ~_ _ a ~_ .~_ e.•..._ SP•M401 ADJUST EXISTING WATER MAIN AT NEW PIPE CROSSING 7 EA $2 000.00 $14,000,OD _____ ..v ..__ _~.. - _ _._ -- _._. of Btdder $4,200.00 ~ $29,400 00 ~ OZ Btdder $2 800.00 $19 800 00 03 Btdder $2,373.74 v .i. _____ $16,816.18~- __ _ 04 Brdder0 $2,420.00 $18,940.00 ~ OS 8ldder _ $2,500.00 $17 500 00 06 Bldder ~ $3,380.00 $23 680.00~; ;SP-M402 `~ CONNECT EXISTING WATER LINES T O NEW WATER SERVICE 16 EA $200.00 $3,200.00 ~ ~.~. Ol Btdder $250 00 $4,000 00 OZ Btdder $186.00 $2,976.00 03 Bidder $237 37 $3 797,92 _ 04 Btdder $242.00 $3,872 00 05 Bidde $2 50000 $40 000.00 06 Btdder $37200 $6,952AD ~SP M403 Y RELOCATE EXISTING FIRE HYDRANT T~ 2 EA $550.00. $1,1 0 0.00-' T SP M404 . . 01 Bidder $1,000 00 $2,000 00 OZ 8ldder $578.00 $1,156.00 03 Btdder $1,313,13 $2 626 28 l 04 Bidder ~ $1,33800 $2 878 DO OS Btdder $1400.00 $2,800.00 06 8ldder $874 00 $1 748 00~ - - , UPGRADE STORM WATER PIPE TO WATER CLASS PIPE 4 EA $500 00 $2,D00.00 01 Btdder $1,200.00 _ $4,800.00 02 8ldder $759.00 $3,036.00 03 Bidder $873 74 $3 494.96 ~ 04 Bldader $890.00 $3,580.00 OS Btdder $910.00 $3,640.00 066idder $1,730.00 $6,820.00 ~~~ (SP-M405 HOT TAP EXISTING WATER MAIN ~ 3 EA $2,000.00 $6,000.00 01 Bidder $1500 00 $4 500.00 6 02 Btdder $1200.00 $3,600.00 03 Btdder $1,333 33 $3 999.99 _ 04 Bidder $1,360 00 $4 080.00 05 Bidder, $1,400.00 $4,200.00 06 Btdder $1,96000 ~ $5 880.00 j ~ P M406A 18"p 3/8"THICK STEEL CASING ~ 30 l.F $140.00 $4,200. U _ ~- ~_. 01 Bidder $150 00 $4,500.00 OZ Bidder $135.00 $ 4,050.00 0381dder $122.73 $3,681.90 _ _ 04 Btdder $125 00 $3,750.00 OS 8ldder $130.00 $3,900.00 06Bldder $147.00$4,410.00 SP-M4068 24"p 3/8"THICK STEEL CASING ~ ~~50 LF $130:00 $6,500.00 f j ~~~~~~ _ -- 01 Btdder $160 00 ~ $8,000 2 Bidder $138.00 $6,9D0.00 03 Btdder $128 79 $6 43960 G 04 Btdder $13100 $6,550.00~"OS 8ldder $134.00 $6,700.00 O6 Btdder 5160.00 38 000 00 - 'SP•M407 - -- -- _ . ABANDON EXISTING WATER SERVICE 18 EA $250.00 $4,500.00 _ 00 00 02 Bidder $49.80 $896.40 03 Btdder $277 78 $6 OOD 04 04 Btdder $283 00 $5 094 00 i 05 Bidder $288.00 $5,184.00 06 Bidder $165 00~ $2 970.0 SP-M504 T _ .__. Yau• __ _ _.__•~ _ RECONSTRUCT EXISTING SEWER SERVICE R~ 360 ~ L $24.00 $8 640.00 ~ ~ BTdder a _ $15.00 $5 400 00 Ol 2 8ldder 539.8 $14,328 00 03 8ldder $7,635.60 $212 _ _ ~ 0 _ ~ 04 Bidder $21.50 $7 740 00 OS Btdder $23.00 $8,280 00 06 Btdder $28 70 $10,332.00 _ 1/9/2012 CT212-09 -Pine and Linder intersection Page 9 Estimate $94,285.00 101 Bldder~ $110,683.00 ~ 02 Bidde~ $89,408.00 ~ ~03 Bldderi 596,313.86. 04 Brdder~ $86,327.00 1 j05 Bidder $137,577.00 ~ ~O6 Bidder' ' _ _ $109,090.90 1 Schertulo 4-Nino Pr9llo Gr~~1, falf?~ fteptaeomont - sa~vur ~~ ~?'aed~, .~'~~?J~ss~rean,o IN270~03 306007 Nine Pdille Groek Pipe Replacement Prnlnrt • Onwerr U Wator Estimate 0307.4.LG.t Type'P' Surface Restoration - } 86 ~ SY~ 530.00 ~ $2,580.00 --- _ a~ OI Bidder $25,50 $2,193.00 , 02 Bidder $21.10 $1,814.60 03 Bidder $35 00 _ _$3,010.00 _. _ - - _-~-- - 04 Bidder $19.00 $1,634.OO~OS Bidder $24.00 $2,084Ax 06 Bidder T $26 85~ $2,309.10 T _ - m __ --- ~ _ - _ _ ,01 6.4.1.G.1 Concrete Repair_ ~~ ~ 36 SY $40.~ $1 440 00 01 B/dder $30.75 $1,101.00 02 Bidder $25.30 ~ $910,80 ~03 Bidder~ $81.84 ~ $2,946.24 oa Brdder $za,oo $1,OO8.OQ (os eidder Sz7.oo ~ $972,00 oeBldderl ~ Sz7.os ~ $973.80 _. - - 'SP 1Adjust Existing Water Mam at New Pipe Crossing ~ 2 ; F~1 ( $2,000.00 I $4 000.00... Ol Bidder $4,200.00 ~u8,400.00 ' 02 B/dder~ $3,100.00 $6 200.00 03 Bidder _SZ,zzz Z7 ~ $4 444 44 - _ ~ ~ _. _ _ i ..._ 04B/ddert ..$2,265.00 $4,530.00 ~ OSBldder+ $2,300.00 $4,600.00 ; 06Bldde $3,230.00 I $6,460.00 SP 2 Ad ust Existin Water Service At New PI a Crossin ~ 2 EA 1 9 p 0 $1200.00 $2,400.00 __ ... _ _ ~- _ ~ ~, ~ _ ;~. ~ ~-._ ~ .._ _. i , w ___ .~ ~ w._ , u~ ~ - ~~ „~. OlBldder $500,00 $1,000.00 028idder $638.00 $1,276.x0 03Bldder $35354 $707_08 _. _ _ __ -_- -_ _ _ __ N __ _ 04 Bidder $360.00 §720.00 05 Bidder $970.00 $740.00 06 BJdder $735 00 $1 470.00. iSP 3 Reconstruct Existing Water Service ~ ~ 120 ~ LF _l $26.00 w $3120 00 ___.. 01 Bidder $20.00 $2,400.00 ~ 02 Bidder $57.40 $6 888 OD ~ 03 Bidder _ $8.08 $989.60 04 Bidder $8.00 $960.00 05 etdder $9.00 $1,080.00 068idder $29.70 ~ $3,584.00 4 ILawn Sod $z,o5 ~ $893 eo ; 02 $1.00 $43 0 OS .00 Of 81ddeJr' $1b,893 80 ~ ~02 Bidder{ _ 517,626.40 ~ ~3 Brdder~ (04 8idder $8,288.00 ~05 8idder _ __ 510,437.00 ~ ~06 BJdder~ 4_30 ~F ( $4.00 $1 744 00T~ Eder $101 $440.38 Ider $10 80 $4 708.80 Estimate ~ $15,284.00 $12,617.7 $19,486,70 1/9/2012 CT212-09 -Pine and IJnderlntersection Page 10 CEstimate ~ $1,76987960 Contract Totals 01 Bidder Nampa Paving ~5chedule 1 a Base Bid Plne Ave & Linder Rd $907 438.131 Schedule ib-Alternate Bid Pine Ave ~ Linder Rd $282,489.36 , Schedule 2-Nine Mile Creek Pipe Replacement ProJect ~y254,245.05 _ Schedule 3-Pine Ava &Llnder Rd Sewer & tNater ProJect $110,583.er, Schedule 4 Nine Mile Creek Pipe Replacement -Sewer & $15,993 Ho 51,570,760.fi8 028idder .Central Paving - - -- -- - 15chedute 1 a Base Bid Pine Ave & Linder Rd ~ ~ - -- $931,705.82 ~Schedule 1 b-Alternate Bid Pine Ave & Linder Rd $368,853.80 ;Schedule 2-Nine Mile Creek Pipe. Replacement project $255,403.70 ;Schedule~3-Pine Ave & Linder Rd Sewer & Water Protect ~ $99,408.ti0 Mlle Creek Plpe Replacement -Sewer & ~ $17,525.40 ___.. v.,~-_. _,_~._.~ __--_ _- _-- 51,882,897.32 08 Bidder ..Idaho Sand & Gravel jSchedule 1a Base Bid P(ne Ave &Llnder Rd $956,664.1 Schedule 1 b-Alternate Bid Pine Ave & Linder Rd $390,449.55 Schedule 2-Nine Mile Greek Pipe Reptacemenl Project _ $293,608.57 p___ ___ __;. __.__-_~ __ _ ~ _ -___ :.Schedule 3-Pine Ave. & Linder Rd Sewer & Water ProJect ~ $95,313:861 Schedule 4-Nine Mile Creok Pipe Replacement.-„Sewer & $12,517,72 04 Bidder WF Construction _ -- - - ',Schedule 9a Base Bid Pine Ave &Llnder Rd ~ ~ $976,771:00 Schedule 1b-Alternate Bid Pine Ava &Llnder Rd $389,159.00 Schedule 2-Nine Mile Creek Pipe Replacement ProJect $291,183.00 _ _. 'Schedule 3-Pine Ave & Linder Rd Sewer & Water Project $85,327.00 Schedule 4-Nine Mile Creak Pipe Replacement - Sewer &f $9,286.00 _.~~ ~_..n ~.._.~.,,~ --.., ___.___ _ $1,761,728:00 05 Bidder C & A Paving Co. Sched 11 au ee Base Bid Pine Ave & Under Rd $970,374.80 Sched__ ib Aitemate Bid Pine Ave &_Llnder Rd 5397,586.30 ~':Schedulef2-Nine Mile Creek Plpe Replacement Project $289,587,25 Schedule 3-Pine Ave & Linder Rd Sewer & Water Project $137,577.00 Schedule 4-Nine Mile Creek Pipe Replacement - Sewer ii, $10,437.00 $1,805,684.35 O6 Bidder Knife River 'Schedule 1a-Base Bid Pine Ave & Linder Rd $1,052,542.95 _~ ___ __r_,_ __._ _.__- -_ __ Schedule 1b Aitemate Bid Pine Ave & ltnder Rd $405,783.95 j--_ __:w.___ _ __.dd.... __. --- -___.~.~. _m Schedule 2-Nine Mile Creek Pipe Replacement ProJect $291,923.80 #Schedule 3-Pine Ave &Llnder Rd Sewer 8~ Watef Project $_109,898,90 1 iSchedule 4-Nine Mil t e Creek Pipe t2eplacement Sewer & $19,485.70 -__ --------- --._ .r_~_..b~,..- ~_ $1,879,433.10 L_ 510,418,927.27 1/9/2012 CT212-09 -Pine and Under intersection Page 11 THIS INTERAGENCY AGREEMENT FOR ROADWAY CONSTRUCTION/POTABLE WATER AND ~ - SANITARY SEWER UTILITY IMPROVEMENTS FOR PINE AVENUE AND CINDER ROAD INTERSECTION AND NINE MILE CREEK PIPE REPLACEMENT ("Agreement") is made and entered into this .LL, day ,~ of ' ~ 1 2t( 2011 ("Effective Date"), by and between the Ada County Highway ~a District, a highway district organized under Title 40, Chapter 14, Idaho Code ("ACRD"), and thf v N.o,~ City of Meridian, a municipal corporation organized under Title 50, Idaho Code ("City"). ~ "~' _ ° ~ ~ ~ _ pursuant to Idaho Code § 67-2332, ACRD and City desire to undertake a E ~.5 r , joint effort to share the tasks and costs of reconstructing the Pine Avenue and Linder Road =m®~ ~ LL, Intersection, including potable water and sanitary sewer utility adjustments and installations as v detailed in Project Number 306007 (the "Project"); and ~ m A ~ EItEA5, ACRD is willing to arrange for adjustments and installation of potable water and sanitary sewer utilities as part of the Project plans so long as ACRD is fully reimbursed for all costs and expenses it incurs as a result of additional work attributable to the adjustments and installation of the potable water and sanitary sewer utilities within the Project boundaries, including but not limited to, costs for changed conditions, plan errors and omissions, and delays attributable to the potable water and sanitary sewer utility design and installation; 101®VV, THE F®RE, in consideration of the foregoing premises, mutual covenants and agreement herein contained, the parties hereto agree as follows: 1. A,CI1nU 5>EIAI,I,t a. Solicit, receive, and open bids and for executing and administering the construction contract for the Project referenced herein ("Contract'; b. Provide City with a complete set of combined bid documents for the roadway reconstruction and for the potable water and sanitary sewer utility work referenced herein; c. Furnish City with an abstract of all bids received, and obtain City's concurrence with ACHD's selection for award of the Contract prior to making such award; d. Coordinate with City regarding execution and any modification of the Contract, with regard to any provisions that may impact City's potable water and sanitary sewer utility work; e. Make monthly progress payments and the final payment to the Contractor in conformance with the terms of the Contract; Iri'1'~RAGENCY AGREEMENT FOR ACg€D PRO.I~Cr No. 306007 PAGE 1 Ox 6 f. Obtain City's concurrence prior to approval of each Contractor's progress payment estimate and submit to City a copy of each estimate together with an invoice for City's share of the Contract costs earned by and to be paid to Contractor; g. Obtain City's prior approval for any change order work involving the installations, adjustments, relocations, and abandonments of potable water and sanitary sewer utilities; h. Provide for the reference and replacement of all pre-existing survey monuments within the work area; i. Provide the trench compaction testing, at the minimum frequency rate of one (1) test per five hundred (500) lineal feet per one foot (1') of trench depth, for the potable water and sanitary sewer utilities from one foot (1') above the pipe zone to sub-grade of the roadway section; j. Provide all re-testing required in any area that does not meet Contract requirements; k. Provide the field survey and grade control necessary for construction of the roadway; 1. Establish centerline or offsets and stationing prior to City staking potable water and sanitary sewer utilities contained in City's portion of the work; and m. Coordinate with City prior to making changes to ACHD's portion of the Contract where such changes may impact City's portion of the Contract. 2. CITY SI~AI.,I.: a. Inspect all potable water and sanitary sewer utilities installed under the Contract and provide copies of appropriate tests and diaries to ACl'ID Project Representative; b. Provide field survey and grade control required for the installation of the potable water and sanitary sewer utilities installed under the Contract; c. Provide AC]3D with the construction plans, special provisions, and unit bid quantities for the potable water and sanitary sewer utilities to be included in the bid documents for the Contract, including the requirement that all work regarding the potable water and sanitary sewer utilities must be performed in conformance with the most current edition of the Idaho Standards for Public Works Construction ("ISPWC") and the most current City of Meridian Supplemental Specifications to the ISPWC; d. Remit to ACRD, withinthirty-five (35) days after the date of invoice therefor, all funds for which City is responsible pursuant to the approved final Contract and this Agreement; e. Reimburse ACRD for all additional costs incurred by ACRD, up to a maximum of five percent (5%) of City's construction costs, including overhead and benefits, project administration, compaction testing, and soils work required solely for the installations, INTERAGENCY AGREEMENT FOR ACID PROJECr NO.306007 PAGE 2 of 6 adjustments, relocations, and abandonments of the water and sanitary sewer facilities, which reimbursement shall be calculated as the actual quantities ofwork acceptably performed, and/or, installed, as determined from field measurements made by City, and paid for pursuant to the unit, and/or lump sum prices established in the Contract; f. Reimburse ACRD for mobilization, traffic control, flagging, detours, and weekly meetings, on a prorated basis, to be calculated using the percentage of City's project costs as they relate to the total project construction costs; g. Be liable for the cost of repairing any trench failures attributable to failure of potable water and sanitary sewer utilities; and h. Reimburse ACRD for any additional costs to ACRD attributable to the installations, adjustments, relocations, and abandonments of City's portion of the potable water and sanitary sewer utilities or to the removal of any or all items from the Contract that are associated with the installation of potable water and sanitary sewer utilities. 3. TIDE P TIES I3ERET® I+'IJR.TIIER AGREE TIiAT: a. Prior to commencement of work by the Contractor, the Parties, together with the Contractor, shall inspect the entire Project for the purpose of locating and resolving any items of concern or misunderstanding; b. This Agreement may not be enlarged, modified, amended or altered except in writing signed by both of the parties hereto; c. All signatories to this Agreement represent and warrant that they have the power to execute this Agreement and to bind the agency they represent to the terms of this Agreement; d. Should either party to this Agreement be required to commence legal action against the other to enforce the terms and conditions of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees and costs incurred in said action; e. Any action at law, suit in equity, arbitration or judicial proceeding for the enforcement of this Agreement shall be instituted only in the courts of the State of Idaho, County of Ada; f. This Agreement shall be binding upon and inure to the benefit of the personal representatives, heirs and assigns of the respective parties hereto; g. Nothing in this Ageement shall be construed to be an indebtedness or liability in violation of Article VIII, Section 3 of the Idaho Constitution; h. The validity, meaning, and effect of this Agreement shall be determined in accordance with the laws of the State of Idaho; ItvTERAGENCY .eaGREEMENi' FOR .4~CHD PROJECT NO.306007 PAGE 3 of 6 This Agreement and the exhibits hereto constitute the full and entire understanding and agreement between the parties with regard to the transaction contemplated herein, and no party shall be liable or bound to the other in any manner by any representations, warranties, covenants and agreements except as specifically set forth herein; The promises, covenants, conditions, and agreements herein contained shall be binding on each of the parties hereto and on all parties and all persons claiming under them or any of them; and the rights and obligations hereof shall inure to the benefit of each of the parties hereto and their respective successors and assigns; k. If any part of this Agreement is held to be illegal or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent reasonably possible; The failure of a party to insist on the strict performance of any provision of this Agreement or to exercise any right or remedy upon a breach hereof shall not constitute a waiver of any provision of this Agreement or limit such party's right to enforce any provision or exercise any right. No acknowledgments required hereunder, and no modification yr waiver of any provision of this Agreement or consent to departure therefrom, shall be effective unless in writing and signed by ACRD and City; m. This Agreement maybe executed in two or more counterparts, each of which shall be deemed an original, but both of which together shall constitute one and the same. n. The parties hereto agree that nothing herein contained shall be construed to create a joint venture, partnership, or other similar relationship which might subject any party to liability for the debts and/or obligations of the others, except as otherwise expressly agreed in this Agreement; and o. Time shall be of the essence for all events and obligations to be performed under this Agreement. INTEl3AGEIVCY ACREENIENT FOR l~C~ ~ROJEGT N0.306007 PAGE A or 6 IN WITNESS HEREOF, the parties hereto have executed this Agreement on the day and year herein first written. ~I ATTEST: ADA COUNTY HIGfIWAY DISTRICT .,~. ' y -~---~- Y~ Bruce Wong becca W. Arnold Director President, Board of Commissioners. .ATTEST: ~~o~,~eeo { OF MERIDIAN 3 '~ any I 13 ,~ m ~oaao Jaycee Holman "°.~, ~*`~ ammy a eerd City Clerk °°'`~~~ t• -e°`~ Mayor STATE OF IDAHO ) i IrtTERAGENCY AcREEb9ENT tort ACS PROJECr No. 306007 PACE 5 of 6 STATE OF IDAHO ) ss. COUNTY OF ADA ) On this ~_ day of _ ~~~P7~ , 2011, before me, the undersigned, personally appeared TAMMY DE WEERD and JAYCEE HOLMAN, Mayor and City Clerk respectively of MERIDIAN CfTY, a municipal corporation, known to me to be the persons whose names are subscribed to the within instrument, and acknowledged to me that they executed the same for and on behalf of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. I[va~~ac~~vc~r tAGREEM~rrr FoR AC Fao~cr rto. 306007 PAGE 6 of b