Agency Comments„ o;s R' ~;. CENTRAL DISTRICT HEALTH DEPARTMENT Retum to:
HEALTH Environmental Health Division pease
DEPARTMENT
^ ~9~
^ Garden City
Rezone # ~Z ~l `-b~.5' . ~~ 1 (-~~ ~ Meridian
Conditional Use # C'-~ ~ ((-~~' ^Kuna
Preliminary /Final /Short Plat ~~ I ~ -~ f ~ pACZ
-~.,,~,H.~. C.~n..~l~,~cp ^Star
^1. We have No Objections to this Proposal.
p2. We recommend Denial of this Proposal.
^3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^4. We will require more data concerning soil conditions on this Proposal before we can comment.
^5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
ps. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
^7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
After written approval from appropriate entities are submitted, we can approve this proposal for:
,~-sentral sewage ^ community sewage system ^ community water well
^ interim sewage central water
^ individual sewage ^ individual water
~. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
~sentral sewage ^ community sewage system ^ community water
^ sewage dry lines J~'.central water
10. Run-off is not to create a mosquito breeding problem.
p11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
p12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
p13. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
p14. Please see attached stormwater management recommendations
^ 15.
Reviewed By: s~G~=~
Date: /~/ ~3 / ~'~
Review Sheet
15726.001EH0904
SETTLERS' IRRIGATION DiSTRiCT
P.O. BOX 7571 BOISE, IDAHO 83707-1571
PHONE: 344-2471 FAX: 343-1642
November 29, 2011
Cornel Larson
Larson Architects
210 Murray St.
Boise, ID 83714
Re: AZ 11-00.5, RZ 11-006, PP 11-011, CUP 11-009 Spurwing Challenge
Dear Mr. Larson:
COPY
~~~~TV
NOV ~~
CI T y "~ ~ ?~~~
(.~,- _
C~TyD~EF?' „~CF~^N
F~~E
After review of the Preliminary Plat of the above-mentioned application, Settlers Irrigation
District requests the following:
1. All irrigation/drainage facilities along with their easements must be protected and
continue to function. The facility involved is the North Slough Lateral. Please contact the
Rod Wagner of the North Slough Lateral, at 888-6161, for additional requirements.
2. A Land Use Change Application must be on file prior to any approvals.
3. A license agreement MUST be signed and recorded prior to construction of any SID
facilities, or within its easements.
4. Any changes to the existing irrigation system such as relocation, water delivery, tiling,
and landscaping must be approved by Settlers Irrigation District's Board of Directors.
5. All storm drainage must be retained on-site.
6. All irrigation ponds combined shall not exceed a certain amount of stored water equal to
the allocated water right, of this property, over a 24 hour period.
7. A pressure irrigation system must be provided to service all lots within the above-
mentioned subdivision from the current delivery point. If the developer wishes to have
Settlers Irrigation District own, operate, and maintain the pressure irrigation system then
a license agreement will need to be signed and recorded.
If you have any questions please ca11343-5271.
Sincerely,
Nathan Draper, Manager
Settlers Irrigation District
Enclosures
Cc: City of Meridian (w/o enclosures)
Page 1 of 1
Machelle Hill
From: Dave Szplett [Dave.Szplett@itd.idaho.gov]
Sent: Friday, November 25, 2011 7:28 AM
To: clerk
Subject: The Club at Spurwing - AZ 11-005, RZ 11-006, PP 11-011, CUP 11-009
Attachments: The Club at Spurwing letter on 112511.pdf
ITD has lots of comments on this application.
ITD has an existing corridor plan and an existing access management plan for the section US 20-26
abutting the applicant's site.
The original letter is in the mail.
Attached is a copy.
Thank you for keeping us informed.
Dave
Dave SzpCett
Access Management Manager-ITD District III
Email: dave.szplett@itd.idaho.eov
208.334.8377 office
208.949.5683 cell
11 /29/2011
IDAHO TRANSPORTATION DEPARTMENT
P.O. Box 8028
Boise, ID 83707-2028
(208) 334-8300
itd.idaho.gov
November 25, 2011
MS Machelle Hill
Meridian City Clerk's Office
33 E. Broadway Avenue
Meridian, ID 83642
Re: The Club at Spurwing - AZ 11-005, RZ 11-006, PP 11-011, CUP 11-009
Dear MS Hill:
The Idaho Transportation Department (ITD) has reviewed the referenced development
application. There are several key issues for your agency's review.
Please note that ITD has an existing corridor plan and an existing access management plan for
the section US 20-26 abutting the applicant's site.
1. The new public road access (North Spurwing Way) location meets District policies. The
location is aligned with the existing Long Lake Way and meets existing access spacing
standards. ITD will require a standard approach permit for this new approach. The
approach permit will require detailed engineering drawings and may require additional
traffic information. Please contact Matt Ward at 334.8341 to complete the necessary
application paperwork.
2. There is an existing traffic signal at the US 20-26 intersection with Long Lake Way. The
site plan shows the new North Spurwing Way roadway aligning with Long Lake Way. The
applicant will be required to reconstruct and expand the existing traffic signal. Please
coordinate the signal design with ACRD staff once the access permit is approved by ITD.
3. The new North Spurwing Way will replace the existing Spurwing Way, located
approximately 660-ft to the west. The original site plan for this project showed a cul-de-
sac for the original Spurwing Way, closing the existing intersection, and renaming the
original street as Spurwing Court. The current site plan shows retaining the existing
Spurwing Way but limiting the US 20-26 intersection to right-in/right-out operation. The
existing Spurwing Way intersection does not meet current ITD policy for intersection
separation. The existing intersection does not meet the access management plan for the
corridor. The access permit application for the new North Spurwing Way should include a
plan to close the existing Spurwing Way intersection with US 20-26.
4. The US 20-26 corridor plan identifies a 200-ft right-of--way or 100-ft on either side of the
section line. The project site appears to have 50-ft ofright-of--way at the present time. This
development project should dedicate a total of 100-ft ofright-of--way, approximately 50
additional feet.
5. The corridor's importance and future traffic volumes on US 20-26 indicate that traffic noise
may become an issue to any residential developments near the roadway corridor. ITD does
not install noise walls or noise berms. Any noise wall or noise berm considered for abutting
US 20-26 should be constructed by the applicant and located outside the public right-of--way.
6. A second right-in access is shown on the concept plan, approximately 500-ft west of Linder
Road. The development application indicates that this second access is not part of the current
project. This second access does not meet current ITD policy, does not match the corridor
access management plan, and is not approved. A separate approach permit will be required if
this second access is requested at a later date. The necessary approach permit will require
detailed engineering drawings and may require some level of traffic analysis. Please contact
Matt Ward at 334.8341 to complete the necessary application paperwork.
If you have any questions, you may contact Matt Ward at 334-8341 or me at 334-8377.
Sincerely,
~~~
Dave Szplett
Access Management Manager
dave. szplettnitd. Idaho. gov
&7~r~~„~~ u~.~Der
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
28 November 2011
City of Meridian
City Clerk's Office
33 E Broadway Avenue Ste 102
Meridian, 1D 83642-2619
RE: RZ11-005/Genesis Center
Dear Jaycee:
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
Nampa & Meridian Irrigation District has no comment on the above-referenced application on
REZONE only.
All laterals and waste ways must be protected. All municipal surface drainage must be
retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District
must review drainage plans. The Developer must comply with Idaho Code 31-3805.
Si erely,
Andy Madsen
Crew Foreman
Nampa & Meridian irrigation District
AM/dbg
C: File/Office
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS • 40,000
•r+~;n
& ~r~~r~„~ ~ a awe
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
2$ November 2011
City of Meridian
City Clerk's Office
33 E Broadway Avenue Ste 102
Meridian, ID 83642-2619
RE: AZ 11-005, RZll-006, PP 11-011, CUPll-009/Spurwing Challenge
Dear Jaycee:
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
Nampa & Meridian Irrigation District has no comment on the above-referenced application as
it lies outside of our district boundaries. Please contact Nathan Draper with Settlers Irrigation
at 344-2471 or at PO Box 7571, Boise, ID 83707.
All laterals and waste ways must be protected. All municipal surface drainage must he
retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District
must review drainage plans. The Developer must comply with Idaho Code 31-3805.
Sincerely,
Greg G. Curtis
~i%ater Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
C: N. Draper, Settlers Irr