Loading...
Applicant Response to Staff ReportNovember 3, 2011 Bill Parson, Associate City Planner City of Meridian 33 E. Broadway Suite 210 Meridian, Id. 83642 RE: Chesterfield Conditions of Approval Dear Bill: The applicant has reviewed the condition of approval for the annexation and preliminary plat and request a couple of modifications to the conditions. The following is a list of the condition with the requested modification: 1.2 SITE SPECIFIC REQUIREMENTS -PRELIMINARY PLAT: 1.2.1: Modification to the preliminary plat: • The applicant will modify the plat to comply with the R-8 zone dimensional standards • The phasing plan was prepared based on anticipated market demand and best engineering practices. The applicant does not wish to plat more lots than what the market will demand, the phasing that is being proposed are for lots in which we believe there will be a demand for in the future platting of this property. If we extend infrastructure as proposed, we would be required to plat additional lots we do not see the demand for and/or extend infrastructure without a means to recoup the cost. If necessary we would proposed moving that amenity to a common lot adjacent to the first or second phase. • We will include the pathway as requested. 1.2.2 The applicant will provide stubs as proposed. 1.2.3 The applicant is proposing more open space as required by City Code. This should state that we provide a minimum of 2.8-acres of open space. Also, we were only proposing a gazebo and picnic tables as an amenity in Lot 3, Block 13. If additional amenities are requested by the City we would propose a pathway instead of a tot lot. There was a significant playground constructed by the applicant in the first phase of this development. The applicant would like to propose a mix of amenities, as proposed with the gazebo and picnic tables, along with a pathway. 1.2.4 Modifications to landscape plan: • Landscape buffer along Pine Avenue will be constructed as proposed. • The applicant will widen Lot 54, Block 6, and construct a pathway as required. However, we would like to modify the condition to add an additional pathway to the south. The block length of this section of roadway is approximately 760-feet from centerline to centerline. We can modify the plat to conform to the required 750-foot block length requirement, therefore we request this condition be stated as an either or, modify the plat or add a micro path to the south. • The applicant will provide micro paths as requested. • Micro path fencing will be designed in accordance to code. • The drainage areas will be designed in accordance to code. GENERAL REQUIREMENTS: The applicant will comply with all general requirements. 2. Public Works Department: The applicant will comply with all conditions of approval. 3. Fire Department: The applicant will comply with all conditions of approval. 4. Parks Department: The applicant will comply with all conditions of approval. 5. Police Department: The applicant will comply with all conditions of approval. 6. Sanitary Service Company: N/A 7. Ada County Highway District: The applicant will comply with all conditions of approval. In general we believe this project conforms to the requirements outlined in the City staff report. I will be available for question on the November 3, 2011 Planning and Zoning Commission meeting for additional clarifications regarding this project. If you need information prior to that meeting please call me at 871-7020 and I will provide it immediately. Sincerely, CK Engineers P.C. Steve Arnold Planning Projects Manager