Loading...
Agency Comments10/24/2011 12:19 2083441437 BOISE PROJECT PAGE 01/02 ,~y~p~ // 1 ' `~ '~~~ y" T~yY~.~'fl',. (JJ t3 L1rE $1~0 CHtiI~Mn~+oF'TME00AR0 AT 3~ 7 OPERATING AGENCY FOR 167,D~J0 ~ ~~ ~pNT1E~DL AORESPORnaEFOLLOWIMO ~Q~s~ ~~~ ` ~C~ ~ ], Va J IRg1GATION DISTRICTS DEREK VERMEER viOF ~NnIRMAN OF THE 9OARD IFORMEfiLY BOISE U.S. RECLAMAtION PRO.IECI~ PAUL J. DEVi<ALI 2~t95 OVERLAND RO/1D NAMPA-MERIDIA(`I DISTRK:T PROJECT MANhGER 60iSE, IDAHO fy3705.3i55 eOISE•KUNA DI$TRK:T WILDER DISTRICT TIMOTHY M. PAGE NEW YORK DISTRICT Ag$IRTANT PROJECT MANAr;ER 91Q QF,ND DI.aTRICT APRYL GAWDNER 3FCRETARY-TRCA3URER JEFipI FLOYD TEL: (2081 34~-17lI ggglgTnNT SEGRETARY•TREASUREfl FAX: (208) 3M1.14~ 24`h October 2011 City o#' Meridian City Clerk's Office 33 E. Broadway Avenue, Meridian, Idaho 83642 RF: .T.~awkins Companies File No. MDA-11-010 Parcel Numbers 51225449450; 51225449630; S1225449030; 51225417300 Boise-Kun.a irrigation District BK-90 C, BK-90 A1, T3K-90 A., BK-90 A2 Carlson Latera130+80, 31 x-40 Tumbler Latera121-~10 Sec. 25, T3N, lt1W, B.M. Bill Parsons: The United States' Carlson and Tumbler Laterals lie within the boundary of the above- mentioned location. The easement for these .laterals is held in the name of the United States through tlae Bureau of Reclamation uztdex the authority of the ,A,et off' August 30, 1890. (26 5tat. 391; 43 U.S.C_ 945) The Boise Project Board of Control is contracted to operate and, maintain these laterals. We assert a. federal. easement 22' north and 20' south of. the Carlson Lateral centerliune and we assert a federal easement l8' west and 18' east feet East of the Tumbler Lateral centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. Fencing (as may be required) must be constructed just off of Boise Project facilities, to insure public safety and prevent encroachments. Wording on the preliminary and final recorded plat needs to be noted that this development must adher. a to Idaho Statutes, Title 42-1209. Whereas, these easements are for the operation and maintenance of our facility, no activity should hinder our ability to d.o so. The Boise Project does not approve 1~Lndscap.i.ng (other than grass) within its easements, as this will certainly increase our cost of, maintenance. 10/24/2011 12:19 2083441437 BOISE PROJECT PAGE 02/02 Project facilities and/or easements that parallel, and are within and/or intended to be within road right-of--ways due to any development of this property must be relocated outside of road right-of--ways. The easements of Boise Project facilities will rcmai.n the sam..e unless agreed upon and/or approved with written pcrmi.ssion from Boise Project Board of Cozttrol.. Crossing agreements must be secured and signed by all parties prior to March lsc o£ each year. e~, ti.rne schedule for the construction to be done during the non-irrigation season must be approved by Boise Project prior to any activity within Project easements. No construction will be allowed within the easement boundaries of the Boise Project Boazd of Control facilities after March 15`" of each year. However, on a case by case basis, overhead utilities and utilities boring underneath a Project facility may be allowed after Nfarch 15~' if reviewed and approved by the Boise Project. Sturm Drainage and/or Street Runoff must be retained on site. Laval i,.mgationldrainage ditches that cross tl~,is property, iz~ order to serve neighboring properties, must remain un,obstructcd and protected by an appropriate easement_ Boise Project Board of Control requests an irrigation and drainage plan for review. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, ~., ,~~ Tim Page Assistant Project Manager 13PDC t~nn,pltp cc: Pattl J. Deveau Project Manager, BPBC Phil Comegys Watermaster, Div; 2 BPBC Lauren Boehlke Secretary - Treasurer, SKID k'i.le CENTRAL •• DISTRICT PI'rHEALTH DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Preliminary /Final /Short Plat -010 Retum to: `(~~~~ ^ Base ^ Eagle ^ Garden City e ^ Kuna ^ACZ ^ ~. ^1. We have No Objections to this Proposal. ^2. We recommend Denial of this Proposal. ^3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^4. We will require more data concerning soil conditions on this Proposal before we can comment. ^5. Before we can comment concerning individual sewage disposal, we will require more data conceming the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. ^7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ®8. After written approval from appropriate entities are submitted, we can approve this proposal for: .central sewage ^ community sewage system ^ community water well ^ interim sewage central water ^ individual sewage ^ individual water ~, The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: I~central sewage ^ community sewage system ^ community water ^ sewage dry lines central water ~10. Run-off is not to create a mosquito breeding problem. ^11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ~12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ~13. We will require plans be submitted for a plan review for any: food establishment swimming pools or spas child care center beverage establishment ocery store ^14. Please see attached stormwater management recommendations ^ 15. Reviewed By: /,c}' Date:~o / ~ / 1/ Review Sheet 15726-OOtEH0904 ~~~~. ~~~ fi~ ~~ ~a~a d ~llo~id~a<= ~~gar~ D~ca~et 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 City of Meridian City Clerk's Office 33 E Broadway Avenue Ste 102 Meridian.., ID 8362-2~ 19 RE: MDA 11-010/Amendment to Development Agreement to Extend Time Dear Jaycee: Nampa & Meridian Irrigation District has no comment on the above-referenced application as this project lies outside our district boundaries. Please contact Bob Carter, Boise Project - Board of Control, at 344-1141 or 2465 Overland Rd., Room 202, Boise, Idaho 83705-3173. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District must review drainage plans. The Developer must comply with Idaho Code 31-3805. Sincerely, ~~ Greg .Curtis Asst. Water Superintendent Nampa & Meridian Irrigation District GGC/dbg C: File/Office B. Carter; Boise Project, Board of Control APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 5 October 2011