DAA Shell CZC 05-116e ~ .~, ~ y ~ ~e,~' . r~ r ,~ ~ ~ r ,r CtTY OF ~~~~ ~ ~~ . - ~., ~; ~~ a IUANa ~% ~O 11993 CERTIFICATE OF ZONING COMPLIANCE* Date: September 8.2005 project Name: DAA Shell Owners: Dave Evans Construction ,~~ F (~x-~~e~ ~~ t ~~ 1~1~ i~°~-- Site Address: Lot 14, Block 1, Bonito Subdivision No. 3 (south side of Copper Pt Drive near Ea a Rd? Proposed Use: 6 0000 Square-Boot Shell and Core Building- Zoning: C-G Comments: Conditions of Approval: Project is subject to all current City of 1Vleridian ordinances and conditions of approval forthe El Dorado/Bonito Subdivision/Planned Development/DevelopmentAgreemmt, Bonito Subdivision No. 3 Preliminary Plat and Bonito Subdivision No. 3 Pinal Plat. The issuance of this permit does not release the applicant from any requirements of the approved Annexation and Rezone, Conditional YJses, Preliminary Plat (PP-OS-010), and 1?inal .Plat (FP-05-038) permits issued for this site. NOTE: The applicant originally applied for a CZC for a dance arts academy on this site. It has been determined that a dance arts academy requires conditional use permit approval in the C-G zone. The applicant has subsequently requested CZC approval for a shell and core building only. Prior to occupancy of the subject building either a tenant improvement f Tl) OR a conditional use permit (CUP) should be issued by the City. Site Plan: The site plan prepared by Dave Evans Construction, labeled Page 1, dated May 5, 2005, and stamped 9-8-05 "approved" by, the Meridian Planning & Zoning Department, is approved with the following changes: l) Acondition of approval for'the El Dorado. development required a bicycle rack to be installed at all buildings used for office and retail uses within the development. Unless anon-office or non-retail use is proposed, construct a bicycle rack on this site; 2) All internal landscape planters must be at least 5-feet wide, measured inside of curbs (MCC 12-13-11-3.B). Except for the above-mentioned changes, the site plan is not to be altered without prior written approval of the Planning & Zoning Department. Landscaping The submitted landscape plan prepared by Moonlight Landscaping, labeled`Sheet 1 of 1, dated 03/25/2005 and stamped "approved" on 9-8-OS by the Meridian Planning & Zoning Department substantially complies with the approved landscape plan for Bonito Subdivision No. 3 prepared by New West Landscapes and is approved with no changes. The approved landscape plan is not to be altered without prior written approval of the Planning &•Zoning Department: No field changes to the landscape plan permitted; prior written approval of. :.all material changes is required. NOTE: The landscape plan does not depict the dumpster located in the southwest planter. In addition to screening the dumpster, at least one tree shall be installed within said landscape planter. Irri ag tion: An underground, pressurized irrigation system must be installed to all landscape areas per the approved specifications and in accordance with MCC 12-13-8 and MCC 9-1-28. k r a Curbing: Per MCC 12-13-7-9, all landscape azeas adjacent to driveways, pazking lots, or othervehicleuse areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. P_arkin~: MCC 11-13-4.F requires standard parking stalls to be 19-feet long by 9-feet wide adjacent to 25-foot wide drive aisles. The parking stalls comply with MCC, but staff can not verify that the drive aisles are at least 25-feet wide. The project engineer/architect shall certify that the drive aisles comply with MCC (25-feet wide) and that the number and size of handicap-accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance with ADA. The applicant shall be responsible for meeting the requirements of ACHD as they pertain to this development. Sidewalks: All sidewalks shall be constructed as submitted and in accordance with MCC 12-5-2.K. Sidewalks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with the MCC. Li tin :Lighting shall not cause glaze or impact the traveling public or neighboring development. Down-shield. all lighting so it does not spill onto adjacent properties. Si a e: No signs are approved with this CZC. All business signs require a separate sign permit in compliance with the sign ordinance. Trash Enclosure: Any dumpster(s) must be screened in accordance with MCC 11-12-1.C. Trash enclosures must be built in the location and to the size approved by SSC. Handicap-Accessibility: The structures, site improvements and parking must be in compliance with all federal handicap-accessibility requirements. ACRD Acceptance: All impact fees, if auy, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City of Meridian Planning & Zoning staff for approval prior to the issuance of a building permit. Certificate of Occu~cv: Unless otherwise approved, a tenant improvement permit shall be issued by the City prior to occupancy of the subject building. All required improvements must be complete prior to obtaining a Certificate of Occupancy. A Temporary Certificate of Occupancy maybe obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. Plan Modifications: The approved Site and Landscape Plans, stamped "approved" on 9-8-OS are not to be altered without prior written approval of the Planning & Zoning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required Craig Hood ` ~ ~cssociate City Planner *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. 7 f -y...,..... - ;~ PLANNING & ZONING DEPARTMENT INSPECTION CHECKLIST COMMERCIAL/CZC SITES ~ This checklist should be attached to the inside cover of the CZC file at ALL times. Planner/Inspector Name: Project Name: CZC File No.: Contractor/Company Name: Phone No.: First Inspection Date: / / Second Inspection Date: / / Third Inspection Date: / / (NOTE: If a third inspection is required, a fee of $60 must be submitted to the Pc&ZDept. be ore the inspection is done.) Landscape Plan Checklist Item Site Notes O.K. ~ A~. Date of approved landscape plan`~:~', /~„ /~; ,<~"- z... _ ~B: Street buffer/ Perimeter /Buffer betweei~ land use .:~ ~~~ .. ~ 1. Width of buffer (exclude _ - .. detached s/w widths) 2. # of trees 3. Caliper/size of trees (measure 6-8 inches above round) 4. Species mix per plan 5. Groundcover (ifseeded, veri ermination) 6.~Right-of--way landscaping 7. Verify no encroachments (e.g. fencin , arking) $. $erming (max. 2:1 slope; 3:1 i lawn >, .. . C. Planters - ~.~-~: . .:~ `~ r. ~.:~-~; rs ,''n, 1. Verify min. 5' b/w curbs . 2. Verify min. 50 sq. ft. ~ t 3. Plantings per plan m, ~D. Existing treeslmitigaton ~~ 1. Verify existing tree(s) retained 2. Verify mitigation tree(s) planted ~ I;.~i~. ~: _. s. IPckZ=:,~3r~zet':1'c~Z ~tcdtnirl)~:i~ctl~r,r~~~r~t;"'c~.'" 2. Verify minimum width E. Curbing 1. Installed per plan `F. ,Special conditions/Redlines 1. Verify any special conditions from CZC or redline notes on plan are complete i ~c4-L'J'~i ~ ZtT .I't~ 'I, .~ t<iP12P; i.~)i:~).di'tit; ('Itt ~~c)~2C'7E'. fj Post-Inspection Checklist Item Date Com lete A. Incomplete? (Follow 5 steps below) 1. Obtain bid for incomplete improvements + 110% 2.Owner/contractor posts surety (cash, check or Letter of Credit) 3. Clearly print # of days the "Temp CO" is valid on card 4. Sign "Temporary" column on CO card 5. Submit check or Letter of Credit to Finance Dept. with memo B.'Complete? 1. Sign and date "Final" column on CO card 2. Notify Finance Dept. to release surety (if it was a Temporary CO) 2. Complete checklist and close file * The only instance that a CO maybe released prior to 100% completion of improvement is inclement weather, as determined by the Director. If weather is a factor, follow MCC 12-13-19-2. ~~Li'. ?i 3.}i~~w 1''c~f',rSf' ix~ 1jct;/. #t~a ??€'t )t'J>.ti'Zi€1(lii ~?i)~lC7E';i • i-• s: ~ r ,. - ; :` ~ rY+ Sonya Watters _ .. } Sonya Watters ~ ~ From: Tuesday, May 09, 2006 8:55 AM [ ~ `' Sent: To: 'daveb~devansconstruction.com' Subject:LL Idaho~Minor Emergency & DAA Shell ~ ~ ~ A -- - ~ ~ ~ ,3 Hi Dave, - ~ ~ °~ •', w-u of items needed to be completed prior to occupancy from my inspection last week:.. _ •" ~ r~. Just a folio p ~ '~~ r, , Idaho Minor Emergency: ~ * ed arkin on west & east sides of building has not been marked/signed. ~ f~. #: Handicapp p g * Parkin stall striping needs to be extended for stall sizes to meet 9'x19' code requirements w/a 25' wide drive aisl 1 I ~' g 1 a ~~ * Bike rack, (not sure if this has already been installed but it needs to be if it's not, prior tooccpancy) _.. # ~ q DAA Shell: * Dumpster enclosure must be completed with this site, along with landscaping within this area _ ~ P ~ `~` * Parking stall striping needs to be extended for stall sizes to meet 9'x19' code requirements w/a 25' wide drive~aisle ~ * Bike rack (not sure if this has already been installed but it needs to be if it's not, prior to occpancy) ~ a a I Give me a call when everything is complete. ~ R ~_~ ~ _ Thanks, ~ Sonya ~ Sonya Watters ~, ,, _ . r _ ' ~ i ~ {. T, ~ t ~ ; 5 `i CI'TY`OF MERIDIAN ~ ~' ` i Planning Department 3 ' ~ ~ " ~ ' 660 E. Watertower Ln, Ste. 202 ;' Meridian, Idaho 83642 ~~~~~~~~~~~~~~~~ ~ t • (208) 888-6854„ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ` Phone: (208) 884-5533 Fax. _ ~ ~ ~ ~ ~ ~ - ~'' F ~ 6 ,._ ~ f ~` ~.. . ~ I, I iI .d q ~ .ka, }}. •.. ~~= t ~ .. a ~+ a ' .`«, ' ~. `" ~ ~ > _.., ,. _ . _ __ ~.~r~ ~ 1~ `• i ~..~- 1 ~ .,., r w q I I Visit us at our website: www.newwestlandscape.com ~ r~ n• r ,' ! . , 7154 W. STATE ST.. SUITE 390 • BOISE IDAHO 83714 • (208) 377-8300• FAX (208) 939-2476, ~ ~ 1 /23/2006 NAME /ADDRESS Dave Evans Construction 5561 N. Glenwood Street, Suite A Boise, ID 83714 II ITEM DESCRIPTION Site preparation, rough grade Irrigation installation Fine Grade Plants material installation Bark ground cover installation Sod Lawn Installation (standard) Rock /Boulder installation (not shown on plan) Import topsoil by others (can add, if needed) ESTIMATE NO: 6024 a PROJECT ` DAA Shell * EL DORADO B.P Thank you for this opportunity!!! ~: ~ [ r ~ TOTAL r~00.00 00.00 ~00 4,812.Ob ~,, ~0 , ~' ~ ~ ~(~~-~~ ~~~~~~~ TOTAL- ~~2,sos.oo AUTHORIZED SIGNATURE: Visit us at our website: www.newwestlandscape.com ~, Af 7154 W. STATE ST.. SUITE 390 • BOISE IDAHO 83714 • (208) 377-8300.• FAX (208} 939-2476 ~ ~ ~;:e ~, r ~~~ f } i! ,,~ . ~ ~ ~ _ p' =Right-of--Way & Development Department' : ~ ~ ry~~ ~ ~ ~ Planning Review Division CHD ~'. ' ; ~~ ~ t. ~ ~ ~ ~ ~ ~ e { ` ~ i t ~ ' September 22, 2005 t ,. TO: Travis Burrows. Dave Evans Construction. - 5561 N Glenwood, Ste A ~ i" .Boise, ID 83714 - ~ ~ ` SUBJECT : MCZC-O5-116 DAA Shell Lot 14 in Blk 1, Bonito Sub #3 ~ ° , On January 16, 2002, the Ada County Highway District acted on Bonito Subdivision/ MCUPOI-037 / MAZO1-O1~ (Eldorado Business Campus) and on March. 8, 20Q5 the District acted on Bonito Subdivision No. 3. The same conditions and requirements also apply to MCZC-OS-116. I' have attached the above mentioned staff reports for your information. • YouNwill need. to submit final plans to the ACHD Development Review Department prior to receiving fmal approval. • A traffic impact fee will be assessed by ACRD and: will be due prior to the issuance of a building permit., Contact ACRD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions, please feel free to contact meat (208) 387-6171. Sincerel ,, ~ ~ Karen Anderson Right=of--Way Specialist Right-of--Way and Development Services cc: Project Fiie, Construction Services ~1Vleridan City Wes Steele -1250 E Iron Eagle Dr, Ste 200 Eagle, ID 83616 Ada County Highway District • 3775 Adams Street • Garden City,1D • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us ~': ~; [i ' • CITY OF MERIDIAN . Planning & Zoning Department 66d E. Watertower Ln_, Ste. 202, Meridian, ID 83642 ' (208)$84-5533 Phone / (208)888-6854 Fax CERTIFICATE OF ZONING COMPLIANCE (CZC}APPLICATION (Section 11-19-1, Zoning andDeveIopment Ordinance) PROJECT NAME: ~ !.J /Z IT s ~ ~ `L . APPLICANT: yA V i :~ ~i u d /D W,5 ~~ad ~ ~ Ud~ ~ ~f +~C- ~U'-~ ) ADDRESS: _ c ~, ~ ( ~ . ~-- I ~ u an~ ~te. ~ II c1i Se. ~ .L. ~ $ 371 `~ PHONE: S C, ~- ~ Z 0 3 FAX: $ 53 - I Z Z b~ E-MAIL: ' OWNER(S) OF RECORD: ~Glv-Q E VA.~--S Gf~. S~/~^ c`~t1~`^ b ADDRESS. PHONE: V v`~ FAX: E-MAIL: -ARCHITECT (IF DIFFERENT THAN APPLICANT): W t ~ ~ }-cue,' L ' ADDRESS: 125 G . ^Y~~ ar- St-cloo ~a.yl~ r~ 83G/~ PHONE: g ~~ ' $ J~ I FAX: ~ ~~ ' 97oa E-MAIL w 5~<< ~ I~t.a~;+t ~ .Gdtit ADDRESS, GENERAL LOCATION OF SITE: E• Ca~pcr t~Ot ~t'~ ~ ~ TOWNSHIP, RANGE, AND SECTION: ~ ~ I ~:i::Z DESCRIPTION OF USE: ~ lr~e ~ I S c ~ ~j~t co~ Op 0 • ~,~ { PRESENT ZONE CLASSIFICATION: C - C-, - o~ ~? I, ~ ~ ~ . do hereby affirm that T will agree to pay any additional sewer, water or Otra~ fees or charges, if any,. associated with the use that Uwe have applied for, whether the use be residential, ~ commercial or industrial in nature. Furthermore, I have read the information contained herein and certify that the information is true and correct. ~- \\ t ~^- "~`-~-~ ~~ E LJ (Applicant's Signature) 5~ ~ X05 (Date) 1 M E r r.j ~ ~ F ,~ t Rug 04 2005 10:46R~Dave Evans Construction 208-853-1220 ~ .• /, August 4, 2005 To: City of Meridian Planning ~ Zoning Dept. RE: New building for DAA SHELL at Ei Dorado Business Park Statement of Proposed Use of Rroperty t r This portion of Lot 4, Block 1 of Bonito Subdivision will be used fora 6000 square foot, one story shell and core and will be part of larger subdivision of Lot 4. Please see the plans for any additional information. Travis Burrows Dave Evans Construction 7 t +~ E ~ , t a i RD ~ ~ e . . ~i k ~~ . ~ 4 ~!`~ i ry yr 66y ~yy yam. qty a 7 T T T T T C L 3 O Z w O m x C~ a w ~~ ~~ ~i i k 6 Y ~ ~ 1. ~ f.. j ~. d ~uw ~~s of moor, wmcS ~c r + _ _ ~}-uz-13~v~~i ~(:~ ADA COUNTY RECO , `~_ .,D NAVARRO AMOUNT 6.00 2 ~~ ~ a BOISE IDAHO 0210410 5:00 PM DEPUTY Pate Thompson I I II + RECORDED-REQUEST OF I~I ~'III)I~II~)I'I~~~I'"I(III'~fII ~II ' ~ Title One i ~ ~`_' 14~ 1 ~# ~ ~, . WARRANTY DEED ~, For value received, Kimball Properties Limited Partnership, the grantor, ,does hereby grant, bargain, 'sell and convey unto William David Evans and Caroline-F. Evans, husband and wife, the grantee, whose current address is 5561 N Glenwood St, Boise ID 83714, the following real property located in Ada County, Idaho: See Exhibit A, attached; To have and to hold said premises, with their appurtenances, unto .the grantee, its heirs and assigns forever. And the grantor does hereby covenant to and with the grantee that it is the owner in fee simple of said premises, that they are free from all claims except taxes and assessments; .recorded easements, rights-of-way, and restrictions; and other matters apparent or of record, and that it will warrant and defend the same from all other lawful claims whatsoever: Dated: / 2 ~ I(~u ~-f/' ~ off- ~ 0 S.. Kimball Properties invited Partnership ~. Winston H. Moore Jeff W OOre_ hic attnrnau_in_f~rt State of Idaho ) ss. ' County'of Ada ) On this 4th day of February, 2005; before"me, the undersigned, a Notary Public in and for said State, personally appeareii Jeff. W. Moore, known or identified to me to be the same person whose name is subscribed to the within instrument as the attorney in fact of Winston H. Moore, and he duly acknowledged to me that he executed the name o~~~Ah H. Moore as principal on behalf of Kimball Properties Limited Partnership, a partnership in w~~idap~~l is a partner, and his own name as attorney in,fact, and that said partnership executec~~.-~~iie. '••. ~Y '•. 13OTAR Y ,L~u~ , f~ ,.. Notary Public fo Idaho t y ~. 1°iUBLIC ;~ ~ Residing at ~ois~ rdi9-t,Fa '~.~~ •••'••... ,...•• • .~~~ Comm Expires _ 5'= z ~o- 0 4 ~ ' t ~ r , ~l a r ' ~ f ~ m~ t= ~ I F ,- .~ ~ ~ r ~ w ri r + ~ ~~~ Y~~ ~1 ~LtVL~ 1111E . ~. r ! ~T~TE D~ IDAI-I{~ )e .. CDTJl~tT`Y [)~' AIWA ) ~ , , 1, L~avt Eva.M.S S5 ~ I ~ . G ~~~aro~ Ste. ~ ~ ' (tee) (address) ,~ 4 ' g0~ S ~ ~ ~ ~~ + being first duly sworn upon ~o oath, depose and say: a , a (city) (state) ~ r 1. That I am the record owner of the property described on the attached, anal I grant my permission to: E (tee) (address) , to submit the accompanying application pertaining to that property. 2. I a~ee to indemnify, defend and hold the City of Meridian and it's employees harmless ' from any claim or liability resulting from any dispute as to the statements contained t ~ herein or as to the ownership of the property, which is the subject of the application. , ~ Dated this ~ ~ day of /"tGt~'Y,~ goo s , ~-., (Signs re) , A SUBSCRIBED AND SWORN to before me the day and. year first above written. ,, E t * ~ ° ~'w ,•*~~ y ~' ; * '~ Notary Public for o w ' p`t PR '~ = Residing at ~O l $C ~ ~,~- , • ~/ ~ ;~ ;~ P~4> ~; ~ ~~ My Commission Expires: ..,.'., SrA TE o~ ;~`'~ ~~~I~~~~~~~~~ ' ' . s ~ E a I" • ~ M a ~ k .. . f y 4 . a / ,. . § j`F ' ~ • ro Property Description ' Dave Evans Construction at EI Dorado January 27, 2005 A parcel of land being part of Lots 2 and 6, and all of Lots 4 and 5, in Block 1 of Bonito Subdivision, according to the official plat thereof as filed in the records of Ada County, Idaho, which parcel is also Parcels C, D and E of Record of Survey #6671 recorded in Ada County as Instrument No. 1041 X4825, and Parcel F of Record of Survey #&786 recorded in Ada County as Instrument No. 105012677, and which parcel in~the aggregate is more particularly described as follows: Commencing at the Southeast corner of Lot 5 in said Block 1; thence ' North 85° 55' 46" West 206.07 feet to a point; thence North 00° 00' 00" East 405.12 feet to, a point of curve; thence along a curve to the left, said curve having a central angle of 45° 49' S9", a radius of 237.00 feet, and a long chord bearing South` 84° 18' 03" East 184.57 feet to a point; thence North 72° 46' 57" East 43.23 feet to a point of curve; thence along a curve to the right, said curve having a central angle of 46° 48' 12", a radius of 463.00 feet, and a long chord bearing South 83° 48' S7" East 367.78 feet to a point; thence South- 00° 00' 00"'East 158.70 feet to a point; thence 'South 90° 00' 00" West 18.09 feet to a point; thence South 00° 00' 00" East 101.29 feet to a point of curve; thence ` along a curve to the left, said -curve having a central angle of 29° 25' 05", a radius of 250.00 feet, and a long chord bearing South 75° 25' 10" West 126.95 feet to a point; thence , South 60° 42' 38" West 121.50 feet to a point of curve; thence along°a curve to the right, said curve having a central angle of 33° 21' 35", a radius of 200.00 feet, and a long chord bearing South 77° 23' 26" West 114.81 feet to a point; thence North 85° 55' 46" West 26.15 feet to the point of beginning; EXCEPTING THEREFROM all of Lot 3 in-said Block 1. Exhibit A t ~, i' t ~ ~ ~. ~. a f r • CONTENTS OF CZC APPLICATION (incomplete applications will not be processed) An application for a Certificate of Zoning Compliance shall be filed with the Planning and Zoning staff by the owner of the property or the applicant of the proposed use..The application shall contain the following information: [~T. Completed and sued CZC application form. ~ The last deed of record for the subject property. ~.__ ~r' 1Votarized Affidavit of Legal Interest (attached): v ~: f Four (4) copies of a detailed site plan, drawn to a scale of not less than 1 "-50' . Also include Four (4) copies of an 81/2" x 11" reduction of the site plan.. ~-~ ~. Submit a scalable Vicinity Map of the subject property and surrounding properties {a map may be obtained from the Meridian Planning & Zoning Department). v 6. Three {3) copies of the landscape design in campliance with the Landscape Ordinance, drawn to a scale of not less than 1"=50'. Also, include three (3) copies of an 8 I/2" x 11" reduction. See attached landscape .submittal requirements. v Three (3) copies of irrigation performance specifications in compliance with the Landscape Ordinance. (Form attached) ~ ~". Written approval or a stamped site plan from Sanitary Service Company {SSC) indicating that ' the designs of the trash enclosure and access drive are acceptable. ~- +9''~ A calculations table that shall list the number of parking stalls, building size, lot size, ~ landscaping, open space, setbacks, fencing, screening and coverage. ~- F / i 4 e~ ~ 1~. A written statement from the applicant detailing the propo use(s) o e p erty. Please list ~ ~ ,, as many details as possible. ~- ~ , t .d~l~ A fee of $60.00. ~-- ~~ ACRD Acceptance: Applicant shall be responsible for eetin~ the require is of ACRD as they pertain to this application. All impact fees, if any, sh be paid to the issuance of a banding permit. If any changes must be made to the site plan to accommodate the ACRD requirements, a new site plan shaIl be submitted to the City of Meridian Planning & Zoning Department for approval prior to the issuance of a building permit. ~~~~~~ ~~~- 5 tio~~ 6~ p~~~, -~~,`~- . y. . .. _w ~ ~.~ . ~ F . . 03/24/2005 09:36 8885052 SANITARY SERVICES Ma,~ 23 2005 1:53P~ Dare Evans Constructexon 08-853-1220 .~ ~EVANS ~CONSTRU~TlON 5581 N. Glenwood ST Boise, ID 83714 Off Ice 853-1203 Fax 8531220 gevansGOnstructlon.com ra n s rn Etta :Date: March 23, 2005 From: ; Travis Burrows To: Bill Company: Sanitary Service Company Via Fax #: ; 888-5052 ;Via other: Subj®ct: : - Q A ~- SNE~L_L_ _ ~ EI Dorado Attached: Site Plan~& Dumpster Detail If you have any questions or need anything else, please ; let rrie know. Thanks ..SANITARY SERUICE COMPANY I i s a r ~. ~ i M ,~ ~~ r t,: ~ ~a yi , ~, ~i } d~ f _ ; gpprc~d .+BV ~ ~. ~~~o ay aF COMMENTS:. _~o, ~aoNf~4 a,~-~~-o~ C~~QA~~~ i . 3•tac~ 6e ,0,¢or~aEC ; • Co ~ F y py. ~ ~, ~ 1 ~ ~ ~.~{, k `d t 3 ~ '~ PAGE @1 p.1 '8,3/24/2005 09:36.,. 052 SANITARY VICES ~. •Mar 23.2005 1:53 Dave Evans Construction 208-853-1220 1 r~v a o A ~t 9 O ~ t04 ~~ ~~~a~ u ~ J ~-01i q ti t-. p ~ ~z m ~ ~ ~ =y ~ ~ _ T ~ ~ ~ ~ a4 g t r ~ ~ ~. 4 Q 3 ~ to ~' _ 1 A ~ v Y ~ ~ " ~~ o ~ ~~ M M p v ~ ,~ ~ ~~ ra~ w f q 4 } ~_ OD •~~ s ~ ~' 9 n ~$ ,. PAGE 02 p.2 ~, f r ~ } 1 q q - R R ~. 24/2005 09:36 8885052 SANITARY SERVICES PAGE r Z3 2005'1:53P~ Dave Evans Construction ~09-953-1220 O fw t+Aw nwr oerrwtt~ r, ins a rA trrwn 4ttit. un rtttastno-ttm a trstrattw r nuMNrw~ a nr+~eoga r,~ MeR rrltp raao ~ as ~ mrsl-r wwim S ~ m ~ 90N1T0 Wi.Y C7 u ~ " ~ '^ z B b s .. a H rA A6L t(pp~: ~~ O ~g • h 3 ~ ~~ ~ v/ ~~ tl~~#~ ~, ~- tl~~ ~ !~ ~ 9 F i O 1 Q !'~ /Q `' ~ ~r-[~aaw~.. ~ 'i1t~~~A~~~~ anon n~a Resa~,y oonrEMr,arsrtmrR ... DAA SIiELL DAVE EVAtdS ~+ ~~~~~ ~ ~! 1__ ~ ~,e~w.aNerae EI Doraeio Buoinoea Ps-k ~ ~ ~~ a ~ ~ BtMA IO/S}Qt p+~+~ (~1 Zwft~iW? 9AA: ddgMr~taO.otlM tept N.~-wovaef la.., to spt~ OMe~ ~ff.Ix00 tier [tesA7iD ~ ~ ~, 03 ~ ~ . 3 ~ ~' t r { i.~ ` ~ t i {. Y: f l: f F F ~° i ~ + ~ t I t 6 k E E t t. ,. t 03/24/2005 09:36 888 052' SANITARY SERVICES PAGE 04 Mar 23 2005 1:53Ph~ Dave Evans Construction ~'08-853-1220 p.4 r ,z ~ ~ ~~ p o sE ~. ~~ ~~ ~~ ~. ,~ } _~ ~ , i ` ~ IRRIGATION PEx~'OI7~VIANCE SPE CIFICATIONS PER ORDINANCE 12-13-8 NOTE: Submit 3 copies of this completed form with any application for Cerfifzcate of Zoning Compliance (CZC). Project Name: ~ >4 ~ $1~}£LL Specifications: .Available Gallons per Mtnute: ~ ~ Available Water Pressure: CJ Point of Connection (de°scribe and/or submit a site plan): ~~ • Primary Connection: 4 {71.2, ~~iv~~ • Secondary Connection. Landscape Area: If the irrigation system is hooked to City water as a primary or secondary water source, submit the square-footage of landscape areas to be rrigated.• s.f. F Backflow Prevention A backflow prevention device must be installed as required by City Ordinance 9-3. Coveraee The irrigation system must be designed to provide 100% coverage with head to head spacing or triangular spacing as appropriate. Matched Precipitation Rates , Sprinkler heads must have.. matched precipitation rates within each control valve circuit. Irrigation Zones Sprinkler heads irrigating lawn or other~`high-water-demand areas must be circuited so that they are on a separate- zone or zones from those irrigating trees, shrubs, or other reduced- water-demand areas. OversPraX Sprinkler heads must be adjusted to reduce overspray onto impervious surfaces such- as sidewalks, driveways, .and parking areas. a s ! x e! ~ 1Ct'? . 11 ~ ~.'f.-~I~J Additional Irrigatio~ites: - ° , Irrigation Required ' All landscape areas regulated by the City Landscape 'Ordinance (12-13) shall be served with an automatic underground irrigation system. Additional requirements affecting;pr"essurized irrigation : 4 , '~ ~ systems can be found in City Ordinance 9-1-28. ~' ,. ° Irrigation Water Source Use of non-potable irrigation water is required when determined to be available by the City Public E Works Department as regulated by City Ordinance. 9-1-28. If city potable water is used, a ~ ' separate water meter is recommended so the owner can avoid paying sewer fees for irrigation ° water. Potable water shall not be used as a primary irrigation water source on non-residential Lots ~ with' more than %2 acre of landscaping. Year round water availability is also required by connecting to city potable water or an on-site well as a secondary source. y ° ~ Certification: I, Jc L , do hereby affirm that any irrigation system installed for the project mentioned above will be designed and installed in compliance with the specifications and notes stated in this form. ~( y~.~~~~' ~ (JC L~ r ~ - q v5 4 Applicant's Signature Date '' e ° ° r ~ • CI'T'Y OF ~ ~Y1Gl~1G~7? 33 E. Idaho Ave. T Meridian, ID 83642 r ~° hF ~ ~,' ~F o r ~eR' ~ TREASURE V ~~~ SINCE € 1903 F ;,=~1 I~ Security _ Applicant / a l~ S Date ::~ ' ~~' D~ 1 ~ ~~,J J Address 0 ~j 7~ Phone CASH CHECK # v NAME ON CHECK IF DIFFERENTTHAN APPLICANT ., e u ;~ I i i t i I t I ~ I I I I I 1 1 I I I 1 I I i l . ~ ! i 1 I I I I PAYMENT DOES NOT INDICATE ACCEPTANCE OF APPLICATION TAX r .. `5 7 61 Receiv d sy, TOTAL ~ ~ t' r f E I ,. fr 9a~so f el/L~/U~ ~ J F JQU F Y C I r' F 7 i _.~ o- ----_ ______ _____._ _. _._~ _ -__ _~.__ Eg~~m>- ~Sf~g~'~'~~iff~~~ 3~0 >. ~~ ~ ~~~$~ ~8~~~ ~ a ~ _~ g m ~ ~ a $ o o - ° `- ~ ~ ~ m I~ s ~ iy ~ ~ s n" . t ~ 0(G1 ~.~ zQ r S x_ 3~: °~wo ~m ~w ~m3 nm ~~~ <o ~m a~ _o 33. ~$ 33=~ =o m ~~ ~ ~~ i r `~ y ,_ C~~~ ,1 z~ at8ta I ~F` ~~~ ~~3~}~$q;s~ r~oa$~3~~~ ~ ~~ ~~~~ '7= 333~i~ ~ ~i~i[ ~~~~ ~_ ° ~ ~~ Si ~ ~a~ ~ ~ ~ ~ ~ gg s ~ $ S ~~ ~~ E€ ~ ~~i~l ~ ~ p~ ~ s 3 ~ ~ c ~~ ~ 8 g, ~ ~ ~ ~ l ~- - -- 4~ ~~ 8 ~ ~ ~ PROJECT: ~I i,~ 1 i,m ~ ~I ~~ ~i~ i ~ o~ sr~,~- ~ O ~ , I ~ m ! o ~ Eldorado Business Park ! ~ i~ 11 m rn Meridian, Idaho ~ I s i i lm W _ ~ a m o ~ 2~ q 7 $ ~ I 8 ~ ¢ ~ ~ ~ i 1 ~ g ~ - I ~ $ ~ ~ , ~ ' ~I i ~ -w -- ~ _ - -- -- - -' ~ - T - s ~ s ~ i ~ ~ ~ , $ ~ z ~ H i r t ~ ~_ i f , i f0 i a 4 r s ~ . ~ i t t t i f E 1 i S ff/ 7 1 I Y t ~ ! `` , c t t t t t. t fi - - - , --- J - _ - -, ,~ - -~ - ~~ I /~ !~ EV/'1NS ! MOONLIGHT.C'andecaprng c oc o_r`+srnuc4ioo-!i,. ~ i 2525NStokesberry Pl. Ste.C 5561 N Glerrvroad SL SuRe A I Meridian, Idaho 83642 Boise Idaho 83714 ~ J , ~ .. ._..__._. .,, ..~ ...,,. ,.,.~ „~ ,~„~,,,,~.., v.iw, em,rtreLH!:1_ U+ Llfi RCPn'OMI.'1g1;, RCt~q Dig VD7FlG.R]N M Tt;S Y.aiRVYEN~ DP .^.$ OT.Tr,~ n'i~u~ H' C_~f +'30" E 1.8.0:' "~~i ~ eF~ -- `> E~ ~ '_ o $ olo c G of ue•,., :~ ._ _...~ \@ ~ •m _ _ __ ' ~~ep~b" _ a S ~~ - -13®. -_ 'yIV °ID $a ...AOD'~D'ODw 1$e.>D-. -.~, . ~~' -- -~; ~~ _ e~ gR~s, 'e; `~.S~L £~g~ s~R ~g ~ a ~~ m8~~ $pir'~s~ k a~ f; E ~' ~ ~ = g 5 }ice S ~8g 3 [?F ~] ~ t. Est 8" .._ 3pr w ~r cegpa-~ ~ a "~~~» as s ~~ €~. ~~ ~~;~ ;~~ ~~ ~_ _~ s ~~ = ~ o ~,~ ~~C~ag o~g g~~z ~€ zo E~ ¢s as E~~~ ~$§~~t ~ ~~ ~aa ~ s I g p 6~£~n -~~ z~ :$ Rn~ 2p s3 ~s 9#g._a-- 2 ~ P - R RERg Te. ~: 8= 3? "o. ~~ ps ~ R "g~ ~s€~a:e F ~ R ~ ~ ~E a • e S ~~ p~r ~~_-^ R" €"a nR ~ ~ a'18 °=''i^t # 8 g° 33 ~ '3 ~, Y ==R?~ ~€' ~T~T~_~ ~ ~~~AA ~ ppis ~ ~s- g€~' x {F ~~ ~~eL~ L 2~~4_D p`s #`4.j~~' nos :. E_ j•e ~C'e~= a i ~^ :.. ~o ~' t F~ ~ ~ PR ~~-~- '* ~ fv~) u.n~.x ~•~< R ig i..-~, . _ri,a%as a . a .Y..e... ~~aF yn .~ .. .. ~~..~ z, b 6 ELIMINARY PLAT TOOTADSAN-ORTON ENGINEfiRING CObiPA1vY BONITO SUBDIVISION N0.2 corasuuwc ~c)aeees, supveroxs urp auatw[es Q ~ 9JJ] Cl9NDEr1 BD~JLNAnD DRS W: A liCSiJBBPIS.ON OY I~JTS 4 & 6, BIAG'B i, BONffO EUBD ,~ so;, , eRwD esJia-zoos town a'xErLE. w=r•o ` N~-'•~C?P1 CIYT~ A11.1 CO[JF1TY, IIIA50 PHOe:E (209) 3?:-ue2 ~i mR z: << ~' ~ ~ ~ YS Fig i ~ 5 s~~~`r~ $~~~ ~ ~ ~~~~'~~~~ ~ ~~ o g ~~ ~ ~~ '- '~ ~ .. ' i ... ~~~~_~ a¢a ~ ~ _ ~'€~' ~ ~~_'~~~~ •: l~,~ x I ~ ~1--- g 3 m y 0 v~om Z ~d z°~~ ~ t~ -nn~iv ~ r' co ~a~c ~f3 `~pON C ~ ~ _~ Q Z Nnzv,° < `~ ~~~~~ N ~roe~ 0 ~laN~ Z ~ O ~~~~ ~ ~ c F s I F F S ~,. F ~ F F I 3 1 ® 2005 DAVE EVARS COI~TRIICTIOIL TNS 56115 TIE PROPERTY ~ DEC. SNY REPROp1CipN, REVSE dR IpOHCATRN OP iN15 NSTRIRBI-~CONTEIfiS MIIIIOIfY SPECEiC ItNTTO1 PEItlKSIp10F OEC K STRICTLY PRplITED. \_ _n Z_ T~ V W O O . N ~ ~ D N ~ N ~ T N ~ y T D m Cn ~ ~ T fnu N N ~ (/1 ~ E. Dl ~ T W T 5. r T a T~ a m a a+ E g °. II 11 ~+ 11 V1 D fj jt pAj t~0 ~ m O A N O Of u ~ to ~ N d k pN ~ x j Cn 7 C ip 7 N -' ~N ~ ~ ~ +p ~ 1 0n N N ~ d q ~ ~-^ ~ ~ p y ~ n ~ O7~ o ~ o~ ~ °F S+p o a m m ~ F d ~ ~ m ~mm m ym em Fin3m ~~yn ~~' ~3cn~~ vd ~'~ m~ ~ $mmn am3. ~m ~ € r y ~~~ 8~ g o$m~~.~~~8 ~'gg mg ~ ~ ~ ~ m m m °c m ~ c ~ m'~ ~ 3 °O 'mmm o~-~~ m ~ ~ & O Ol A 41 N l1 ~ ~ ~ + T T T ~~ Nom. ~ m on ~T.m 0 3 Z' in'R^ O a= ~ ~ n - mm nW ~. _ H~ °'$ r ~ ate. °~~ ~^ m> j- V, ~a ¢1T+ rF ~ ~• ~i3 /}~ ~ o a `V „~. m O V ~ Q T O~ N _V 3o m H ~w m ~ ~ O v i 1 i p, a 1 N 9 .`:,. fL] T 9 ~ ~ ~~ wN9~g $ ~ ~ DAVE EVANS N Dom' ~ g '^ ~ ~a ~~g~~ 3~ DAA Shell CONSTRUCTION ~ ~'`< ~= CJl +~~ ~8~ ~ B EI Dorado Business Park 5561 N. Glenwood ST B i ID 83714 ~~~ Q ~ ~ O o se, Office 853-7203 Fax 853-1220 O m ~ 01 Ema ev m o Existing Property Line 3 v N m N C) m 7 fS+ ```}° 0 ~ 2 KCine . , SetUac 98.7 20.-0^ ??:0, ~.~ cn r z c o m „ arF r N~ m p m ~' oF$ ~ ~N . ~ ~ a `` O ~ I•. O O :..x 'i~ a• E v ~~. 7~ J$3?? ~ ~ 3as ~ ~ ~ 3 ~~~~~ ~ ~ ~ Z ' $ } ~3 3 oo 3 a D ~ L nl ~ y f f C C C 7 r odh a~ ms p ~'x - v 5, 6' W n s m p r. Dm m~ $_ R _. a~. ~~ . ~~ °£ m ~~'a$ ~ r~ O 5 i r ' m s4 ~ ~ ~ ~ .. w;} ~ ~ ~ r~'' 1~~,gtEaf~~~1eY'~~a~~ ~6~ i~~~~ 9~d ~ ~ ---- ~~~~ 3~s ~p g-__ g~gp~~~r~~~~g s~~~~~~° ~am~~ ~ioi~~ ~@ pp ~~j.~ 3 i ;S~ 9 Ea jf l~ ~$~s@@~'3~ _ ~ $;~~~ ~ ~ $g ~ i~~sg$ ° k: ~ ~ $$g a ~~ ~ 3c~~y $$ `i ~ ~ s ^$ ~s~J gg3 ~ ~ jj d ~~ ' =t4 ~~ $ 5~ ~ ~ ~ ~~€4 ~ ~ e ~# ~ a \ ~. §~ $~ C 3 D 9 ~~ i~ Fj 1 j4E~! t ~ i i69lH~in ~~ j i € ~ ~ ~ s ~ ~ ~ ~ ~~ ; ~ ~ ~ ~ o #~ ~ ~ ~ . ~~ ~° '~i ~~~ ~~ $~~ ~q~ p w _ .. __ a i m -~ m f + -_ ~ , ~I ~ I ~ ~ ~ i $ ~ $ 3 , ; f _.__ I __ ... _. I I _ _ I ___ .. . -- ! ! P ; ~ o ~ , . u ~ , H , ! _ _ u e ~ ~* ~, ~, ,, ~ (~ ~ ~ o~y, ~ PROJECT: ~~~ ~~~ I ~~ ~~ ° ~ ~ g I pc4~, sh~,lV ' ~EVArvs ! Moorrz~IG~-rr.e~~~s j . !N ! ~ I cor±srsucrlo_y__ 2525NStokesberryPl.Ste.C I! O ! I m o Eldorado Business Park 5561 N Glerrvrood St SuNe A __ _.-,- _ ~_ I ___ _ _- _-- Meridian, Idaho 83642- -- / / 'v, I Meridian, Idaho ~~ ~O ~ ! ~ ~ I ~ Boise Idaho 63714 ~ __ ~,. _- ~ -- F {r f j c __-- - i ~ QQ -~.. f... _~ ~ F 1 o O (/) ~_ N Z m • ~ ~- n n n n a o o ; ' ~ ~ a o ^ o w m Z M r O ... .- ~ .. .~ .- ... .~ .. .. .~ .. .. .. z ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ s ~ ~ ~ s38a8: M ~ ~ A N C ~~~~~3 o ~ ~ Y <~~ ~~ a ~~.. ~ ~~ ~ ~ ~a. ~ ~ _~ N 3 W m Z 2 ~ ~ ~~~~ ~~~ ~ ~~~ ~N ffi ~ ~ ~~ >ozk=~ ~~~ ~~; ~ ~ Oil O a O ~~ ~ h d~ ~~~~ ~~ ~~ ~ ~~ ~, --~ ~ o ~ ~ to (~J W U ~~ ~ ~ ~z ~~ ~o ~~ ~g8'~M~K ~~~ ~~' g~ "' 9°Y ~$~h o ~1tu~ ~~ N v N ~ Q N N~ y'i~ ~y5 (y~~~~~ ~~~ ~~ ~~ (}y~`nj~9a ~ 1. pypy oa T ~ ~ ~/~ Q _l Z ~ C C 6 < Y! <E ~~ ~p~ ~ W ~ ~ ~(~ ~ J LJ lQ Q a•: ~g ~ <o~~~ i tS~~~ i ~ OGOffi~~ W y~~ q~ ~4.j~ 8~' ~-ffi ~ ~~ ~ ~,~ ~~ ~ V' '~ C ~o 4 L J ~~ V 1 ~ 2 W ~ ~~~ ~~ ~€ ~~~~ ~~~ ~~~~' ~°~ ~~~ a~ ~~ ~~ ~~ 233 ~ K ~~ ~, ~ F- ~ ~ ~ ? O ~ ;, Z Q W M ~ ~N-T------ ------- - - U ~ U to ® I ° z ~ ~ 3 I o ~- ~ I I I I I I I p i ^~ O ~° LO a I ~ ~ I5~ I y ~ ~ ,_ N ~I I O ~, O I H~ o ON I~ 'k • /~ JY avow a~sra acnos 3 9NINY3E r10 SISYB ,SB'iSB$ .Y~OS,fi.00S -r-~,_ _,eazau _. _ ----_ _. ----_ _ __ 0+ ~~ O R ~~ ~~~ © vY /' M A ~ ~ ~ ~ V ng ~ O M ~ ~ ® N ~^ ~ „~ In ~3 IN i ~ ~~ ~~ ~ I ~o © I °z J ~+ @Qgq ~ on ~ ~ //1 C# _ ~ ~i Y~yf, ~ W a yyij ffi /(/yO WN T WN HH: ~ ~yJ 2~ oF{ ~fn ~ g~ Z ~O U~~J < 1. C /~ Y S~ ~ ~ ~ 0~~~~ S~ N Li0 vl~ yW ~ d<~ ~ ~ Y ~ ~i WB ~ ,• V 0 ~ N n o~~ ~~ ~ q y © O ,OQY09Z - a8,~r,vTaun F U V W~W W U U N j a ~ < 2 F- Wt a R ~ W <W < Q 0 0 Y < N 2 (n<j W jC C a j 2 W S plz.l ~ ~ Z~m R m ~ W i ~ Fo <eoj~rc `"O~„ w i Z~Z ~ ~ u 2 2 Z W~~ y~~ Z~ z 0 ~ C F -~ U ~- 41 Vi ~ U ~ N ~ C N M C ~Z I;I,I i l l ~..~o ..Too. ~ ~ I I I I I ~ I I~I~i '~ 4 ~ ~ ~ ~~ ~'~~ _ u .-; © _ i ~ .a ~ ~ ~e!~~ '~ O ~ I '~ ~ „ .m ~ a ©~ ~ ~ -. ~ ~ ° © N ~ ~ z r ~ CQ k ~ V O a Pn d ® O y ~ O ~ '% mCO D ® ~ c ' E~i y { ~ ~' ~i ti U F OO O I - ® ~ ~ ~ I ® I ~.~. q k ~ y ~ I ~ „~„ y~ ,1p ~ U q ^ / -~ yN Q ~ yOf ~ \ ~ ~ o - ;ZS.6i.OdY __ --- ---- ------ O ~ _ ~~ ---- ~y _ _ - ~ I7 31S,Zt.ION ~ v n ~q ai~~az° ~R ~a ~~ ~~ y ~° •~ U h ~-~ x o ~~~~ ~~ 7 ^^ "~~ ^~ ~ ~ R r ~ .,j,~ Rug 04 2005 10:46R Dave Evans Construction 208-853-1220 AV EvaN s ~O~sTR~~T~O~ 5561 N. G{enwood ST Bose, !D 83714 Office 853-9 203 Fax 853-1220 devansconstruction.com ra n s rn i tta l :Date: August 4, 2005 From: ; Travis Burrows • ,a To: Craig Hood - Company: City of Meridian Via Fax #: :Via Other: 885-6854 Subject: DAA shell CZC : Attached: Revised Statement of Proposed Use 1 am also sending a copy of Tim Mokwa's email conversation w/ Joe Guenther. Highlighted is the issue of being able to : submit CZC and building permit applications. Give me call with any good .news you might have. Thanks . 7I IZ ~I~° Copy. ... ~' i I° • 1 ~ s #' ~, ~~ -~~ r { ~. ,~ ~~ i,. 4 C ik# ~, ~, ' Ftug 04 2005 10:46RM Dave Evans Construction ~20t3-853-1220 p.3~ ~ ~ ° AuC 04 OS 10:3Sa ~oottiman 0`rton En~r. Co. ~B-323-P399 p.l~ ~ ~ ~ ~ ` "" - ' ' • ` ~ 007CH AN-4yiTON ENGINEERING COMPANY „ ,, F CONSUL'f1NG ENG1NStaRS, SURVEYORS AND PLANMRS 977 CHINDEN DnUL:2V.~Rp AOISE, Il)ANU S]IIQ•'dtK111. 10831]=718N • fAX 1Ud~3:'3•Z]99 t-vlse®~aengrco,cum Fchru~try I I , '?qUS Cary;i~fFMc~idian, f'I~ulita~ aatd Devdloprileot Scrvices~g ~7(7O t~. ~~i1LCl1.()~h'Ci li.ll:,'SL1LC ~.~2 °• _ ~`_ ~ , r , . Mericliau,lD 83642 " ~": ` ~`';':' t E ?~ a ~~~ ~ , k,_ t -Re° Rcsubdivision iif Lets 4 rind 5, Bluek ,),;`BaaiEu Subdivision, Meridian, )))°- I dear .Icw: _ ~~ .P ,~ k~~,• ~3 ~ ~ , w,• ~ t:~ ., ,s ~~~ '° ~, ° G .. ~ ~ ~ ! ~~ x l~ttacllul is a I',-eiitixut~lry Plat Application, C:Iteckii~t, altd all required intorntufip:- her the City r cif MeriJian.~pp{ication c~rtd checklist ti+r l'relta»tnary pl+it Af+proval. This praposad re- ~~ubiiivisian C~i+rrtains approximately 4.OG-acres, 1'he site i:: bordered ot~ the Nc+tth br Copses t Point,Driva which will Provide vehicular access to the {•n,+nc+~ed office cuhdivicii~n Thr,. t ; nrupuxxi use Is con~merciul (office) and is in con~pliarace with the existing pr~>Perty rUni,t16 dcsiguaLion ii!•C-Ci. The dev~iuplncnt col~cept, platT<nt;d improvements anc! pt•t~pn~e~l use arc also in eompliancr with the hevel~,p,n~nl A~~eGUirul fur Il+c overall SlthtliViSiOA° I t11t [ lwlth yt71! u+uple ui' weeks ago .tor the pl~e-application elm:fetc~icv <In~i t believe 1' have; ~nc:athorated efts t dia~usaian into the prcik~rrtti4n ol`tJ,is application. 1 also?, alt that Same time, n~ct ~;°itli Rnu;c~ Fceclaetat to discuss the p><eiiltainary ectgincering rNquir~~ntents for the prclin,in:lrv Mat aid have p incal•Ptirated o~lr discussion into the prc~paratiul~ of the el)closed prelintindly endir Bering plan,. P Lot •I2, I31acl: I, a~ sl~uwn an the plat will contain a shared ingresslegre,ti, crc+`s-access, harlci~lg, ' storrn water, irri~-atiall and public utilities easement. in f~tior of all )i-ts ill the subclivisiii,n. The parking lot a~.i:ess isles have be~.n desi6l~ed iu accardanc~ wills the City of Mc-•idi,u~ and the ' {nternation;ll fire colic rec~uireitnCllts, for widths slid radii cu provide the required etxa~~rgency vehicle access t~~ thr Propnsecf huildin~s, ~' her our pre-~~pplicatiiin conference, a traffic analysis ktas not been dons .pecilica.lly f or tt+is Eavpusal r~-subdivision since the two tots tieing praposr:d Tor re-,uhdivision ,fro R•~art of ~m overall larger ,uhdivision (l3unitn SuUdivisinll No, 1). 7'he prnnused use is in cnmhlianc;rr with ~ ~" the uu~s slantt~:d far die overal 14uUdivision :+nd therel7~w the trafFie generated by chic , de.velc-pntvnt was :~ln:ady crn,~idered by the City in Che,iT review of the B(lnitp Sul-division No. 1. We ar~• not regi:e:aing a varies:ice from the Laity cat-Mc:ridiaii with this a{;-hlicatian, As we discussed in the tueetatig, aural is to eontinuc; through the subdivisiot- praec~s ~llzd subn~il I~~x building permits as soon a, passible. Per o~° cunve~rsatiotl, once thy: ~•~li~tiintary plAt ha, been received and accented by the Clty, we cai~ subtnii Certificate of 2r2r~tvn~('uln iia~tce A[~Pllcatlons fitt the individual huilding5. t7ner. ~, CZf_' /\pplie,ation hrs been :~Npr•>v~;d, vue could ~~~II'. [ ;' , . 6OISE -CQEUIt d'AI.ENE , Rug 04 2005 10:46RM Dave Evans Construction 208--853-1220 p.4 Rug 04 t75 1p:39a ~'ooahman Orton Engr. Co. ~9-323-2399 p.2 'i I'OOTHMAK-OR'xON ENGINEEfft11YG COMPANY , Mr..l~~r (.~~.,wl~hcr February 1 1, ?QOS t'agc '? n I' 2 submit the co~a5tructian plants for aubGc wurl~s review acid building permit ap)~lic„tiun~ lbr hu_ i~l~in,~s that have received their C'.ZC: sp~rov~~l. While the preliminary and f final pl,~.ts arc be;in~ pr'~ce,~seTCfie ~tpp icat~t may pu w n1u vennits, fear ~Il building$ wttieh h2ve r~:ceivcd C1C' approval. 1-Iowevice;_Z_~i-t~~icate of (:)ec:una~ a will na1 be ~a ~nced, by the ('ity. tut~'il the lu~~~l plat Matt bean re~ont~rd,••~f'lea5e let me know if I h3vr misintc~~reced any of ou~• convcr.a~ ion so w^ ~sn a~i•just our ~chcdule, if necessAry. ~ ~~~ Y~.t,e,~, df W~ h;ave itiacle evt;ry Ct7brt ca address all chc reyuircmencs ot'the Meridi~~ Suhdit i8ii~~t °` ~'~''~'' ~~ Ordin~tncc~ I'or i,he design ol'this development and the cuntuni of the ~pplicetion. "Ve will address ~• any cclmnionts, questions, or rtiqueyty relating to this applicati+m n-•nmrtly ;1n1~ tM7111t yUU ^t ~^'''~ ~idvun~e for tMc tinte~y pl'ocesSing ofthis Preliminary Pl~i.l .4ppiication. siilccl-r,ly, f t,~c.~'1'1lMril~'-nRTUN L;NCiT,T~TEEIZfN(a ('OMPANY 'Tits Mul:wa, f'rgj~ct ivf at~agc:r cc. Wn~. L)uvid Evnns, [~~tvc L'•vans C:U11slJy.IlalUn 'f'r1~vir' Burrows, Dave Evans C'ot~a~;ruction .I r f fi: Iq~ /Ni I IYPI~'N./:1'I i 1~1I17 •Prc~PR~l.~pp/icnnnn('uvi~rl• I I -p.f. d~~c Rug 04 2005 1O:46AM Dave Evans Construction 208-1353-1220 Asps 04 05 10:39a ~oothman Orton Eh~r. Co. ~8-323-2399 Mokwa, 71m From: Mokwa, Tim gent: To: Subject: Contacts: Attachment Guys, FYI,.,. W~dn©sday, January 26, 2005 4'28 PM Collingwood, Rick; Brooks, Russell FtN: Eddoraao Tim Scharff s: 04907-EO8P-BASE-RB.dwg From: Mvkwa, Tim Sent; Wednesday, January 26, 2005 4:Z0 PM To: 't)tnS@G~vansCOnstrliCtlon.COtn' Subject: Eldorado Tim, { p.5 p.3 P;tgc 1 of z r '! 1 spoke with Meridian again yesterday and I wanted to get you guys what I have as it relates to ;,chedule for Eldorado. Certificate of Zoning Compliance (CZC) approval, which is kind of similar to $oise'f~ Dusgn Review is required before you can submit for building permits. Prior to submitt ng the CZC epplicationa which will be required for each building) we will have to have City Gouncil appnwal of the Final Plat. What ibis means is that we are !coking at about a 4 to 5 month period between the preliminary f)lal application and being able to submit for building permits. In light of my conversation with Dave yPCtprday, to carpet a date of Late Jun~a ~ mid July for bldg permit submittal we have to get the preliminary plat application into Meridian by the 15th of Fi ~bruary. They only accept 6 applications a month, so to be more sure that ours is enE~ of the 6 accepted applications, we need to try and get the preliminary plat application in at least towards the end of the first week in February, The City of Meridian has a very detailed application. In order to meet this schedule, would it be possible to divvy up some of the work. There are some of the application items that Travis h~~s p~dled together in the past t~i at would be really helpful in meeting this schedule. Also a landscape plan is required, Would it be possible tv have the guy who did the TWN Landscape Plan prepare this one as well'? I could work with him to get him a base file to work with. If we make the Feb 16th cutoff (for pre Plat Application), our P arn~7_ hearing would be April i th and City Council would be May 3rd or May ~otn, we would have another month imin~mum) after that for City Gouncil approval of the Final Plat. That would put Council approval of the Final plat in Mid June (this assumes everything sails through in just one meeting). CZC approval would take another ore to two weeks, since it is staff Level, That means the best case scenario is building pem~itapplicr~liu~~~s u~i bn submitted the end of June, While we are Waitln;g for the staff approval of the CZC we will be working with DEC for plan al,proval. This 6hould bQ doable since Meridian is on the fast track review process with pEG2. I have requested a pre application meeting with the staff since chi„ is required before we can a:ut~mit the pre plat. We ;,hould try to discuss with them if we could possibly get building permit applicdlivny in For ~ eview while we are waiting for Council approval of the final plat, but wall to actually pull the permit until lator to try and save some time, but it sounded like from my discussion with Kristy at the City, that they would want Council approval before thay would accept the CZC application and staff approval of the CZc; before Ihey would even aa;cpt the bldg permit appliratinn. WP will Certainly d0 what we can to keep the ball rolling. We have been working on the site layout t0 get the fire access radius. The attached file is whet we have to date. With yrnir f~K we will move full speed ~ho~d on the pre plat. 8/412UU5 Rug 04 2005 10:46RM Dave Evans Construction 208-853-1220 v~uC 04 05 lO:~i0a ~oothman Orton En6n. Co.` ~t3-3z3-2399 p'.6t~± . P• 4 PngN 2 of 2 Please call to discuss and ifyou would please fill Dave in on the ::chedule issues, since I know you guys are making deals and promises. 1 suggest we get together to review the application in the next two days to make sure we know who is pulling together aU of the required supplemental info for the plat appGi;atU7n. Tim e x~4~zoos ,, From the December staff report for El Dorado (AZ, CUP, PP): The Applicant proposes to develop the property in a complimentary fashion to Silverstone Corporate Center on the east side of Eagle Road, with a mix of uses such as office, retail, food ,flex space and hotel/motel uses. They are requesting conceptual approval of the entire 80-acre project and, subsequent to final platting and standard approvals, be allowed to construct each lot with a Certificate of Zoning Compliance and building permit (with no CUPs). The Applicant has requested that a large number of land uses governed by the Zoning Schedule of Use Control (Ordinance 11-8-1) be developed within the El Dorado Business Campus as permitted uses, outlined as such in a Development Agreement. A complete list of the requested uses is attached to the original application. The Applicant has further requested that Building #1, an office building located in the northwest corner of the site on Overland Road, be allowed a building permit for his first building prior to the plat being recorded based on the right of one building permit per legal parcel. This request is addressed below 4. The Applicant has requested that a single building permit for Building # 1 (see CUP Site Plan) be granted for the legal parcel prior to the Final Plat being recorded. Staff supports this request if adequate fire flow and pressure is present prior to the commissioning of the new City well currently being built in the Silverstone Project, and that a condition shall be that a Certificate of Zoning Compliance may not be applied for prior to the formal Annexation ordinance being adopted. All perimeter landscaping and any required fencing shall also be installed prior to issuance of the building permit. 9. Bicycle racks shall be installed at all buildings used for office and retail use within the El-Dorado Subdivision. The findings were approved with these conditions as well. ~~ ~~~~ - ~~~~T~~~~r~o~ ~ 5561 N. Glenwood St. Suite A, Boise, Idaho 83714 (208) 853-1203 FAX (208) 853-1220 E~ . E-mail: devansconstruction.com R ~ R May 9, 2005 To: City of Meridian Planning & Zoning Dept. 3 1 RE: New building for DAA SHELL at E! Dorado Business Park, ~. 3 ` Statement of Proposed Use of Property This portion of Lo of Bonito Subdivision will be used fora 6000 square foot, one story nce Arts Academ nd will be part•of larger subdivision of Lot 4: Please see the plans or a a ditional information. ~e~ 1 ~~ .~~ `--' J ,(~ .Travis Burrows Dave Evans Construction See ! ,~ ~ ~\ I ~ ~ ~~ . ~ ~